A Bill
Name of Work :- CONSTRUCTION OF POLICE SUB – HEAD QUARTER AT BARHANPUR.
Name Of Agency :- M/s. Shubham EPC Private Limited.
Agreement No :- B-2/CE/02/2021-22.
Date Of Work Order :- 09-11-2021
Bill No :- Clause 38-02 Bill.
Paid Qty
Description Total Qty Up to Qty Now Rate Bill Rate Amount
Item Till Now Previous to be Paid
No. Bill
Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap
/ granite/quartzite/ gneiss metal for R.C.C. columns as per detailed
designs and drawings or as directed including steel centering, formwork,
cover blocks, laying/pumping, compaction finishing the formed surfaces
15 with cement mortar 1:3 of sufficient minimum thickness to give a smooth 105.63 0.00 105.63 14,345.10 14,345.10 1,515,272.91
and even surface or roughening if special finish is to be provided and
curing etc.complete,(Excluding reinforcement and structural steel).with fully
automatic micro processorbased PLC with SCADA enabled concrete
Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed
sand VSI Grade) Second Floor
Providing and applying Texture plaster with finishing with texture material
of approved make in 3 to 4 millimeter thickness on previously plastered
58 surface, including Plaster Groove 6mm thickness or Tape Grooves 35 to 1,056.96 0.00 1,056.96 705.64 705.64 745,833.25
45 mm thickness or as required, in all position including preparing the
surface, scaffolding etc. complete Ground Floor
Providing water proof bedding for flooring of Bath and WC 25 mm thick in
C.M. 1:3 including using approved water proofing compound in specified
proportion as per manufacturers specifications for per bag of cement
65 245.73 0.00 245.73 545.86 545.86 134,134.18
including leveling, curing and covering 10 years guarantee on court fee
stamp paper of Rs.500/- including ponding test etc. complete. Ground
Floor
Providing water proof bedding for flooring of Bath and WC 25 mm thick in
C.M. 1:3 including using approved water proofing compound in specified
66 proportion as per manufacturers specifications for per bag of cement 478.07 0.00 478.07 551.81 551.81 263,803.81
including leveling, curing and covering 10 years guarantee on court fee
stamp paper of Rs.500/- including ponding test etc. complete. First Floor
Providing water proof bedding for flooring of Bath and WC 25 mm thick in
C.M. 1:3 including using approved water proofing compound in specified
67 proportion as per manufacturers specifications for per bag of cement 684.93 0.00 684.93 557.77 557.77 382,033.41
including leveling, curing and covering 10 years guarantee on court fee
stamp paper of Rs.500/- including ponding test etc. complete. Second
Floor
Providing structural steel work in trusses, other similar trussed purlins and
members with all bracing, gusset plates etc. as per detailed designs and
drawings or as directed including cutting, fabricating, hoisting, erecting
156 0.92 0.00 0.92 115,126.06 115,126.06 105,685.72
fixing in position, Making riveted/ bolted/ welded connection and one coat
of anticorrosive paint and over it 2 coats of oil painting approved quality
and shade etc. complete. Ground Floor
Providing, laying and fixing P.V.C. pipe of 40mm dia. with fittings such as
bends, tees, reducers, clamps, etc. including necessary excavation,
237 trench filling etc. complete. Includingremoving existing pipe line if 959.48 0.00 959.48 568.68 568.68 545,637.09
necessary and conveying and stacking the same in PWD chowky or as
directed etc. complete. SECOND FLOOR
261 Providing and fixing Ball Cock for 32 mm with necessary fittings. SECOND 422.00 0.00 422.00 2,901.97 2,901.97 1,224,631.34
FLOOR
Providing and fixing sky light as per drawing including 10 mm thick multi
295 wall poly carbonate sheet in Lexan of Sabic make of approved colour 52.80 0.00 52.80 4,584.20 4,584.20 242,045.76
including 60mm x 60mm square tube,12 mm base plate,10 gauge weld
mesh,25mm x 25mm x 5mm MS angle including coat. Ground Floor
Providing and fixing sky light as per drawing including 10 mm thick multi
wall poly carbonate sheet in Lexan of Sabic make of approved colour
296 50.12 0.00 50.12 4,629.85 4,629.85 232,048.08
including 60mm x 60mm square tube,12 mm base plate,10 gauge weld
mesh,25mm x 25mm x 5mm MS angle including coat. First Floor
Providing & Fixing powder coated G.I. with Glazed openable door shutters
(French door type) with frame consisting of 125x60mm G I Box type frame
by using 18 gauge G.I.sheet including all necessary hold fasts etc, and
330 openable ( folding /french type ) 22 gauge G.I.Section pressed in various 86.94 0.00 86.94 6,442.10 6,442.10 560,076.17
profiles (Z,T etc.) , including providing 10mm Sq.gaurd bars and 5 mm
thick plain glass, standard stainless steel fittings (aldrop,tower bolt,hinges
, etc.) inclusive all Lobour,material,Transportation ,fixing on site with
attractive powder coating finish to GI section etc. Complete Ground Floor
Providing & Fixing powder coated G.I. with Glazed openable door shutters
(French door type) with frame consisting of 125x60mm G I Box type frame
by using 18 gauge G.I.sheet including all necessary hold fasts etc, and
331 openable ( folding /french type ) 22 gauge G.I.Section pressed in various 86.94 0.00 86.94 6,506.61 6,506.61 565,684.67
profiles (Z,T etc.) , including providing 10mm Sq.gaurd bars and 5 mm
thick plain glass, standard stainless steel fittings (aldrop,tower bolt,hinges
, etc.) inclusive all Lobour,material,Transportation ,fixing on site with
attractive powder coating finish to GI section etc. Complete First Floor
Providing & Fixing powder coated G.I. with Glazed openable door shutters
(French door type) with frame consisting of 125x60mm G I Box type frame
by using 18 gauge G.I.sheet including all necessary hold fasts etc, and
332 openable ( folding /french type ) 22 gauge G.I.Section pressed in various 86.94 0.00 86.94 6,572.11 6,572.11 571,379.24
profiles (Z,T etc.) , including providing 10mm Sq.gaurd bars and 5 mm
thick plain glass, standard stainless steel fittings (aldrop,tower bolt,hinges
, etc.) inclusive all Lobour,material,Transportation ,fixing on site with
attractive powder coating finish to GI section etc. Complete Second Floor
Providing and fixing P.V.C. Rain water pipes of 110mm outer diameter and
having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992
including proper rainwater receiving recess with P.V.C. plug, bend,
necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall
using approved wooden cleats projecting 25mm to 40mm from face of wall
340 a fixing with clips of approved quality and number ,filing the joint using 791.73 0.00 791.73 1,447.02 1,447.02 1,145,649.14
rubber gasket with solvent cement and properly resting the shoe of pipes
on C.C. or masonry blocks, including necessary scaffolding and
maintenance for 3 yrs for any leakages or dislocations of pipes. All the
P.V.C. fittings and additional 2 piece socket clips shall be got approved
from engineer in charge etc. complete. Second Floor
Providing and fixing double scaffolding system (cup lock type) on the
exterior side of building/structure, including additional rows of scaffolding in
stepped manner as per requirement of site, made with 40mm dia M.S.
tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint
with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps
and staircase system in the scaffolding for working platform etc. and
maintaining it in a serviceable condition for execution of work of cleaning
348 and/ or pointing and/ or applying chemical and removing it thereafter. The 4,271.51 0.00 4,271.51 425.77 425.77 1,818,680.81
scaffolding system shall be stiffened with bracings, runners, connecting
with the building etc, wherever required, if feasible, for inspection of work
at required locations with essential safety features for the workmen etc.,
complete as per directions and approval of Engineer-in-charge. Note:- (1)
The elevational area of the scaffolding shall be measured for payment
purpose. (2) The payment will be made once only for execution of all items
for such works. Second Floor
Providing and supplying in standard lengths Polyethelene Pipes, confirming
to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like
mechanical connector i. e. thread / insert joint / quick release coupler joint
/compression fitting joint or flang ed joint excluding coupler/specials,
369 including transportation and freight charges, inspection charges, loading / 554.25 0.00 554.25 1,006.36 1,006.36 557,775.03
unloading charges, conveyance to the departmental stores & stacking the
same in closed shade duly protecting from sunrays & rains, excluding GST
levied by GI & GOM in all respect etc. complete. a) 63 mm HDPE (PE-
100 a) 6 Kg/Sq. cm ::-GROUND FLOOR
1/1