Management System

RAT Project Briefing

Date
Project Name
Project Number
Vessel / Installation

A. SCOPE OF WORK

Work scope expected duration as agreed with client


Team roles and responsibilities
Technical drawings etc.
B. EQUIPMENT
Load out list checked
Equipment checked
Additional equipment’s to be hand carried etc.
C. CONTACT DETAILS
NDE Contacts - Contact list issued
Client contacts - Main point of contact plus travel meet and greet details
D. TRAVEL ARRANGEMENTS
Tickets issued
Visas
Vaccinations
Other
E. QA HSE
PPE issued
HAZID
Method Statement, if applicable
Risk Assessments (specific for the project and work task)
Work Procedures and Risk Assessments
(to be sent back to HQ for approval prior to commencing the task)
Rescue Plan
(to be sent back to HQ for approval prior to commencing the task)
Site Safety inspection
Toolbox talks
DPR
Management of Change - (Reminded)
Deviation reporting and OBS card system
Near miss / Accident reporting
Safety Bulletins. (Last bulletins to be reviewed.)
F. SUPERVISORS AND ATTENDEES SIGNATURES
10.2.33 F v5

ISO 9001
ISO 14001 Page 1/1