Contractual value

Sr Item description

EUR 129,764,634

1.00 Services EUR 8,093,302

1.10 Basic and Detailed Engineering Works EUR 2,100,000

1.20 Procurement Services EUR 4,851,197

1.30 Logistic services for the Deliveries procured by OWNER / EP Contractor EUR 1,142,105

2.00 Supplying material EUR 42,323,552

2.10 TCF EUR 947,368

2.20 Supplying mechanical material EUR 25,421,614

2.2.1 Overhead Crane EPC Works Required For The Rice Straw Preparation Building EUR 510,000

2.2.2 Overhead Crane EPC Works Required For The Workshop Building 15 tons EUR 70,000

Compressed Air System (Electric Screw Type Compressor) ...


2.2.3 EUR 1,000,000
As per latest drawings (4 main compressors 1200 M3/h+1emergency compressor)

Weighbridge Full Electro-Mechanical System EPC Works ...


2.2.4 For Trailer & First Tail & Second Tail ... Full Capacity (20 TON & with length 18 m) … ( 70 tons and EUR 84,211
25 meter )

2.2.5 Water & Waste Water Treatment Full System EPC Works as per latest drawing and MRQ ... EUR 2,000,000

2.2.6 Ventilation System EUR 1,500,000

2.2.7 Supply of Static Equipment and Metal work complete Fabrication from Carbon Steel Material EUR 4,806,400

2.2.8 Supply of Static Equipment and Metal work complete Fabrication from Stainless Steel Material EUR 880,800
Contractual value

Sr Item description

EUR 129,764,634

2.2.9 Fire Fighting Supply EUR 4,507,619

2.2.10 Piping ,Fitting & Valves Supply EUR 1,800,000

2.2.11 Refractory Material Supply EUR 855,000

2.2.12 Pumps of tanks(27 pumps) EUR 529,604

2.2.13 Structural Steel Supply Material Work EUR 5,859,474

2.2.14 Tanks Material Work EUR 823,914

2.2.15 GRP Potable Water Tank EUR 52,632

2.2.16 Tanks & Vessels Accessories + loading and feeding conveyors for bulk materials . EUR 141,959

2.30 Supply of E&I material EUR 15,954,569

2.3.1 Service Building and lightening resistance EUR 2,727,397

2.3.2 Supplying of cables for production line ( UPS + generator + transformer ) EUR 8,328,583

2.3.3 Cable trays for production line EUR 371,548

2.3.4 Telephones ,CCTV cameras, internet and fire alarm works EUR 830,720

2.3.5 control of fire alarm and connecting it to firefighting system EUR 668,665

2.3.6 Electrical and instruments works EUR 2,218,528

2.3.7 Cathodic protection EUR 186,618


Contractual value

Sr Item description

EUR 129,764,634

2.3.8 MCC panel for simple camp 115 panel (‫) ﺍﻋﻣﺎﻝ ﻟﻭﺣﺎﺕ ﺍﻟﻛﻬﺭﺑﺎء ﻟﻠﺗﺣﻛﻡ ﻓﻲ ﺧﻁ ﺍﻻﻧﺗﺎﺝ‬ EUR 622,511

3.00 Construction Works EUR 77,859,624

3.10 Civil and Building Work EUR 46,645,105

3.1.1 Excavation EUR 343,155

3.1.2 Backfilling EUR 9,171,136

3.1.3 replacing soil EUR 4,420,832

3.1.4 Reinforced Concrete piles EUR 7,452,758

3.1.5 Concrete piles EUR 786,316

3.1.6 Architecture and finishing works EUR 14,821,618

3.1.7 Roads EUR 1,431,596

3.1.8 Concrete Fence EUR 1,831,689

3.1.9 tanks EUR 1,250,127

3.1.10 paving and interlock EUR 1,980,000

3.1.11 production line civil work EUR 3,155,879

3.20 Mechanical Work EUR 28,258,376

3.2.1 Piping Work EUR 2,336,225

3.2.2 NDT EUR 158,505


Contractual value

Sr Item description

EUR 129,764,634

3.2.3 Steal Structure EUR 9,639,920

3.2.4 Fire Fighting Erection Work EUR 2,035,049

3.2.5 Tanks Works EUR 1,069,895

3.2.6 Painting EUR 2,733,595

3.2.7 Insulation EUR 2,176,237

3.2.8 Equipment Erection EUR 1,861,700

3.2.9 Machinery Erection EUR 6,247,250

3.30 E&I Work EUR 2,956,143

3.3.1 Service Building and lightening resistance EUR 707,963

3.3.2 Supplying of cables for production line ( UPS + generator + transformer ) EUR 798,770

3.3.3 ‫ﻓﺭﺩ ﺍﻟﻛﺎﺑﻼﺕ ﺍﻟﺧﺎﺻﺔ ﺍﺟﻬﺯﺓ ﺑﺧﻁ ﺍﻻﻧﺗﺎﺝ‬ EUR 577,257

3.3.4 Cable trays for production line EUR 183,618

3.3.5 ‫ﺗﻭﺻﻳﻝ ﻛﺎﺑﻼﺕ ﺧﻁ ﺍﻻﻧﺗﺎﺝ‬ EUR 62,558

3.3.6 cameras, internet and fire alarm works EUR 111,160

3.3.7 control of fire alarm and connecting it to firefighting system EUR 164,595

3.3.8 Electrical and instruments works EUR 297,268


Contractual value

Sr Item description

EUR 129,764,634

3.3.9 Cathodic protection EUR 48,316

3.3.10 MCC panel for simple camp 115 panel (‫) ﺍﻋﻣﺎﻝ ﻟﻭﺣﺎﺕ ﺍﻟﻛﻬﺭﺑﺎء ﻟﻠﺗﺣﻛﻡ ﻓﻲ ﺧﻁ ﺍﻻﻧﺗﺎﺝ‬ EUR 4,637

4.00 Assistance during Commissioning and Start-Up activities) EUR 600,000

5.00 Insurance on SK and Petrojet EUR 888,157