Professional Documents
Culture Documents
Ebook Construction Materials Methods and Techniques Building For A Sustainable Future PDF Full Chapter PDF
Ebook Construction Materials Methods and Techniques Building For A Sustainable Future PDF Full Chapter PDF
Ebook Construction Materials Methods and Techniques Building For A Sustainable Future PDF Full Chapter PDF
Construction,
Materials, Methods,
and Techniques
Building for a sustainable future
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
This is an electronic version of the print textbook. Due to electronic rights restrictions,
some third party content may be suppressed. Editorial review has deemed that any suppressed
content does not materially affect the overall learning experience. The publisher reserves the right
to remove content from this title at any time if subsequent rights restrictions require it. For
valuable information on pricing, previous editions, changes to current editions, and alternate
formats, please visit www.cengage.com/highered to search by ISBN#, author, title, or keyword for
materials in your areas of interest.
Important Notice: Media content referenced within the product description or the product
text may not be available in the eBook version.
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Construction Materials, Methods, and © 2022, 2017 Cengage Learning, Inc.
Techniques: Building for a Sustainable Future, WCN: 02-300
Fifth Edition
Unless otherwise noted, all content is © Cengage.
Eva Kultermann & William P. Spence
ALL RIGHTS RESERVED. No part of this work covered by the copyright
SVP, Higher Education Product: Erin Joyner
herein may be reproduced or distributed in any form or by any
VP, Higher Education Product Management: means, except as permitted by U.S. copyright law, without the prior
Thais Alencar written permission of the copyright owner.
Product Director: Jason Fremder The MasterFormat® Groups, Subgroups, and Divisions and cover used in
Product Manager: Vanessa Myers this book are from MasterFormat®, published by CSI and C onstruction
Product Assistant: Kimberly Klotz Specifications Canada (CSC), and are used with p ermission from CSI.
For those interested in a more in-depth explanation of MasterFormat®
Learning Designer: Elizabeth Berry
and its use in the construction industry visit www.csiresources.org
Content Manager: Manoj Kumar /standards/masterformat or contact:
Digital Delivery Lead: Elizabeth A Cranston CSI
Director, Marketing: Neena Bali 123 North Pitt St, Ste 450, Alexandria, VA 22314
Marketing Manager: Scott Chrysler Tel 800.689.2900, Fax 703.684.0465
csi@csinet.org, www.csiresources.org
IP Analyst: Ashley Maynard
IP Project Manager: Kellianne Besse Portions of this publication reproduce excerpts from the 2021 Interna-
tional Building Code, International Code Council, Inc., W
ashington, D.C.
Production Service: Lumina Datamatics, Inc. Reproduced with permission. All rights reserved. www.iccsafe.org
Designer: Felicia Bennett
Cover Image Source: Michael Lee/Moment/Getty For product information and technology assistance, contact us at
Cengage Learning Customer & Sales Support, 1-800-354-9706
Images
or support.cengage.com.
Interior image Source: Michael Lee/Moment/Getty
For permission to use material from this text or product,
Images submit all requests online at www.cengage.com/permissions
Printed in Mexico
Print Number: 01 Print Year: 2021
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Table of Contents
Part I Introduction Chapter 02 Regulatory Constraints, Standards,
and Green Building Rating Systems 21
Division 00 Procurement and Learning Objectives 21
Contracting Requirements
The Regulatory Environment—
Csi MasterFormat®1
Zoning and Codes 21
Zoning Ordinances 21
Division 01 General Requirements 2 Building Codes 22
The Development of Building Codes 22
Chapter 01 The Construction Industry: The International Residential Code 24
An Overview 3 The International Building Code (IBC) 24
Organization and Content of the
Learning Objectives 3 International Building Code 25
Construction: A Dynamic Industry 4 Americans with Disabilities Act
Pre-Construction Activities 5 (ada)/Universal Design 27
Pre-Design and Design Standard Development Organizations 28
Development 6 National Institute of Building Sciences
Building Information Modeling 9 (NIBS) 28
Construction Documents 9 International Organization for
Specifications and the Standardization (ISO) 28
MasterFormat 9 American National Standards Institute
The Project Delivery Process 11 (ANSI) 29
Construction Contractors 11 ASTM International 29
Selecting the Contractor 12 Underwriters Laboratories Inc. (UL) 29
Project Delivery Methods and American Society of Heating,
Types of Construction Contracts 12 Refrigerating and Air-Conditioning
Design-Bid-Build 13 Engineers (ASHRAE) 30
Design-Build 13 National Association of Home Builders
Construction Management (CM) 13 of the United States (NAHB) 30
Integrated Project Delivery 14 Trade Associations 30
Lean Construction 14 American Concrete Institute (ACI) 31
Public-Private Partnership (PPP) 14 Portland Cement Association (PCA) 31
The Construction Process 14 The Masonry Institute of America 31
Construction Methods: American Institute of Steel
Subcontractor Agreements 15 Construction (AISC) 31
American Wood Council (AWC) 31
Construction Scheduling 15
Permitting 15 Sustainable Design and Green
Pre-Construction Planning and Building Rating Systems 32
Temporary Facilities 16 The Environmental Impact of the
Shop Drawings, Submittals, Construction Industry 32
and Mock-Ups 16 Sustainable Construction 33
Construction Observation 18 Sustainable Design 34
Contractor Requests for Sustainable Building Certification
Information (RFI) 18 Systems 34
Modifications to the Construction The U.S. Green Building Council
Contract 18 (USGBC) and LEED Rating System 34
Project Close Out 19 LEED NC Version 4 36
Construction Safety 19 Green Globes 37
Review Questions 19 NAHB National Green Building
Program™ 37
Key Terms 20
Energy Star 38
Activities20 Other Assessment and
Additional Resources 20 Certification Programs 38
iii
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
iv Table of Contents
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Table of Contents v
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
vi Table of Contents
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Table of Contents vii
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
viii Table of Contents
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Table of Contents ix
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
x Table of Contents
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Table of Contents xi
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
xii Table of Contents
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Table of Contents xiii
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
xiv Table of Contents
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Table of Contents xv
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
xvi Table of Contents
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Table of Contents xvii
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
xviii Table of Contents
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Table of Contents xix
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Preface
Sustainable construction is no longer a unique means Division 1 addresses general requirements, including activ-
of building, but rather an integral part of how the industry ities such as contractor selection, price and payment proce-
is being revolutionized. Cutting-edge building materials, dures, administrative requirements, and various legal controls
systems, and construction practices have been added to and requirements. Additional details are given in Appendix B.
the existing knowledge in each chapter. Types of materials, Division 2 outlines the existing conditions present on a
environmentally friendly options, and rating and certification project site, their assessment, and technologies available
systems are explored, as well as industry trends. This book for remediation.
has been thoroughly updated and revised to remain current Division 3 presents a detailed study of the manufacture,
with industry technologies and standards: types, characteristics, and properties of concrete. Consid-
●● The U.S. Green Building Council and LEED V.4.1 rating system eration of the impact of admixtures, proportioning, water,
mixing, placing, and curing is included. Emerging technolo-
●● Effective construction planning for efficient material use
gies, such as smog-eating and 3-D printed concrete, have
●● Environmentally friendly building materials with emphasis on recy- been added. Drawings and photos are used extensively to
cled content and materials that promote manufacturer, contractor, illustrate cast-in-place and precast concrete construction
and occupant health systems.
xx
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Preface xxi
Division 4 includes detailed information on mortar, the key to provide enclosure for a variety of activities. This division
to durable masonry construction. The materials, manufactur- discusses and illustrates a diverse offering, including air-
ing processes, and construction techniques utilized in clay supported and fabric structures, geodesic domes, and other
brick, concrete masonry, and stone construction are explained pre-engineered assemblies.
in detail and generously illustrated. Division 14 examines the range of conveying systems in
Ferrous and nonferrous metals are presented in Division 5. current use, including conveyors, elevators, escalators, mov-
Their characteristics, mechanical properties, and practical ing walks, and material-handling systems.
applications are discussed. Steel frame and pre-fabricated Division 21 organizes the many complex factors related to
construction systems and details are illustrated. the regulation, operation, and maintenance of fire-suppression
One of the largest divisions in the book, Division 6, covers systems, including installation, instrumentation, and control.
the vast array of wood and plastic materials that are used in Water, carbon dioxide, clean-agent, wet chemical, and dry
construction. Their properties, characteristics, and recom- chemical fire-extinguishing systems are covered.
mended applications are explained. Several chapters detail A basic need for a successful building is a well-functioning
wood structural framing systems, including light wood frame, plumbing system. Division 22 summarizes the system of pipes
heavy timber, and innovative new panelized mass wood and other devices installed in a building for the distribution of
assemblies. The remainder of this division is used to present potable water and the removal of waterborne wastes. Innova-
the various types of composites and plastic materials that find tive new water-saving technologies and fixtures for a variety of
increasing use in modern construction. applications are outlined.
Division 7 is concerned with insulating, waterproofing, and Division 23 is a large one, encompassing heating, venti-
sealing buildings against the weather. Structures are exposed lating, and air-conditioning systems. Basic methods of heat
to a variety of climate extremes, including temperature swings, transfer, the fuels employed, and the types of heating and
driving rain and wind, and subsurface water. Walls, ceilings, cooling systems and equipment are explained and illustrated.
and floors must be properly insulated and sealed against
Electrical distribution systems inside a building supply
moisture penetration. Bituminous materials, bonding agents,
electrical power and transmit information through an internal
sealers, and sealants are covered. Details, components, and
communications system. Division 26, Electrical Systems, car-
materials commonly used for both residential and commercial
ries the discussion from the generation and transmission of
roofing systems conclude this division.
electrical power to the service components in both residen-
The types, styles, methods of operation, and materials tial and commercial buildings. Renewable power systems are
used for doors and windows continue to develop. Many of the illustrated, and extensive information on lighting technologies
products frequently employed are illustrated in Division 8, in is accessible. Equipment for controlling and operating the
addition to stock and custom-made storefronts. Glass is used electrical system, as well as equipment used for communi-
extensively in facade and window assemblies, so the types, cation, such as alarm, television, public address, and other
properties, and uses of the numerous glass products avail- communication systems, is presented.
able are discussed. New and innovative glass products are
Division 28 covers the various electronic safety and secu-
increasing the range of uses and applications of the material
rity systems in buildings and related exterior areas where secu-
in modern commercial construction. Finally, an entire chapter
rity is important. Video surveillance and personal protection
is devoted to discussing and illustrating various types of clad-
systems are included, as are electronic detection and alarm
ding systems that find common use in commercial buildings.
systems for fire detection.
Finishing the interior of a building involves an incredi-
Division 31 encompasses the full range of site construc-
bly diverse range of products. Division 9 combines interior
tion activities, including soils and subsurface investigations,
finishes; decorative and protective coatings; gypsum, lime,
site preparation, excavations, earthwork, foundations, and the
and plaster products; acoustical finishes and materials; and all
installation of utilities and drainage systems.
types of finish flooring. Construction and finishing procedures
for interior walls, partitions, and ceilings, their properties, and Review questions at the end of each chapter provide the
fire resistance requirements are integrated. reader with a means of reconsidering what has been read and
reinforcing the learning objectives. Key terms are listed and
Divisions 10, 11, and 12 cover the variety of specialty prod-
sources of additional information are provided to enable the
ucts, equipment, and furnishings that find use both within buildings
reader to explore areas in greater depth.
and on project sites. Examples include visual displays, telephone
enclosures, vending equipment, casework, and furniture. A master glossary at the end of the text provides detailed
definitions for all key terms throughout all divisions. Appendix
The most interesting compilation of special construction
A furnishes the MasterFormat numbering system in its entirety.
assemblies are found in Division 13. Special structural sys-
Appendix B provides details concerning the information in
tems refer to innovative long-span structures that are used
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
xxii Preface
Division 1, General Requirements. Appendix C provides an advances in the field, many topics have been updated while
extensive listing of U.S. and Canadian professional and trade others have been expanded and reorganized. New topics
organizations. These organizations provide information that is include the following:
vital to the continual development of materials and construc- ●● An extensive discussion of the increasing use of digital technologies
tion techniques. They create materials standards and installa-
in construction including Artificial Intelligence, GPS/Robotic earthwork
tion specifications and publish building codes, manuals, and
technologies, and 3-D printing applications.
technical reports on an ongoing basis. Readers can refer this
information to gain additional insight as they read the chap-
●● New project delivery approaches such as Lean Construction and
ters in this book. Detailed metric information is available in Public-Private Partnerships.
Appendix D. This information is essential because construc- ●● An expanded section on the development of mass timber construction
tion is moving toward using the metric system in the future. techniques.
Appendix E lists the weights of commonly used construction ●● Additional information on modular and pre-manufactured construc-
materials. Appendix F gives the names and atomic symbols of tion components.
selected chemical elements, and Appendix G provides data ●● New information on recent advances in telecommunications and data
on the coefficients of thermal expansion of selected construc-
systems.
tion materials.
●● A fully updated list of the latest U.S. and Canadian professional and
technical print and online resources.
The entire text has been updated with extensive new photos and
FEATURES OF THIS BOOK
●●
This new edition emphasizes innovative materials and tech- Start right away!
nologies that encourage the student of construction to knowl- Cengage Learning Testing Powered by Cognero works on
edgeably address the challenges of building in today’s global any operating system or browser.
environment. Since construction technology is constantly
evolving, the text provides an understanding of the myriad of
●● No special installs or downloads needed.
new materials, methods, and techniques, and how to properly ●● Create tests from school, home, the coffee shop—anywhere with
apply them to contemporary construction challenges. In light of Internet access.
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Preface xxiii
What will you find? emeritus at Pittsburg State University, KS. We owe a great
debt to the technical knowledge of William Spence, who, while
●● Simplicity at every step: A desktop-inspired interface features drop-
no longer involved in this revision, provided the core around
down menus and familiar intuitive tools that take you through content
which the text is structured.
creation and management with ease.
●● Full-featured test generator: Create ideal assessments with your
choice of fifteen question types (including true/false, multiple choice,
opinion scale/likert, and essay). Multi-language support, an equation ACKNOWLEDGMENTS
editor, and unlimited metadata help ensure your tests are complete
and compliant. A major factor in the organization, writing, and illustrating of
this book was the help given by hundreds of manufacturer
●● Cross-compatible capability: Import and export content into other
representatives. Representatives of many of the professional
systems.
and technical organizations supporting the construction
industry also made important contributions. A special note
of appreciation is due to the consultants located at univer-
ABOUT THE AUTHORS sities across the country for their assistance in reviewing the
manuscript and the illustrations. Few notable contributions
Eva Kultermann is a licensed architect, associate professor are from:
and associate dean of academic affairs at the Illinois Institute Barry K. Hallsted, Ph.D. Utah Valley University;
of Technology, College of Architecture. She has a background
Aloysius A. Attah, P.E., University of North Texas-Denton;
in construction and is currently involved in developing, review-
ing, and revising the institution’s architectural curriculum. Willis Kennedy Jr., Metropolitan Community College-Omaha;
William P. Spence was Dean of the College of Technol- Josh Steele, Metropolitan Community College;
ogy and Professor of Construction Engineering Technology John M. Travis, North Dakota State College of Science.
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Disclaimer
The information presented in this book was secured from a accurate presentations. However, the author and publisher
wide range of manufacturers, professional and trade asso- assume no liability for the accuracy of applications shown.
ciations, government agencies, and architectural and engi- It is essential that appropriate architectural and engineering
neering consultants. In some cases, generalized or generic staff be consulted and specific information about products
examples are used. Every effort was made to provide be obtained directly from manufacturers.
xxiv
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Part I
Introduction
00
Procurement and
Contracting Requirements
Csi MasterFormat®
00 10 00 Solicitation
00 20 00 Instructions for Procurement
00 30 00 Available Information
00 40 00 Procurement Forms and Supplements
00 50 00 Contracting Forms and Supplements
00 60 00 Project Forms
00 70 00 Conditions of the Contract
00 90 00 Revisions, Clarifications, and Modifications
DimiSotirov/Shutterstock.com
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
01
General Requirements
01 00 00 Summary
01 20 00 Price and Payment Procedures
01 30 00 Administrative Requirements
01 40 00 Quality Requirements
01 50 00 Temporary Facilities and Controls
01 60 00 Product Requirements
01 70 00 Execution and Closeout Requirements
01 80 00 Performance Requirements
01 90 00 Life Cycle Activities
Andrey_Popov/Stock/Shutterstock.com
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
1
The Construction Industry: An Overview
L E AR N I N G O B J E C T I V E S
Upon completion of this chapter, the student should be able to: ●● Be familiar with the roles and responsibilities of owners,
●● Gain an understanding of the scope of the construction architects, and contractors.
industry. ●● Recognize the structure and organization of construction
●● Identify the different phases and activities that make documents.
up the building design and construction planning ●● Categorize the types of project delivery methods used in
process. commercial construction and how they are administered.
●● Define the types of drawings and specifications that ●● Describe the phases and administrative procedures that
make up a set of construction documents. serve to organize the on-site construction phase.
The construction industry is one of the largest commercial Figure 1.1 The process by which a building or other project is
activities in the United States, encompassing establishments designed and built can be divided into four discreet project phases.
engaged in the construction of buildings and larger engi-
PROJECT CONCEPTION BY OWNER
neering projects, such as roadways and utility infrastructure.
Construction with all of its related and supporting industries has PRE-DESIGN PLANNING
always played a vital role in the nation’s economy, accounting
for an annual average of 5 to 10 percent of the gross domestic
product.
Compared with other large industries, some characteris- BUILDING DESIGN
DRAWINGS AND SPECIFICATIONS
tics are unique to the planning of buildings and infrastructure.
Most new buildings are custom designed and constructed, BIDDING AND NEGOTIATION
involving long development schedules. Because each proj-
ect is site specific, its execution is influenced by physical,
social, and regulatory conditions, such as weather, availability
of skilled workers, and local building codes. Since the
PRE-CONSTRUCTION PLANNING
service life of a commercial building can be more than
50 years, future technical requirements must be considered
throughout the planning process. Because of the techno-
logical complexity of construction, building plans must be
CONSTRUCTION
flexible enough to allow for changes and adjustments both
during construction and after. PROJECT CLOSE OUT
The process by which a building or other project is
designed and constructed can be divided into four discreet
project phases (Figure 1.1). The pre-design phase sets structure. The pre-construction phase selects the various
the initial objectives and criteria under which a building will be project participants and outlines their contractual agreements.
planned. The design phase determines the actual geometry, Finally, the construction phase is involved with the physical
materials, and performance characteristics of the finished realization of the finished building.
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
4 Division 1 General Requirements
Figure 1.2 Building construction involves the assembly of a The industry is currently in the midst of profound changes
building on a piece of property. caused by unprecedented technological advances that are
reshaping all areas of production. Borrowing some of the
cost-efficient practices of manufacturing for construction, the
industry is moving toward modularization and prefabrication
of components by assembling building elements that can be
transferred to a construction site for rapid assembly. While still
not widely adopted, the use of pre-manufacturing techniques
is increasing due to its numerous advantages. Because
components are assembled in controlled manufacturing
conditions, both quality and productivity are increased. Pre-
manufacturing also results in shorter construction schedules,
lower costs and reduced site disturbance.
Another development is the rise of smart project man-
agement, adopting a variety of emerging digital technologies.
Automation of construction sites through robotics, drones, and
state-of-the-art budgeting and scheduling tools and technologies
all promise to be productivity-enhancing changes (Figure 1.5).
The rise of artificial intelligence (AI) is also making its mark
on construction. Digital capabilities surrounding predictive
design, digital building doubles, and the use of augmented and
virtual reality during project planning can eliminate errors and
shorten the development timeline for complex projects.
Finally, the industry is aggressively developing strategies
for using natural resources in ways that will sustain the natural
environment for generations to come. The importance of the
construction industry instituting changes that promote both
energy and resource efficiency cannot be overstated and is
covered in Chapter 2.
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Chapter 1 The Construction Industry: An Overview 5
Figure 1.3 “Heavy construction” is the term used for larger infrastructure projects, such as highways, bridges, and canals.
Daniel Jedzura/Shutterstock.com
Figure 1.4 The construction industry is supported by a broad Figure 1.5 A construction drone program can dramatically
range of industries that manufacture the materials and components improve the accuracy of construction surveys, progress reporting,
designated for a project. safety, and inspection processes.
PRE-CONSTRUCTION ACTIVITIES is the result of the collective ideas, talents, and services of a
large and diverse group of professionals. A vast array of planning
Owners, both public and private, plan buildings and other decisions must be made at the onset of any construction project.
construction projects to accommodate desired functional and These include an evaluation of the vision for a project, its scope,
spatial needs. The design and construction of a building project functional requirements, the determination of a site, budgets
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
6 Division 1 General Requirements
Figure 1.6 The design and construction of a building project is ●● Financial advisers and institutions that arrange the project
the result of the collective ideas, talents, and services of a large and financing, and attorneys who coordinate the legal and
diverse group of professionals. contractual issues of the project
●● Insurance companies that provide risk coverage to the
owner, contractor, and design consultants
●● Authorities and regulatory agencies that have jurisdiction
over the construction and establish standards in the form
of codes, ordinances, and permits
Geber86/E+/Getty Images
Pre-Design and Design Development
Owners most often procure the services of an architect or
an architect/engineering/contracting firm (AEC) to help in the
and financing, project scheduling, and assurance that regulatory development of project definition and feasibility. Once an archi-
constraints such as zoning and code regulations will be satisfied. tect or AEC firm has been identified, the pre-design portion of
the work can begin. In this phase, sometimes referred to as a
One of the first tasks in commencing larger construction
feasibility study, the architect, other design consultants, and
projects is the selection of the project team participants.
the owner mutually determine the goals and objectives of the
Members of this multi-disciplinary group are selected based
project. Most projects begin with a thorough examination of
on their professional credentials, experience with projects of
the existing needs, goals, and constraints that will influence a
similar size and scope, and, sometimes, previous working
design. Typical pre-design considerations include: title search
collaboration among the various team members (Figure 1.6).
and zoning analysis, site search and selection, financial plan-
The established project team works together in developing a
ning, scheduling and programming among others.
project plan that addresses the roles and responsibilities of
each member, and identifies at what point in the process each Programming is the research and decision-making pro-
member will join in the work. cess that determines the specific set of needs that a building
is expected to fulfill, and identifies the scope of work to be
Regardless of size, the three main players in any con-
accommodated and designed.
struction team are:
Design sketches and feasibility studies are developed
●● The owner that initiates the project as a series of alternatives for approval by the owner. Early
●● The architect and engineers who design the building design efforts focus on establishing what is known as the
●● The general contractor who completes the actual design intent. Design intent is a statement that defines the
construction anticipated aesthetic, functional, and performance character-
istics of the finished building or project. Functional and spa-
Supporting these main players is a team of other profes-
tial requirements, including types, sizes and adjacencies of
sionals, each involved with particular aspects of the larger
spaces, are defined and tabulated. The architect will conduct
project. These include:
initial checks that zoning and building code requirements can
●● Consultants that provide professional services to the be met within the design concept. Surveys and drawings of
architect, contractor, or owner existing conditions are obtained or prepared. The result of
●● Subcontractors who perform portions of the work under pre-design work will be a written program. A program is a
the direction of the general contractor written document that explains design intentions, controls,
●● Product representatives who assist with submittals and and standards for a project, including detailed space require-
furnish field services such as consulting, and inspecting ments and the types of equipment and systems to be used.
the installed work This phase is complete when the owner and architect agree
●● Manufacturers who produce materials or products, and that the scope of work, anticipated construction cost, and
material suppliers who furnish materials and products of time schedule are well defined.
construction During design development, initial design ideas are further
●● Testing laboratories and inspection agencies provide developed into detailed drawings of the building, indicating
quality control services to the owner and contractor exact sizes and relationships between building elements.
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Chapter 1 The Construction Industry: An Overview 7
Architects use a system of orthographic drawings of a also used for interior finishes, partition types, and structural
building or structure to simplify the graphic understanding elements of a building.
of complex assemblies. The floor plan is a representation Most architectural drawings generated today use a sys-
of a building looking down after a horizontal plane has been tem of computer-aided drafting, known as CAD. Before
cut through it and the top portion removed (Figure 1.7). the advent of CAD, drawings were painstakingly generated
A building section gives a view of a building after a vertical by hand, and making significant changes to the drawings
plane has been cut through it and the front portion removed was difficult and time consuming. CAD software enables the
(Figure 1.8). An elevation drawing shows the exterior facade design team to efficiently create and manage modifications
of a building, delineating geometries and the materials of to the architectural drawing set. The use of the software also
construction (Figure 1.9). facilitates effective communication between the various con-
Since plans, sections, and elevations cannot show all sultants on a project through digital file sharing.
the specific aspects of the construction, larger-scale detail Because of the multitude of systems under consideration
drawings are used to explain the joining of materials, ele- at this stage, the architect will normally hire the services of
ments, and components of the various building assemblies. other design consultants in the development of systems. Struc-
Detail drawings are keyed into plans and sections drawings tural, mechanical, electrical, plumbing and civil engineers, fire
to give more information on the specific means of assembly. protection consultants, interior and landscape designers, and
Other information included in the drawings are schedules that cost-estimating consultants are common on most projects of
reduce the amount of information that must be placed directly larger scale. Depending on the type of building being designed,
on the drawings themselves. Door and window schedules, for other specialty consultants, such as traffic and parking con-
instance, use graphic symbols on the plan drawings that are sultants, lighting designers, or acoustical specialists, may be
keyed into a schedule, a table format that lists the type, size, brought into work with the team. During this stage of the work,
and operating characteristics of each element. Schedules are most substantive decisions regarding the structural frame,
Figure 1.7 The floor plan is the most-often-referred-to drawing in a set of construction documents showing the relationship of spaces and
overall building dimensions.
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
8 Division 1 General Requirements
Figure 1.8 A building section graphically illustrates a cut through the building from foundation to roof, showing interior spaces and the
materials of construction.
Date
Descriptions
REVISIONS
SHEET NO.
A-5.1
Figure 1.9 An elevation drawing shows the exterior facade of a building, delineating geometries, building heights, and the materials of
construction.
PRODUCED
BY
THE STUDENTS
AND FACULTY
OF THE CoA IIT
METAL ROOFING W/ 3360 South State Street
COOL ROOF COATING Chicago, IL 60616
GREENHOUSE
R: 1-A6
3904 South Indiana Avenue
COMMUNITY PROJECT
METAL ROOFING W/
COOL ROOF COATING
Descriptions
REVISIONS
TAPERED
GLUELAM FASCIA
SHEET TITLE
3-A5.2
EXTERIOR
ELEVATIONS
1-A5.3
SHEET NO.
A-4.1
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Chapter 1 The Construction Industry: An Overview 9
mechanical systems, materials, and construction methods are The use of the Building Information Modeling system results
determined. If a contractor for the project has been selected, it in enhanced efficiencies during the construction process itself.
is advisable to include them in the development of solutions for Construction methods, sequences, and details can be studied
constructability and other technical aspects of the construction. using the modeling process, resulting in fewer mistakes, fewer
changes, and, ultimately, shorter construction schedules. The
software allows for complete material takeoffs to be generated,
Building Information Modeling eliminating the painstaking process of calculating material
quantities by hand. By designing in a three-dimensional model
Building information models (BIMs) are computer files which
systems integration can be visualized and better coordination
serve to manage the complexity of the interdisciplinary
realized. Information from models can be fed directly to mate-
information that goes into the design and construction phase
rial fabricators, eliminating the need for shop drawings and
activities of a building that can be exchanged and networked
ensuring tight dimensional tolerances. Students of construc-
to support decision-making. The National Institute of Building
tion should become familiar with the BIM software, because its
Sciences (NIBS) sponsors the buildingSMART alliance, whose
use in the construction industry is now widespread.
aim is to optimize a computer software system that standardizes
the design, construction, operation, and maintenance process
for buildings by compiling all of the related information in a Construction Documents
single electronic format. The software, known as Building
Information Modeling (BIM), has revolutionized the way Once all basic decisions have been approved by the owner, the
buildings are designed, constructed, and maintained. Architects architect and consultants will commence with the final phase
and engineers use BIM to generate a three-dimensional of the design process, the preparation of construction docu-
model of a building with embedded links to other project ments. Construction documents (CD) consist of two inter-
information. In its current state, BIM has a range of capabilities, dependent components: the drawings and the specifications.
including drawing, construction estimating and scheduling, Construction drawings, sometimes referred to as work-
interdisciplinary coordination, and generating fabrication ing drawings, visually outline the dimensional relationships
protocols. BIM also runs analysis of structural design solutions, between all aspects of the building including their location,
building code compliance, projected energy performance and form, size, and quantities, as well as the materials used, and
consumption models, and daylight penetration (Figure 1.10). their colors and textures. Working drawing sets are organized
The buildingSMART alliance publishes the National BIM from the general overall building plans, sections, and eleva-
Standard – United States® which consists of reference standards, tions, down to the level of the detail, indicating fasteners and
terms, and definitions; information exchange standards; and prac- connections. Full drawing sets are collated according to dis-
tice guidelines to support users in their implementation of BIM. cipline and include civil, architectural, structural, mechanical,
electrical, and plumbing (MEP), and fire protection sheets,
among others (Figure 1.11). The drawings are the basis on
Figure 1.10 A BIM model illustrating the capability of which the contractor generates cost estimates, and are used
visualization and integration of various building systems. to guide the actual construction of the building on the site.
Since working drawings cannot give all of the details
involved in describing the quality and performance charac-
teristics of specific materials, construction methods, and
project procedures, the construction documents include a
written manual called the specifications. The specifications
describe in writing more detailed information on the exact
types of materials to be used and the ways in which con-
Image courtesy of Mortenson Construction and McKinstry Company
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
10 Division 1 General Requirements
Figure 1.11 Construction drawings are organized sequentially from the general to the detail and in order of design discipline.
INDEX OF DRAWINGS
COVER CODE MATRIX/SITE LOCATION
C1.1 SITE PLAN
ARCHITECTURAL STRUCTURAL
A1.1 BASEMENT AND 1ST FLOOR DEMOLITION PLANS S1.1 FOUNDATION PLANS
A1.2 2ND FLOOR AND ROOF DEMOLITION PLANS S1.2 1ST AND 2ND STRUCTURAL FLOOR PLANS
ST
A2.1 BASEMENT AND 1 FLOOR PLANS S1.3 STRUCTURAL DETAILS
A2.1 2ND FLOOR PLAN/DOOR AND FINISH SCHEDULE MECHANICAL
A3.1 ENLARGED INTERIOR PLANS M1.1 1ST AND 2ND FLOOR MECHANICAL PLANS
ST ND M1.2 MECHANICAL DETAILS AND SCHEDULES
A4.1 1 AND 2 FLOOR REFLECTED CEILING PLANS
A5.1 EXTERIOR ELEVATIONS PLUMBING
A6.1 BUILDING SECTIONS P1.1 PLUMBING RISER DIAGRAMS
A7.1 STAIR SECTIONS AND DETAILS P1.2 PLUMBING SCHEDULES AND DETAILS
A8.1 ENLARGED WALL SECTIONS ELECTRICAL
A9.1 DETAILS E1.1 BASEMENT ELECTRICAL PLANS AND NOTES
A9.2 SOLAR CHIMNEY DETAILS E1.2 1ST AND 2ND FLOOR POWER PLANS
A9.3 MILWORK AND TRIM DETAILS E1.3 1ST AND 2ND FLOOR LIGHTING PLANS
and Construction Specifications Canada. It is used by U.S. and Figure 1.12 The 2020 MasterFormat is used by U.S. and
Canadian construction companies and material suppliers, the Canadian construction companies and material suppliers to
McGraw-Hill Information Systems as a basis for their Sweet’s organize construction activities, products, and requirements into
Catalog Files, and the R. S. Means Company construction a standard order.
cost data publications. MasterFormat provides a standard
for writing specifications using a system of descriptive titles
and numbers to organize construction activities, products, and
© 2020 The Construction Specifications Institute, Inc. (CSI).MasterFormat® image and trademarks used under permission from CSI.
requirements into a standard order that facilitates the retrieval
of information and serves as a means for all participants within
the construction industry to communicate (Figure 1.12). Since
the design and completion of construction projects involves
individuals in many technical fields, the ability to communicate
effectively by having a standard sequence for identifying and
referring to construction information is essential.
MasterFormat
The numbers and titles in MasterFormat are divided into ®
50 basic groupings called divisions, 34 of which are active,
with 16 reserved for future expansion. Each division has a
2020 EDITION
title and identifying number (Table 1.1). Division 1 describes Master List of Numbers and Titles
for the Construction Industry
the general requirements of the contract, outlining admin-
istrative requirements for a construction project, such as
project management procedures, and construction facili-
ties and controls. See Appendix B for more information on
Division 1. Divisions 2 through 19, the Facility Construction
Subgroup, deal mainly with the materials of construction ®
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Chapter 1 The Construction Industry: An Overview 11
Table 1.1 Divisions 2–19 MasterFormat Facilities Subgroup In addition to purely technical information, Division 00
of the specifications outlines the guidelines for the pre-
DIVISION 02 EXISTING CONDITIONS construction phase of the project. These include the General
DIVISION 03 CONCRETE Conditions of the contract, a blueprint for the construction
DIVISION 04 MASONRY delivery process. Division 00 addresses such issues as how
the bidding process will be conducted, what kinds of bonds
DIVISION 05 METALS
and insurance the contractor is required to hold, and when
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
the actual on-site construction may commence. It includes
DIVISION 07 THERMAL AND MOISTURE PROTECTION the bid forms that the contractor will use in submitting the
DIVISION 08 OPENINGS proposal for construction. The completed specifications are
DIVISION 09 FINISHES known as the project manual. The completed contract
documents then consist of the construction drawings, and
DIVISION 10 SPECIALTIES
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
12 Division 1 General Requirements
Figure 1.13 General contractors assume the responsibility for the a team approach that incorporates design, construction, and
construction of an entire project at a specific cost and by a specified budget planning with owner involvement in a cooperative and
date. The general contractor signs contracts with subcontractors, coordinated effort. This integration, which integrates estimating
who perform the required work within their technical areas, such as and cost control throughout the design and development effort
this electrician. rather than at its conclusion, often facilitates the best overall
solutions.
Most projects select a single contractor to oversee and
complete the work on an entire project. The single prime
contractor is responsible for all of the work, including that
which has been subcontracted. An alternative method is to
divide portions of the work among more than one entity by
employing the services of multiple prime contractors. Multiple
prime contracts are often used on large and complex
Bunwit Unseree/Stock/Shutterstock.com
projects where a number of specialty contractors are engaged
to complete different parts of the work. A high-rise building,
for instance, may use one contractor for the foundations and
site work, another for the building structure, and a third for the
interior build out and finishes. In this case, each will enter into
a separate contractual agreement with the owner. The use of
multiple prime contracts also has the advantage of reducing
construction costs by eliminating the general contractor’s fee.
or concrete work. Specialty contractors do the work required Multiple prime contracts are often used for projects that
in a limited area, like elevator or communication equipment are fast tracked. Fast tracking a project shortens the over-
installation, for example (Figure 1.13). Both specialty and all construction time by beginning work on site prior to the
subcontractors are independent contractors employed by the completion of the construction documents. Construction
general contractor to perform specific work at a specified cost. documents for fast-track projects are often completed in
While subcontractors work independently on a site, bringing their sequenced packages. A first package may be for site prepa-
own employees, supervisors, and tools to the job, their work is ration and foundations, a second for the structural frame, and
overseen by a project superintendent. The superintendent is a third for the installation of the exterior envelope. Careful
the general contractor’s on-site representative responsible for coordination between the design team and multiple contrac-
continuous field supervision, coordination, and completion of tors is essential for a fast-track project.
the work. The superintendent makes sure that work proceeds
according to the project schedule, and that the activities of the
various subcontractors working on the site will not interfere
Project Delivery Methods and Types of
with one another. Construction Contracts
A project delivery method determines how a construction
Selecting the Contractor project will be completed; delegates the responsibilities,
rewards, and risks between participants; and regulates the
A number of different options are available in the selection of a relationship between the owner and the contractor. Division 00
contractor for construction. For publicly financed projects, con- of the written specifications, General Requirements, outlines
struction contractors are generally sought through a process the general conditions of the construction contract. This
of competitive bidding. In this method, qualified construction information provides the basis upon which the contractual
contractors are invited to bid on the project on a competitive relationships between all parties involved in a project will be
basis, with the contract often being awarded to the contractor administered. Standard forms for construction contracts,
that submits the lowest bid. A variation of this process used which can be modified to suit conditions, are available from
more on privately funded projects is called invitational bidding, the American Institute of Architects (AIA). A number of options
wherein only preselected contractors are asked to provide bids exist to define the contractual relationship between the owner
on a project. and contractor on a particular project. The three most common
An owner may decide on a contractor with whom they project delivery methods currently in use are:
have worked on previous projects without seeking other bids ●● Design-Bid-Build (DBB)
and agree upon a negotiated contract. A negotiated con-
tract can have the advantage of bringing a contractor into the
●● Design-Build
project in the pre-construction phase of the work, encouraging ●● Construction Management (CM)
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Chapter 1 The Construction Industry: An Overview 13
CONSULTANT
Figure 1.16 In the construction manager delivery method, the
OWNER ARCHITECT owner contracts with a construction manager to oversee both the
CONSULTANT design and construction process. Solid lines in this image indicate the
contractual relationships that are held between project participants,
GENERAL CONSULTANT whereas dashed ones indicate lines of communication.
CONTRACTOR
CONTRACTOR
CONTRACTOR
SUB SUB SUB CONSULTANTS CONSTRUCTION
CONTRACTOR CONTRACTOR CONTRACTOR MANAGER
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
14 Division 1 General Requirements
The construction manager may act purely as an advisor, strive to maximize value and minimize waste. The Lean Con-
providing guidance and expertise throughout the design struction Institute defines the process as “…the application of
and construction of a project. Known as Construction lean thinking to the design and construction process creating
Management for Fee, in this method the manager does not improved project delivery to meet client needs and improved
guarantee a budget or schedule, and neither will they perform efficiency for constructors.” Specific techniques include tight
any work on site. Alternatively, the construction manager may scheduling of different trades such that construction contin-
act in an advisory capacity during design and then sign a ues without interruption, reducing material stockpiles and idle
contract with the owner to act as general contractor once the equipment on site, and using modelling and visualization tech-
construction documents are complete. When the management niques to improve planning and communication.
firm acts as general contractor, it assumes all the liability and
responsibility of a general contractor, which is why this delivery
method is known as Construction Management at Risk. Public-Private Partnership (PPP)
In both cases, the construction manager becomes a rep- A Public-Private Partnership (PPP), sometimes referred to
resentative of the owner in overseeing the work of both the as 3P, is a project delivery contract between a federal, state or
architect and the contractor. In the construction management local governing body and a private developer with the aim of
delivery method, the contractor is involved in the planning of a providing a service or development for the benefit of the public.
project prior to the start of construction to help oversee sched- The basic concept is that a public entity can partner with a pri-
uling, cost control, constructability, and additional expertise. vate developer for the construction, operation, and financing of
building or infrastructure projects. In a PPP project, the private
partner hires, supervises and compensates the contractor, and
Integrated Project Delivery participates in the design, financing and construction process.
Integrated Project Delivery (IPD) is an increasingly com- Public-private partnerships provide enhanced construction
mon project delivery approach that attempts to bring together solutions over those run exclusively as a public or private ini-
all the diverse participants for a project at the beginning of tiative as each entity does what they specialize in. The public
the design phase and throughout the procurement and con- partner is better at identifying the necessary projects, whereas
struction of the project. A project team including the owner, the private partner tends to work more efficiently and effectively
architect or AEC firm, engineers, energy and green design con- because their compensation is dependent on their performance.
sultants, contractor, construction manager, material suppliers, The private developer also has more control and flexibility
facilities manager, and regulatory officials is established at the when compared to a government agency, and can select a
onset of building planning and design. The team meets for a project approach that best suits the project’s needs. Because
brainstorming session at the beginning of a project and con- the private developer assumes the risk of time and cost over-
tinues to work collaboratively in establishing design intent and runs, the approach creates strong incentives to deliver the
functional requirements. By including all stakeholders early in work on time and on budget.
the design process, many coordination issues can be solved
efficiently throughout the design and construction sequence.
This approach considers the multifaceted systems involved in
a project as acting interdependently, and seeks to identify syn- THE CONSTRUCTION PROCESS
ergies throughout the process. In general, integrated design
is an approach that seeks to achieve high performance on a After the execution of an agreement, the construction stage
wide variety of well-defined environmental and social issues of a project involves the contractors planning, administration,
while staying within budgetary and scheduling constraints. and completion of the actual construction of the final building.
It follows the design through the entire project life, from pre- Construction is without question the most demanding stage of
design through occupancy and into operation. Integrated proj- any project.
ect delivery typically uses a multi-party agreement among key The notice to proceed is a written directive from the
participants. In a multi-party agreement (MPA), the primary owner to the contractor that sets the date that the contractor
project contributors employ a single contract specifying their can begin the work under the conditions of the contract. The
respective roles, rights, obligations, and liabilities. directive identifies the contract delivery method and estab-
lishes the start of the construction schedule. The architect and
Lean Construction other members of the design team are typically responsible
for monitoring the contractor’s compliance with the contract
Closely related to IPD, lean construction adapts lean manufac- documents by conducting site visits, evaluating submittals,
turing techniques and applies them to the construction industry. reviewing requests for contract changes or substitutions, and
Lean construction can be characterized as techniques that certifying applications for payments.
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Chapter 1 The Construction Industry: An Overview 15
Subcontractor Agreements material, but the general contractor may prefer to purchase the
Seldom does a general contractor have the personnel to com- plumbing fixtures. Drywall installers typically prefer to do the work
plete all of the tasks required to construct a building. Many but expect the general contractor to have the materials available
activities, such as mechanical, electrical, and plumbing (MEP) when they appear on the job. If changes are to be made, the
work, are handled by subcontractors employed by the general agreement should specify that the general contractor review these
contractor. It is essential that the general contractor and sub- changes with the owner. The subcontractor should not proceed
contractor have a detailed written contract, stipulating what with changes unless they are approved by the general contractor.
portion of the work is to done by which entity. Following are All trades are subject to meeting safety standards, and even
some of the basic topics covered in subcontractor agreements. though the general contractor may have the overall responsibil-
Contracts should include a schedule that includes the start- ity, the contract should indicate these safety standards must be
ing, interim, and completion dates. Clauses outlining who is to met by all subcontractors. Another concern on all construction
pay for expenses caused by any delays are included. These may jobs is site cleanup. The contract must specify daily and final
define what type of delay would constitute a breach of contract cleanup responsibilities in detail.
that would permit the general contractor to employ a new sub- All contracts should require that the subcontractor is
contractor. Who assumes responsibility for obtaining required responsible for having all the required licenses for his or her
permits and notifying inspectors when the job has progressed trade and for having a comprehensive, up-to-date insurance
to benchmark points should be noted. Some statement regard- policy. Although legal differences exist across the country, it
ing the failure of a subcontractor to complete the work to the is advantageous to have the subcontractor agree to indemnify
required quality expected is necessary. the general contractor if the subcontractor fails to pay workers
Of great importance is a clearly specified payment schedule. compensation or injury claims, and the general contractor is
This includes the costs of materials and labor provided, and the held responsible for paying them. The subcontractor should
terms of payment. Materials suppliers for major portions of the provide a written warranty for the work done so the owner can
work can be specified. Typically, a plumber supplies the pipe contact the subcontractor if something fails or needs repair.
The construction phase typically ends when the owner a project. Computer programs for critical path scheduling are
submits the final payment to the contractor. During the con- widely available and can efficiently schedule large and complex
struction phase of a project, the contractor is the primary par- building projects.
ticipant of the ongoing work.
Permitting
Construction Scheduling Prior to any work commencing on site, the constructor must
The construction schedule assigns progressive dates to all proj- secure a variety of regulatory permits. The building permit is
ect activities and phases. Project scheduling is used to match a certificate issued by the local governing authority having
the resources of equipment, materials, and labor with the proj- jurisdiction (AHJ) authorizing the construction of a project
ect construction phases over time. It indicates the estimated after a thorough review of the construction documents to
start and completion dates of various components, establishing ensure compliance with local building, safety, and fire codes.
milestones and sequences that help in coordinating the numer- The building permit must be posted in a clearly visible
ous subcontractors on the site. Poor scheduling can result in location until the project is completed (Figure 1.17). Specialty
considerable waste as workers and equipment wait for needed subcontractors are responsible for securing permits to allow
resources or the completion of preceding tasks by other trades. their own portion of the work to proceed.
The most widely used scheduling technique is the critical Most commercial projects will require a general building
path method (CPM) for scheduling, sometimes referred to as permit, as well as electrical, plumbing, HVAC, and other per-
“critical path scheduling.” This method calculates the minimum mits. Additional certifications for the use of cranes or other
time required for a certain task, along with the possible start heavy equipment may also need to be secured.
and finish times for the project activities. The duration of the Inspectors employed with the jurisdiction will conduct
critical path represents the minimum time required to complete periodic inspections of the work throughout the progress
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
16 Division 1 General Requirements
Figure 1.17 A building permit is issued by the governing authority Figure 1.18 A field office provides a central command post for the
having jurisdiction that approves the construction of a project after a day-to-day site activities, housing the construction documents, project
thorough review of the construction documents. The permit must be files, and provides an office for the project superintendent.
displayed throughout the duration of construction.
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Chapter 1 The Construction Industry: An Overview 17
Figure 1.19 A shop drawing detailing the fabrication of a steel beam and column system.
1"
1 15/16"
PLAN
1'–4" TYP. DRILL 7/16" DIA. HOLE
1 15/16" IN TOP FLANGE OF
DRILL 9/16" DIA. HOLE W8 18, 1 OF 22
IN BOTTOM FLANGE OF
W8 18 W8 18, 1 OF 8
8 1/8"
14'–1 1/2"
8'–11 7/8"
A shop drawing gives precise directives for the fabrication of data submittals are drawings, schedules, performance data,
certain components, such as structural steel work, concrete and brochures that give manufacturer’s information on the
reinforcing, or pre-cast concrete components. It is generated characteristics of a material and allow the architect to verify that
to explain the fabrication and sometimes installation proce- the product under consideration will satisfy the requirements
dures of the items to the manufacturer’s production crew or listed in the specifications. A product sample is an actual
contractor’s installation crews (Figure 1.19). Shop draw- physical example of a material that can be examined to assure
ings are substantially different from architectural drawings that colors, textures, and other characteristics adhere to the
in style and content, including manufacturing conventions, original design intent.
and special fabrication instructions. They are generated by Some contracts will ask for a sample of an entire build-
the manufacturer of the material, reviewed by the contrac- ing component, such as a wall panel, to be built for on-site
tor, and submitted to the architect for final approval. The fast evaluation. A construction mock-up is a full-size model of a
processing of shop drawings is crucial to the start of any proj- proposed construction system built to judge the appearance
ect, as the ordering of materials is often dependent on their of an assembly, examine its construction details, and test for
completion. performance under actual site conditions (Figure 1.20). These
The written specifications of the construction documents models allow the contractor to investigate different means of
typically require the contractor to submit product data and achieving the level of workmanship required by the construc-
material samples to the architect for final approval. The tion documents. Mock-ups often remain on the site throughout
submittal process is an important and time-consuming step at construction, to provide a basis against which to judge the fin-
the beginning of managing any construction project. Product ished construction as it progresses.
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
18 Division 1 General Requirements
Figure 1.20 An example of a full-scale mock-up used to study contract documents do not provide clear and comprehensive
facade details on the Sacramento Civic Center. directives. The request for information (RFI) is used by the
contractor to obtain clarification on specific components and
assemblies that are not fully detailed or understood through
a comprehensive review of the drawings and specifications.
These requests often occur during the bidding phase, as the
contractor examines the documents in detail for the first time.
A contractor could ask, for instance, for more informa-
tion on the details of an interior finish application. In order to
obtain the answer, the contractor can submit a request for
information to the architect. The RFI should not be used to
request that an alternate product model or manufacturer be
substituted for the one originally specified.
The RFI must be processed quickly by the architect, since
both the project budget and schedule may be affected. If
the response to the RFI involves no time or cost changes,
the architect can respond by a memorandum or clarification
notice. If the RFI will substantially change the project sched-
ule and/or budget, the architect may choose to initiate a con-
struction contract modification.
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Chapter 1 The Construction Industry: An Overview 19
Project Close Out Figure 1.21 Examples of common personal protective equipment
used on the construction site.
Prior to all construction being concluded, a number of admin-
istrative benchmarks must be met to complete the contractual
obligations between the owner and the contractor. When the
contractor determines that the work is nearing completion,
the architect or construction manager is asked to return to the
site and conduct an inspection of substantial completion. The
inspection occurs at a point when all major portions of the work
have been completed but a number of final details have yet to
be finished. A listing of the remaining items to be installed or
fcafotodigital/E+/Getty Images
repaired is called a punch list. The punch list is initially pre-
pared by the contractor and then added to by the architect and
engineering consultants during their inspections.
During project close out, the contractor is obligated to
collate and submit all product and equipment warranties for
the installed work to the owner. Warranties are common for
such items as windows, roofing, appliances, and electrical, of fatalities and countless injuries each year. In 1970, the U.S.
heating, and other mechanical equipment. The contractor also Congress passed the Williams-Steiger Occupational Health and
typically provides a warranty that the finished product is free Safety Act (OSHA) that initiated the regulation of safety standards
of all defects and agrees that any work that requires repair will for the construction industry. OSHA develops safety guidelines
be corrected within a one-year period. Operations and main- and administers their enforcement through a system of recur-
tenance manuals are generated to educate building staff in the ring site inspections. OSHA Standards-29 CFR–1926 Safety and
proper use and care of all building systems and equipment. Health Regulations for Construction, give extensive guidelines
Finally, record drawings are completed, indicating where mod- for construction means, methods, and materials handling. The
ifications were made to the original contract documents. standards cover every conceivable aspect of construction safety,
Before a final certificate of completion can be issued, the from personal protective and life-saving equipment (Figure 1.21),
inspecting authority must substantiate that all work is installed tool and equipment safety, fire protection and prevention, mate-
and complete, and that the quality of workmanship meets rials storage, use, and disposal, to the signs, signals, and barri-
the specified standards. All equipment and appliances must cades that are required on a site.
have undergone functional testing and be working properly. The The general contractor is responsible for administering safety
site must be thoroughly cleaned, surplus materials and tempo- procedures on the construction site. Detailed safety procedures
rary equipment removed, and surrounding streets and sidewalks are often specified in the general requirements division of the
returned to their pre-construction condition. The contractor will construction documents. An accident prevention program,
apply to the local jurisdiction for a certificate of occupancy. including training and education, must be implemented at the
The certificate is issued by the local building department indicat- start of any construction project. Workers must be trained in rec-
ing that the building is compliant with locally adopted building ognized safe working practices and the proper use of mandated
codes and is in proper condition to be occupied. personal protective gear. Copies of the current OHSA standards
are required by law to be kept in the field office along with mate-
rial data sheets outlining the hazards associated with certain
Construction Safety construction materials. All safety equipment and barriers must
Throughout any construction project, a thorough accident pre- undergo regular inspections and be documented in a written
vention and safety training program must be implemented and log. With knowledge and expertise in construction safety, gen-
maintained. The construction industry has one of the most haz- eral contractors must provide the quality guidance that workers
ardous work environments in the country, accounting for hundreds must have in order to prevent injury and the loss of life.
Review Questions
1. What are the three major divisions of the construc 3. What is the difference between construction draw
tion industry? ings and specifications?
2. What professionals are responsible for the prepa 4. How does the MasterFormat help all participants
ration of construction documents? in the industry communicate?
Copyright 2022 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Another random document with
no related content on Scribd:
que si me la hallaban quedaria
pobre y si moria sin que supiesen
donde estaba pesábame pensar
que se habia de perder. Pues
venido á mi patria y no sin
congoja y dolor, venida la noche,
cuando todos estaban en silencio
y quietud, levantabame yo y abria
las huesas adonde tenia el tesoro
enterrado y en una mesa
comenzabalo á contar y
mirandolo me pesaba porque lo
poseia, pues en conservarlo me
daba tanta congoja y dolor, y
despues de vuelto á la tierra no
podia dormir considerando si
estaba seguro allí, si los cofres en
que estaba la plata y aparador los
podian hurtar; en viendo un raton
ó una mosca luego saltaba de la
cama pensando que ladrones me
hurtaban y robaban; voceaba con
gran priesa y espanto y levantada
mi gente decianme denuestos é
injurias, que aun agora con ser
gallo no los querria sufrir,
llamabanme abariento rixoso
miserable y que ellos mismos me
robarian con enojo de mi misera
abaricia, dezian que no querian
serbirme y tenian mucha razon
porque muchas noches los azia
lebantar cinco y seys vezes que
no los dexaba dormir: ¿Quién
contaria agora, Micillo, por orden
los sobresaltos, las malas
comidas y bebidas que yo pasé?
Hallarias de verdad que son los
ricos verdaderos infelices sin
algun descanso ni plazer porque
se les va la gloria y el descanso
por otros albañares de
asechanzas que no se paresce,
ladrillados por encima con
lisonjas. E quánto mejor duerme
el pobre que no el que tiene de
guardar con solicitud lo que con
trabajo ganó y con dolor de lo
dejar. El amigo del pobre será
berdadero y el del rico simulado y
fingido, el pobre es amado por su
persona y el rico por su azienda,
nunca el rico oye verdad, todos le
dizen lisonjas y todos les
maldizen en ausencia por la
enbidia que tienen á su posesion.
Con gran dificultad allarás en el
mundo un rico que no confiese
que le será mejor estar en su
mediano estado e en esta
pobleza, porque en la berdad las
riquezas no hazen rico sino
oqupado, no hazen Señor, sino
mayordomo, y más son siervos de
sus riquezas y ellas mesmas les
acarrean la muerte, quitan el
plazer, borran las buenas
costumbres; ninguna cosa es tan
contraria del sosiego y buena bida
quel guardar y arquerir tesoros y
habellos de conservar. Gran
trabajo es sobre todo ver el
honbre veynte hyjos alredor de si
de contino pregon á Dios que yo
me aya de morir porque ellos se
entreguen y hereden mi posesion.
Pues sobre todos mis males te
quiero contar los trabajos que
pasé despues.
CAPITULO X
Gallo.—Proquré de casarme la
tercera vez con una que se llamó
Laureola hyja de Aureo Consul
que ni en generacion ni estado
era mi ygual, salbo que era la
más apuesta dama que en toda la
probincia se halló, la qual tomé
porque siendo pobre y no de tan
buena parte no tenia causa de
conquistarme como las pasadas.
Quiero dezir, amigo Micyllo, sy
con las pasadas habia tenido
trabajada bida, con aquella no me
faltaron tragos de muerte, porque
sintiendose tan soblimada en
hermosura y a mi con sennales
de vejez en la cara y con algunas
canas y con algun desquydo della
en la cama y sin dientes para
comer, dezia cosas abominables
contra su padre, porque siendo
ella tan hermosa la habia casado
con honbre tan feo, pudiendo
enplearla en persona de mayor
merescimiento y de menor edad
con que ella pudiera mejor gozar
su edad é hermosura; digote en
verdad, Micillo amigo, que
haziendome vna mannana de
dormido le oí dezir estando en
contemplacion: ¡oh! malandantes
sean los dioses y todo esto que
permiten y ordenan, pues
ordenaron y permitieron que mi
gentileza y hermosura se pusiese
en poder deste monstruo, el qual
piensa que con los bienes me
paga y que con el buen
tratamiento me contenta y con las
palabras me satisfaze. Sy supiera
en quanto tengo sus riquezas y el
caso que hago de su tratamiento
y lo que estimo sus buenas
palabras, no haria bida conmigo,
é maldita sea la donzella que se
casa con quien no conosce
porque no se vea engannada y
lastimada segun yo agora;
pluguiera á los dioses que me
traxeran agora no á poder de
quien tanto duerme y de quien tan
poco bela, bueno para lo que le
cumple, malo para lo que le
conbiene, diestro á las malicias,
torpe en las buenas obras. Bien
penso Areo Consul, mi padre, que
en darme este marido me hazia
gran bien y merced; bien paresce
que tubo mayor quydado de su
probecho que dolor de mi daño.
Si tubiera memoria de mi bien no
me procurara tanto mal; penso
que me casaba con él para tener
descanso, yo pienso que jamas
me faltará trabajo, porque quien
duerme despues de haber
dormido y no trabaja despues de
haber holgado como este bestiglo
haze ¿qué puedo esperar del sino
que el bibira con su desquydo y
yo morire con mi quydado? a él
se pasa en sueños la vida y a mi
se me trasporta en trabajos el
tiempo, maldita sea yo quando
dixe de sy; ¿por qué no dixe de
no? porque me matara un honbre
bibo y no me diera vida un
hombre muerto; aunque creo que
la vida que me dara será tal como
de las otras dos mugeres que ha
tenido; pluguiese á los dioses que
asi como agora está se quedase y
que nunca mas mis ojos le viesen
despierto. Y quando vi, Micillo,
que tan deshonestas cosas dezia
hize que despertaba por no oyr
otras peores en viendome
despierto; lebantóse de apar de
mí más enojada que contenta,
diziendo que me levantase en
hora mala que se me pasaba el
tiempo en dormir, sobre lo qual
benimos en tanta descordia que
no descansé hasta que puse las
manos en ella y de aquel enojo
murio, de cuya muerte y no
menos de la vida quedé con tal
escarmiento que acordandome de
aquella muger y no poniendo en
olbido las otras propuse de hacer
vida solo y no mal acompañado, y
no queriendo olbidarme la
rigorosa fortuna de contentarse
con el mal pasado me dieron a
Coridona por muger, con la qual
por...
CAPITULO XIII