Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 8

Chapter 8: “Continuous Process

Improvement”

“Improvement begins with I” - Arnold H.


Glasow

TQM – means gradual and continuous


improvements of the processes within the
organization.

The New Improvement Methodologies


Evolved in Japan: Concept, Techniques and
Tools that are Used for Continuous Process
Improvement:
namely the defects under
 Juran’s Trilogy control.
 Kaizen
 Kaizen Blitz  Quality Plan – a living
 5S Practice document revised often.
 Three MUs
 The Seven Deadly Wastes
 Business Process Reengineering  KAIZEN

 Kaizen – is a Japanese word,


 JURAN’S TRILOGY means gradual, orderly and
continuous improvement.
 Juran brings out that good
financial results are achieved
in an organization through
Three (3) Managerial
Processes: PLANNING,
CONTROL AND
IMPROVEMENT

 Juran’s Quality Trilogy:


QUALITY PLANNING,  Continuous Improvement – is
QUALITY CONTROL, AND achieved through improving the
QUALITY IMPROVEMENT current way of manufacturing
and eliminating waste.
 Which means; “Managing for
Quality is Achieved by the  Kaizen – is a Japanese
Use of Three (3) Managerial strategy for continuous
Processes of Planning, improvement.
Control and Improvement.”
 Improvement – is not one –
 3 Regions: Chronic Wastes, time activity, but a continuous
Quality improvement, and activity.
New zone of quality
 2 Activities of Kaizen: >
 Quality Planning – is Maintenance, > Improvement
completed before the
operations begin.  Maintenance – involves
activities directed at maintaining
 Quality Control – is helpful to current technological,
keep the fire under control, managerial and operating
standards.
 Represent the best, easiest and safety
 Improvement Function – aim way to carry out a job in the form of
at revising the current operating procedures and work
standards. instructions.
 Represent the best way to preserve
 Innovation aims at dramatic know-how and expertise and
improvement of the existing standardize the procedure for the same
 Evolve effective means to measure
performance and standardized the same
 Standardize all the procedures that are
use in the organization for maintenance
and improvement of process
 Standardize the training programs
 Standardize the audit for diagnosing
problems
 Standardize the procedures for
processes, whereas, Kaizen preventing occurrence of errors and
aims at small incremental minimizing variability
improvement in the existing
processes. PDCA and 7 Quality Tools
 Kaizen advocates usage of 7
 Three (3) Basin Principles of
Quality Tools for problem
Kaizen:
solving.
 It encourages forming cross-
1. Work place
functional teams for
effectiveness
improvement.
2. Elimination of waste,
 This will facilitate effective
strain and discrepancy
implementation for
3. Standardization
improvement.
Table 8.3 Three MUs and Their
Meaning

The waste, strain and discrepancy is respect of


the following are to be reduced and finally
eliminated:
 Human resources
 Production volumes
 Inventory (materials)
 Time
 Working space
 Machinery
 Techniques
 Facilities
 Tools and jigs
 Thinking
Standardization – objectives:
Goal of Kaizen

 Is a quick improvement
methodology (2nd).
Kaizen – is a low cost approach to  Kaizen – means making small
improvement, available to every organization improvement over an extended
that has the determination to improve processes period.
for delighting customers.  Goal – to create a better
production line.
Key Implementation  It is also known as Kaizen
workshop which targets a
 The organizations embrace particular work place.
Kaizen in 2 ways as given
below: Whether it is a Kaizen Blitz or Kaizen in the
traditional sense, it involves the following:
1. Gradual improvement of processes
2. Kaizen Blitz  Application of 5S for improving
workplace effectiveness
Gradual Improvement Processes  Reduction and finally elimination of 3
MUs
 the 1st methodology  Standardization of effective
 Apex Quality Council – constitute by methodologies for carrying out the work
the management, which overseas
continual and gradual improvement in
the processes.
 PAT – a specific teams, constituted with
specific goal for each improvement
project.
 QC – tools for reorganizing work places
of the factory for their effectiveness.
 PDCA Cycle – to evolve and implement
improvement plans.

 KAIZEN BLITZ
A Typical Improvement Process using Kaizen is 2. Straighten
3. Scrub
4. Systematize
5. Standardize

 The Japanese equivalent names for the


5 practices start with the alphabet “S”
known as 5S Practices.
 5S Tools – a perusal of the 5S
Practices.

indicated in Fig. 8.2

Kaizen Blitz – Benefits


1. Seiri – Sort

 Objective – is to sort and throw


away unnecessary items.
Separate tools, machinery,
products, inspection, work in
progress, and documentation
into necessary and unnecessary
and discharged unnecessary
items.

 Categories of Items:
 Low usage
 Medium usage
 High usage

2. Seiton – Straighten

 For easy and fast access when


needed, everything has a place
and everything in its place.
 5S PRACTICES
 The executive has to devise a
 Is rather a management tool system:
focused on fostering and
sustaining high quality Step 1: Plan to Arrange Neatly
housekeeping. 1. the management should
plan to arrange
 5S: everything at the
1. Sort
appropriate place in STEP 3: Be Consistent in Following the
appropriate manner. Rules
7. It should be the
Some of the problems in retrieving things are: discipline on the part of
the employees to follow
1. Not knowing the correct names of the the rules, which they
things made for themselves
2. Not sure where things are kept
3. Storage site at a far off place 3. Seiso – Scrub
4. Storage sites scattered all around
5. Repeated visits to far off places for  Objective – is to clean and
taking and putting back inspect the respecting work
6. Hard to locate the things since the box places thoroughly, so that there
contains many other things is no dust on the floor,
7. Storage location and items not labeled machinery and equipment. Keep
8. Thing is not there, but no clear whether machinery and work
the stock is exhausted or somebody is environment clean.
having it
9. No distinction between good parts and 4. Seiketsu – Systematize
defected parts, all look same
10. Too wide to carry  Objective – Is to maintain
11. Too heavy to carry standards of work place
12. No trolleys to carry huge items organization by making
13. Improper design of path ways with lot of everything clean and orderly at
obstructions all times. Develop routine
practices for cleaning and
STEP 2: Decide Where Things should be checking.
Stored
2. The organization should  Visual Management
have a name for every 8. is an effective means
item and a place for for systematic work
each item to be stored. place organization.
9. Is self-contained and
The following procedures should be adhered to: understandable
instruction, painted
1. Everything should have a name neatly at the right
2. A place for everything and everything in places.
its place
3. Quick identification and retrieval 5. Shitsuke – Standardize
mechanism
3. Frequent-use item  Objective – is to make the
should be retrievable previous four steps part of the
easily daily routine and to observe
4. Safe storage/transfer self-discipline through
4. Heavy things on the continuous practice. Follow
bottom procedures and standardize
5. Heavy things to be continuously to improve
carried on trolleys processes and reestablish
6. Benches and ladders to standards.
be used wherever
required  Discipline
5. Height consideration for the storage of 10. is the fundamental
items depending on the frequency of requirement of success
their use for any organization.
11. It will come only with eligibility of the 5S Certification
repeated instructions, will be considered.
coaching and training.
12. Follows Standardization
 SEVEN DEADLY WASTE
 Self-Discipline – guarantees
the continuity of a daily routine.  Waste from Overproduction
 Waste of Waiting
5S Certification  Transportation Waste
 Processing Waste
 National Productivity and  Inventory Waste
Competitiveness Council (NPCC) of  Waste of Motion
Mauritius offers 5S Certification.  Waste from Product Defect
 It was introduced in April 2002
 Aim – developing and assisting the 1. Overproduction waste
productivity culture across Mauritius.
 occurs due to failure of
 NPCC 5S CRETIFICATION: THE production planning when
PROCESS: money is blocked in the unsold
products.
1. A team of 5 auditors will audit the  Just-in-time (JIT) – Is the right
gemba (work place) proposed for approach.
certification. 3 audits, spread over
the period of one year will be 2. Waste due to waiting
conducted.
 Work-in-progress (WIP) – is a
2. The audited organization should direct measure of quality of the
keep the following relevant organization.
information:  Occur at any stage of
- General background of manufacturing due to poor
the organization. planning, organizing as well as
- Sections or departments lack of dynamism in making
where 5S is applied. alternate arrangements when a
- Photographs of the particular man, machine or
sections or departments material is not available due to
where 5S is applied. unforeseen circumstances.
- Tangible and intangible
benefits gained. 3. Transportation - unnecessary
- Documented proof: transportation is a waste.
Support structure 5S (like
a formal 5S coordinator), 4. Processing waste – if a process is help
training on 5S conducted up due to breakdown of the machine,
attendance sheets, money is lost.
standards (for colour
codes, etc.) and proof of 5. Inventory waste
regular 5S activities.
 Supply chain management
3. A certificate will be awarded by should be such that there are no
NPCC and Kaizen institute (Africa excess materials, similarly, the
and Pacific) to any organization, organization should produce
which has successfully exact number of every part.
implemented 5S Practices.  Every part should be accounted
to avoid inventory waste.
4. Following 3 random audits and on
the basis of the audit report, 6. Waste of motion
 Watts Humphrey says, the considerations, which
purpose of driving is to reach processes are redundant
the destination on time and not and make a
to spin the wheel. recommendation
 The objective of the accordingly to the
organization should be to add management. Then,
value by every motion of the management will take the
employee and machinery. final decision to eliminate
the process.
7. Products defects
Radical Redesign
 The defects parts or supplies
cause loss of money. - Dramatic improvements
 Thus eliminating scrap through cannot be achieved only
zero defect is the only solution through fundamental
to the problem. rethinking. It calls for
design of new processes.

 BUSINESS PROCESS - The reengineering team


REENGINEERING (BPR) should question
fundamentally the
What is BPR? necessity to follow the
existing procedures of
BPR – is undertaken essentially to result new processes or
in a quantum jump in performance of methods or use of
processes. machinery and should not
care to throw all of them
- Is the fundamental and start fresh, only then,
rethinking and radical dramatic improvements
redesign of a business can take place.
processes to achieve
dramatic improvement in How to carry out Reengineering?
critical, contemporary
measures of performance The Five Phases of Reengineering Cycle are
, such as cost, quality given below:
service and speed.
1. Planning
- Dramatic Improvement 2. Process Study
– will only help the 3. Study of the Best Practices
organization to leapfrog 4. Redesign
in performance or 5. Implementation
achievements.
Reengineering does not fit in Kaizen. However,
- Objective – is to reduce reengineering may be called occasionally to
the cost of maintaining make quick and dramatic improvements in the
quality, improving service process.
features and delivering
the products and services INFORMATION TECHNOLOGY
fast.
 Application of IT will help in
improvement of productivity, efficiency
Fundamental Rethinking and quality of the work.
 The most difficult part in reengineering is
- BPR – Is an opportunity the intelligent way of understanding the
for innovative person to current practices and finding innovative
decide, after due new methods.
 IT can be applied not only in
reengineering process, but also in the
continuing process.

BPR AND TQM

 The aim of BPR is to make dramatic


improvement in quality.

 TQM is not only continuous


improvement, but has many other
factors as given in the previous
chapters. BPR is one o the tools to
achieve TQM.

 The 2 approaches namely TQM and


BPR neither contradicts nor
compliments each other because they
are 2 parts of the same approach.

 Business Reengineering as a
fundamental component of total quality
approach. Therefore, total quality is an
objective, TQM means to achieve it
and BPR is an important tool within the
TQM Technology.

You might also like