WORKS REPORT
HES-001-2023
FOR
Challenges
None
TYPICAL BLOCK B
Shuttering of the ground beams was done.
Challenges
None
TYPICAL BLOCK C
No activity was done, awaiting steel fixing of the shear walls.
No activity ongoing.
Challenges
None
TYPICAL BLOCK D
No activity was done, awaiting shuttering of the bases and rafts.
No activity ongoing.
Challenges
None
TYPICAL BLOCK E
Setting out of shear wall positions on the bases and rafts was done.
No activity ongoing.
Challenges
None
TYPICAL BLOCK G
No activity was done, awaiting shuttering of the bases and raft.
No activity ongoing.
Challenges
None
TYPICAL BLOCK H
No activity was done, awaiting shuttering of the bases and rafts.
No activity ongoing.
Challenges
None
TYPICAL BLOCK J
No activity was done, awaiting shuttering of the shear walls.
No activity ongoing.
Challenges
None
SHOP BLOCK K
No activity ongoing, awaiting backfilling of the foundation.
No activity ongoing.
Challenges
None
SHOP BLOCK L
De-shuttering of the shear walls in progress.
Challenges
None
SHOP BLOCK M
Preparation of the bases and rafts for blinding was done.
Challenges
None
SHOP BLOCK N
No activity was done.
No activity ongoing.
Challenges
None
SHOP BLOCK P
No activity ongoing, awaiting debris clearance.
No activity ongoing.
Challenges
None
SHOP BLOCK Q
No activity was done.
No activity in progress.
Challenges
None
SHOP BLOCK R
No activity was done, awaiting steel fixing of the bases and rafts.
No activity ongoing.
Challenges
None
SHOP BLOCK S
No activity was done, awaiting casting of the bases and rafts.
No activity ongoing.
Challenges
None
WASTEWATER TANK
Hard rock breaking of the foundation was done.
SITE SAFETY.
Site safety measures were observed.
The organization of the site was OK.