Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

E 22350

E 22380

E 22410

E 22440
will the info of the MK04-05125L
excavation level at the
setting out point be B
ou
MK04-06419K nd
shown ar
y
Li
ne

N 34920 N 34920

B
ou
nd
ar
y
Li
ne
MK04-06505P

Y
D AR
U N
BO
TE
SI
D
SE
O PO
PR
MK04-06505P pt 1.What is the maximum excavated level?
18
2.Indication of water levels in the drawing
17
16
e
19 3.Ensure that the water levels are link to a discharge
N 34890
15-SP r Lin 20 N 34890
14-SP
C ont
ou 21 level
13-SP
12-SP 22
11-SP
10-SP 23
9-SP 25 26
8-SP ine
ur L
98 99
7-SP o 100 24
Co n t 97
27
6-SP 96 101
92 93 94
95
102 105 106 107 28
91 103 77 104 79-SP 29
5-SP 108
90 SP 30
109
4-SP 76 31
89 80-SP 110
3-SP
SP 111
2-SP 32
88 81-SP 112
75 78-SP
1-SP 113 33
SP 84-SP
87 114
126 125 124 82-SP 115 34
74-SP 123 35
86 Turfing 122 83-SP 116 36
85 127
73-SP 121
147 117
128 120 37
146 118
145 129 119
72-SP
144 38

143 130 40 39
71-SP 42 41
142 43 SP SP
N 34860 44 N 34860
70-SP 131 e SP
141 Lin 45 SP
69-SP r 46 SP
140 ou
nt
132 47 SP
Co
68-SP SP
139 48
67-SP 133 49 SP
Co

138 SP
134 50
nt

66-SP 137 135 SP


ou

136 51
r

65-SP SP
52
Lin

SP SHOP DRAWING REVIEW


e

64-SP 53
SP
63-SP ARUP'S REVIEW
54
62-SP SP
e 55
61-SP Contour Lin 56 SP DATE : ________________ Namyo Lim
04/01/2024 REVIEWED BY : ________________
60-SP 59 57 SP
58
SP
SP SP SVY 21 DATUM
A - CARRY OUT FINAL CHECK BEFORE PROCEEDING WITH WORKS.
Turfing MK04-06505P
B - ATTEND TO COMMENTS AND RESUBMIT
0 5 10 15 Metres
Y C - REJECTED, WORKS NOT TO PROCEED UNTIL
AR
U ND DRAWING IS REVISED AND RESUBMITTED.
BO SCALE : 1:300
ITE
DS
OSE
OP THIS REVIEW CHECKS THE GENERAL CONFORMANCE AND COMPLIANCE WITH THE DETAILS
PR
STIPULATED IN THE WORKING DRAWINGS. IT EXCLUDES REVIEW ON DIMENSIONAL SETTING
N 34830 N 34830 OUT, BAR BENDING SCHEDULE, COMPLETENESS OF E&M REQUIREMENTS ON OPENINGS,
PENETRATIONS AND CAST-IN ITEMS. THE APPROVAL DOES NOT RELIEVE THE CONTRACTOR
E 22350

E 22380

E 22440
E 22410

OF THEIR DUTY TO COMPLY WITH THEIR CONTRACTUAL OBLIGATIONS IN COORDINATING


WITH ALL INTERFACING PARTIES, CARRYING OUT CROSS DISCIPLINE CHECKS AND
ENSURING ACCURACY AND COMPLETENESS OF THE INFORMATION PRESENTED IN THE
SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UNDUE OMISSIONS,
ERRORS AND DEVIATIONS FROM THE CONTRACT, DRAWINGS AND SPECIFICATIONS
REGARDLESS IF THESE WERE IDENTIFIED OR COMMENTED DURING THE REVIEW.

FOR REVIEW

- 26/03/2024 ISSUED FOR REVIEW

You might also like