Contractor Competency assessment form (Star rating system) - Annexure "8"

Form No:SAFETY/FORMS/CSM/08 Revision No:06 Effective Date :1st Nov 2019


CSMS TOTAL SCORE 426 CSMS RATING : No Star
Organization name M/s. Shreeji Aqua Treatment Pvt Ltd Assessment team : Bureau Veritas Industrial Services India Pvt. Ltd. (BVIS)

Contractor Proprietor Mr Sunil Metha - MD Team Leader : Babul Ch Majumdar


Name

Organization Registered
Address H-24, H BLOCK, LALTOPI NAGE, MORWADI , PIMPRI - 411018 Team Member : Babul Ch Majumdar

TSL representatives (CA/ CA - Mr Anoop Srivastava CO - Mr Siba Prasad Panda


CO /Mentor / Local safety Date of Assessment 13-01-2024 18:00
professional)

Comments by Assessor :
Health & Safety Management available. Compliance report of the previous audit is not evident. Vendor is
Vendor Code SNC9 being assessed 1st time.

Work Order No.1: 3000147264


/K05, VALID Jan 2024
Department: Entire Plant CO Name: Mr Siba Prasad Panda

Work Order No.2: Department : CO Name:


Active work order numbers
with Department
Work Order No.3: Department : CO Name:

Work Order No.4: Department : CO Name:

Audit Location:

Risk Parameter: (Risk of job High Risk : High


where contractors to be
engaged) Low Risk : # Tata Steel Khopoli representative - CO - Mr Siba Prasad Panda and Miss Monali Bhosle - Assistant
Environment specialist were present at the time of assessment and Miss Monali Bhosle were present at the
Both : time of site visit.
# M/s. Shreeji Aqua Treatment Pvt Ltd representatives, Dr. Sachin Jadav - Area Manger , Mr Pravin
Type of Contract Suriyavanshi - HR Manager, Mr Abhey Lakhole -Site Sup, Miss Anisha Lakhole Environment Specialist were
present during entire assessment and site visit.
Manpower contract Currently they do Ambient, Noise, illumination monitoring also water sampling and soil testing at site. They
are being validated for High risk activity I.e : Stack monitoring Above personnel were accompanied during
Supervision contract site visit at WCRM Picklling area. Site Team: Mr Rohit Chikane - Field Officer KW 0823841887 & Mr Rabindra
Kshirsagar - Field Officer KW 0823838419
Set apart contract
Transient contract

Other Services

Environment Monitoring
Tick the type of work the company is capable of undertaking :

Civil, Structural & Building Lifting equipment Maintenance and Services Utility Services
Maintenance

Electrical Maintenance and


Cleaning Services Mechanical Maintenance and services Services

Instrumentation Calibration and Transportation and Material Handling


Testing Catering Services

Waste materials / slag / Manpower supply Mining related activity


reclaiming & disposal

Lifting, Loading, Unloading,


feeding & packaging Road maintenance Rail maintenance

Env monitoring
Any Others, please specify

1.What is total manpower strength of your organisation working in Tata Steel? 4

1.1. Number of Supervisors and their qualifications (Attach list): BSc

1.2. Number of certified and skilled employees (Please attach list of employee with skill level): 3 ( including supervisor)

1.3. Number of unskilled employees: 1

1.4. Number of Site Safety Supervisors and their qualifications (Attach list): Nil

2.Total Value of Contract in currency as applicable with Tata Steel: Example in Rupees: (less than 5 Lacs / 5 to 25 lac/ 25 lac to 1 crore, and
above 1 crore If more than 1 crore, mention exact value ).
28 L

3. Name of the departments/locations where you are currently engaged in Tata Steel: TSL , Khopoli

4. Organisational Structure of your organisation: (e.g. MD, GM, Managers etc.) MD

Evaluation Criterion for Star Rating and Safety Performance Evaluation

0 = Process not yet started/ No System.


1 = Poor- Weak Safety system and process, weak or no system of Lead Indicator identification, reporting and compliance monitoring; little awareness; minimal or no ownership and commitment. (Survival)

2 = Reasonable- Some system & process exist; inconsistent system of Lead Indicator identification, reporting and compliance monitoring; awareness may be present, but implementation of this aspect is haphazard or not
evident at all. (Reactive stage)

3 = Good- Safety Management system & process exist and documented; improving trend of system of Lead Indicator identification, reporting and compliance monitoring; system is implemented at the minimum levels;
ownership and commitment visible at some extent. (Dependent stage)

4 = Very Good- H&S Management System is addressed systematically, documented and updated regularly, reaching the respective targets regularly; good system of Lead Indicator identification, reporting and compliance
monitoring; integration with other activities is at high levels; felt and visible ownership and commitment. (Independent stage)

5 = Excellent- Can be recognised as a leader in this particular aspect of the H&S Management System; everyone is involved and high levels of integration and ownership & commitment are demonstrated.; continuous
improvement is evident. (Interdependent stage)

Assessment Frequency: Once in two years(within 24months) for the 4 & 5-Star rated vendors and once in a year(within 12 months) for 3 -Star rated Vendors from the date of the previous assessment . Assessment reports must be logged in ‘ENSAFE-IT SYSTEM’ by
the CA/ CO within 4 days after receiving report from central safety team. [Refer to DOC. NO.: SAFETY/PROC/CSM/ 01, SAFETY/PROC/CSM/ 02] NOTE: [(5 Star- 850-1000), (4 Star-750-849), (3 Star-650-749), (2 Star- 550-649), (1 Star- 450- 549), (No Star- Less than
450)]
All the requirements will be evaluated in a scale of 0 to 5 which will be weighted for Star rating score calculation.
s Industrial Services India Pvt. Ltd. (BVIS)

umdar

umdar

nce report of the previous audit is not evident. Vendor is

a Prasad Panda and Miss Monali Bhosle - Assistant


of assessment and Miss Monali Bhosle were present at the
atives, Dr. Sachin Jadav - Area Manger , Mr Pravin
te Sup, Miss Anisha Lakhole Environment Specialist were

monitoring also water sampling and soil testing at site. They


k monitoring Above personnel were accompanied during
ohit Chikane - Field Officer KW 0823841887 & Mr Rabindra
ership and commitment. (Survival)

implementation of this aspect is haphazard or not

system is implemented at the minimum levels;

Indicator identification, reporting and compliance

& commitment are demonstrated.; continuous

nt . Assessment reports must be logged in ‘ENSAFE-IT SYSTEM’ by


0-749), (2 Star- 550-649), (1 Star- 450- 549), (No Star- Less than
Attributes SN Criteria Requirements Guideline for audit Expected Aspects

1.1 Safety & Health Management 0. 0% :No system exists. # No system exists- no policy , no organization structure.
System (Policy & Principles,
Safety Manuals, Safety
Organization) (Safety manuals –
(Look for HIRA or JHA
document, Legal compliance
system, Emergency Planning
system, Safety dash board,
Safety audit & review system,
Operational control, Asset
Management).

1. 20% : Documented Safety and Health #Documented Safety and Health management system exists and organizational structure exists- safety manual (policy,
management system exists and procedure, objectives,OCP,hazard & risk assessment-GRA/HIRA, JHA, SWP,SOP, emergency preparedness & response
organizational structure exists. plan), organization structure (roles and responsibility , competence management)

2. 40% : Regular Audits done through Internal # Regular Audits done through Internal & External agencies- audit done at planned interval either internal or external in reference
& External agencies. to requirements / criteria (CSMS,OHSAS OR other safety management system)

3. 60%: Evidence exists for Corrective and #Evidence exists for Corrective and Preventive action taken along with improvement regularly- based on audit presence of
Preventive action taken along with corrective and preventive action along with root cause analysis.
improvement regularly.
4. 80%: Continuous improvement in the # Continuous improvement in the system based on feedback of Audits - improvement in objective (leading & lagging indicator), &
system based on feedback of Audits. evidence of continual improvement trend.

5. 100% participation of all employees # participation of all employees along with all of above - evidence of participation in tool box talk, safety
along with all of above. meeting, safety campaign, safety quiz, safety competition etc.
1.2 Documented procedure on 0. 0% :No system exists. # No system exists - No procedure for selection and deployment of skilled and Certified employees
selection, deployment of skilled and 1. 20% : Benefit of Safety Certification given at the # Benefit of Safety Certification given at the time of employment - whether safety supervisor, project manager
Certified employees. Job time of employment have undergone any formal certified safety courses (OHSAS, NEBOSH,RLI/CLI courses, diploma in industrial safety, Tata Steel
description, Roles & courses)
Responsibilities to be available
mentioning safety as one of the 2. 40% : Existing Personnel encouraged # Existing Personnel encouraged undertaking safety courses - company initiated , sponsored safety training.
mandatory requirement (Which undertaking safety courses.
institute ,Type of skill training like
Mechanical, Electrical etc..) 3. 60% : Safety a mandatory requirement # Safety a mandatory requirement for engaging all employees - safety aspect in job description,
for engaging all employees. appointment/employment contract.
4. 80% : Documented Safety certification # Documented Safety certification requirement beyond a certain level in the hierarchy - safety certification course by safety
requirement beyond a certain level in the supervisor project manager & above.
hierarchy.
5. 100% : Positions beyond a certain level can # Positions beyond a certain level can be occupied by personnel having exemplary safety records and having safety certification -
be occupied by personnel having exemplary evidence of safety competence of top management , excellent safety record.
safety records and having safety
certification.

1.3 Documents showing safety 0. 0% : No system exists. # No JHA in place


planning process for safe 1. 20% : Job hazard Analysis exists for 25 % of the # 20% Job takes into account of JHA, but no corrective and preventive measures in place
execution of jobs- JHA jobs. No evidence of preventive and
document, Audit plans, planning for corrective measures at site.
tools & equipments,Job execution
plan, work permit system, 2. 40% : Job hazard Analysis exists for 50 % # 40% Job takes into account of JHA, but no corrective and preventive measures in place
Method statement of the jobs. No evidence of preventive and
corrective measures at site
3. 60% : Job hazard Analysis exists for 50 % of the # 60% Job takes into account of JHA, with preventive measures planned w.r.to potential hazard identified
jobs. The jobs are well planned and evidence
exists of Safety features at site to
counter the Hazards identified.

4. 80% : Job hazard Analysis exists for 75 % of the # 80% Job takes into account of JHA, with preventive measures planned w.r.to potential hazard identified
jobs. The jobs are well planned and evidence
exists of Safety features at site to
counter the Hazards identified.

5. 100% : Job hazard Analysis exists for 100 # 100% Job takes into account of JHA, with preventive measures planned w.r.to potential hazard identified
% of the jobs. The jobs are well planned and
evidence exists of Safety features at site counter
the Hazards identified

1.Planning of Safety
System & Process 1.4 System and processes for 0. 0% :No system or process exists. # No system or process exists -
training on Safety standard, 1. 20 %: Documented system and process exists # Documented system and process exists along with training organizational structure and infrastructure - Organization has
Behavioural based, Job specific, skill along with training organizational structure and defined personnel for training , training infrastructure
development, emergency infrastructure.
preparedness for employees and
supervisors.

2. 40 %: Along with above a training records # Along with above, training records maintained on all SOPs - Training on SOP given with evidence/record.
maintained on all SOPs.
3. 60%: Along with above SOPs getting # Along with above SOPs getting revised based on feedback continuously - revision on SOP based on feedback
revised based on feedback continuously (training effectiveness)
4. 80%: Along with above pictorial SOPs # Along with above pictorial SOPs displayed at site in regional languages for better understanding of all employees -
displayed at site in regional languages for pictorial display of SOP (in regional language)
better understanding of all employees.
5. 100%: Along with the above employees # Along with the above employees display an exemplary understanding of all SOPs at site - interview / discuss during site visit.
display an exemplary understanding of all
SOPs at site.
1.5 System for two way 0. 0% : No system or process exists. # No system of communication
communication (Top – Bottom – Top) 1. 20 %: Documented system and process exists # Documented system is in place for internal communication. MoM available as record/display in office
between contractor leadership for communication between all levels of
and their workforce (Proprietor Contractor leadership and their workforce.
engagement in line walk, Safety Visual displays MoM of meetings and action taken
meeting etc.). reports.

2. 40 %: Along with the above evidence exists # Documented system is in place. Evidence of Leadership team visit, discussion and action exist
of leadership team visits and
discussions and action.
3. 60%: Along with the above evidence exists # Along with above top management involvement in implementation action exist (evidence is must)
of leadership team and the proprietor visits and
discussions and action

4. 80%: Along with above record of # Along with evidence exist w.r.to feedback and communication on action
improvements undertaken as a result of
such communication and feedback
5. 100%: Along with the above recognition # Along with above reward/recognition mechanism exists for participation/ suggestion on action (evidence/record)
and reward for participants for such
communication exists
2.1 Capability of Workforce, (Skilled, # Deployment of Skilled & certified vendor a) Deployment of below 70% certified employees at site, Score - 0 marks
Certified Competent Supervisor, Site employees ( supervisors, site safety supervisors and
Safety Supervisors and manpower workman as per the job requirements ) from
etc.) Verify through site visit and JNTVTI or other TSL approved institutions. b) Deployment of 70- 90 % certified employees at site & having up to 15-30% employee in gold &
Interview. platinum proficiency : Score - 10 marks
c) Deployment of 90- 100% certified employees at site with right skill in right job & having 30-50 %
employee in gold & platinum proficiency Score- 20 marks
d) Deployment of 100% certified employees at site with right skill in right job & having more than 50
% employee in gold & platinum proficiency Score- 25 marks
# Hazard identification and Risk a) Inadequate hazard identification and poor implementation of safety measures mentioned in work
assessment :Inclusion of site specific , job specific permit, Score – 0 marks
and adequate six directional hazard in Work
permit .Job Hazard Analysis by contractor b) Inclusion of Job specific, site specific hazards & safety measures mentioned and addressed
supervisors adequately in work permit , Score – 5 marks
.Learnings from JHA incorporating in c) Job specific, site specific hazards and safety measures mentioned adequately in work permit and
known to the working group. Score – 10 marks
# Compliance to deployment of applicable safety a) Non-compliance captured with respect to applicable safety standard , SOP and permit system ,
standards at site as mentioned in “SOP” and permit Score - 0 marks
system
b) Non-compliance captured with respect to only one aspect ( applicable safety standard , SOP or
work permit system)Score - 10 marks
c) 100% compliance to applicable safety standards , ‘SOP’ & work permit system , Score - 15
marks

2.2 Conducting Tool box # Conducting Tool Box meetings daily at all a)In adequate records on Toolbox meetings and participation below 80% in Tool Box
,mass meeting regularly and sites of location by site supervisors , site safety meetings, Score – 0 marks
leadership supervisors
engagement( Contractor proprietor . b) Maintaining adequate records & 100% participation of work men &supervisors in Tool Box
line walk). (Verify through meetings, Score – 10 marks
Records , Interview & site visit)
c) Compliance of tool box meeting points being captured & reviewed ,Score – 20 marks

# Participation of Proprietor / Locational in a)Below 80% compliance of monthly line walk & mass meeting, Score - 0 marks
charge in Line walks and Monthly mass
meetings and maintaining records b) Monthly compliance of line walk & safety mass meeting & record available - 10 marks

c) Monthly compliance of line walk by proprietor being captured in E Proc (IT system)) &
mass meeting record available -15 marks

d) compliance of line walk & mass meeting points , 20 marks


# Effectiveness of line walk , tool - box a) Compliance of learning of the Incidents of the department /division /location , is less than
meeting & safety mass meeting 80%– 0 marks

b) Compliance of learning of the Incidents of the department /division /location , compliance


is 80-94%%– 5marks

c) Compliance of Learning of the Incidents of the department /division /location , compliance


is more than 95%– 10 marks

2.3 Providing & ensuring usage of # Hazard mapping with respect to location a)Hazard mapping not available ,score – 0 marks
standard (IS/EN) and right PPEs specific and usage of applicable and standard
b) Availability of Hazard mapping with the current job requirements but non-compliance
while performing the job. Ensure PPEs by contractor employees at working site
related to use of PPE observed, score – 10 marks
timely replacements.
c) Availability of Hazard mapping and 100% employees using required and standard PPE
,score – 20 marks

(Verify through site visit # Physical condition of PPE using a)Some of employees using defective PPE , score - 0 marks
and Interview). by employees at working site
b) 100% employees using non defective PPE ,score - 20 marks
# Regular audits on usage of PPE by a)Poor compliance on Audits on PPE usage and review , score – 0 marks
supervisors and review of PPE quality and
improvements by vendor b) Regular audits by supervisors with specified frequency and review by vendor on monthly
basis , score – 10 marks

2.4 Providing & ensuring safe usage # Availability and usage of applicable and a)List of Standard, applicable Tools & Tackles not available , score – 0 marks
of standard, certified and right standard tools & tackles by contractor at
b) List of Standard, applicable Tools & Tackles available but non-compliance observed at
tools & tackles, equipment’s and working site
site, score – 10 marks
calibrated safety gadgets (e.g. Gas
detectors) while performing the c) List of 100% Standard, applicable Tools & Tackles available and no non-compliance
job. (Verify through Records and observed score – 20 marks
Site visit)
# Physical condition & legal compliance of a)Legal compliance not followed and poor condition of Tools & Tackles , score – 0
applicable tools- tackles & equipment at marks
working site (
As applicable) b) 100% Legal compliance being followed and all the Tools & Tackles are defective free
,score - 20 marks

# Tools & Tackles based audit by contractor's a)Poor compliance of audits and review , score – 0 marks
supervisors (site
b) Regular audits by supervisors with specified frequency and review by vendor on monthly
verification)
basis , score – 10 marks

2.5 Ensuring a good housekeeping # Working sites house keeping maintained in a)Poor house keeping at site ,score – 0 marks
free from any slip / trip / fall systematic approach
b) 100% compliance to excellent House keeping at site , storage & contractor shed , score – 15 marks
hazards at working sites. (Verify .Material storage area, stores area and rest
through site visit) sheds orderliness maintained. Free from Slip /
Trip /
Fall hazards.

# Implementation of 1S ,2S at site. a)Concept of 1S & 2S not followed , score – 0 marks


b) Deployment of 1S & 2S at site, storage & contractor shed ,score - 15 marks
#and approach for 5S concept at working sites . a)Poor compliance of audits and review , score – 0 marks
Check list developed on 5s and being followed
b) Regular audits by supervisors with specified frequency and review by vendor on monthly
regularly
basis , score – 10 marks

C) Concept of 5 S & Visual workplace management is deployed , score -20 marks


2.6 Self-Safety Initiative / Project by # System of safety improvement projects exist a)System not exist and poor engagement of top leadership ,score – 0 marks
contractor for Safety Improvement and known to 100% supervisors. Involvement
of top management in self initiated safety b) System exist for capturing suggestions by employees and other stake holders related to safety improvement projects
projects (record of no. of suggestion & involvement of top leadership in implementation of safety
improvement projects .score – 10 marks
# Safety improvement projects a)Less than 4 nos of safety improvement projects in a year – 0 marks
implemented at working sites
b) Minimum 4 safety improvement projects implemented - 20 marks
# Safety projects to improve system related a)Less than 2 nos of system related safety improvement projects in a year, score -0
gaps marks

b) Minimum 2 nos. System related safety improvement project implemented , score - 10


marks

c) Confirmation of Implementation of all types of safety improvement projects in field by


CO /TSL representative & assessor , score -20 marks
3.1 Contractor safety audit by the 0. 0% -System does not exists # No safety audit done
contractors' supervisor and site 1. 20%-Regular self-audits not done. # Safety audit done on adhoc basis (no audit plan, no checklist)
safety supervisors in the field.
(Verify records)
3.1 Contractor safety audit by the
contractors' supervisor and site
safety supervisors in the field.
(Verify records) 2. 40% -Audit done occasionally but no # Safety audit done with no record
record found
3. 60% -Regular audit done but record # Safety audit done as per plan, but no record
not in place.
4. 80%-Regular audit done, record is in # Safety audit done as per plan, report available with CAPA
place with follow up action.
5. 100%-The same points are not # Safety audit findings are not repetitive (effectiveness of audit)
recurred in the next audit
3.2 Corrective and preventive 0. 0%: No system exists. # No CAPA
action on self-audit report 1. 20%: System for identification of # CAPA covers unsafe practices of severity 4&5
specifically on 4 & 5 severity unsafe practices of severity 4 & 5 exists.
potential. (Verify records & site visit)
2. 40%: Structured review mechanism for # Review of CAPA of unsafe practices of severity 4&5
unsafe practices of severity 4 & 5.

3. 60%: Systematic process of correction of all # Systematic process of correction of all unsafe practices of severity 3, 4 & 5 exists.
unsafe practices of severity 3, 4 & 5
exists.
4. 80%-There is no unsafe practice of # No unsafe practice of severity 4 & 5 observed by auditor during filed visit at the time of assessment.
severity 4 & 5 observed during filed visit.
5. 100%-Procedure violations of severity # Procedure violations of severity 3 does not exists
3 does not exists
3.3 Compliance to Generic and 0- 0%- Basic deviation of PPE observed # Basic deviation of PPE observed
Specific Safety clauses as per
contract. (Verify through site visit
and Interview based on some 1- 20%-Generic safety clauses have been # Generic safety clauses have been followed
Work order). followed
2- 40%-Specific safety clauses with # Specific safety clauses with reference to hierarchy of hazard control is followed
reference to hierarchy of hazard control is
followed
3- 60%-Safety violation with respect to # Safety violation with respect to workforce capability does not exists
workforce capability does not exists
4- 80%-Infrastructure resources tools & # Infrastructure resources tools & tackles are provided with right quality
tackles are provided with right quality
5- 100%-Process of doing job has been # Process of doing job has been standardized and followed and learning and integration approach is visible
standardized and followed and learning and
integration approach is visible

4.1 Reporting, investigation and 0- No system of reporting incident and # No system of reporting incident and health issues
learning of all incident / health issues
accident, Health issue.
1- Adhoc and weak system available # Adhoc and weak system available
2- A documented procedure for # A documented procedure for reporting of incidences exists and followed and investigation carried out
reporting of incidences exists and followed and
investigation carried out
3- Reporting and investigations done # Reporting and investigations done systematically and root causes are identified
systematically and root causes are
identified
4- Recommendations are implemented # Recommendations are implemented and learning shared
and learning shared
5- Learning from other incidents shared # Learning from other incidents shared and implemented
and implemented
4.2 Near miss and Unsafe act / 0- No system of reporting incident and # No system of reporting near miss & unsafe act/ condition
condition reporting, health issues
investigation and corrective
action. 1- Adhoc and weak system available # Adhoc and weak system available
2- A documented procedure for # A documented procedure for reporting of Near miss exists and followed and investigation carried out
reporting of Near miss exists and followed
and investigation carried out
3- Reporting and investigations done # Reporting and investigations done systematically and root causes are identified
systematically and root causes are
identified
4- Recommendations are implemented # Recommendations are implemented and learning shared
and learning shared
5- Learning from other near miss shared # Learning from other near miss shared and implemented
and implemented
4.3 Skill retention, amenities, 0- No system. No amenities and high skilled # No system of skill retention # No amenities provided
employees liability etc. (Verify employees turnover # High employee turnover
through records and Interview)
1- Amenities provided and it is of # Amenities provided is of minimum requirement
minimum requirement
2- Employees are motivated and remain with # Employees are motivated to remain in the organization
the organization

3- Employees grievances are recorded # Employee grievance are recorded and considered for action
and individual consideration is given
4- No grievances from employee and # No grievance from employees on amenities provided, hygiene and workplace environment
amenities are provided considering hygiene
and workplace environment
5- A feedback system exists for # Feedback system exists to capture employee suggestion, engagement and retention
capturing employees engagement and
retention
4.4 Campaign e.g. (Safety quiz, 0- No system for safety campaign # No safety campaign
Safety skid etc.) to develop 1- It is done haphazardly # Adhoc safety campaign
Safety Culture. (Verify through
records and Interview) 2- Done systematically and involvement of # Safety campaign done systematically (record is must)
employees are there

3- A monthly or annual plan is available and # Plan for campaign available with theme
campaigns are conducted as per theme

4- Ownership of campaign are fixed and # Responsibility of campaign are defined and topic based campaign are conducted
topic based are conducted
5- Campaigns are linked to past # Campaigns are linked to past incidents and based on learning (record/evidence)
incidents and based on learning
4.5 Reward, Recognition and 0- No system # No system
Consequence Management
System of Contractor. (Verify
through records) 1- Ad hoc system available # Ahhoc system

2- There is criteria and documented # Defined criteria & documented procedure


procedure for both
3- System is followed and applied to # Mechanism of bad & good performer exist (shall be transparent and shall be known to employees)
identify good and bad performer

4.Performance
Measure: Lead
indicator
through records)

4- PDCA is followed and learning and # PDCA is followed and learning and integration approach visible and reduction in unsafe acts and practices
integration approach visible and reduction in
4.Performance unsafe acts and practices
Measure: Lead
indicator
Evaluation status
( on the 0 to 5 )
Remarks
Actual score

HSSE Ms System SATPL/OHS & SMS/01 DTD 1/3/2023 - available


HSSE Policy: D & A , HSE Policy, Employee Retention Policy, POSH, QA, Environmental Policy were shown at the time of audit. All
policies are in the manual - in English and Marathi version, signed by MD. No policies awareness training evidence available.
Organogram: part of manual Pg -16
Role and Responsibilities are defined for each rank - Pg no 48

Documented Safety & Health Management System in place.


Safety Manual available vide Doc. No SATPL/OHS & SMS/01 DTD 1/3/2023 and signed by MD. Safety Policy available in English and
Marathi, signed by MD.
Safety Principle available. Objectives are set and declared. Safety Organisation Structure available.
03 no. of SOP ( IMS/K/SOIL/SAMPLLING/SOP -001, prepared by vendor for all activities as per existing Work Order, approved by TSL
representative ( through mail).
03 no. of JHA ( SATPL/OSH & SMS prepared by the vendor for all activities considering the requirement of PPEs and Tools & tackles and
all training requirements. Documents are not approved by TSL representative, even not by the person who made the documents.
No consolidate Method statements is in place.
Emergency scenarios are not mentioned in the Emergency Preparedness & Response ( ERP) document. They follow TSL mock drill Plan.
Safety Dash Board maintained on yearly basis. Dashboard shows two no's ERP drill conducted but no document evidence available.
All legal documents (PF, ESI, etc.) available with a Compliance System. WC Policy available for workers NA
Asset Management is maintain properly.

NO Regular Audits done through Internal & External agencies -


Audit plan available for Severity Audit, PPE Audit, Tools & Tackles Audit, Housekeeping Audit, etc. Contractor Safety Audit conducted on
weekly basis and reports available with 1, 2 and 3 severity violations. Self assessment (Anx-08) audit conducted by vendor on
24.08.2023 and verified by CO on ..........

No audit plan. No CAPA of Audit observations (1, 2 and 3 severity cases) evident

No document evidence / trend to establish on continuous improvement process in place based on feedback of Audits.
No records of audit feedback, Leading and Lagging indicator available.

Employees participation are visible in tool box talk, safety meeting, Lack in safety competition safety campaign,
Quizzes.
1 10
Procedure in place for selection and deployment of skilled and Certified employees
Documented procedure for selection and deployment of skilled employees clearly defined in manual. No Safety
person deployed at site. No Safety Certification given at the time of employment -No documental evidence shown at the time
assessment.

0 0

JHA in place

Job takes into account of JHA, but no corrective and preventive measures in place

Documents are not approved by TSL representative, even not by the person who made the documents.

Person was not able to explain how the document was prepared and its application

1 10
System exists
Documented training procedure available in manual.
No one is defined trainer for specific job I.e.: safety oriented topics, Emergency and others (BBS or any Standard). No dedicated infra
structure available for training.
No Training calendar / plan available to cover all declared trainings.
Training matrix were not shown at the time of assessment.

1 10

Documented system of two way communication mentioned in manual as Line Walk, Mass Meeting and TBT. MoM of Mass meeting not
available as record

Evidence of Leadership team visit and discussion were not available.

0 0
No Skilled & certified vendor employees deployed in the site . No one completed JNTVTI nor from any TSL
approved institution.

0 0

10 10 Work permit no 027953 dtd 20/11/2023 verified along with Height work permit 019449.

Job specific, site specific hazards and safety measures mentioned adequately in work permit and known to the
working group, verified during site visit and interview with site personnel.

Permit to work SOP not available in the manual.

0 0

100% Participations of workmen in TBT, No daily TBT schedule available, Topics are randomly selected and covered.

10 10 Records of 100% participation is available as attendance record

Compliance of tool box meeting points being captured but not reviewed. Last TBT done by Mr Abhey on
11/1/2024.
Line walk and mass meeting are on monthly basis. Shared 1 LFI in the Mass meeting , however no records of action
and list of participant available.

0 0

Effectiveness of line walk , tool -box meeting & safety mass meeting not verified. No records available.

0 0

20 Hazard mapping (SATPL/OSH &SMS/21/18) available on PPE

20

100% employees using non defective PPE verified during site visit.

20 20
100% employees using non defective PPE.

0 No checklist used for PPE audit, No PPE audit compliance records available. No audits observation recorded and
actions reviewed
0

20 List of Tools & Tackles available

20
100% Standard applicable Tools & Tackles available. Legal compliance being complied with w.r.to all the Tools & Tackles.

20

20
100% Legal compliance being followed and all the Tools & Tackles are defective free

Legal compliance being complied with w.r.to all the Tools & Tackles

0 0 Supervisor does not conduct audit on regular interval, actions items not reviewed by vendor on monthly basis

No dedicated office. Working sites house keeping is maintained.

15 15

Working sites is free from slip/ Trip and Fall hazards when we visited at site.
15 15 Concept of 1S & 2S followed

10
Supervisor does not conduct audit on regular interval, actions items not reviewed by vendor on monthly basis
10

System exist for capturing suggestions by employees related to safety improvement projects & Top leadership is
involved in implementation of safety improvement projects

10 10 2 Self Safety improvement project done:


1. Enhance shoes Quality.
2.Manual stack monitoring to digital monitoring.

0 0 2 nos safety improvement projects done.

20 20 2 nos. System related safety improvement project implemented.

Assessor reviewed the project during site visit and confirm their implementation.

No reports available that Contractor safety audit is done by the contractors' supervisor
No safety audit done, no record evident

0 0
0 0

No CAPA on CSA observation shown at the time of assessment

0 0

No process in place for correction of all unsafe practices of severity 1,2 & 3 . Related records not maintained. No unsafe practice of
severity 4 & 5 observed during field audit.

Procedure violations of severity 3 exist as mentioned in severity audit reports.


1. PPE Issue. Verbal consequence management applied.
Tools Third party inspection done.
Safety violation with respect to workforce not evident during site visit at workshop.
2 12

Job process - not standardized

No incident and health issues reporting procedure available in the manual

0 0

Near miss & unsafe act/ condition reporting not defined in the manual. However NM PI format is available. No NM
/ PI is captured.

1 8

Basic amenities provided by TSM and maintained by the contractor.


Employee motivational programme documented in manual as non statutory scheme.
1. Leave encashment
2. Bonus 3.Room Facility
Employees are motivated to remain in the organization. No exit process exist.

2 16

Grievance raised by employees in written format. Grievance are address. Records available.
No record to show any grievances on hygiene and workplace environment.

Feedback process not available

safety campaign procedure is derived in the manual


Campaigned is on adhoc basis. No theme followed
1. Oath taking. 2.Hazards Hunts
3. Safety quiz on Environment subject.

2 16

Documented procedure of Reward, Recognition and Consequence Management System mentioned in manual with
criteria.
Consequence Management System known to employees, verify by discussing with workers during site visit. Mechanism to find out bad
performer exist and known to employees.
Safety Rewards given to selected employee's on Best safety Performance. Safety Rewards given to Mr Nisar Ansari on Best safety
Performer.
Mr Promod for best ETP maintainer.

PDCA is not applied not followed.

3 24
3 24
5- There is positive impact among # Positive impact amongst employees and they are motivated
contract employees and they are highly
motivated
5.1 Zero Lost time /serious injury 0-60 # No LTI/Serious injury/ permanent disablement incident
or permanent disability >/=1-0 # 1 or more LTI/Serious injury/ permanent disablement incident
5.2 Zero First aid case 0-40 Score # No first aid incident
1 or more-0 score # 1 or more first aid incident
5.3 Non-Injury Incidents (e.g. 0-10 score # No property damage case
Property Damage) 1or more-0 score # 1 or more property damage case
5.Performance 5.4 Safety violation of fatal 0 - 20 # No fatal potential violation of severity 4 & 5 violation.
measure: Lag potential of severity 4&5 >=1 - 0 # Fatal potential violation of severity 4 & 5 violation are more than or equal to 1.
indicators applicable
for the Location itself 5.5 Safety noncompliance cost 0-20 score # No cost recovery violation evident
recovery / Penalty imposed / 1-0 score # 1 or more cost recovery violation evident
0 : 0 score # No fatality, zero score will be awarded, i.e. no deduction of marks.
Fatality : 1 # If vendor is responsible -100 score will be awarded.i.e 100 marks will be deducted from total score # If vendor not responsible,
a) Responsible marks will not be deducted.
5.6 Fatality of contractor employee b) Not Responsible

1
Self assessment done by vendor :Yes / No

2 Verified by CO / Mentor : :Yes / No


3
Report (1 &2) seen by Third party
agency during assessment
:Yes / No
60 60 No LTI/Serious injury/ permanent disablement incident reported.

40 40 No FAC happened till date

10 10 No property damage case reported

20 20 No fatal potential violation of severity 4 & 5 violation reported.

20 20 No cost recovery violation were observed

0 Nil fatality.

Score obtained 426