JOB SAFETY ANALYSIS.

JSA Title: Equipment leading JSA Date: 08.10.2022 JSA Composer Name & Sign: Reviewed Name & Sign:
Job Safety Analysis with Crane
(L+1 of Composer/ Designee)
Role of employee doing job: Category of activity : Department: Projects Approved by (Name & Sign):

Supervisor: Section: Mechanical SHE-Head/ Representative SLT/ Zone-Owner


Type of Activity: Equipment leading with Crane
Category of activity: High
Required / recommended PPE: Safety Shoe, Helmet, Safety Goggles
Sequence of Basic Job
Potential Hazards Recommended Safe Job What Could Go Wrong Corrective Action
Steps
1.Fastening of Equipment with 1. Topping of equipment 1. Equipment should be on elevated support 1.Toppling of equipment 1.Place where support is taken to jack should be
lifting rope/chain/tape to while taking to enable lifting. while insertion of capable of lifting the weight
lifting hooks (or) around the Rope/Chain/Tape round or 2. In case of not elevated, equipment should Rope/chain/tape/Latch. 2.Supports used to inserted under the equipment
equipment under the equipment be jacked by any end to insert solid supports 2. Toppling during jacking/ should be capable of bearing the load.
at bottom. after insertion of support due
to failure
2.Lifting of Equipment with 1.Toppling of equipment 1. Loading of crane should be limited to 1. Fall down of equipment due 1.Annual testing of Crane Hook and Rope.
Crane while lifting of equipment capacity. to failure of Crane hook or 2. Periodic Inspection and checking of
with Crane. 2. Crane should be positioned on a level area Rope. Rope/Chain/Tape used for lifting.
2.Crush injury to avoid toppling. 2. Fall down of equipment due 3. Inspection of Crane position at time of permit.
3. Loading of lifting rope/chain/Tape should to failure of lifting
Rope/Chain/Tape. 4. Work should be carried out with Trained Rigger
be limited to capacity. in good supervision.
4. Accessories should be in good condition 3. Fall down of equipment due
and certified. to toppling of Crane.
5. Proper packing should be arranged under 4. Equipment may fall on
the load before lifting the equipment body parts while lifting.

3.Leading of equipment with 1. Equipment or crane may 1. Speed of the crane should be limited to be 1.Fall down of equipment 1. Inspection of Crane path at time of Permit.
crane. topple. below 10kmph and travel should be on level due to toppling of Crane. 2. Double Tag lines to be provided to control
2. Fall/Crush injury. surface. 2. Fall down of equipment movement of the load. Person should be away from
3. Electrical 2. Accessories should be in good condition due to sway. the equipment swing area and Crane wheels
and certified. 3. Equipment/Material
3. Maintain the distance from the powelines. swing.

1
JOB SAFETY ANALYSIS.
JSA Title: Equipment leading JSA Date: JSA Composer Name & Sign: Reviewed Name & Sign:
Job Safety Analysis with Crane
(L+1 of Composer/ Designee)
Role of employee doing job: Category of activity: Department: Approved by (Name & Sign):

Supervisor: Section: SHE-Head/ Representative SLT/ Zone-Owner


Type of Activity: Equipment leading with Crane
Category of activity: High
Required / recommended PPE: Safety Shoes, Safety glasses, Helmet
Sequence of Basic Job
Potential Hazards Recommended Safe Job What Could Go Wrong Corrective Action
Steps
4. Person may come under 3. Trained Riggers to guide movement of the
crane/wheel. vehicle with load. Whistle to be used to stop
5. Person may get electrical and warn the people at the work area/path.
shock by working/touching 4.Maintain the distance from the power line at
near a power line. height.
5. Leading equipment bottom should not be
more than one (1) feet height from the ground
to avoid swing.
4. Lowering of equipment 1. Toppling of equipment 1. Support should be adequate to bear 1. Toppling of equipment 1. Support should be of adequate sixe to bear
with Crane to support. due to failure of support after the load of equipment. after putting it on support. load preferably with lables.
lowering of equipment on to 2. Keep hands clear of wire rope and 2. Toppling during 2.No forcing of Lifting Rope/Chain/Tape in
it. rigging. removal of case it is entangled.
2. Fall/Crush injury. 3. Don't stand under the load. Rope/Chain/Tape due to 3. Good communication should be maintained
entanglement. with operator and crew by using
3. Miscommunication communication system.
may lead to incident. 4. Restricted work place entry.

2
Extension Purpose:
(Every day respective team to be signed on the specified column by ensuring all the requirements mentioned in the JSA & add further controls if any required to safe execution of the
job).
Reviewed Name & Sign: Approved by (Name & Sign):
Date Duration JSA Composer Name & Sign: Additional Comments if any
(L+1 of Composer/ Designee) SHE-Head/ Representative SLT/ Zone-Owner