National Highways Authority of India
(Ministry of Road Transport and Highways, Government of India)
wernt of-5 el 6, Beee-10, arear, aE Reet - 110 075 « G-5 & 6, Sector-10, Dwarka, New Dethi-110075
‘FRTV/Phone : 91-11-25074100 / 25074200
aa usta svat afer
(ae oRaee ote asrrf sara, art azar) ay
NHAI/Policy Guidelines/ Standard Documents/2022
Policy Circular No.11.44/ 2022 dated 23" December, 2022
{Decision taken on E-Office File No. NHAI/CMD/EPC/2020-Part(1) (Comp. No. 154678)}
Sub.: Standard EPC Agreement for National Highways and Centrally Sponsored Road
works proposed to be implemented on Engineering Procurement and
Construction (EPC) mode of Contract - Amendment to Schedule H -reg.
MoRTH vide circular No.RW/NH-33044/88/2021-SR(P&B)/DNT(215840) dated
19.12.2022 has issued amendment to Schedule H of Standard EPC Agreement issued vide
MORTH letter dated 05.03.2019. A copy of aforesaid circular is attached herewith for
information and compliance.
2. This issues with the approval of Competent Authority.
Encl.: As stated above
2) 12) 22
(Sanjay Kumar Patel)
General Manager (Coord.)
To:
All Officers of NHAI HQ/ ROs/ PIUs/ CMUs/ Site Offices
Copy to:
1, Hindi Officer for translation in Hindi.
2. Library for hosting the circular on library site.
3. Web Admin for circulation.Annercture
Government of India
Ministry of Road Transport & Highways
(S&R Zone)
No.1, Parliament Street, Transport Bhavan, New Dethi-110001
File No: RW/NH-33044/88/2021-S&R(P&B)/DNT(215840) Dated: 19" December, 2022
To,
The Chief Secretaries of all State Governments/UTs
2. The Principal Secretaries/ Secretaries of all States/ UTs PWD dealing with National
Highways, other centrally sponsored schemes and state schemes
3. The Chairperson, National Highways Authority of India (NHAl), G-5&6, Sector-10,
Dwarka, New Dethi-110075.
4, The Managing Director, National Highway Infrastructure Development Corporation
Ltd., 3 floor, PTI Building, Parliament Street, New Dethi-110001
5. Director General (Border Roads), Seema Sadak Bhawan, Ring Road, New Delhi-
110010.
6. Secretary General, IRC, IRC Bhawan, Kama Koti Marg, Sector-6, R.K.Puram, New
Dethi-110022
7. Director, IAHE, Industrial Area, A-5, Sector-62, Noida-201309
8. NIC for uploading on Ministry’s websites
Subject: Standard EPC Agreement for National Highways and Centrally Sponsored Road
works proposed to be implemented on Engineering procurement and Construction
(EPC) mode of Contract.
- Amendment to Schedule H.
Madam/Sir,
Ministry has issued Standard EPC Agreement for National Highways and Centrally
Sponsored Road works proposed to be implemented on Engineering procurement and
Construction (EPC) mode of Contract vide Ministry's letter no. RW/NH-37010/4/2010-
EAP(Printing) Vol.-IV dated 05.03.2019.
2. Payments are made under EPC projects as per weightages stipulated in Schedule-H
of Contract agreement. Presently payment for pre-cast items such as Bridge Girders, RE
Wall Facia Panels/Blocks are made only after completion of the respective work/stage
including erection / launching as mentioned in schedule H. Significant working capital of
the contractor in Pre-casting of Bridge Girders & RE Wall Facia Panels/Blocks is locked for
considerable period of time. This frequently causes liquidity problems to the contractors
which in turn affects the progress of the work. To improve the cash flow situation of the
Contractors, it is proposed to introduce sub stages in Schedule H of EPC Projects for making
Payment against casting of precast items such as Bridge Girders and RE Wall Facia
Panels/Blocks.
In view of above, the following amendment has been made to EPC Contract
Agreement as shown in the last column of the respective tables in Annexure-|
3. This is issued with the approval of Competent Authority.
Yours faithfully,
(A-K-Rushwaha)
SE, SER (R)
For DG (RD) & SS
Page 1 of 10Copy to:
1. AILROS/ ELOs of MoRTH and all Technical Officers at MoRTH Headquarter.
2. PPS toSecretary (RTH), PPS to DG (RD) &5, PS to ASFA, PS to all ADGs
Page 2 of 10Annexure -I
Amendments to Standard EPC Agreement for National Highways and Centrally Sponsored
Road works proposed to be implemented on Engineering procurement and Construction
(EPC) mode of Contract vide Ministry's letter no. RW/NH-37010/4/2010-EAP(Printing)
Vol.-IV dated 05.03.2019.
1.3.2 Minor Bridges and Underpasses/ Overpasses.
Procedure for estimating the value of Minor bridge and Underpasses/ Overpasses
shall be as stated in table 1.3.2:
Table 1.3.2
‘Stage of Payment ‘Weightage | Payment Procedure | Amended Payment Procedure
‘A2- New minor bridges |
Gi on completion of the |[**) Gi) Super-structure: | (il) Super-structure:
super- structure in all
respects including wearing Payment shall be| Payment shall be made on pro-rata
coat, bearings, expansion made on pro-rata | basis on completion of a stage i.e.,
joints, hand rails, crash basis on completion | completion of super-structure of at
barriers, road signs & of a stage i.e. |least one span in all respects as
markings, tests. on completion of super-| specified in the column of “Stage
jcommpletion cisco lose structure of at least| of Payment” in this sub-clause
all respect. Jone span in alllexeluding any payment made in
respects as specified | pursuance to here in under:
in the column of|If precast girders/segments are
“Stage of Payment” | used, on casting of all such girders |
in this sub-clause. | and segments for at least one span
and on submission of Indemnity
Bond by the Contractor, 40% of
the actual cost of such precast
girders/segments determined
| based on SOR prevalent on the
Base date within 30 days of
submission of the bill therefor. In|
ease the Contract Price is lower!
higher than the Estimated Project
Cost as per RFP, then the SOR
rates shall be reduced/ increased in|
the same proportion accordingly
| Balance payment shall be after
Jerection of / launching of these
clements as per stage payment
stipulations
[B2New 7 = |
| Underpasses/Overpasses _
(ii) Super-structure: On (ii) Super-structure: | (ii) Super-structure:
completion ofthe
superstructure in all Payment shall be| Payment shall be made on pro-rata
respects including wearing made on pro-rata basis on completion of a stage i.e
coat, bearings, expansion basis on completion | completion of super-structure of at
joints, hand rails, crash | Teast one span in all respects asbarriers, road signs
markings, tests on
completion etc. complete
in all respect.
‘Wearing Coat (a) in case
of Overpass- wearing coat
including expansion joints
‘complete in all respects as
specified and (b) in ¢ase of
underpass- rigid pavement
including drainage facility
complete in all respects as
specified as specified.
of a stage ie
completion of
superstructure of at
Jeast one span in all
respects as specified
in the column of
“Stage of Payment
in this
| sub-clause,
specified in the column of “Stage
of Payment” in this sub-clause
excluding any payment made in
pursuance to here in under:
If precast girders/segments are
used, on casting of all such girders
and segments for at least one span
and on submission of Indemnity
Bond by the Contractor, 40% of|
the actual cost of such precast
airders/sezments determined
based on SoR prevalent on the
Base date within 30 days of|
submission of the bill therefor. In
case the Contract Price is lower!
higher than the Estimated Project
Cost as per RFP, then the SOR
rates shall be reduced! increased in
the same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations.
(iii) Approaches: On
completion of approaches
including Retaining walls!
Reinforced Earth walls,
stone pitching, protection
works complete in all
| respect and fit for use.
or
(ii) Approaches:
Payment shall be
made
oon pro-rata basis on
completion of a stage
i.e. completion of
approaches in all
respect as specified
(iii) Approaches:
Payment shall be made on pro-rata
basis on completion of a stage i.e.
completion of approaches in all
respect as specified excluding any
payment made in pursuance to here
in under:
If Reinforced Earth Wall is used
with Facia Panels/Blocks, on
casting of all the Facia
Panels/Blocks of all approaches
and on submission of Indemnity
| Bond by the Contractor, 40% of
the actual cost of such precast
girders/segments determined
‘based on SOR prevalent on the
Base date within 30 days of.
submission of the bill therefor. In
‘ease the Contract Price is lower!
higher than the Estimated Project
Cost as per RFP, then the SOR
rates shall be reduced! increased in
the same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment!
stipulations
Page 4 of 10
/ —1.3.3 Major Bridge works, ROB/RUB and Structures.
Procedure for estimating the value of Major Bridge works, ROB/RUB and
Structures shall be as stated in table 1.3.3:
Table 1.3.3
‘Stage of Payment Weightage [Payment Procedure _ | Amended Payment Procedure
‘A.1- Widening and
spairs of Major Bridges _ : -
ii) Superstructure | [**] Gi) Super-structure: | (ii) Super-structure:
(including bearings) Payment shall be Payment shall be made on pro-
made rata basis on completion of a
con pro-rata basis on | stage i.e. completion of super-
completion of a stage | structure including bearings of
i.e. completion of | at least one span in all respects
super-structure |as specified excluding any
including bearings of | payment made in pursuance to |
at least one span in all | here in under:
respects as specified. | If precast girders/ segments are |
used, on casting of all such
iders and segments for atleast
‘one span and on submission of
Indemnity Bond by the
Contractor, 40% of the actual
cost’ of such precast
girders/segments determined
based on SoR prevalent on the
Base date within 30 days of
submission of the bill therefor.
In case the Contract Price is
[lower/ higher than the
| Estimated Project Cost as per|
RFP, then the SOR rates shall
be reduced/ increased in the
same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations,
‘A2- New minor bridges
[Gli Super-structure ie (ii) Super-structure: | (i) Super-structure:
(including bearings)
Payment shall be | Payment shall be made on pro-
made rata basis on completion of a
‘on pro-rata basis on | stage i.e. completion of super-
completion of a stage | structure including bearings of
i.e. completion of | at least one span in all respects
super-structure as specified excluding any
including bearings of | payment made in pursuance to
at least one span in all | here in under:
| respects as specified. | If precast girders/segments are
l used, on casting of all_such
Page 5 of 10 jegirders and segments for at least)
cone span and on submission of|
Indemnity Bond by the
Contractor, 40% of the actual
cost of such precast
girders/segments determined
based on SoR prevalent on the
Base date within 30 days of]
submission of the bill therefor.
In case the Contract Price is
lower’ higher than the
Estimated Project Cost as per|
REP, then the SOR rates shall
be reduced/ increased in the
same proportion accordingly.
Balance payment shall be after |
erection of / launching of these
elements as per stage payment
stipulations.
idening and
repairs of
(a) ROB
(>) RUB
Gi) Super-structure
(including bearings)
Gi Super-structure:
Payment shall be
made
on pro-rata basis on
completion of a stage
i.e. completion of
super-structure
including bearings of
atleast one span in all
respects as specified.
Gi
‘Super-structure:
Payment shall be made on pro-
rata basis on completion of @
stage i.e. completion of super-
structure including bearings of|
at least one span in all respects
as specified excluding any
payment made in pursuance to
here in under:
If precast girders/segments are
used, on casting of all such
sirders and segments for atleast
‘one span and on submission of]
Indemnity Bond by — the
Contractor, 40% of the actual
cost of such precast
girders/segments determined
based on SoR prevalent on the
Base date within 30 days of
submission of the bill therefor.
In case the Contract Price is
lower/ higher than the
Estimated Project Cost as per
REP, then the SOR rates shall
be reduced/ increased in the
same proportion accordingly.
Balance payment shall be after|
erection of / launching of these
elements as per stage payment
stipulations
Page 6 of 10,
ppB2-New
(a) ROB
(b) RUB
(iii) Super-structure (iii) Super-structure: | (iii) Super-structure: |
(including bearings)
Payment shall be Payment shall be made on pro-
‘made rata basis on completion of a
‘on pro-rata basis on | stage i.e. completion of super-
completion of a stage | structure including bearings of|
Jie. completion of [at least one span in all respects,
super-structure as specified excluding any
including bearings of | payment made in pursuance to
at least one span in all. | here in under:
respects as specified. | If precast girders/segments are
uused, on casting of all such|
girders and segments for at least
‘one span and on submission of|
Indemnity Bond by the
Contractor, 40% of the actual
cost of such precast
| girders/segments determined
based on SoR prevalent on the
Base date within 30 days of|
submission of the bill therefor.
In case the Contract Price is
lower’ higher than the
Estimated Project Cost as per
REP, then the SOR rates shall
be reduced’ increased in the
same proportion accordingly.
Balance payment shall be alter
erection of / launching of these
elements as per stage payment
stipulations,
iil) Approaches |**] (vii) Approaches: | (vil) Approach
(including Retaining
walls/Reinforced Earth | Payments shall be| payments shall be made on
wall, stone pitching and made on completion of | completion of both approaches
protection works) both approaches} including stone _ pitching,
including stone| protection works, —_ et. |
pitching, protection
‘works, etc. complete in
all respects as,
specified.
complete in all respects as
specified excluding any
payment made in pursuance to
here in under:
IF Reinforced Earth Wall is used
| with Facia Panels/Blocks, on
casting of all the Facia
Panels/Blocks ofall approaches
‘and on submission of |
Indemnity Bond by the
Contractor, 40% of the actual
cost__of such _yprecast
Page 7 of 10girders/segments determined
based on SOR prevalent on the
Base date within 30 days of
submission of the bill therefor.
In case the Contract Price is
lower/ higher than the
Estimated Project Cost as per
RFP, then the SOR rates shall be
reduced/ increased in the same
proportion accordingly,
Balance payment shall be after
‘erection of /aunching of these
‘elements as per stage payment
stipulations
Gr Widening and
repairs of Elevated
Seetion/Flyovers! Grade
Separators
Gi) Super-structure
(including bearings)
tt
(iii) Super-structure:
Payment shall be
made
‘on pro-rata basis on
completion of a stage
e. completion of
super-structure
including bearings of
at least one span in all
respects as specified.
|
(i Super-structure:
Payment shall be made on pro-
rata basis on completion of a
stage i.e. completion of super~
structure including bearings of]
at least one span in all respects
as specified excluding any
payment made in pursuance to
here in under:
If precast girders/segments are
used, on casting of all such
girders and segments for atleast
one span and on submission of
Indemnity Bond by the
Contractor, 40% of the actual
cost of — such precast
girders/segments determined
based on SoR prevalent on the
Base date within 30 days of|
submission of the bill therefor.
In case the Contract Price is
lower’ higher than the
Estimated Project Cost as per
RFP, then the SOR rates shall
bbe reduced’ increased in the
same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations.[(vil) Approaches
(including Retaining
walls/Reinforced Earth
wall, stone pitching and
protection works)
specified.
(vii) Approaches:
Payments shall be
all respects as
(vii) Approaches
including stone
on casting of all
Panels/Blocks of all
girders/segments
lower higher
stipulations
Payments shall be made on
made on completion of| completion of both
both approaches
including stone
pitching, protection
approaches
pitching,
protection works, ete. complete
in all respects as. specified
works, etc. complete in | excluding any paymi
pursuance to here in under:
If Reinforced Earth Wall is
used with Facia Panels/Blocks,
ent made in
the Facia
approaches
and on submission of Indemnity
Bond by the Contractor, 40% of
the actual cost of such precast
determined
based on SoR prevalent on the
Base date within 30 days of|
submission of the bill therefor.
In case the Contract Price is
than the
Estimated Project Cost as per
REP, then the SOR rates shall
be reduced/ increased in the
same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
C2 -New Elevated
Seetion/Flyovers! Grade
Separators
ii) Super-structure
(including bearings)
ISS)
made
(i) Super-structure:
Payment shall be
‘on pro-rata basis on
completion of a stage
i.e. completion of
super-structure
including bearings of
at least one span in all
respects as specified.
i
structure including
at least one span in
as specified excl
here in under:
Indemnity Bond
‘Super-structure:
Payment shall be made on pro-
rata basis on completion of a
stage i.e, completion of super-
bearings of|
all respects
juding any
payment made in pursuance to
If precast girders/segments are
used, on casting of all. such
girders and segments for atleast
cone span and on submissi
n of |
by the
Contractor, 40% of the actual
cost of — such
girders/segmenty
precast
determined
Page 9 of 10
ye‘based on SoR prevalent on the
Base date within 30 days of|
submission of the bill therefor.
In case the Contract Price is
lower/ higher than the
Estimated Project Cost as per
RFP, then the SOR rates shall
bbe reduced/ increased in the
same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations |
(vil) Approaches ra (vii) Approaches: | (vil) Approaches: |
(including Retaining
walls/Reinforced Barth Payments shall be |Payments shall be made on
wall, stone pitchidg and made on completion of | completion of both approaches
| eect ec) Pachabeg ane, | pte wrk, complet
pitching, protection | in all respects as specified
‘works, etc. complete in| excluding any payment made in
all respects as, pursuance to here in under:
specified. If Reinforced Earth Wall
| used with Facia Panels/Blocks,
| on casting of all the Facia
Panels/Blocks of all approaches
and on submission of Indemnit
Bond by the Contractor, 40% of |
| the actual cost of such precast
girders/segments determined
based on SoR prevalent on the
Base date within 30 days of]
submission of the bill therefor.
In case the Contract Price is
lower? higher than the
Estimated Project Cost as per
RFP, then the SOR rates shall
be reduced’ increased in the
same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations
ip
tf
Page 10 of 10