08.04.24 EHS Observation Report

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

EHS OBSERVATION REPORT

Project: Chennai DC2_Siruseri-Unitile


Project Start
01.11.2023
Date:
Report Date: 08.04.2024
S Observat Observation Observed Date Tim No. of Action Status Observation
.N ion Picture by e involv Taken & Cleared
o ed Time
person
1 Left the Sangeeth.C 02.04 6.50 0 Inform Close
excess .24 pm ed the d on
materials worker 6.59p
on the to m
floor remov
e the
materi
als
2 Lack of Sangeeth.C 03.04 11.0 0 Inform Close
housekee .24 2am ed the d on
ping worker 7.24p
to wear m
hand
gloves

3 Poor Sangeeth.C 03.04 11.5 0 Inform Close


housekee .24 6am ed the d on
ping worker 2.52p
to m
clean
the
area