Download as pdf
Download as pdf
You are on page 1of 2
‘ANNEXURE =I ‘ofthe Meating Subject: | Meeting on PANACEA Electrical Works Date: (08.09.2022 a Re Place: HYDERABAD HEAD OFFICE aaa SIVA ENERGY : Mr. SIVA. Mr. PARI PANACEA : Mr. PRABAKARAN, Mr, PANKAJ, Mr. MANOHARAN, Ms. YESHWANTHI Date of issue: | 18.03.2022 Prepared by: | Yeshwanthi. k The following are the points discussed with reference to M/s. Siva Energy’s Quotation Ref: SEI/SM/72-Ri/20-21 Responsible person for Implementation ‘The Transformer foundation is considered in the offer and the platform height is confirmed as 1.2 Mtr and the weight of transformer shall be ? tonnes approx. Rlue metal structure Room length is confirmed as 10 Mtr x 6.5 Mtr. Civil work for Panel room is in Panacea scope. Design for the same should For every 40 Mrs 1 poe Tor treet gt shal be provided, Lists provided in the pattern as 3 solar Het and street light alternatively for every 40 mtrs. Therefore 10 total Solar The utility panel shall be shifted near ETP area (2 Panel Cables from Main panel to all the required locations should M/s. Siva energy to provide block diagram for all the electrical Involved and included in the quate for clear understanding Single phase, 3 Phase (Phase segregation DB) are provided. in| Points Discussed 1. | Transformer | Platine | shal be provided around transformer 2. | Panel room Dimensions be provided by M/s. Siva Energy. 5 Tiiting | Ditance and'ype of ihts lights and 10 streetlights, eres ree room) i a 5 Gable] Fram panel room | | be considered by M/s. Siva Energy. hee eee — 7 [aang bes Tied a | ie fichinepanel | tecston | nverter/uPs oxv | scope __| In PANACEA Scope | 10. Official License ‘Schedule ‘Schedule for obtaini | Sie every. 11. | M/s.Siva Energy ‘Admin Office Quotation | wtig aed ghtng Fire fighting panel shall be Kept in Panel room (PANACEA scope). Soft starter details shall be provided by M/s. PANACEA and the same should be incorporated in Utility Panel by M/s. Siva Energy. i official license to be provided by M/s. [As discussed Admin office inside wiring and lighting will be in| PANACEA Scope. Hence the amount for the same is deducted and only Other wiring and lighting such as Pump house, | security root ete stall Le in M/s. Siva Energy supe. Note + All the above points were discussed and are approved by M/s. Siva Energy. Page | 1 APPROVED MAKE OF MATERIAL S.NO. | __ EQUIPMENT ce ts cables Polycab Switch Gear at HT panels Siva Energy (CBS) z 4 us od 5 MCB aT | 6 s Polycab [ea Pomel Meters rs a Terminal Block Phoenix o Ci-Resin Cast Rishab al 10 | Modular Switch / Socket Ankor Roma he Transformer EVR POWER 12 Lightening Arrestor (ES) ____Reputed _ 13 Cable tray Siva Energy / Hot dip galvanized - 70 ee merons 14 | Protective Relays Lar 15 TPanel Board Siva Energy 16 Yard Strutura’s siva Energy Bolted Design aera ~~ Capactor ter 8 | -APFCR Relay iat 19 PVC Conduit Sun Plast |_ 20 Flame proof Fittings / Sockets aE FCG a Solar Stret Light SUNDROP i Signature Signature fl ENVIR’ (Mr. Saravanan (DIRECTOR) M/s. PANACEA ENVIRO PVT LTD. DIRECTOR Mr. Siva Kumar (DIRECTOR) M/s. SIVA ENERGY & INFRASTRUCTURE Pane | 2

You might also like