HPCL- Mittal Energy Ltd

Metal Crafts Constructors Pvt Ltd


Job Safety Analysis
Main Activity: Transportation of materials JSA No:
Sl. Sub Activities Hazards (Both Existing as Control Measures.
No. (List the tasks required to well as potential) Against (List the control measures required to eliminate or minimize the risk
perform the activity in each task list the hazards of injury arising from the identified hazard.)
the sequence they are that could cause
carried out injury/damage to people,
equipment or the
environment.
Ensure the competency the driver/operator (operator/driver
should have heavy license and crane/hydra operator should be
approved by HSSE/HMEL)
Vehicle speed should not more than 25kmph without load and
Collision of vehicle or hit 15kmph with load.
movement of vehicle , to objects, personals
Check and ensure the vehicle/equipments is in good working
1 Entry of vehicle & condition before use.
crane into warehouse
Follow HMEL golden rule No 7 & 9 ( Do not drive under
influence of drugs & alcohol)
Toppling down the Ensure good firm level of ground condition.
vehicle/Equipment due to Ensure the service of banks men during working the
uneven ground condition equipment & reversing the vehicle
Do not use bare hands to handle heavy material.
Contact Injury from the
keep the distance from the moving parts, loads
moving parts of
Use correct tools and proper PPE’s.
equipments ,tools & loads
Use guide rope to control the movement of lifting load.
Use crane/hydra wherever required
Back injury of personal
Avoid unusual body movements such as
due to lifting excess load,
bending ,stretching ,stooping
Loading/unloading adopting wrong poster
2 Do not lift one person more than 50 kg.
material
use TPI certified & healthy condition lifting tools & Tackles
Fall of materials/ load due
Movement of People in the area to be restricted by physical
to unbalance improper
barication.
lifting methods
Qualified banks man/Foreman shall lead the lifting jobs
In correcting parking of Take clearance from the authority.
the vehicle could cause Valid permit to work should in place wherever required(i.e.
blocking emergency route ISBL, roads)
A competent Banks man should accompany the truck / trailer
during transportation
Shifting the materials Collision of vehicle or hit Follow safe speed limits in curves stop look and proceed.
3
in the trailer to objects, personals
Projected part to be highlighted by caution tape.
Provide adequate Information, instruction and Trainings.
Contact Injury from the
moving parts of follow all the control measures given in step 2 & 3
equipments ,tools & loads
4 Unloading material
Fall of materials/ load due
to unbalance improper follow all the control measures given in step 2 & 3
lifting method
Done by;-

Name: - Desi:- sign:- Date:-

Name: - Desi:- sign:- Date:-

(Note:-JSA sheet to be done by issuer and acceptor of work permit. In case of need representative from other discipline should
also be involved)