Table 3.

2 Modified Rational Method - Calculation Sheet Left Side Name of Scheme : SCRDP

Location : MO-P-DR2 Section : All Date : 10/09/2023 Engineer : Md. Rajedul Islam

Design of Drains
Calculation of Peak Flows
Drain Downstream Remarks
Conversion

Water level

drain depth
Contributin

Road Level
Travel time
Length (m)

Type P/S/T
g distance

Peak Flow

Bed Level
Drain Ref.

DrainWith
Hydraulic

Hydraulic
Design of
Contrib'g
Area (ha)

Top Slab
Capacity
Effective

area (ha)

Slope 1:
Intensity

Gradient

Slope 1:

Existing
Storage

velocity
(mm/hr)
Rainfall
Cum've

Type of

Time of

Design

Design

Design

Design
Factor
Runoff

Depth*

Actual

Top of
(mins)

(m3/s)

(m3/s)
Depth
Coeff.

Coeff.

Conc.

Water
Width
Drain

Drain

Drain

Drain

Drain

Drain
(m/s)
Area

Side
(m)

Chainage Road level Water level Drain Bed levelDrain Top level
0 100 0.70 0.70 10 1.00 200 S 0.80 0.85 0.00 1.00 3.422 3.12 2.272 1.00 3.42 00+000 3.422 3.122 2.272 3.422
Main Drain 00+018 00+018 3.280 3.027 2.177 3.376
00+037 19 100 0.19 0.70 0.70 0.09 0.09 Rect 0.5 10 118.43 1.00 0.03 200 S 0.80 0.85 0.00 1.00 2.120 1.442 3.376 3.03 2.177 0.95 3.38 ok 00+037 3.101 2.912 2.062 3.280
00+060 23 100 0.23 0.70 0.70 0.11 0.21 Rect 0.6 11 115.02 1.00 0.07 200 S 0.80 0.85 0.00 1.00 2.120 1.442 3.28 2.91 2.062 0.89 3.28 ok 00+060 3.078 2.832 1.982 3.101
00+076 16 100 0.16 0.70 0.70 0.08 0.28 Rect 0.4 11 112.81 1.00 0.09 200 S 0.80 0.85 0.00 1.00 2.120 1.442 3.101 2.83 1.982 0.95 3.10 ok 00+076 3.030 2.717 1.867 3.078
00+099 23 100 0.23 0.70 0.70 0.11 0.40 Rect 0.6 12 109.86 1.00 0.12 200 S 0.80 0.85 0.00 1.00 2.120 1.442 3.078 2.72 1.867 1.01 3.08 ok 00+099 2.860 2.597 1.747 3.030
00+123 24 100 0.24 0.70 0.70 0.12 0.51 Rect 0.7 13 107.01 1.00 0.15 200 S 0.80 0.85 0.00 1.00 2.120 1.442 3.030 2.60 1.747 0.96 3.03 ok 00+123 2.713 2.497 1.647 2.860
00+143 20 100 0.20 0.70 0.70 0.10 0.61 Rect 0.6 13 104.81 1.00 0.18 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.860 2.50 1.647 0.92 2.86 ok 00+143 2.706 2.397 1.547 2.713 143.00,0.00143.00,27.06 143.00,23.97 143.00,15.47 143.00,27.13
00+163 20 100 0.20 0.70 0.70 0.10 0.71 Rect 0.6 14 102.74 1.00 0.20 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.713 2.40 1.547 1.01 2.71 ok 00+163 2.479 2.322 1.472 2.706
00+178 15 100 0.15 0.70 0.70 0.07 0.78 Rect 0.4 14 101.26 1.00 0.22 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.706 2.32 1.472 0.86 2.71 ok 00+178 2.412 2.212 1.362 2.479
00+200 22 100 0.22 0.70 0.70 0.11 0.89 Rect 0.6 15 99.21 1.00 0.25 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.479 2.21 1.362 0.90 2.48 ok 00+200 2.440 2.160 1.310 2.412
00+226 26 100 0.26 0.70 0.70 0.13 1.02 Rect 0.7 16 96.95 1.00 0.27 500 S 0.80 0.85 0.00 1.00 1.341 0.912 2.412 2.16 1.310 0.98 2.41 ok 00+226 2.441 2.124 1.274 2.440
00+244 18 100 0.18 0.70 0.70 0.09 1.11 Rect 0.5 16 95.47 1.00 0.29 500 S 0.80 0.85 0.00 1.00 1.341 0.912 2.440 2.12 1.274 1.02 2.44 ok 00+244 2.496 2.082 1.232 2.441
00+265 21 100 0.21 0.70 0.70 0.10 1.21 Rect 0.6 17 93.83 1.00 0.32 500 S 0.80 0.85 0.00 1.00 1.341 0.912 2.441 2.08 1.232 1.11 2.44 ok 00+265 2.540 2.032 1.182 2.496
00+290 25 100 0.25 0.70 0.70 0.12 1.33 Rect 0.7 17 91.98 1.00 0.34 500 S 0.80 0.85 0.00 1.00 1.341 0.912 2.496 2.03 1.182 1.21 2.50 ok 00+290 2.540 1.968 1.118 2.540
00+322 32 100 0.32 0.70 0.70 0.16 1.49 Rect 0.9 18 89.77 1.00 0.37 500 S 0.80 0.85 0.00 1.00 1.341 0.912 2.540 1.97 1.118 1.27 2.54 ok 00+322 2.650 1.938 1.088 2.540
00+334 12 100 0.12 0.70 0.70 0.06 1.55 Rect 0.3 19 88.99 1.00 0.38 400 S 0.80 0.85 0.00 1.00 1.499 1.020 2.540 1.94 1.088 1.30 2.54 ok 00+334 3.160 1.890 1.040 2.650
00+353 19 100 0.19 0.70 0.70 0.09 1.64 Rect 0.5 19 87.78 1.00 0.40 400 S 0.80 0.85 0.00 1.00 1.499 1.020 2.650 1.89 1.040 1.46 2.65 ok 00+353 #REF! 1.845 0.995 2.000
00+371 18 100 0.18 0.70 0.70 0.09 1.73 Rect 0.5 20 86.69 1.00 0.42 400 S 0.80 0.85 0.00 1.00 1.499 1.020 3.160 1.85 0.995 2.01 2.00 ok 00+371 #REF! #REF! #REF! #REF!

00+244
Table 3.2 Modified Rational Method - Calculation Sheet Left Side Name of Scheme : SCRDP

Location : MO-P-DR2 Section : All Date : 10/09/2023 Engineer : Md. Rajedul Islam

Design of Drains
Calculation of Peak Flows
Drain Downstream Remarks
Conversion

Water level

drain depth
Contributin

Road Level
Travel time
Length (m)

Type P/S/T
g distance

Peak Flow

Bed Level
Drain Ref.

DrainWith
Hydraulic

Hydraulic
Design of
Contrib'g
Area (ha)

Top Slab
Capacity
Effective

area (ha)

Slope 1:
Intensity

Gradient

Slope 1:

Existing
Storage

velocity
(mm/hr)
Rainfall
Cum've

Type of

Time of

Design

Design

Design

Design
Factor
Runoff

Depth*

Actual

Top of
(mins)

(m3/s)

(m3/s)
Depth
Coeff.

Coeff.

Conc.

Water
Width
Drain

Drain

Drain

Drain

Drain

Drain
(m/s)
Area

Side
(m)

Chainage Road level Water level Drain Bed levelDrain Top level
Overland Distance: 100 0.70 0.70 10 1.00 800 S 0.70 1.00 0.00 1.15 3.658 3.46 2.458 1.10 3.83 00+000 3.658 3.458 2.458 3.833
Main Drain 00+000 00+018 3.521 3.435 2.435 3.696
00+018 18 100 0.18 0.70 0.70 0.09 0.09 Rect 0.5 10 118.59 1.00 0.03 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.521 3.44 2.435 0.99 3.70 ok 00+037 3.339 3.412 2.412 3.514
00+037 19 100 0.19 0.70 0.70 0.09 0.18 Rect 0.5 11 115.73 1.00 0.06 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.339 3.41 2.412 0.83 3.51 ok 00+060 3.409 3.383 2.383 3.584
00+060 23 100 0.23 0.70 0.70 0.11 0.29 Rect 0.6 11 112.54 1.00 0.09 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.409 3.38 2.383 0.93 3.58 ok 00+076 3.275 3.363 2.363 3.175
00+076 16 100 0.16 0.70 0.70 0.08 0.37 Rect 0.4 12 110.48 1.00 0.11 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.275 3.36 2.363 0.81 3.18 ok 00+099 3.231 3.334 2.334 3.131
00+099 23 100 0.23 0.70 0.70 0.11 0.49 Rect 0.6 12 107.70 1.00 0.15 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.231 3.33 2.334 0.80 3.13 ok 00+123 3.250 3.304 2.304 3.150
00+123 24 100 0.24 0.70 0.70 0.12 0.60 Rect 0.7 13 105.02 1.00 0.18 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.250 3.30 2.304 0.85 3.15 ok 00+143 2.931 3.279 2.279 2.831 143.00,0.00143.00,29.31 143.00,32.79 143.00,22.79 143.00,28.31
00+143 20 100 0.20 0.70 0.70 0.10 0.70 Rect 0.6 14 102.94 1.00 0.20 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.931 3.28 2.279 0.55 2.83 ok 00+163 2.759 3.254 2.254 2.659
00+163 20 100 0.20 0.70 0.70 0.10 0.80 Rect 0.6 14 100.97 1.00 0.22 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.759 3.25 2.254 0.40 2.66 ok 00+178 2.821 3.236 2.236 2.721
00+178 15 100 0.15 0.70 0.70 0.07 0.87 Rect 0.4 15 99.58 1.00 0.24 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.821 3.24 2.236 0.49 2.72 ok 00+200 2.692 3.208 2.208 2.592
00+200 22 100 0.22 0.70 0.70 0.11 0.98 Rect 0.6 15 97.63 1.00 0.27 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.692 3.21 2.208 0.38 2.59 ok 00+226 2.833 3.176 2.176 2.733
00+226 26 100 0.26 0.70 0.70 0.13 1.11 Rect 0.7 16 95.47 1.00 0.29 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.833 3.18 2.176 0.56 2.73 ok 00+244 2.470 3.153 2.153 2.370
00+244 18 100 0.18 0.70 0.70 0.09 1.20 Rect 0.5 17 94.06 1.00 0.31 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.470 3.15 2.153 0.22 2.37 ok 00+265 2.535 3.127 2.127 2.435
00+265 21 100 0.21 0.70 0.70 0.10 1.30 Rect 0.6 17 92.49 1.00 0.33 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.535 3.13 2.127 0.31 2.44 ok 00+290 2.550 3.096 2.096 2.450
00+290 25 100 0.25 0.70 0.70 0.12 1.42 Rect 0.7 18 90.72 1.00 0.36 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.550 3.10 2.096 0.35 2.45 ok 00+322 2.682 3.056 2.056 2.582
00+322 32 100 0.32 0.70 0.70 0.16 1.58 Rect 0.9 19 88.60 1.00 0.39 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.682 3.06 2.056 0.53 2.58 ok 00+334 2.583 3.040 2.040 2.483
00+334 12 100 0.12 0.70 0.70 0.06 1.64 Rect 0.3 19 87.84 1.00 0.40 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.583 3.04 2.040 0.44 2.48 ok 00+353 2.627 3.017 2.017 2.527
00+353 19 100 0.19 0.70 0.70 0.09 1.73 Rect 0.5 20 86.69 1.00 0.42 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.627 3.02 2.017 0.51 2.53 ok 00+371 3.221 2.994 1.994 3.121
00+371 18 100 0.18 0.70 0.70 0.09 1.82 Rect 0.5 20 85.63 1.00 0.43 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.221 2.99 1.994 1.13 3.12 ok
Table 3.2 Modified Rational Method - Calculation Sheet Left Side Name of Scheme : SCRDP

Location : MO-P-DR2 Section : All Date : 10/09/2023 Engineer : Md. Rajedul Islam

Design of Drains
Calculation of Peak Flows
Drain Downstream Remarks

Water level
Conversion

drain depth
Contributin

Road Level
Travel time

Type P/S/T
Length (m)

g distance

Peak Flow
Drain Ref.

Bed Level

DrainWith
Hydraulic

Hydraulic
Design of
Contrib'g
Area (ha)

Top Slab
Capacity
area (ha)

Slope 1:
Intensity

Gradient
Area(ha)

Slope 1:

Existing
Effective
Storage

velocity
(mm/hr)
Rainfall
Cum've

Type of

Time of

Design

Design

Design

Design
Factor
Runoff

Depth*

Actual

Top of
(mins)

(m3/s)

(m3/s)
Depth
Width
Coeff.

Coeff.

Conc.

Water
Drain

Drain

Drain

Drain

Drain

Drain
(m/s)
Side
(m)

Chainage Road level Water level Drain Bed level Drain Top level
0 100 0.70 0.70 10 1.00 0 S 0.80 0.80 0.00 0.95 3.491 3.341 2.541 1.05 3.74 00+000 3.491 3.341 2.541 3.741
Main Drain 00+018 00+018 3.438 3.265 2.465 3.571
00+037 19 100 0.19 0.70 0.70 0.09 0.09 Rect 0.5 10.3 118.43 1.00 0.03 250 S 0.80 0.80 0.00 0.95 1.872 1.198 3.321 3.265 2.465 0.96 3.57 ok 00+037 3.275 3.173 2.373 3.688
00+060 23 100 0.23 0.70 0.70 0.11 0.21 Rect 0.6 11 115.02 1.00 0.07 250 S 0.80 0.80 0.00 0.95 1.872 1.198 3.438 3.173 2.373 1.17 3.69 ok 00+060 3.231 3.109 2.309 3.525
00+076 16 100 0.16 0.70 0.70 0.08 0.28 Rect 0.4 11 112.81 1.00 0.09 250 S 0.80 0.80 0.00 0.95 1.872 1.198 3.275 3.109 2.309 1.07 3.53 ok 00+076 3.310 3.081 2.281 3.481
00+099 23 100 0.23 0.70 0.70 0.11 0.40 Rect 0.6 12 109.86 1.00 0.12 250 S 0.80 0.80 0.00 0.95 1.872 1.198 3.231 3.081 2.281 1.05 3.48 ok 00+099 2.931 2.985 2.185 3.560
00+123 24 100 0.24 0.70 0.70 0.12 0.51 Rect 0.7 13 107.01 1.00 0.15 250 S 0.80 0.80 0.00 0.95 1.872 1.198 3.310 2.985 2.185 1.23 3.56 ok 00+123 2.856 2.885 2.085 3.181
00+143 20 100 0.20 0.70 0.70 0.10 0.61 Rect 0.6 13 104.81 1.00 0.18 200 S 0.80 0.80 0.00 0.95 2.093 1.339 2.931 2.885 2.085 0.95 3.18 ok 00+143 2.821 2.785 1.985 3.106 143.00,0.00143.00,28.21 143.00,27.85 143.00,19.85 143.00,31.06
00+163 20 100 0.20 0.70 0.70 0.10 0.71 Rect 0.6 14 102.74 1.00 0.20 200 S 0.80 0.80 0.00 0.95 2.093 1.339 2.856 2.785 1.985 0.97 3.11 ok 00+163 2.692 2.710 1.910 3.071
00+178 15 100 0.15 0.70 0.70 0.07 0.78 Rect 0.4 14 101.26 1.00 0.22 200 S 0.80 0.80 0.00 0.95 2.093 1.339 2.821 2.710 1.910 1.01 3.07 ok 00+178 2.850 2.600 1.800 2.942
00+200 22 100 0.22 0.70 0.70 0.11 0.89 Rect 0.6 15 99.21 1.00 0.25 200 S 0.80 0.80 0.00 0.95 2.093 1.339 2.692 2.600 1.800 0.99 2.94 ok 00+200 2.470 2.470 1.670 3.100
00+226 26 100 0.26 0.70 0.70 0.13 1.02 Rect 0.7 16 96.95 1.00 0.27 200 S 0.80 0.80 0.00 0.95 2.093 1.339 2.850 2.470 1.670 1.28 3.10 ok 00+226 2.535 2.380 1.580 2.720
00+244 18 100 0.18 0.70 0.70 0.09 1.11 Rect 0.5 16 95.47 1.00 0.29 200 S 0.80 0.80 0.00 0.95 2.093 1.339 2.470 2.380 1.580 0.99 2.72 ok 00+244 2.550 2.368 1.568 2.785
00+265 21 100 0.21 0.70 0.70 0.10 1.21 Rect 0.6 17 93.83 1.00 0.32 1800 S 0.80 0.80 0.00 0.95 0.698 0.446 2.535 2.368 1.568 1.07 2.79 ok 00+265 2.682 2.354 1.554 2.800
00+290 25 100 0.25 0.70 0.70 0.12 1.33 Rect 0.7 17 91.98 1.00 0.34 1800 S 0.80 0.80 0.00 0.95 0.698 0.446 2.550 2.354 1.554 1.10 2.80 ok 00+290 2.583 2.337 1.537 2.932
00+322 32 100 0.32 0.70 0.70 0.16 1.49 Rect 0.9 18 89.77 1.00 0.37 1800 S 0.80 0.80 0.00 0.95 0.698 0.446 2.682 2.337 1.537 1.25 2.93 ok 00+322 2.627 2.330 1.530 2.833
00+334 12 100 0.12 0.70 0.70 0.06 1.55 Rect 0.3 19 88.99 1.00 0.38 1800 S 0.80 0.80 0.00 0.95 0.698 0.446 2.583 2.330 1.530 1.15 2.83 ok 00+334 3.075 2.319 1.519 2.877
00+353 19 100 0.19 0.70 0.70 0.09 1.64 Rect 0.5 19 87.78 1.00 0.40 1800 S 0.80 0.80 0.00 0.95 0.698 0.446 2.627 2.319 1.519 1.21 2.88 ok 00+353 #REF! 0.000 0.979 2.000
00+368 15 100 0.15 0.70 0.70 0.07 1.71 Rect 0.4 19 86.87 1.00 0.42 1800 S 0.80 0.85 0.00 1.00 0.707 0.481 3.000 2.311 1.461 1.64 3.25
00+371 0 0 0.00 0.00 0.00 0.00 1.72 Rect 0.0 19 87.78 1.00 0.42 S 0.00 0.00 0.00 0.00 2.120 0.000 3.075 0.979 2.20 2.00 FALSE 00+371 #REF! #REF! #REF! #REF!

00+244
PROJECT NAME : SOUTHERN CHATTOGRAM REGIONAL DEVELOPMENT PROJECT (SCRDP)

Sub Project Name : Construction of RCC Drain from Farruk shop to Box Culvert (Ch. 0+018 km to Ch. 0+371km) at Moheshkhali Pourashava in
Cox's Bazar District.

Package No. : SCRDP-MO-P-DR2

HYDRAULIC DESIGN OF MO-P-DR2

Table 3.2 Modified Rational Method - Calculation Sheet

Section : All Date : 12/10/2023 Engineer : Md. Delwar Hossain Akhand

Design of Drains
Calculation of Peak Flows
Drain Downstream Remarks
Runoff Coeff.

Design Drain

Drain Design

Drain Design
Drain Length

Contributing

Cum've area
distance (m)

Water Depth

Bed Level
Slope

Actual drain
Water level
Conversion

Road Level
Travel time

Type P/S/T
Peak Flow
Drain Ref.

DrainWith
Hydraulic

Hydraulic
Design of
Contrib'g
Area (ha)

Top Slab
Slope 1:

Capacity
Gradient
Intensity
Area(ha)

Existing
Effective

velocity
Storage

(mm/hr)
Rainfall
Type of

Time of

Depth*

Design
Factor

Top of
(mins)

(m3/s)

(m3/s)
Coeff.

Conc.

Width

depth
Drain

Drain
(m/s)
Side
(ha)
(m)

1:
0 100 0.70 0.70 10 1.00 0 S 0.80 0.85 0.00 1.00 3.491 3.341 2.491 1.10 3.74
Main Drain 00+018
00+037 19.00 100 0.19 0.70 0.70 0.09 0.09 Rect 0.5 10.3 118.43 1.00 0.03 250 S 0.80 0.85 0.00 1.00 1.896 1.290 3.321 3.265 2.415 1.01 3.57 ok
00+060 23.00 100 0.23 0.70 0.70 0.11 0.21 Rect 0.6 11 115.02 1.00 0.07 250 S 0.80 0.85 0.00 1.00 1.896 1.290 3.438 3.173 2.323 1.22 3.69 ok
00+076 16.00 100 0.16 0.70 0.70 0.08 0.28 Rect 0.4 11 112.81 1.00 0.09 250 S 0.80 0.85 0.00 1.00 1.896 1.290 3.275 3.109 2.259 1.12 3.53 ok
00+099 23.00 100 0.23 0.70 0.70 0.11 0.40 Rect 0.6 12 109.86 1.00 0.12 250 S 0.80 0.85 0.00 1.00 1.896 1.290 3.231 3.081 2.231 1.10 3.48 ok
00+123 24.00 100 0.24 0.70 0.70 0.12 0.51 Rect 0.7 13 107.01 1.00 0.15 250 S 0.80 0.85 0.00 1.00 1.896 1.290 3.310 2.985 2.135 1.28 3.56 ok
00+143 20.00 100 0.20 0.70 0.70 0.10 0.61 Rect 0.6 13 104.81 1.00 0.18 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.931 2.885 2.035 1.00 3.18 ok
00+163 20.00 100 0.20 0.70 0.70 0.10 0.71 Rect 0.6 14 102.74 1.00 0.20 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.856 2.785 1.935 1.02 3.11 ok
00+178 15.00 100 0.15 0.70 0.70 0.07 0.78 Rect 0.4 14 101.26 1.00 0.22 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.821 2.710 1.860 1.06 3.07 ok
00+200 22.00 100 0.22 0.70 0.70 0.11 0.89 Rect 0.6 15 99.21 1.00 0.25 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.692 2.600 1.750 1.04 2.94 ok
00+226 26.00 100 0.26 0.70 0.70 0.13 1.02 Rect 0.7 16 96.95 1.00 0.27 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.850 2.470 1.620 1.33 3.10 ok
00+244 18.00 100 0.18 0.70 0.70 0.09 1.11 Rect 0.5 16 95.47 1.00 0.29 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.470 2.380 1.530 1.04 2.72 ok
00+265 21.00 100 0.21 0.70 0.70 0.10 1.21 Rect 0.6 17 93.83 1.00 0.32 1000 S 0.80 0.85 0.00 1.00 0.948 0.645 2.535 2.359 1.509 1.13 2.79 ok
00+290 25.00 100 0.25 0.70 0.70 0.12 1.33 Rect 0.7 17 91.98 1.00 0.34 1000 S 0.80 0.85 0.00 1.00 0.948 0.645 2.550 2.334 1.484 1.17 2.80 ok
00+322 32.00 100 0.32 0.70 0.70 0.16 1.49 Rect 0.9 18 89.77 1.00 0.37 1000 S 0.80 0.85 0.00 1.00 0.948 0.645 2.682 2.302 1.452 1.33 2.93 ok
00+334 12.00 100 0.12 0.70 0.70 0.06 1.55 Rect 0.3 19 88.99 1.00 0.38 1000 S 0.80 0.85 0.00 1.00 0.948 0.645 2.583 2.290 1.440 1.24 2.83 ok
00+353 19.00 100 0.19 0.70 0.70 0.09 1.64 Rect 0.5 19 87.78 1.00 0.40 1000 S 0.80 0.85 0.00 1.00 0.948 0.645 2.627 2.271 1.421 1.26 2.83 ok
00+368.50 15.50 100 0.15 0.70 0.70 0.07 1.71 Rect 0.4 19 86.84 1.00 0.42 1000 S 0.80 0.85 0.00 1.00 0.948 0.645 3.013 2.256 1.406 1.27 2.83 ok
00+371 0.00 0 0.00 0.00 0.00 0.00 1.72 Rect 0.0 19 87.78 1.00 0.42 S 0.00 0.00 0.00 0.00 0.645 3.075 0.979 0.00 0.00
Chainage Road Level 1 Catchment Area
00+000 3.658 Number of CA Ha
00+018 3.521 inflow 00+000 CA-1 2.7
00+037 3.339 00+000 00+178 CA-2 2.2
00+060 3.409 00+178 00+371 CA-3 2.52
00+076 3.275
00+099 3.231
00+123 3.25
00+143 2.931
00+163 2.759
00+178 2.821
00+200 2.692
00+226 2.833
00+244 2.47
00+265 2.535 2 Maximum Overland Distance =
00+290 2.55 3 Runoff coefficient =
00+322 2.682 4 Storage coefficient =
00+334 2.583
00+353 2.627
00+371 3.221
Catchment Area Maximum Overland Distance 1
ha sqm m Number of
0.000 inflow 00+000 CA-1
4.9 0.0022 315 00+000 00+178 CA-2
7.42 0.00252 200 00+178 00+371 CA-3

315 200 180


0.7
0.7
Catchment Area Maximum Overland Distance
Ha ha sqm m
1.05 0.000
220 221.05 0.22 315
252 473.05 0.252 200