2 Modified Rational Method - Calculation Sheet Left Side Name of Scheme : SCRDP
Location : MO-P-DR2 Section : All Date : 10/09/2023 Engineer : Md. Rajedul Islam
Design of Drains
Calculation of Peak Flows
Drain Downstream Remarks
Conversion
Water level
drain depth
Contributin
Road Level
Travel time
Length (m)
Type P/S/T
g distance
Peak Flow
Bed Level
Drain Ref.
DrainWith
Hydraulic
Hydraulic
Design of
Contrib'g
Area (ha)
Top Slab
Capacity
Effective
area (ha)
Slope 1:
Intensity
Gradient
Slope 1:
Existing
Storage
velocity
(mm/hr)
Rainfall
Cum've
Type of
Time of
Design
Design
Design
Design
Factor
Runoff
Depth*
Actual
Top of
(mins)
(m3/s)
(m3/s)
Depth
Coeff.
Coeff.
Conc.
Water
Width
Drain
Drain
Drain
Drain
Drain
Drain
(m/s)
Area
Side
(m)
Chainage Road level Water level Drain Bed levelDrain Top level
0 100 0.70 0.70 10 1.00 200 S 0.80 0.85 0.00 1.00 3.422 3.12 2.272 1.00 3.42 00+000 3.422 3.122 2.272 3.422
Main Drain 00+018 00+018 3.280 3.027 2.177 3.376
00+037 19 100 0.19 0.70 0.70 0.09 0.09 Rect 0.5 10 118.43 1.00 0.03 200 S 0.80 0.85 0.00 1.00 2.120 1.442 3.376 3.03 2.177 0.95 3.38 ok 00+037 3.101 2.912 2.062 3.280
00+060 23 100 0.23 0.70 0.70 0.11 0.21 Rect 0.6 11 115.02 1.00 0.07 200 S 0.80 0.85 0.00 1.00 2.120 1.442 3.28 2.91 2.062 0.89 3.28 ok 00+060 3.078 2.832 1.982 3.101
00+076 16 100 0.16 0.70 0.70 0.08 0.28 Rect 0.4 11 112.81 1.00 0.09 200 S 0.80 0.85 0.00 1.00 2.120 1.442 3.101 2.83 1.982 0.95 3.10 ok 00+076 3.030 2.717 1.867 3.078
00+099 23 100 0.23 0.70 0.70 0.11 0.40 Rect 0.6 12 109.86 1.00 0.12 200 S 0.80 0.85 0.00 1.00 2.120 1.442 3.078 2.72 1.867 1.01 3.08 ok 00+099 2.860 2.597 1.747 3.030
00+123 24 100 0.24 0.70 0.70 0.12 0.51 Rect 0.7 13 107.01 1.00 0.15 200 S 0.80 0.85 0.00 1.00 2.120 1.442 3.030 2.60 1.747 0.96 3.03 ok 00+123 2.713 2.497 1.647 2.860
00+143 20 100 0.20 0.70 0.70 0.10 0.61 Rect 0.6 13 104.81 1.00 0.18 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.860 2.50 1.647 0.92 2.86 ok 00+143 2.706 2.397 1.547 2.713 143.00,0.00143.00,27.06 143.00,23.97 143.00,15.47 143.00,27.13
00+163 20 100 0.20 0.70 0.70 0.10 0.71 Rect 0.6 14 102.74 1.00 0.20 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.713 2.40 1.547 1.01 2.71 ok 00+163 2.479 2.322 1.472 2.706
00+178 15 100 0.15 0.70 0.70 0.07 0.78 Rect 0.4 14 101.26 1.00 0.22 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.706 2.32 1.472 0.86 2.71 ok 00+178 2.412 2.212 1.362 2.479
00+200 22 100 0.22 0.70 0.70 0.11 0.89 Rect 0.6 15 99.21 1.00 0.25 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.479 2.21 1.362 0.90 2.48 ok 00+200 2.440 2.160 1.310 2.412
00+226 26 100 0.26 0.70 0.70 0.13 1.02 Rect 0.7 16 96.95 1.00 0.27 500 S 0.80 0.85 0.00 1.00 1.341 0.912 2.412 2.16 1.310 0.98 2.41 ok 00+226 2.441 2.124 1.274 2.440
00+244 18 100 0.18 0.70 0.70 0.09 1.11 Rect 0.5 16 95.47 1.00 0.29 500 S 0.80 0.85 0.00 1.00 1.341 0.912 2.440 2.12 1.274 1.02 2.44 ok 00+244 2.496 2.082 1.232 2.441
00+265 21 100 0.21 0.70 0.70 0.10 1.21 Rect 0.6 17 93.83 1.00 0.32 500 S 0.80 0.85 0.00 1.00 1.341 0.912 2.441 2.08 1.232 1.11 2.44 ok 00+265 2.540 2.032 1.182 2.496
00+290 25 100 0.25 0.70 0.70 0.12 1.33 Rect 0.7 17 91.98 1.00 0.34 500 S 0.80 0.85 0.00 1.00 1.341 0.912 2.496 2.03 1.182 1.21 2.50 ok 00+290 2.540 1.968 1.118 2.540
00+322 32 100 0.32 0.70 0.70 0.16 1.49 Rect 0.9 18 89.77 1.00 0.37 500 S 0.80 0.85 0.00 1.00 1.341 0.912 2.540 1.97 1.118 1.27 2.54 ok 00+322 2.650 1.938 1.088 2.540
00+334 12 100 0.12 0.70 0.70 0.06 1.55 Rect 0.3 19 88.99 1.00 0.38 400 S 0.80 0.85 0.00 1.00 1.499 1.020 2.540 1.94 1.088 1.30 2.54 ok 00+334 3.160 1.890 1.040 2.650
00+353 19 100 0.19 0.70 0.70 0.09 1.64 Rect 0.5 19 87.78 1.00 0.40 400 S 0.80 0.85 0.00 1.00 1.499 1.020 2.650 1.89 1.040 1.46 2.65 ok 00+353 #REF! 1.845 0.995 2.000
00+371 18 100 0.18 0.70 0.70 0.09 1.73 Rect 0.5 20 86.69 1.00 0.42 400 S 0.80 0.85 0.00 1.00 1.499 1.020 3.160 1.85 0.995 2.01 2.00 ok 00+371 #REF! #REF! #REF! #REF!
00+244
Table 3.2 Modified Rational Method - Calculation Sheet Left Side Name of Scheme : SCRDP
Location : MO-P-DR2 Section : All Date : 10/09/2023 Engineer : Md. Rajedul Islam
Design of Drains
Calculation of Peak Flows
Drain Downstream Remarks
Conversion
Water level
drain depth
Contributin
Road Level
Travel time
Length (m)
Type P/S/T
g distance
Peak Flow
Bed Level
Drain Ref.
DrainWith
Hydraulic
Hydraulic
Design of
Contrib'g
Area (ha)
Top Slab
Capacity
Effective
area (ha)
Slope 1:
Intensity
Gradient
Slope 1:
Existing
Storage
velocity
(mm/hr)
Rainfall
Cum've
Type of
Time of
Design
Design
Design
Design
Factor
Runoff
Depth*
Actual
Top of
(mins)
(m3/s)
(m3/s)
Depth
Coeff.
Coeff.
Conc.
Water
Width
Drain
Drain
Drain
Drain
Drain
Drain
(m/s)
Area
Side
(m)
Chainage Road level Water level Drain Bed levelDrain Top level
Overland Distance: 100 0.70 0.70 10 1.00 800 S 0.70 1.00 0.00 1.15 3.658 3.46 2.458 1.10 3.83 00+000 3.658 3.458 2.458 3.833
Main Drain 00+000 00+018 3.521 3.435 2.435 3.696
00+018 18 100 0.18 0.70 0.70 0.09 0.09 Rect 0.5 10 118.59 1.00 0.03 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.521 3.44 2.435 0.99 3.70 ok 00+037 3.339 3.412 2.412 3.514
00+037 19 100 0.19 0.70 0.70 0.09 0.18 Rect 0.5 11 115.73 1.00 0.06 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.339 3.41 2.412 0.83 3.51 ok 00+060 3.409 3.383 2.383 3.584
00+060 23 100 0.23 0.70 0.70 0.11 0.29 Rect 0.6 11 112.54 1.00 0.09 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.409 3.38 2.383 0.93 3.58 ok 00+076 3.275 3.363 2.363 3.175
00+076 16 100 0.16 0.70 0.70 0.08 0.37 Rect 0.4 12 110.48 1.00 0.11 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.275 3.36 2.363 0.81 3.18 ok 00+099 3.231 3.334 2.334 3.131
00+099 23 100 0.23 0.70 0.70 0.11 0.49 Rect 0.6 12 107.70 1.00 0.15 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.231 3.33 2.334 0.80 3.13 ok 00+123 3.250 3.304 2.304 3.150
00+123 24 100 0.24 0.70 0.70 0.12 0.60 Rect 0.7 13 105.02 1.00 0.18 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.250 3.30 2.304 0.85 3.15 ok 00+143 2.931 3.279 2.279 2.831 143.00,0.00143.00,29.31 143.00,32.79 143.00,22.79 143.00,28.31
00+143 20 100 0.20 0.70 0.70 0.10 0.70 Rect 0.6 14 102.94 1.00 0.20 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.931 3.28 2.279 0.55 2.83 ok 00+163 2.759 3.254 2.254 2.659
00+163 20 100 0.20 0.70 0.70 0.10 0.80 Rect 0.6 14 100.97 1.00 0.22 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.759 3.25 2.254 0.40 2.66 ok 00+178 2.821 3.236 2.236 2.721
00+178 15 100 0.15 0.70 0.70 0.07 0.87 Rect 0.4 15 99.58 1.00 0.24 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.821 3.24 2.236 0.49 2.72 ok 00+200 2.692 3.208 2.208 2.592
00+200 22 100 0.22 0.70 0.70 0.11 0.98 Rect 0.6 15 97.63 1.00 0.27 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.692 3.21 2.208 0.38 2.59 ok 00+226 2.833 3.176 2.176 2.733
00+226 26 100 0.26 0.70 0.70 0.13 1.11 Rect 0.7 16 95.47 1.00 0.29 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.833 3.18 2.176 0.56 2.73 ok 00+244 2.470 3.153 2.153 2.370
00+244 18 100 0.18 0.70 0.70 0.09 1.20 Rect 0.5 17 94.06 1.00 0.31 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.470 3.15 2.153 0.22 2.37 ok 00+265 2.535 3.127 2.127 2.435
00+265 21 100 0.21 0.70 0.70 0.10 1.30 Rect 0.6 17 92.49 1.00 0.33 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.535 3.13 2.127 0.31 2.44 ok 00+290 2.550 3.096 2.096 2.450
00+290 25 100 0.25 0.70 0.70 0.12 1.42 Rect 0.7 18 90.72 1.00 0.36 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.550 3.10 2.096 0.35 2.45 ok 00+322 2.682 3.056 2.056 2.582
00+322 32 100 0.32 0.70 0.70 0.16 1.58 Rect 0.9 19 88.60 1.00 0.39 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.682 3.06 2.056 0.53 2.58 ok 00+334 2.583 3.040 2.040 2.483
00+334 12 100 0.12 0.70 0.70 0.06 1.64 Rect 0.3 19 87.84 1.00 0.40 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.583 3.04 2.040 0.44 2.48 ok 00+353 2.627 3.017 2.017 2.527
00+353 19 100 0.19 0.70 0.70 0.09 1.73 Rect 0.5 20 86.69 1.00 0.42 800 S 0.70 1.00 0.00 1.15 1.027 0.719 2.627 3.02 2.017 0.51 2.53 ok 00+371 3.221 2.994 1.994 3.121
00+371 18 100 0.18 0.70 0.70 0.09 1.82 Rect 0.5 20 85.63 1.00 0.43 800 S 0.70 1.00 0.00 1.15 1.027 0.719 3.221 2.99 1.994 1.13 3.12 ok
Table 3.2 Modified Rational Method - Calculation Sheet Left Side Name of Scheme : SCRDP
Location : MO-P-DR2 Section : All Date : 10/09/2023 Engineer : Md. Rajedul Islam
Design of Drains
Calculation of Peak Flows
Drain Downstream Remarks
Water level
Conversion
drain depth
Contributin
Road Level
Travel time
Type P/S/T
Length (m)
g distance
Peak Flow
Drain Ref.
Bed Level
DrainWith
Hydraulic
Hydraulic
Design of
Contrib'g
Area (ha)
Top Slab
Capacity
area (ha)
Slope 1:
Intensity
Gradient
Area(ha)
Slope 1:
Existing
Effective
Storage
velocity
(mm/hr)
Rainfall
Cum've
Type of
Time of
Design
Design
Design
Design
Factor
Runoff
Depth*
Actual
Top of
(mins)
(m3/s)
(m3/s)
Depth
Width
Coeff.
Coeff.
Conc.
Water
Drain
Drain
Drain
Drain
Drain
Drain
(m/s)
Side
(m)
Chainage Road level Water level Drain Bed level Drain Top level
0 100 0.70 0.70 10 1.00 0 S 0.80 0.80 0.00 0.95 3.491 3.341 2.541 1.05 3.74 00+000 3.491 3.341 2.541 3.741
Main Drain 00+018 00+018 3.438 3.265 2.465 3.571
00+037 19 100 0.19 0.70 0.70 0.09 0.09 Rect 0.5 10.3 118.43 1.00 0.03 250 S 0.80 0.80 0.00 0.95 1.872 1.198 3.321 3.265 2.465 0.96 3.57 ok 00+037 3.275 3.173 2.373 3.688
00+060 23 100 0.23 0.70 0.70 0.11 0.21 Rect 0.6 11 115.02 1.00 0.07 250 S 0.80 0.80 0.00 0.95 1.872 1.198 3.438 3.173 2.373 1.17 3.69 ok 00+060 3.231 3.109 2.309 3.525
00+076 16 100 0.16 0.70 0.70 0.08 0.28 Rect 0.4 11 112.81 1.00 0.09 250 S 0.80 0.80 0.00 0.95 1.872 1.198 3.275 3.109 2.309 1.07 3.53 ok 00+076 3.310 3.081 2.281 3.481
00+099 23 100 0.23 0.70 0.70 0.11 0.40 Rect 0.6 12 109.86 1.00 0.12 250 S 0.80 0.80 0.00 0.95 1.872 1.198 3.231 3.081 2.281 1.05 3.48 ok 00+099 2.931 2.985 2.185 3.560
00+123 24 100 0.24 0.70 0.70 0.12 0.51 Rect 0.7 13 107.01 1.00 0.15 250 S 0.80 0.80 0.00 0.95 1.872 1.198 3.310 2.985 2.185 1.23 3.56 ok 00+123 2.856 2.885 2.085 3.181
00+143 20 100 0.20 0.70 0.70 0.10 0.61 Rect 0.6 13 104.81 1.00 0.18 200 S 0.80 0.80 0.00 0.95 2.093 1.339 2.931 2.885 2.085 0.95 3.18 ok 00+143 2.821 2.785 1.985 3.106 143.00,0.00143.00,28.21 143.00,27.85 143.00,19.85 143.00,31.06
00+163 20 100 0.20 0.70 0.70 0.10 0.71 Rect 0.6 14 102.74 1.00 0.20 200 S 0.80 0.80 0.00 0.95 2.093 1.339 2.856 2.785 1.985 0.97 3.11 ok 00+163 2.692 2.710 1.910 3.071
00+178 15 100 0.15 0.70 0.70 0.07 0.78 Rect 0.4 14 101.26 1.00 0.22 200 S 0.80 0.80 0.00 0.95 2.093 1.339 2.821 2.710 1.910 1.01 3.07 ok 00+178 2.850 2.600 1.800 2.942
00+200 22 100 0.22 0.70 0.70 0.11 0.89 Rect 0.6 15 99.21 1.00 0.25 200 S 0.80 0.80 0.00 0.95 2.093 1.339 2.692 2.600 1.800 0.99 2.94 ok 00+200 2.470 2.470 1.670 3.100
00+226 26 100 0.26 0.70 0.70 0.13 1.02 Rect 0.7 16 96.95 1.00 0.27 200 S 0.80 0.80 0.00 0.95 2.093 1.339 2.850 2.470 1.670 1.28 3.10 ok 00+226 2.535 2.380 1.580 2.720
00+244 18 100 0.18 0.70 0.70 0.09 1.11 Rect 0.5 16 95.47 1.00 0.29 200 S 0.80 0.80 0.00 0.95 2.093 1.339 2.470 2.380 1.580 0.99 2.72 ok 00+244 2.550 2.368 1.568 2.785
00+265 21 100 0.21 0.70 0.70 0.10 1.21 Rect 0.6 17 93.83 1.00 0.32 1800 S 0.80 0.80 0.00 0.95 0.698 0.446 2.535 2.368 1.568 1.07 2.79 ok 00+265 2.682 2.354 1.554 2.800
00+290 25 100 0.25 0.70 0.70 0.12 1.33 Rect 0.7 17 91.98 1.00 0.34 1800 S 0.80 0.80 0.00 0.95 0.698 0.446 2.550 2.354 1.554 1.10 2.80 ok 00+290 2.583 2.337 1.537 2.932
00+322 32 100 0.32 0.70 0.70 0.16 1.49 Rect 0.9 18 89.77 1.00 0.37 1800 S 0.80 0.80 0.00 0.95 0.698 0.446 2.682 2.337 1.537 1.25 2.93 ok 00+322 2.627 2.330 1.530 2.833
00+334 12 100 0.12 0.70 0.70 0.06 1.55 Rect 0.3 19 88.99 1.00 0.38 1800 S 0.80 0.80 0.00 0.95 0.698 0.446 2.583 2.330 1.530 1.15 2.83 ok 00+334 3.075 2.319 1.519 2.877
00+353 19 100 0.19 0.70 0.70 0.09 1.64 Rect 0.5 19 87.78 1.00 0.40 1800 S 0.80 0.80 0.00 0.95 0.698 0.446 2.627 2.319 1.519 1.21 2.88 ok 00+353 #REF! 0.000 0.979 2.000
00+368 15 100 0.15 0.70 0.70 0.07 1.71 Rect 0.4 19 86.87 1.00 0.42 1800 S 0.80 0.85 0.00 1.00 0.707 0.481 3.000 2.311 1.461 1.64 3.25
00+371 0 0 0.00 0.00 0.00 0.00 1.72 Rect 0.0 19 87.78 1.00 0.42 S 0.00 0.00 0.00 0.00 2.120 0.000 3.075 0.979 2.20 2.00 FALSE 00+371 #REF! #REF! #REF! #REF!
00+244
PROJECT NAME : SOUTHERN CHATTOGRAM REGIONAL DEVELOPMENT PROJECT (SCRDP)
Sub Project Name : Construction of RCC Drain from Farruk shop to Box Culvert (Ch. 0+018 km to Ch. 0+371km) at Moheshkhali Pourashava in
Cox's Bazar District.
Design of Drains
Calculation of Peak Flows
Drain Downstream Remarks
Runoff Coeff.
Design Drain
Drain Design
Drain Design
Drain Length
Contributing
Cum've area
distance (m)
Water Depth
Bed Level
Slope
Actual drain
Water level
Conversion
Road Level
Travel time
Type P/S/T
Peak Flow
Drain Ref.
DrainWith
Hydraulic
Hydraulic
Design of
Contrib'g
Area (ha)
Top Slab
Slope 1:
Capacity
Gradient
Intensity
Area(ha)
Existing
Effective
velocity
Storage
(mm/hr)
Rainfall
Type of
Time of
Depth*
Design
Factor
Top of
(mins)
(m3/s)
(m3/s)
Coeff.
Conc.
Width
depth
Drain
Drain
(m/s)
Side
(ha)
(m)
1:
0 100 0.70 0.70 10 1.00 0 S 0.80 0.85 0.00 1.00 3.491 3.341 2.491 1.10 3.74
Main Drain 00+018
00+037 19.00 100 0.19 0.70 0.70 0.09 0.09 Rect 0.5 10.3 118.43 1.00 0.03 250 S 0.80 0.85 0.00 1.00 1.896 1.290 3.321 3.265 2.415 1.01 3.57 ok
00+060 23.00 100 0.23 0.70 0.70 0.11 0.21 Rect 0.6 11 115.02 1.00 0.07 250 S 0.80 0.85 0.00 1.00 1.896 1.290 3.438 3.173 2.323 1.22 3.69 ok
00+076 16.00 100 0.16 0.70 0.70 0.08 0.28 Rect 0.4 11 112.81 1.00 0.09 250 S 0.80 0.85 0.00 1.00 1.896 1.290 3.275 3.109 2.259 1.12 3.53 ok
00+099 23.00 100 0.23 0.70 0.70 0.11 0.40 Rect 0.6 12 109.86 1.00 0.12 250 S 0.80 0.85 0.00 1.00 1.896 1.290 3.231 3.081 2.231 1.10 3.48 ok
00+123 24.00 100 0.24 0.70 0.70 0.12 0.51 Rect 0.7 13 107.01 1.00 0.15 250 S 0.80 0.85 0.00 1.00 1.896 1.290 3.310 2.985 2.135 1.28 3.56 ok
00+143 20.00 100 0.20 0.70 0.70 0.10 0.61 Rect 0.6 13 104.81 1.00 0.18 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.931 2.885 2.035 1.00 3.18 ok
00+163 20.00 100 0.20 0.70 0.70 0.10 0.71 Rect 0.6 14 102.74 1.00 0.20 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.856 2.785 1.935 1.02 3.11 ok
00+178 15.00 100 0.15 0.70 0.70 0.07 0.78 Rect 0.4 14 101.26 1.00 0.22 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.821 2.710 1.860 1.06 3.07 ok
00+200 22.00 100 0.22 0.70 0.70 0.11 0.89 Rect 0.6 15 99.21 1.00 0.25 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.692 2.600 1.750 1.04 2.94 ok
00+226 26.00 100 0.26 0.70 0.70 0.13 1.02 Rect 0.7 16 96.95 1.00 0.27 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.850 2.470 1.620 1.33 3.10 ok
00+244 18.00 100 0.18 0.70 0.70 0.09 1.11 Rect 0.5 16 95.47 1.00 0.29 200 S 0.80 0.85 0.00 1.00 2.120 1.442 2.470 2.380 1.530 1.04 2.72 ok
00+265 21.00 100 0.21 0.70 0.70 0.10 1.21 Rect 0.6 17 93.83 1.00 0.32 1000 S 0.80 0.85 0.00 1.00 0.948 0.645 2.535 2.359 1.509 1.13 2.79 ok
00+290 25.00 100 0.25 0.70 0.70 0.12 1.33 Rect 0.7 17 91.98 1.00 0.34 1000 S 0.80 0.85 0.00 1.00 0.948 0.645 2.550 2.334 1.484 1.17 2.80 ok
00+322 32.00 100 0.32 0.70 0.70 0.16 1.49 Rect 0.9 18 89.77 1.00 0.37 1000 S 0.80 0.85 0.00 1.00 0.948 0.645 2.682 2.302 1.452 1.33 2.93 ok
00+334 12.00 100 0.12 0.70 0.70 0.06 1.55 Rect 0.3 19 88.99 1.00 0.38 1000 S 0.80 0.85 0.00 1.00 0.948 0.645 2.583 2.290 1.440 1.24 2.83 ok
00+353 19.00 100 0.19 0.70 0.70 0.09 1.64 Rect 0.5 19 87.78 1.00 0.40 1000 S 0.80 0.85 0.00 1.00 0.948 0.645 2.627 2.271 1.421 1.26 2.83 ok
00+368.50 15.50 100 0.15 0.70 0.70 0.07 1.71 Rect 0.4 19 86.84 1.00 0.42 1000 S 0.80 0.85 0.00 1.00 0.948 0.645 3.013 2.256 1.406 1.27 2.83 ok
00+371 0.00 0 0.00 0.00 0.00 0.00 1.72 Rect 0.0 19 87.78 1.00 0.42 S 0.00 0.00 0.00 0.00 0.645 3.075 0.979 0.00 0.00
Chainage Road Level 1 Catchment Area
00+000 3.658 Number of CA Ha
00+018 3.521 inflow 00+000 CA-1 2.7
00+037 3.339 00+000 00+178 CA-2 2.2
00+060 3.409 00+178 00+371 CA-3 2.52
00+076 3.275
00+099 3.231
00+123 3.25
00+143 2.931
00+163 2.759
00+178 2.821
00+200 2.692
00+226 2.833
00+244 2.47
00+265 2.535 2 Maximum Overland Distance =
00+290 2.55 3 Runoff coefficient =
00+322 2.682 4 Storage coefficient =
00+334 2.583
00+353 2.627
00+371 3.221
Catchment Area Maximum Overland Distance 1
ha sqm m Number of
0.000 inflow 00+000 CA-1
4.9 0.0022 315 00+000 00+178 CA-2
7.42 0.00252 200 00+178 00+371 CA-3