Plan
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
Creation of List of School
Project Team Project Head
Team April, 2019
Teachers
Posting of Mounted/
Activities for Showed the
School
the Opening Schedule of
Head
of Classes of Activities for 500.00
the School the opening Teachers
Year of classes April, 2019 MOOE
Parents
ACCESS
Project Title:
BAON MO, SAGOT KO
Problem Statement:
40 out of 267 are habitually tardy in all grade levels
Project Objective Statement:
To increase the attendance of students from 227 to 600 by SY:
2019 - 2022
Root Cause:
Financial problem
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School
Creation of List of Project Head, Dept.
May 2019 500.00 MOOE
Project Team Team Heads,
Teachers
Calling for an Attendance School
Organizational Minutes of the Head, Dept.
1,000.00
Meeting meeting Heads,
ACR June 2019 Class MOOE
Advisers
Students’ Record
List of students
Identifying School
who are habitually
Students Who tardy Head, Dept.
June 2019
are Habitually Heads,
Tardy Class 500.00
Advisers, MOOE
Subject
Teachers
Identifying List of sponsors School
Sponsors and and benefactors Head, Dept.
Benefactors for Heads,
the Project July 2019 Class 500.00 MOOE
Advisers,
Subject
Teachers
Planning and Attendance Sheet School
Meeting with Minutes of the Head, Dept.
2,000.00 MOOE/
the Parents and meeting Heads,
Students July 2019 Class GPTA
Advisers, Funds
Subject
Teachers
parents and
students
Implementation List of students School
of the program who availed the Head, Dept.
program August 2019- GPTA/
Heads,
Acknowledgement August 2022 Alumni,
Teachers 20,000.00
receipt LGU
Monitoring and Monitoring Tool School
Evaluation The academic Head, The
Quarterly 500.00 MOOE
Performance of Project
the students Team
The Project Team
Root Cause:
Food Choice of Students
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
Dept. Heads,
MAPEH,
Science &
Creation of List of TVE
Project May 2019 500.00 MOOE
Project Team Teachers, SSG
Team Adviser,
School Nurse,
Vendor
Representative
Calling for an Attendance School Head,
Organizational Minutes of Dept. Heads,
Meeting the MAPEH,
meeting June 2019 Science & 1,000.0 MOOE
ACR TVE 0
Teachers, SSG
Adviser,
School Nurse,
Vendor
Representative
Conduct of the Baseline P.E & Health
Baseline Nutritional Teachers and
Nutritional Status of School Nurse
Status the June 2019
Students
List of 1,000.00
students MOOE
who have
undergone
the BNS
Conduct of Attendance School Head, 500.00 MOOE
Orientation sheet Dept. Heads,
Seminar with Minutes of P.E. & Health
the Food the Teachers, SSG
meeting July 2019
Vendors Adviser,
regarding Copy of School Nurse,
DepEd Order DepEd Vendors
No. 8, s. 2017 Order No.
8, s. 2007
Training Attendance School Head,
Workshop on Sheet Dept. Heads,
3,000.00 MOOE/
Low Cost and ACR P.E. & Health
Nutritious Training July 2019 Science & GPTA
Food Matrix TVE Funds
Teachers, SSG
Adviser,
School Nurse,
Vendors
Incorporation Lesson School Head,
of Health- Plans Dept. Heads,
June 2019
related Teachers’ Teachers
Subjects and IM’s 300.00 MOOE
the
Importance of
Eating
Nutritious
Food
Conduct of the List of
End Line students’
nutritional January 2020 P.E. & Health 500.00
Nutritional
status at Teachers and
Status of MOOE
the end of School Nurse
Students
school year
Project Title:
REVIEW FOR EXCELLENCE
Problem Statement:
Increase the number of passers from 0 to 10 students in any
scholarship examination
Project Objective Statement:
To increase the number of passers from 0 to 10 students in any
scholarship examination by school 2019 - 2020
Root Cause:
Only few students passed in any scholarship examination
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
Creation of List of June 2019- Dept. Head,
Project Project 2022 Subject
Team Team Teachers
Gathering Flyers,
leaflets and
and
social
Disseminati School Head,
media
ng Posted the Dept. Head,
July 2019- 2022 1,000.00 MOOE
Information information Subject
regarding in the Teachers
the school
Scholarship Bulletin
Boards
Planning
Training
for the design School Head,
Conduct of Attendance August 2019 - Dept. Head,
500.00 MOOE
the Special Schedule 2022 Subject
Review of the Teachers
class review
Attendanc
e of the
School Head,
Conduct of students August –
who Dept. Head,
the Review December 5,000.00 MOOE
attended Subject
classes 2019- 2022
the review Teachers
Teacher’s
Log Book
Monitoring List of School Head, 500.00 MOOE
of the students Dept. Head,
Scholarship who took Subject
Examination the
scholarship January – Teachers
examinatio March 2020 -
n 2022
Hanging of Streamers
Streamers with the
name of School Head,
with the
the Dept. Head,
Name of July 2019-
students Subject
Students March 2022
who Teachers 3,000.00 MOOE
who passed
the passed the
Scholarship examinatio
n
Examination
at the school
gate
Project Title:
MASSIVE CAMPAIGN ON ABSENTEEISM
Problem Statement:
Increase performance indicator: cohort survival and completion rate
Project Objective Statement:
To increase performance indicator: cohort survival and completion rate
Root Cause:
Students’ Absenteeism
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
Creation of List of
Project Project June 2019 Teachers
Team Team
Sending
invitation/c Letter Class Advisers
ommunicati invitation June 2019 and Subject 300.00 MOOE
on letters to Teachers
parents
School Head,
Class Advisers
Counselling Guidance
Form Advocate and
Counselling Anecdotal July, 2019 Subject 1,500.00 MOOE
of Students Record Teachers
Agreement
Form
Project Title:
ROAD TO ZERO NON-READERS
Problem Statement:
Out of 267 in all Grade levels only 255 are independent readers in the
English Subject
Project Objective Statement:
To increase the number of independent readers from 255 to 600 by SY:
2019-2022.
Root Cause:
Lack of reading experiences during the developmental reading stage
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
English Dept.
List of
Head, English
Creation of member
s of the June, 2019 200.00 MOOE
Project Team Teachers,
Project Class Advisers
Team
School Head,
Attendan English Dept.
Calling for ce of the Head, English
an persons 1st week of July Teachers,
involved 200.00 MOOE
Organization 2019 Class Advisers
al Meeting Minutes
of the
meeting
School Head,
List of English Dept.
Identifying strugglin Head, English
g readers End week of
Struggling 300.00 MOOE
based on July 2019 Teachers,
Readers
Phil-IRI Class Advisers
results
QUALITY
Project Title:
MAKE IT OUT
Problem Statement:
Out of 267 students in all Grade levels there are 27 non.- numerates
Project Objective Statement:
To increase the number of students who have mastered the basic four
Fundamental skills from 240 to 700 by school year 2019 -2022
Root Cause:
Lack of knowledge of the four fundamental operations in Mathematics
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
Mathematics
List of Dept. Head,
Creation of member Mathematics
s of the June, 2019 200.00 MOOE
Project Team
Project Teachers,
Team Class Advisers
School Head,
Mathematics
Attendan Dept. Head,
Calling for ce of the Mathematics
an persons 1st week of July
involved Teachers, 200.00 MOOE
organizationa 2019
l meeting Minutes Class Advisers
of the
meeting
QUALITY
Project Title:
TRAINING POOL
Problem Statement:
Increase students’ participation from 15 –50 in academic, non
academic and sports competition
Project Objective Statement:
To increase the number of students from 15 – 50 who will participate
in academic, non- academic and sports competition
Root Cause:
Few students who will qualify for the higher competition
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
Creation of List of
Project Project June, 2019 Teachers
Team Team
Call for a
School Head,
Meeting in Attendance
of coaches, Coaches,
relation to
trainers June, 2019 Trainers, 1,000.oo MOOE
the
Sports
Participation Minutes of
the meeting Coordinator
of Students
Conducting,
Schedule School Head,
Discussing
of the Coaches,
and Making
training Trainers,
of Schedule and July 2019 Sports 1,000.00 MOOE
of Training review,
and Coordinator
attendance
Review/Tut and
orial Classes pictorials
List of
athletes
and
Training and
contestant Coaches,
Review of s who will July 2019 - Trainers,
the undergo 15,000.00 MOOE
March 2020 Athletes and
contestants training Contestants
and athletes and
review
and
attendance
Participation List of July 2019- Coaches,
of the qualified March 2020 Trainers,
Athletes and athletes Athletes and
Contestants and contestants 20,000.00
in the contestants
different MOOE
Events and
Contests
Monitoring Accomplis July 2019- Project Team,
and hment March 2020 Coaches
Evaluation Report School Head,
ACR Sports 2,000.00 MOOE
List of Coordinator
athletes and Trainers
and
contestant
who won
in the
contest
and event
School Project Team
Project Title:
REVIEW FOR ASSESSMENT OF STUDENT’S SKILLS
Problem Statement:
Increase the number of passers from13 to 73 students
Project Objective Statement:
To increase the number of passers from 13 to 73 students by school
year 2019 - 2022
Root Cause:
Few students passed the NC II
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
Create a List of June 2019 - Dept. Head,
Project Project 500 MOOE
2022 Subject
Team Team Teachers
List of
School Head,
Identifying different
skills based November 2019 Dept. Head,
the skills to 1,000.00 MOOE
on the - 2022 Subject
assessed
competenc Teachers
y
Planning for School Head,
Schedule
the of pre- January 2020 - Dept. Head,
1,000.00 MOOE
assessment assessmen 2022 Subject
test t test Teachers
List of
students
who take
the pre-
assessmen
t test School Head,
Conduct of
Product February 2020- Dept. Head,
the pre- 5,000.00 MOOE
made by 2022 Subject
assessment
the Teachers
students
during the
pre-
assessmen
t test
Monitoring List of School Head, 1,000.00 MOOE
of the result students Dept. Head,
of the pre- who passed Subject
assessment the pre- June – March Teachers
assessment 2019 -2022
skills test
Conduct the List of School Head,
Assessment students Dept. Head,
who March 2019 - 30,000 MOOE/
Test Subject
passed the 2022 GPTA
Teachers,
assessment Assessors
test
Hanging of Streamers
streamers with the
name of School Head,
with the
the Dept. Head,
name of March 2019 - 3,000.00 MOOE
students Subject
students 2020
who pass Teachers
who pass the
assessment the
test assessment
test
Project Title:
ENHANCEMENT OF TEACHERS COMPETENCE
Problem Statement:
Improve teachers competence through trainings/seminars
Project Objective Statement:
To improve teachers competence through trainings/seminars and
LAC sessions
Root Cause:
Lack of trainings/seminars
Date of
Person Budget
Activity Output Implementati Budget
Responsible Source
on
School Head,
Dept. Heads,
Creation of List of Guidance
Project Project June 2019 Advocate,
Team Team Teachers
Making of
Training School Head,
Matrix/Desi Training Dept. Heads,
Matrix/Desi Master
gn for July 2019 1,000.00 MOOE
gn Teachers
INSET and
LAC
Sessions
School Head,
Conduct of Attendance October 2019 Dept. Heads,
the INSET sheets and Summer Master 20,000.00 MOOE
and LAC Program of 2020 Teachers and
Sessions activities Teachers
Sending Travel July 2019 – School Head, 20,000.00 MOOE
Teachers to Order March 202 Dept. Heads,
Trainings/Se Certificate Teachers
minars of
Appearance
Pictorials
Monitoring Monitoring School Head,
and Tool Dept. Heads,
July 2019 –
Evaluation Teachers
March 2022
1,000.00 MOOE
Project Title:
SBM Level of Practice
Problem Statement:
Improve SBM Level of Practice level 1 – 3
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
Creation of Created Teachers,
project June, 2019
Project Team
team PTA
President
Project Title:
BAYANIHAN SA PAARALAN
Problem Statement:
100 out of 267 parents attended the Brigada Eskwela
Project Objective Statement:
To increased the attendance of the parents from 100 to 300 by school
year 2019 - 2022
Root Cause:
Poor attendance of parents
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
Creation of Created Teachers,
project February 2019
Project Team
team GPTA
Officers, SSG
Implementatio Attendance
n of the Sheet (BE
Form 4) May 2019 Project Team, MOOE/
Brigada
Pictorials School Head, GPTA
Eskwela 90,000.0
Program of Brigada Funds
0
Activities Eskwela
Coordinator
Monitoring Monitoring August 2019- School Head MOOE/
the progress tool March 2020 GPTA
Teachers, B. 500.00
of the project Funds
E.
Implementatio
n Committee
Chairman
The Project Team
Project Title:
SCHOOL PERIMETER FENCE
Problem Statement:
Repair and improve the school perimeter fence
Project Objective Statement:
To repair and improve the school perimeter fence for SY:
2019 - 2022
Root Cause:
Dilapidated perimeter fence
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
Creation of Created School Head,
Project Team project team
Teachers
January 2019
Calling for a Attendance School Head,
meeting Minutes of Dept. Heads, MOOE/
January 2019 -
the meeting School GPTA/
2022 500
ACR Physical
Facilities BLGU
Coordinator
Identifying the List of School Head,
Part of the identified Dept. Heads,
parts of the April 2019 -
Perimeter School
perimeter 2022
Fence that Physical 1,000 MOOE/
needs to be fence that Facilities GPTA/
repair and needs to be Coordinator,
improved repaired and Supply BLGU
improved Officer
Making a Program of April 2019 – School Head.
Project Work Work May 2022 Dept. Heads,
Plan School
Physical 300,00 MOOE/
Facilities 0 GPTA/
Coordinator,
Supply BLGU
Officer
Implementatio Program of June 2019- School Head,
n of the project Work March 2022- Dept. Heads,
ACR with School
pictures Physical 30,000 MOOE/
Facilities
Coordinator, GPTA/
Supply
BLGU
Officer
Monitoring the Monitoring June 2019- School Head,
progress of the tool March 2020- Dept. Heads,
project School
Physical
Facilities
Coordinator, 1,000 MOOE/
Supply GPTA/
Oficer BLGU
GOVERNANCE
Project Title:
QUARTERLY SMEA ACCURACY AND ADJUSTMENT
Problem Statement:
Monitor and evaluate the progress of the school programs and project
for adjustment and accomplishment
Project Objective Statement:
To monitor and evaluate the progress of the school programs and
projects for adjustment and accomplishment
Root Cause:
Accuracy and adjustment of the result not established
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head
RUBEN COMEDERO
Administrative Aide IV
GOVERNANCE
Project Title:
GAWAD KALASAG PARA SA KALIGTASAN
Problem Statement:
Lack of awareness and preparedness during calamities
Project Objective Statement:
To increase awareness and preparedness in times of disaster through
trainings and seminars
Root Cause:
Lack of training skills and seminars about disaster preparedness
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head
Creation of List of Dept. Head,
project January 2019 500.00 MOOE
Project Team Teachers,
team
PTA
List of School
identified Principal,
Identifying places in the Dept. Head,
places in the school Teachers.
school which which are PTA, DRRM
are hazardous hazardous to Coordinator,
to students the students April 1- 15, School 500.00 MOOE
and and 2019 Physical
employees employees
Facilities
when disaster when
Coordinator
occurs disaster
occurs
Identifying List of
and selecting teachers and
students who School Head,
faculty and
are willing to DRRM
staff as well June 2019 200.00 MOOE
undergo Coordinator,
as students
trainings and School
and parents
seminars on Physical
who are
disaster Facilities
willing to
preparedness Coordinator,
undergo
SSG Officers
trainings and
seminars
about disaster
preparedness
Planning for Contingency
the school Plan
School
specific Evacuation
Plan Head, DRRM
Contingency
Unification Coordinator,
Plan,
Plan June 2019 School 1,000
Evacuation
Physical
and MOOE
Facilities
Unification
Coordinator,
Plan among
SSG Officers
students,
parents and
teachers for a
specific
calamity
Planning for List of School Head,
the School activities, DRRM
training and MOOE
DRRM Coordinator,
policies and drills, July 2019 School 5 00.00
activities policies and Physical
relating to Work Plan Facilities
education and Coordinator
school safety
Inviting and List of July 2019 School Head,
sending letter names of DRRM
of request to persons who Coordinator,
DRRM received the School 5000
personnel/trai letter Physical
ners from any request/invit Facilities MOOE
agencies or to ation for the Coordinator,
the Leyte disaster Parents,
Division training Employees
SGOD preparedness and Students
Conducting Attendance July 2019 School Head, 10,000 MOOE
Training and sheet March 2022 PTA,
Seminars Program of SDDRM
about disaster activities Coordinator,
preparedness ACR with Student , SSG
pictorials
Monitoring Evaluation March 2020 School Dept.
and sheet Head, Project
1,000.00
Evaluation Narrative Team
Report MOOE
GOVERNANCE
Project Title:
OPERATION HUGAS AT LINIS
Problem Statement:
Improve and maintain the cleanliness and functionality of
WASH in School Facilities
Project Objective Statement:
To improve and maintain the cleanliness and functionality of the
Wash In School facilities for SY: 2019 - 2022
Root Cause:
Some faucets are not functional
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
Creation of Created School Head,
Project Team project team
Teachers 1,000 MOOE
June 2019
Calling for a Attendance School Head,
meeting Minutes of Project
June 2019 -
the meeting Team, SBM
ACR Wins 1,000 MOOE
Coordinator
and Officer,
Teachers
Planning for Action Plan School Head,
the activities in Scheduling Project
relation to for the Team, SBM
WASH in cleaning July 2019 Wins 1,000 MOOE
School Coordinator
Facilities and Officer,
Teachers
Identifying List of School Head,
faucets and identified Project
faucets and April 2019 -
wash facilities Team, SBM
wash 2022
that need to be Wins 1,000 MOOE
repaired and facilities that Coordinator
improved need to be and Officer,
repaired and Teachers
improved
Making a Program of April 2019 – School Head,
project work Work May 2022 Project
plan Team, SBM
Wins 10,000 MOOE
Coordinator
and Officer,
Teachers
Rehabilitation Program of June 2019- School Head,
of the WASH Work March 2022- Dept. Heads,
facilities ACR with School
pictures Physical 5,000 MOOE
Facilities
Coordinators,
SBM Wins
Coordinator,
Teachers
Cleaning of Attendance School Head,
Wash Facilities sheet Project
Schedule of Team, SBM
cleaning June 2019 – Wins 6,000
ACR with June 2022 Coordinator
pictures and Officer, MOOE
Teachers
Monitoring the Monitoring School Head,
progress of the tool Dept. Heads,
project S SBM Wins
Quarterly Coordinator, 1,000 MOOE
Teachers
TITO C. SUMALINOG, JR
Head Teacher III
GOVERNANCE
Project Title:
PROCUREMENT OF THE SCHOOL SUPPLIES AND
MATERIALS AND OTHER SERVICES
Problem Statement:
Increase the needed supplies and materials and other services
Project Objective Statement:
To increase the needed supplies and materials and other services
Root Cause:
MOOE is not enough to cater all the needed school supplies and
materials and other services.
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
Creation of Created Department
project June, 2019
Project Team Heads, Supply
team Officer
Invitation
letter School Head,
Calling for a Memorandu Department
m July, 2019 500.00 MOOE
Meeting Heads, Supply
Attendance Officer
Minutes of
the meeting
Listing of List of School Head,
supplies and supplies and Department
materials and materials and Heads, Supply
other services other July, 2019 Officer 300.00 MOOE
needed by the services
school
Purchase the Canvass School Head,
supplies and Purchase Supply officer
Monthly
materials and Order and BAC
other services Receipts members 15,000 MOOE
by the school
Inspection of Inspection School Head,
the school report Supply
supplies and Purchase officer, BAC
materials order Monthly members, 500.00 MOOE
purchased Receipts Inspection
Committee
Monthly Liquidation Administrativ
Liquidation of report e Officer,
supplies and Bookkeeper,
materials Monthly Disbursing 2,000 MOOE
purchased officer
The Project Team
GOVERNANCE
Project Title:
LIBRENG PAGKAIN PARA SA MAG-AARAL
Problem Statement:
15 out of 267 students were classified as wasted and severely wasted
students will become normal
Project Objective Statement:
To zero –out wasted and severely wasted students in school year 2019
-2022
Root Cause:
No funds available for feeding program
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
Creation of Teachers,
Created June, 2019 School Nurse
Project Team project team
GOVERNANCE
Project Title:
PAARALAN MO’Y PAHALAGAHAN, BASURA MO’Y ITAPON
SA TAMANG LALAGYAN
Problem Statement:
Garbage in the school are not properly segregated
Project Objective Statement:
To purchase 10 big and heavy duty trashcans for
Waste segregation in school in SY: 2019-2022
Root Cause:
Wastes in school are not properly segregated
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
Creation of Created June, 2019 School Head,
Project Team project team Teachers
Solid Waste
Management
Coordinator
GOVERNANCE
Project Title:
SCHOOL COMFORT ROOMS
Problem Statement:
Repair and improve the school comfort rooms
Project Objective Statement:
To repair and improve 4 comfort rooms by SY:
2019 - 2022
Root Cause:
Some comfort rooms are not functional
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
Creation of Created School Head,
Project Team project team
Teachers
January 2019
Calling for a Attendance School Head,
Meeting Minutes of Dept. Heads,
January 2019 -
the meeting School
500 MOOE
ACR Physical
Facilities
Coordinator
Identifying List of School Head,
school comfort identified Dept. Heads,
school April 2019 -
rooms that School
comfort 2022
need to be Physical 1,000 MOOE
repair and rooms that Facilities
improved need to be Coordinator,
repaired and Supply
improved
Officer
Making a Program of April 2019 – School Head
project work Work May 2022 Dept. Heads,
plan School
Physical 30,000 MOOE
Facilities
Coordinator,
Supply
Officer
Implementatio Program of June 2019- School Head
n of the project Work March 2022- Dept. Heads,
ACR with School
pictures Physical 5,000 MOOE
Facilities
Coordinator,
Supply
Officer
Monitoring the Monitoring June 2019- School Head,
progress of the tool March 2020- School
project Physical
Facilities
Coordinator,
Supply 1,000 MOOE
Officer
GOVERNANCE
Project Title:
SCHOOL SPORTS EQUIPMENT AND PARAPHERNALIA
Problem Statement:
Purchase school sports equipment and facilities
Project Objective Statement:
To purchase school sports equipment and facilities in SY:
2019 - 2022
Root Cause:
Lack of sports equipment and paraphernalia
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
Creation of Created School Head,
Project Team project team Sports
Coordinator,
June 2019 Dept. Heads
GOVERNANCE
Project Title:
SHS STUDY SHED
Problem Statement:
Construct Study Shed for Senior High School Students
Project Objective Statement:
To construct study shed for the Senior High School students by SY:
2019-2022
Root Cause:
Lack of study area
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
Creation of Teachers,
Created June, 2019 Dept. Head
Project Team project team
School Head,
Teachers,
Attendance Dept. Head, SHS
Calling for a Minutes of Club and Club
June, 2019 200
meeting the meeting GPTA Funds/
ACR Officers MOOE
GOVERNANCE
Project Title:
STUDENT WELFARE, SAFETY AND PROTECTION
Problem Statement:
Increase the safety of the students inside the school campus
Project Objective Statement:
To increase the safety of the students inside the school campus by
SY: 2019-2022.
Root Cause:
Illegal entrance and exit of the students using backdoor
School Head,
School
Attendance Discipline
sheet Committee
Calling for a Minutes of Chairman,
April 2019 500 MOOE
meeting the meeting Teachers,
ACR with GPTA, Brgy.
pictorials Council
List of School
materials Discipline
Implementatio used for the BLGU/
Committee
n of the repair repair GPTA
September 2019 Chairman, 50, 000
of dilapidated Funds
- 2022 Teachers,
perimeter fence
GPTA
Officers ,
Brgy.
Council
Project Title:
SAVE A DROP
Problem Statement:
The effect of water shortage to employees and students
Project Objective Statement:
To repair and maintain 15 water pipes and 30 faucets by school year
2019 - 2022
Root Cause:
Water shortage in the SHS Wash in Facility and comfort rooms
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head
Creation of Created
June 2019 Dept. Head, 500.00 MOOE
Project Team project
Teachers,
team
PTA
Attendance School
Calling for a Sheet Principal,
departmental Minutes of June 2019 Dept, Head, 500.00 MOOE
meeting the meeting Teachers,
Staff
Identifying List of School Head,
areas that identified Dept. Head,
need areas that Teachers,
improvement/ need PTA, Staff 500.00 MOOE
rehabilitation repair/rehabi
of the water litation of July 2019-
facilities the water March 2022
facilities
Planning for Program of
the Work
repair/rehabili List of
tation of the materials to August 2019- School Head, 500.00 MOOE
water be used for March 2022 Dept. Head,
facilities the Teachers,
repair/rehabi
PTA
litation
Implementatio Attendance
n of the of the project
team and School Head,
project
other Dept. Head,
August 2019 – 10,000.0 MOOE
personnel Project Team
March 2022 0
who do the
repair
GOVERNANCE
Project Title:
PROJECT SAFE HAVEN
Problem Statement:
Repair and improve the SHS classrooms, furniture and fixtures
Project Objective Statement:
To repair and maintain 6 classrooms, 9 furniture and fixtures by
school year 2019 – 2022
Root Cause:
Some classrooms, furniture and fixtures need to be repaired
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
School
Facilities
Creation of Coordinator.
Created January , 2019 Supply 500 MOOE
Project Team project team
Officer and
Dept. Heads
School Head,
Identifying List of School
classrooms, identified Facilities
furniture and classrooms, Coordinator.
fixtures that furniture and February, 2019 Supply 200 MOOE
need to be fixtures that
Officer and
repair and need to be
Dept. Heads
improved repaired or
improved
GOVERNANCE
Project Title:
KAPALIGIRAN MO, ALAGAAN MO
Problem Statement:
Problem Statement:
School Eco-Friendly Programs and Projects were not fully
implemented
Project Objective Statement:
To ensure effective implementation of sustainable eco-friendly
programs and projects by school year 2019 - 2022
Root Cause:
No sustainable Eco-Friendly programs and project
GOVERNANCE
Project Title:
COMPUTER LAB PARA SA LAHAT
Problem Statement:
Repair and maintain the computer laboratory equipment and
peripherals
Project Objective Statement:
To repair and maintain the 4 computer laboratory equipment and
peripherals for SY: 2019-2022.
Root Cause:
Some computer laboratory facilities need to be repaired
School Head,
ICT
Attendance Coordinator,
Calling for a sheet Teachers,
July 2019 500 MOOE
meeting Minutes of ICT Subject
the meeting Coordinator
Materials for
the repair and
Implementatio replaced School Head,
n of the repair some ICT
Quarterly 5,000 MOOE/
and computer Coordinator,
ICT
replacement of facilities and Teachers,
Club
the computer peripherals ICT Subject
funds
laboratory Coordinator
facilities and
peripherals
Monitoring and Monitoring School
Evaluation Tool Head, ICT
Quarterly 500 MOOE
List of Coordinator,
repaired and Teachers,
replaced ICT Subject
computer Coordinator
peripherals
GOVERNANCE
Project Title:
GPTA AND ALUMNI OFFICE
Problem Statement:
Improve and maintain the GPTA and Alumni Office
Project Objective Statement:
To improve and maintain the GPTA and Alumni office by
SY: 2019-2022.
Root Cause:
Limited funds available
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
School Head,
School
Facilities
Coordinator,
Creation of Created Supply
January , 2019 500 MOOE
Project Team project team Officer,
GPTA
Officers
School Head,
School
Facilities
List of
Identifying the Coordinator,
identified
parts of the Supply
parts of the GPTA
building that buildings that February, 2019 Officer, 1,000
Funds
need to be need to be GPTA
improved repaired or Officers
improved
List of
materials
Implementatio needed for the School Head, GPTA
n of the improvement School and
May 2019 - 5,000
improvement of the project Facilities Alumni
2022
of the building Coordinator, Funds
Supply
Officer,
GPTA
Officers
GOVERNANCE
Project Title:
GULAYAN SA PAARALAN
Problem Statement:
Sustain the Gulayan sa Paaralan Program
Project Objective Statement:
To sustain the Gulayan sa Paaralan by SY: 2019-2022.
GOVERNANCE
Project Title:
ENSAYO PARA SA KALIGTASAN MO
Problem Statement:
Sustain the implementation of the DRMM program
Project Objective Statement:
To sustain the implementation of the DRRM program by SY: 2019-