Material Escalation Sheet
Material Escalation Sheet
Page 1 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
Page 2 of 45
CHETTINAD PRODUCTS AND SERVICES PRIVATE LIMITED
AKSHAYA TODAY WORK SITE
RIVER SAND - ESCALATION
Amount on
RA Bill Sand Total Sand Approved Amount on Difference in
Description Unit Qty Approved Basic Rate
No Constant Consumption Rate Basic Rate Amount
Rate
Page 3 of 45
CHETTINAD PRODUCTS AND SERVICES PRIVATE LIMITED
AKSHAYA TODAY WORK SITE
P.SAND - ESCALATION
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
Tower B1 Sqm 459.45 0.854 392.14 60.00 23,528.00 42.86 16,806.00 6,722.00
Tower B2 Sqm 201.79 0.854 172.23 60.00 10,334.00 42.86 7,381.00 2,953.00
Tower B3 Sqm - 0.854 - 60.00 - 42.86 - -
IPS Flooring
Tower B1 Sqm 0.738 - 60.00 - 42.86 - -
Tower B2 Sqm 0.738 - 60.00 - 42.86 - -
Tower B3 Sqm 0.738 - 60.00 - 42.86 - -
Page 4 of 45
CHETTINAD PRODUCTS AND SERVICES PRIVATE LIMITED
AKSHAYA TODAY WORK SITE
M.SAND - ESCALATION
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
100mm Lintel
200mm Lintel
Kitchen Platform
Page 5 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
CEMENT - ESCALATION
RAB 1 Ceiling Plastering CM 1:3, 10mm tk. Sqm 3,912.50 0.117 457.76 265.63 121593.00 210.94 96559.00 25,034.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. Sqm 834.30 0.110 91.77 265.63 24377.00 210.94 19358.00 5,019.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 6mm tk. Sqm 834.30 0.00 0.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.032 0.00 265.63 0.00 210.94 0.00 -
Tower B2 Sqm - 0.032 0.00 265.63 0.00 210.94 0.00 -
Tower B3 Sqm 0.032 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 17.96 0.045 0.80 265.63 213.00 210.94 169.00 44.00
Tower B2 Sqm 36.66 0.045 1.64 265.63 435.00 210.94 346.00 89.00
Tower B3 Sqm 0.045 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing -Nito
0.00 0.00
Bond Packing
Tower B1 Sqm 192.52 0.030 5.70 265.63 1513.00 210.94 1202.00 311.00
Tower B2 Sqm 402.00 0.030 11.90 265.63 3160.00 210.94 2510.00 650.00
Tower B3 Sqm 0.030 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm 109.03 0.033 3.63 265.63 965.00 210.94 766.00 199.00
Tower B2 Sqm 225.93 0.033 7.53 265.63 2000.00 210.94 1588.00 412.00
Tower B3 Sqm 0.033 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm - 0.124 0.00 265.63 0.00 210.94 0.00 -
Tower B2 Sqm - 0.124 0.00 265.63 0.00 210.94 0.00 -
Tower B3 Sqm 0.124 0.00 265.63 0.00 210.94 0.00 -
0.00
RAB 2 Ceiling Plastering CM 1:3, 10mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 1,090.51 0.117 127.59 265.63 33891.00 210.94 26913.00 6,978.00
Tower B2 Sqm 2,859.63 0.117 334.58 265.63 88872.00 210.94 70575.00 18,297.00
Tower B3 Sqm 1,659.59 0.117 194.17 265.63 51577.00 210.94 40958.00 10,619.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 2,258.37 0.110 248.42 265.63 65987.00 210.94 52401.00 13,586.00
Tower B2 Sqm 1,323.34 0.110 145.57 265.63 38666.00 210.94 30706.00 7,960.00
Tower B3 Sqm 2,963.17 0.110 325.95 265.63 86580.00 210.94 68755.00 17,825.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 2.74 0.032 0.09 265.63 24.00 210.94 19.00 5.00
Tower B2 Sqm 9.83 0.032 0.32 265.63 85.00 210.94 67.00 18.00
Tower B3 Sqm 0.032 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 71.50 0.045 3.20 265.63 849.00 210.94 674.00 175.00
Tower B2 Sqm 35.62 0.045 1.59 265.63 423.00 210.94 336.00 87.00
Tower B3 Sqm 0.045 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 1,156.46 0.030 34.23 265.63 9091.00 210.94 7220.00 1,871.00
Tower B2 Sqm 612.90 0.030 18.14 265.63 4818.00 210.94 3826.00 992.00
Tower B3 Sqm 0.030 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Page 6 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
Tower B1 Sqm 576.77 0.033 19.22 265.63 5105.00 210.94 4054.00 1,051.00
Tower B2 Sqm 361.96 0.033 12.06 265.63 3204.00 210.94 2544.00 660.00
Tower B3 Sqm 0.033 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm 35.00 0.124 4.34 265.63 1153.00 210.94 915.00 238.00
Tower B2 Sqm 56.50 0.124 7.01 265.63 1861.00 210.94 1478.00 383.00
Tower B3 Sqm 83.40 0.124 10.34 265.63 2747.00 210.94 2181.00 566.00
0.00 0.00
Cement Concrete M-20 -grade 0.00 0.00
0.00 0.00
100mm Lintel 0.00 0.00
0.00 0.00
Tower B1 RM 78.56 0.138 10.81 265.63 2870.00 210.94 2279.00 591.00
Tower B2 RM 53.04 0.138 7.30 265.63 1938.00 210.94 1539.00 399.00
Tower B3 RM - 0.138 0.00 265.63 0.00 210.94 0.00 -
0.00 0.00
200mm Lintel 0.00 0.00
0.00 0.00
Tower B1 RM 18.88 0.236 4.45 265.63 1183.00 210.94 939.00 244.00
Tower B2 RM 19.22 0.236 4.53 265.63 1204.00 210.94 956.00 248.00
Tower B3 RM 46.80 0.236 11.04 265.63 2931.00 210.94 2328.00 603.00
0.00 0.00
Kitchen Platform 0.00 0.00
0.00 0.00
Tower B1 Sqm 28.10 0.236 6.63 265.63 1760.00 210.94 1398.00 362.00
Tower B2 Sqm 18.74 0.236 4.42 265.63 1174.00 210.94 932.00 242.00
Tower B3 Sqm 281.04 0.236 66.27 265.63 17603.00 210.94 13979.00 3,624.00
0.00 0.00
RAB 3 Ceiling Plastering CM 1:3, 10mm tk. 0.00
0.00 0.00
Tower B1 Sqm 1,243.90 0.117 145.54 250.00 36384.00 210.94 30699.00 5,685.00
Tower B2 Sqm 1,391.24 0.117 162.78 250.00 40694.00 210.94 34335.00 6,359.00
Tower B3 Sqm 2,994.06 0.117 350.31 250.00 87576.00 210.94 73892.00 13,684.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 981.75 0.110 107.99 250.00 26998.00 210.94 22780.00 4,218.00
Tower B2 Sqm 1,559.55 0.110 171.55 250.00 42888.00 210.94 36186.00 6,702.00
Tower B3 Sqm 1,534.92 0.110 168.84 250.00 42210.00 210.94 35615.00 6,595.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 7.64 0.032 0.25 250.00 62.00 210.94 52.00 10.00
Tower B2 Sqm 11.81 0.032 0.38 250.00 96.00 210.94 81.00 15.00
Tower B3 Sqm 0.032 0.00 250.00 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 93.36 0.045 4.17 250.00 1043.00 210.94 880.00 163.00
Tower B2 Sqm 133.80 0.045 5.98 250.00 1495.00 210.94 1261.00 234.00
Tower B3 Sqm 0.045 0.00 250.00 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 1,247.43 0.030 36.92 250.00 9230.00 210.94 7787.00 1,443.00
Tower B2 Sqm 2,156.03 0.030 63.81 250.00 15952.00 210.94 13460.00 2,492.00
Tower B3 Sqm 2.94 0.030 0.09 250.00 22.00 210.94 18.00 4.00
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm 701.76 0.033 23.38 250.00 5846.00 210.94 4933.00 913.00
Tower B2 Sqm 1,084.92 0.033 36.15 250.00 9038.00 210.94 7626.00 1,412.00
Tower B3 Sqm 57.95 0.033 1.93 250.00 483.00 210.94 407.00 76.00
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm 125.58 0.124 15.57 250.00 3893.00 210.94 3285.00 608.00
Page 7 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
Tower B2 Sqm 55.58 0.124 6.89 250.00 1723.00 210.94 1454.00 269.00
Tower B3 Sqm 18.95 0.124 2.35 250.00 587.00 210.94 496.00 91.00
0.00 0.00
Cement Concrete M-20 -grade 0.00 0.00
0.00 0.00
100mm Lintel 0.00 0.00
0.00 0.00
Tower B1 RM 167.26 0.138 23.08 250.00 5770.00 210.94 4869.00 901.00
Tower B2 RM 215.20 0.138 29.70 250.00 7424.00 210.94 6264.00 1,160.00
Tower B3 RM - 0.138 0.00 250.00 0.00 210.94 0.00 -
0.00 0.00
200mm Lintel 0.00 0.00
0.00 0.00
Tower B1 RM 76.74 0.236 18.11 250.00 4528.00 210.94 3820.00 708.00
Tower B2 RM 70.36 0.236 16.60 250.00 4151.00 210.94 3503.00 648.00
Tower B3 RM 2.60 0.236 0.61 250.00 153.00 210.94 129.00 24.00
0.00 0.00
Kitchen Platform 0.00 0.00
0.00 0.00
Tower B1 Sqm 168.62 0.236 39.80 250.00 9949.00 210.94 8394.00 1,555.00
Tower B2 Sqm 65.10 0.236 15.36 250.00 3841.00 210.94 3241.00 600.00
Tower B3 Sqm 84.31 0.236 19.90 250.00 4974.00 210.94 4197.00 777.00
Toilet Water Proofing 0.00 0.00
Tower B1 Sqm 0.086 0.00 250.00 0.00 210.94 0.00 -
Tower B2 Sqm 0.086 0.00 250.00 0.00 210.94 0.00 -
Tower B3 Sqm 133.42 0.086 11.47 250.00 2869.00 210.94 2420.00 449.00
0.00 0.00
RAB 04 Ceiling Plastering CM 1:3, 10mm tk. 0.00
0.00 0.00
Tower B1 Sqm 3,010.25 0.117 352.20 242.19 85298.00 210.94 74292.00 11,006.00
Tower B2 Sqm 2,598.14 0.117 303.98 242.19 73621.00 210.94 64121.00 9,500.00
Tower B3 Sqm - 0.117 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 3,402.68 0.110 374.29 242.19 90650.00 210.94 78953.00 11,697.00
Tower B2 Sqm 5,787.89 0.110 636.67 242.19 154193.00 210.94 134297.00 19,896.00
Tower B3 Sqm 8,032.19 0.110 883.54 242.19 213983.00 210.94 186372.00 27,611.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.032 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 0.032 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm 0.032 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 0.045 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 0.045 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm 0.045 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 108.63 0.030 3.21 242.19 779.00 210.94 678.00 101.00
Tower B2 Sqm 139.49 0.030 4.13 242.19 1000.00 210.94 871.00 129.00
Tower B3 Sqm 0.030 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm 5.44 0.033 0.18 242.19 44.00 210.94 38.00 6.00
Tower B2 Sqm 11.77 0.033 0.39 242.19 95.00 210.94 83.00 12.00
Tower B3 Sqm 0.033 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm 282.43 0.124 35.02 242.19 8482.00 210.94 7387.00 1,095.00
Tower B2 Sqm 46.45 0.124 5.76 242.19 1395.00 210.94 1215.00 180.00
Tower B3 Sqm 0.124 0.00 242.19 0.00 210.94 0.00 -
Page 8 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm - 0.158 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm - 0.158 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm 2,848.06 0.158 450.13 242.19 109016.00 210.94 94,949.00 14,067.00
0.00 0.00
Cement Concrete M-20 -grade 0.00 0.00
0.00 0.00
100mm Lintel 0.00 0.00
0.00 0.00
Tower B1 RM 58.58 0.138 8.08 242.19 1958.00 210.94 1705.00 253.00
Tower B2 RM 64.68 0.138 8.93 242.19 2162.00 210.94 1883.00 279.00
Tower B3 RM - 0.138 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
200mm Lintel 0.00 0.00
0.00 0.00
Tower B1 RM 23.40 0.236 5.52 242.19 1337.00 210.94 1165.00 172.00
Tower B2 RM 32.06 0.236 7.57 242.19 1832.00 210.94 1596.00 236.00
Tower B3 RM - 0.236 0.00 242.19 0.00 210.94 0.00 -
0.00 0.00
Kitchen Platform 0.00 0.00
0.00 0.00
Tower B1 Sqm - 0.236 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 112.90 0.236 26.64 242.19 6453.00 210.94 5620.00 833.00
Tower B3 Sqm - 0.236 0.00 242.19 0.00 210.94 0.00 -
Toilet Water Proofing 0.00 0.00
Tower B1 Sqm 0.086 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 141.76 0.086 12.19 242.19 2953.00 210.94 2572.00 381.00
Tower B3 Sqm 150.11 0.086 12.91 242.19 3127.00 210.94 2723.00 404.00
Tiling- Vitrified,Ceramic Tile Flooring 0.00 0.00
Tower B1 Sqm 0.240 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 0.240 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm 58.52 0.240 14.04 242.19 3401.00 210.94 2963.00 438.00
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00 0.00
Skirting & Daddoing
Tower B1 Sqm 0.270 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 0.270 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm 46.18 0.270 12.47 242.19 3020.00 210.94 2630.00 390.00
0.00 0.00
RAB 05 Ceiling Plastering CM 1:3, 10mm tk. 0.00
0.00 0.00
Tower B1 Sqm 1,611.17 0.117 188.51 226.56 42709.00 210.94 39763.00 2,946.00
Tower B2 Sqm 136.94 0.117 16.02 226.56 3630.00 210.94 3380.00 250.00
Tower B3 Sqm 346.99 0.117 40.60 226.56 9198.00 210.94 8564.00 634.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 9,802.82 0.110 1078.31 226.56 244305.00 210.94 227456.00 16,849.00
Tower B2 Sqm 8,410.86 0.110 925.19 226.56 209614.00 210.94 195158.00 14,456.00
Tower B3 Sqm 6,967.94 0.110 766.47 226.56 173654.00 210.94 161678.00 11,976.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm 0.43 0.032 0.01 226.56 3.00 210.94 3.00 -
Tower B2 Sqm 0.21 0.032 0.01 226.56 2.00 210.94 1.00 1.00
Tower B3 Sqm 0.032 0.00 226.56 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.045 0.00 226.56 0.00 210.94 0.00 -
Tower B2 Sqm 0.045 0.00 226.56 0.00 210.94 0.00 -
Tower B3 Sqm 0.045 0.00 226.56 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Page 9 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
Page 10 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
Tower B2 Sqm 76.12 0.117 8.91 218.75 1948.00 210.94 1879.00 69.00
Tower B3 Sqm 172.62 0.117 20.20 218.75 4418.00 210.94 4260.00 158.00
0.00 0.00
Inner Wall Plastering CM 1:4 , 12mm tk. 0.00 0.00
0.00 0.00
Tower B1 Sqm 2,084.47 0.110 229.29 218.75 50158.00 210.94 48366.00 1,792.00
Tower B2 Sqm 2,641.93 0.110 290.61 218.75 63571.00 210.94 61301.00 2,270.00
Tower B3 Sqm 1,766.88 0.110 194.36 218.75 42516.00 210.94 40997.00 1,519.00
0.00 0.00
300mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm (6.47) 0.032 -0.21 218.75 -46.00 210.94 -44.00 (2.00)
Tower B2 Sqm - 0.032 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.032 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
250mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.045 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.045 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.045 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
200mm AAC Block Work -Nito Bond Packing 0.00 0.00
Tower B1 Sqm - 0.030 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 14.25 0.030 0.42 218.75 92.00 210.94 89.00 3.00
Tower B3 Sqm - 0.030 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm - 0.033 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 49.79 0.033 1.66 218.75 363.00 210.94 350.00 13.00
Tower B3 Sqm - 0.033 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm - 0.124 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.124 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.124 0.00 218.75 0.00 210.94 0.00 -
0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm 1,946.49 0.158 307.64 218.75 67296.00 210.94 64893.00 2,403.00
Tower B2 Sqm 922.08 0.158 145.73 218.75 31879.00 210.94 30741.00 1,138.00
Tower B3 Sqm 2,424.08 0.158 383.12 218.75 83808.00 210.94 80,815.00 2,993.00
0.00
Cement Concrete M-20 -grade 0.00
0.00
100mm Lintel 0.00
0.00
Tower B1 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
Tower B2 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
Tower B3 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
0.00
200mm Lintel 0.00
0.00
Tower B1 RM - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B2 RM 3.25 0.236 0.77 218.75 168.00 210.94 162.00 6.00
Tower B3 RM - 0.236 0.00 218.75 0.00 210.94 0.00 -
0.00
Kitchen Platform 0.00
0.00
Tower B1 Sqm 4.92 0.236 1.16 218.75 254.00 210.94 245.00 9.00
Tower B2 Sqm 4.92 0.236 1.16 218.75 254.00 210.94 245.00 9.00
Tower B3 Sqm 9.37 0.236 2.21 218.75 484.00 210.94 466.00 18.00
Toilet Water Proofing 0.00
Tower B1 Sqm 394.64 0.086 33.94 218.75 7424.00 210.94 7159.00 265.00
Page 11 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
Tower B2 Sqm 264.17 0.086 22.72 218.75 4970.00 210.94 4792.00 178.00
Tower B3 Sqm 52.13 0.086 4.48 218.75 981.00 210.94 946.00 35.00
0.00
Terrace Water Proofing 0.00
Tower B1 Sqm - 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm - 0.430 0.00 218.75 0.00 210.94 0.00 -
0.00
Tiling- Vitrified,Ceramic Tile Flooring 0.00
Tower B1 Sqm 191.79 0.240 46.03 218.75 10069.00 210.94 9709.00 360.00
Tower B2 Sqm 75.71 0.240 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 189.07 0.240 45.38 218.75 9926.00 210.94 9572.00 354.00
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00
Skirting & Daddoing
Tower B1 Sqm 65.52 0.270 17.69 218.75 3870.00 210.94 3732.00 138.00
Tower B2 Sqm 152.17 0.270 41.09 218.75 8987.00 210.94 8667.00 320.00
Tower B3 Sqm 65.99 0.270 17.82 218.75 3897.00 210.94 3758.00 139.00
Page 12 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
0.00
100mm Lintel 0.00
0.00
Tower B1 RM 2.02 0.138 0.28 242.19 68.00 210.94 59.00 9.00
Tower B2 RM - 0.138 0.00 242.19 0.00 210.94 0.00 -
Tower B3 RM - 0.138 0.00 242.19 0.00 210.94 0.00 -
0.00
200mm Lintel 0.00
0.00
Tower B1 RM - 0.236 0.00 242.19 0.00 210.94 0.00 -
Tower B2 RM - 0.236 0.00 242.19 0.00 210.94 0.00 -
Tower B3 RM - 0.236 0.00 242.19 0.00 210.94 0.00 -
0.00
Kitchen Platform 0.00
0.00
Tower B1 Sqm 2.64 0.236 0.62 242.19 151.00 210.94 131.00 20.00
Tower B2 Sqm - 0.236 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm - 0.236 0.00 242.19 0.00 210.94 0.00 -
Toilet Water Proofing 0.00
Tower B1 Sqm - 0.086 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 64.82 0.086 5.57 242.19 1350.00 210.94 1176.00 174.00
Tower B3 Sqm 83.63 0.086 7.19 242.19 1742.00 210.94 1517.00 225.00
0.00
Terrace Water Proofing 0.00
Tower B1 Sqm - 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm - 0.00 242.19 0.00 210.94 0.00 -
Tower B3 Sqm - 0.430 0.00 242.19 0.00 210.94 0.00 -
0.00
Tiling- Vitrified,Ceramic Tile Flooring 0.00
Tower B1 Sqm - 0.240 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 68.25 0.240 242.19 0.00 210.94 0.00 -
Tower B3 Sqm 211.72 0.240 50.81 242.19 12306.00 210.94 10718.00 1,588.00
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00
Skirting & Daddoing
Tower B1 Sqm - 0.270 0.00 242.19 0.00 210.94 0.00 -
Tower B2 Sqm 0.90 0.270 0.24 242.19 59.00 210.94 51.00 8.00
Tower B3 Sqm 139.51 0.270 37.67 242.19 9123.00 210.94 7946.00 1,177.00
Page 13 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
0.00 0.00
100mm AAC Block Work -Nito Bond Packing & Sill
0.00 0.00
Band Concrete
Tower B1 Sqm 264.67 0.033 8.82 218.75 1929.00 210.94 1860.00 69.00
Tower B2 Sqm 347.13 0.033 11.57 218.75 2530.00 210.94 2440.00 90.00
Tower B3 Sqm 595.59 0.033 19.85 218.75 4341.00 210.94 4186.00 155.00
0.00 0.00
200mm Solid Block work 0.00 0.00
Tower B1 Sqm - 0.124 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 44.40 0.124 5.51 218.75 1204.00 210.94 1161.00 43.00
Tower B3 Sqm 20.73 0.124 2.57 218.75 562.00 210.94 542.00 20.00
0.00 0.00
External Wall Plastering 12mm thick with CM 1:6,
and( second coat) top layer of 8mm thick of CM 0.00 0.00
1:3
0.00 0.00
Tower B1 Sqm 236.91 0.158 37.44 218.75 8191.00 210.94 7898.00 293.00
Tower B2 Sqm 1,813.05 0.158 286.55 218.75 62683.00 210.94 60444.00 2,239.00
Tower B3 Sqm 603.08 0.158 95.32 218.75 20850.00 210.94 20,106.00 744.00
0.00
Cement Concrete M-20 -grade 0.00
0.00
100mm Lintel 0.00
0.00
Tower B1 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
Tower B2 RM - 0.138 0.00 218.75 0.00 210.94 0.00 -
Tower B3 RM 6.22 0.138 0.86 218.75 188.00 210.94 181.00 7.00
0.00
200mm Lintel 0.00
0.00
Tower B1 RM - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B2 RM - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B3 RM 4.10 0.236 0.97 218.75 212.00 210.94 204.00 8.00
0.00
Kitchen Platform 0.00
0.00
Tower B1 Sqm - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm - 0.236 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 4.44 0.236 1.05 218.75 229.00 210.94 221.00 8.00
Toilet Water Proofing 0.00
Tower B1 Sqm 0.086 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 0.086 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 555.38 0.086 47.76 218.75 10448.00 210.94 10075.00 373.00
0.00
Terrace Water Proofing 0.00
Tower B1 Sqm 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 0.00 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 0.430 0.00 218.75 0.00 210.94 0.00 -
0.00
Tiling- Vitrified,Ceramic Tile 0.00
Flooring,Kitchen Granite
Tower B1 Sqm 0.240 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 78.06 0.240 218.75 0.00 210.94 0.00 -
Tower B3 Sqm 34.96 0.240 8.39 218.75 1835.00 210.94 1770.00 65.00
Tiling- Vitrified Tile Skirting,Ceramic Tile 0.00
Skirting & Daddoing
Tower B1 Sqm 0.270 0.00 218.75 0.00 210.94 0.00 -
Tower B2 Sqm 4.64 0.270 1.25 218.75 274.00 210.94 264.00 10.00
Tower B3 Sqm 12.03 0.270 3.25 218.75 711.00 210.94 685.00 26.00
Page 14 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
Page 15 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
Page 16 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
Page 17 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
Page 18 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
Page 19 of 45
Cement Total Cement Approved Amount on Basic Amount on Difference in
RA Bill No Description Unit Qty
Constant Consumption Rate Approved Rate Rate Basic Rate Amount
Page 20 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
RIVER SAND - ESCALATION
Tower B1 Sqm 1090.51 0.430 468.92 105.00 49237.00 42.86 20097.00 29,140.00
Tower B2 Sqm 2859.63 0.430 1229.64 105.00 129112.00 42.86 52699.00 76,413.00
Tower B3 Sqm 1659.59 0.430 713.62 105.00 74930.00 42.86 30584.00 44,346.00
Tower B1 Sqm 1243.90 0.430 534.88 115.00 61511.00 42.86 22923.00 38,588.00
Tower B2 Sqm 1391.24 0.430 598.23 115.00 68797.00 42.86 25639.00 43,158.00
Tower B3 Sqm 2994.06 0.430 1287.45 115.00 148056.00 42.86 55176.00 92,880.00
Toilet Water Proofing
Tower B1 Sqm 0.422 0.00 115.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.422 0.00 115.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 133.42 0.422 56.27 115.00 6471.00 42.86 2412.00 4,059.00
RAB 4 Ceiling Plastering CM 1:3, 10mm tk.
Tower B1 Sqm 3010.25 0.430 1294.41 110.00 142385.00 42.86 55475.00 86,910.00
Tower B2 Sqm 2598.14 0.430 1117.20 110.00 122892.00 42.86 47880.00 75,012.00
Tower B3 Sqm 0.00 0.430 0.00 110.00 0.00 42.86 0.00 0.00
Toilet Water Proofing
Tower B1 Sqm 0.422 0.00 110.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 141.76 0.422 59.79 110.00 6577.00 42.86 2562.00 4,015.00
Tower B3 Sqm 150.11 0.422 63.31 110.00 6964.00 42.86 2713.00 4,251.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 1.177 0.00 110.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.177 0.00 110.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 58.52 1.177 68.88 110.00 7577.00 42.86 2952.00 4,625.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 1.324 0.00 110.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.324 0.00 110.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 46.18 1.324 61.14 110.00 6726.00 42.86 2620.00 4,106.00
Tower B1 Sqm 1611.17 0.430 692.80 105.00 72744.00 42.86 29692.00 43,052.00
Tower B2 Sqm 136.94 0.430 58.88 105.00 6183.00 42.86 2524.00 3,659.00
Tower B3 Sqm 346.99 0.430 149.21 105.00 15667.00 42.86 6395.00 9,272.00
Toilet Water Proofing
Tower B1 Sqm 48.06 0.422 20.27 105.00 2128.00 42.86 869.00 1,259.00
Tower B2 Sqm 176.16 0.422 74.30 105.00 7801.00 42.86 3184.00 4,617.00
Tower B3 Sqm 101.82 0.422 42.94 105.00 4509.00 42.86 1840.00 2,669.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 186.62 1.806 337.04 105.00 35389.00 42.86 14444.00 20,945.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 68.52 1.177 80.65 105.00 8468.00 42.86 3456.00 5,012.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 184.84 1.324 244.73 105.00 25696.00 42.86 10488.00 15,208.00
Tower B1 Sqm 320.81 0.430 137.95 105.00 14485.00 42.86 5912.00 8,573.00
Tower B2 Sqm 76.12 0.430 32.73 105.00 3437.00 42.86 1403.00 2,034.00
Tower B3 Sqm 172.62 0.430 74.23 105.00 7794.00 42.86 3181.00 4,613.00
Toilet Water Proofing
Tower B1 Sqm 394.64 0.422 166.44 105.00 17476.00 42.86 7133.00 10,343.00
Tower B2 Sqm 264.17 0.422 111.42 105.00 11699.00 42.86 4775.00 6,924.00
Tower B3 Sqm 52.13 0.422 21.99 105.00 2309.00 42.86 942.00 1,367.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 191.79 1.177 225.74 105.00 23702.00 42.86 9674.00 14,028.00
Tower B2 Sqm 75.71 1.177 89.11 105.00 9356.00 42.86 3819.00 5,537.00
Tower B3 Sqm 189.07 1.177 222.54 105.00 23367.00 42.86 9537.00 13,830.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 65.52 1.324 86.75 105.00 9109.00 42.86 3718.00 5,391.00
Tower B2 Sqm 152.17 1.324 201.47 105.00 21155.00 42.86 8635.00 12,520.00
Tower B3 Sqm 65.99 1.324 87.37 105.00 9174.00 42.86 3744.00 5,430.00
Tower B1 Sqm 113.97 0.430 49.01 105.00 5146.00 42.86 2100.00 3,046.00
Tower B2 Sqm 174.64 0.430 75.10 105.00 7885.00 42.86 3218.00 4,667.00
Tower B3 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Toilet Water Proofing
Tower B1 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 64.82 0.422 27.34 105.00 2871.00 42.86 1172.00 1,699.00
Tower B3 Sqm 83.63 0.422 35.27 105.00 3704.00 42.86 1512.00 2,192.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 68.25 1.177 80.33 105.00 8435.00 42.86 3443.00 4,992.00
Tower B3 Sqm 211.72 1.177 249.20 105.00 26166.00 42.86 10680.00 15,486.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.90 1.324 1.19 105.00 125.00 42.86 51.00 74.00
Tower B3 Sqm 139.51 1.324 184.71 105.00 19395.00 42.86 7916.00 11,479.00
Tower B1 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Page 21 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
RIVER SAND - ESCALATION
Tower B2 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 106.56 0.430 45.82 105.00 4811.00 42.86 1964.00 2,847.00
Toilet Water Proofing
Tower B1 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 555.38 0.422 234.24 105.00 24595.00 42.86 10039.00 14,556.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 78.06 1.177 91.88 105.00 9647.00 42.86 3938.00 5,709.00
Tower B3 Sqm 34.96 1.177 41.15 105.00 4321.00 42.86 1763.00 2,558.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 4.64 1.324 6.14 105.00 645.00 42.86 263.00 382.00
Tower B3 Sqm 12.03 1.324 15.93 105.00 1672.00 42.86 683.00 989.00
Tower B1 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 267.42 0.430 114.99 105.00 12074.00 42.86 4928.00 7,146.00
Tower B3 Sqm 32.29 0.430 13.88 105.00 1458.00 42.86 595.00 863.00
Toilet Water Proofing
Tower B1 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 98.07 0.422 41.36 105.00 4343.00 42.86 1773.00 2,570.00
Tower B3 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 65.84 1.177 77.49 105.00 8137.00 42.86 3321.00 4,816.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 18.08 1.324 23.94 105.00 2513.00 42.86 1026.00 1,487.00
Tower B3 Sqm 5.12 1.324 6.78 105.00 712.00 42.86 291.00 421.00
Tower B1 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Toilet Water Proofing
Tower B1 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 96.99 0.422 40.91 105.00 4295.00 42.86 1753.00 2,542.00
Tower B3 Sqm 13.67 0.422 5.77 105.00 605.00 42.86 247.00 358.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 148.06 1.806 267.39 105.00 28076.00 42.86 11459.00 16,617.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 98.26 1.177 115.65 105.00 12144.00 42.86 4957.00 7,187.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 0.00 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 65.81 1.324 87.14 105.00 9149.00 42.86 3734.00 5,415.00
Tower B1 Sqm 86.31 0.430 37.11 105.00 3897.00 42.86 1591.00 2,306.00
Tower B2 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Toilet Water Proofing
Tower B1 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 33.33 0.422 14.06 105.00 1476.00 42.86 602.00 874.00
Tower B3 Sqm 128.59 0.422 54.23 105.00 5694.00 42.86 2324.00 3,370.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tiling- Vitrified,Ceramic Tile
Flooring
Tower B1 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 1.177 0.00 105.00 0.00 42.86 0.00 0.00
Tiling- Vitrified Tile
Skirting,Ceramic Tile Skirting &
Daddoing
Tower B1 Sqm 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 1.324 0.00 105.00 0.00 42.86 0.00 0.00
Tower B1 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 0.430 0.00 105.00 0.00 42.86 0.00 0.00
Toilet Water Proofing
Tower B1 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.422 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 200.10 0.422 84.39 105.00 8861.00 42.86 3617.00 5,244.00
Terrace Water Proofing
Tower B1 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 1.806 0.00 105.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 66.37 1.806 119.86 105.00 12585.00 42.86 5137.00 7,448.00
Page 22 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
P.SAND - ESCALATION
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
Tower B1 Sqm 1946.49 0.854 1,661.33 60.00 99,680.00 42.86 71,200.00 28,480.00
Tower B2 Sqm 922.08 0.854 787.00 60.00 47,220.00 42.86 33,728.00 13,492.00
Tower B3 Sqm 2424.08 0.854 2,068.96 60.00 124,137.00 42.86 88,670.00 35,467.00
Page 23 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
P.SAND - ESCALATION
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
Tower B1 Sqm 1258.10 0.540 679.37 60.00 40,762.00 42.86 29,116.00 11646.00
Tower B2 Sqm 1020.48 0.540 551.06 60.00 33,064.00 42.86 23,617.00 9447.00
Tower B3 Sqm 0.00 0.540 - 60.00 - 42.86 - 0.00
Tower B1 Sqm 1330.43 0.854 1,135.52 60.00 68,131.00 42.86 48,665.00 19,466.00
Tower B2 Sqm 2774.12 0.854 2,367.72 60.00 142,063.00 42.86 101,474.00 40,589.00
Tower B3 Sqm 1365.95 0.854 1,165.84 60.00 69,950.00 42.86 49,965.00 19,985.00
Tower B1 Sqm 236.91 0.854 202.20 60.00 12,132.00 42.86 8,666.00 3,466.00
Tower B2 Sqm 1813.05 0.854 1,547.44 60.00 92,846.00 42.86 66,319.00 26,527.00
Tower B3 Sqm 603.08 0.854 514.73 60.00 30,884.00 42.86 22,060.00 8,824.00
IPS Flooring
Tower B1 Sqm 0.738 - 60.00 - 42.86 - -
Tower B2 Sqm 0.738 - 60.00 - 42.86 - -
Tower B3 Sqm 38.92 0.738 28.73 60.00 1,724.00 42.86 1,231.00 493.00
Page 24 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
P.SAND - ESCALATION
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
IPS Flooring
Tower B1 Sqm - 0.738 - 60.00 - 42.86 - -
Tower B2 Sqm - 0.738 - 60.00 - 42.86 - -
Tower B3 Sqm - 0.738 - 60.00 - 42.86 - -
IPS Flooring
Tower B1 Sqm - 0.738 - 60.00 - 42.86 - -
Tower B2 Sqm - 0.738 - 60.00 - 42.86 - -
Tower B3 Sqm - 0.738 - 60.00 - 42.86 - -
Page 25 of 45
CHETTINAD BUILDERS PVT LTD
AKSHAYA TODAY WORK SITE
M.SAND - ESCALATION
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
RAB 1
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 17.96 0.110 1.97 49.00 96.00 42.86 84.00 12.00
Tower B2 Sqm 36.66 0.110 4.02 49.00 197.00 42.86 172.00 25.00
Tower B3 Sqm 0.00 0.110 0.00 49.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond 0.00
Packing
Tower B1 Sqm 192.52 0.073 13.97 49.00 685.00 42.86 599.00 86.00
Tower B2 Sqm 402.00 0.073 29.17 49.00 1429.00 42.86 1250.00 179.00
Tower B3 Sqm 0.00 0.073 0.00 49.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond
0.00
Packing & Sill Band Concrete
Tower B1 Sqm 109.03 0.082 8.91 49.00 437.00 42.86 382.00 55.00
Tower B2 Sqm 225.93 0.082 18.46 49.00 905.00 42.86 791.00 114.00
Tower B3 Sqm 0.00 0.082 0.00 49.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 0.00 0.910 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.910 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.910 0.00 49.00 0.00 42.86 0.00 -
100mm Lintel
200mm Lintel
Kitchen Platform
Tower B1 Sqm 28.10 0.434 12.20 49.00 598.00 42.86 523.00 75.00
Tower B2 Sqm 18.74 0.434 8.13 49.00 398.00 42.86 348.00 50.00
Tower B3 Sqm 281.04 0.434 121.97 49.00 5977.00 42.86 5227.00 750.00
Page 26 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
Tower B2 Sqm 53.04 0.910 48.27 49.00 2365.00 42.86 2069.00 296.00
Tower B3 Sqm 0.00 0.910 0.00 49.00 0.00 42.86 0.00 -
100mm Lintel
200mm Lintel
Kitchen Platform
Tower B1 Sqm 168.62 0.434 73.18 49.00 3586.00 42.86 3136.00 450.00
Tower B2 Sqm 65.10 0.434 28.25 49.00 1384.00 42.86 1211.00 173.00
Tower B3 Sqm 84.31 0.434 36.59 49.00 1793.00 42.86 1568.00 225.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 7.64 0.080 0.61 49.00 30.00 42.86 26.00 4.00
Tower B2 Sqm 11.81 0.080 0.94 49.00 46.00 42.86 40.00 6.00
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond 0.00
Packing
Tower B1 Sqm 93.36 0.110 10.23 49.00 501.00 42.86 438.00 63.00
Tower B2 Sqm 133.80 0.110 14.66 49.00 718.00 42.86 628.00 90.00
Tower B3 Sqm 0.00 0.110 0.00 49.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 1247.43 0.073 90.53 49.00 4436.00 42.86 3880.00 556.00
Tower B2 Sqm 2156.03 0.073 156.46 49.00 7667.00 42.86 6706.00 961.00
Tower B3 Sqm 2.94 0.073 0.21 49.00 10.00 42.86 9.00 1.00
0.00
100mm AAC Block Work -Nito Bond
0.00
Packing & Sill Band Concrete
Tower B1 Sqm 701.76 0.082 57.34 49.00 2810.00 42.86 2457.00 353.00
Tower B2 Sqm 1084.92 0.082 88.65 49.00 4344.00 42.86 3799.00 545.00
Tower B3 Sqm 57.95 0.082 4.74 49.00 232.00 42.86 203.00 29.00
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 125.58 0.910 114.28 49.00 5600.00 42.86 4898.00 702.00
Tower B2 Sqm 55.58 0.910 50.58 49.00 2478.00 42.86 2168.00 310.00
Tower B3 Sqm 18.95 0.910 17.24 49.00 845.00 42.86 739.00 106.00
RAB 4 Cement Concrete M-20 -grade
100mm Lintel
200mm Lintel
Kitchen Platform
Tower B1 Sqm 0.00 0.434 0.00 52.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 112.90 0.434 49.00 52.00 2548.00 42.86 2100.00 448.00
Tower B3 Sqm 0.00 0.434 0.00 52.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.00 0.080 0.00 52.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.080 0.00 52.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.080 0.00 52.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Page 27 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
100mm Lintel
200mm Lintel
Kitchen Platform
Tower B1 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.43 0.080 0.03 48.00 2.00 42.86 1.00 1.00
Tower B2 Sqm 0.21 0.080 0.02 48.00 1.00 42.86 1.00 -
Tower B3 Sqm 0.00 0.080 0.00 48.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond 0.00
Packing
Tower B1 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond
0.00
Packing & Sill Band Concrete
Tower B1 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.24 0.082 0.02 48.00 1.00 42.86 1.00 -
Tower B3 Sqm 50.42 0.082 4.12 48.00 198.00 42.86 177.00 21.00
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 17.50 0.910 15.93 48.00 764.00 42.86 683.00 81.00
Tower B2 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
100mm Lintel
Page 28 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
200mm Lintel
Kitchen Platform
Tower B1 Sqm 4.92 0.434 2.14 48.00 103.00 42.86 92.00 11.00
Tower B2 Sqm 4.92 0.434 2.14 48.00 103.00 42.86 92.00 11.00
Tower B3 Sqm 9.37 0.434 4.07 48.00 195.00 42.86 174.00 21.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm -6.47 0.080 -0.52 49.00 -25.00 42.86 -22.00 (3.00)
Tower B2 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond 0.00
Packing
Tower B1 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 14.25 0.073 1.03 48.00 50.00 42.86 44.00 6.00
Tower B3 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond
0.00
Packing & Sill Band Concrete
Tower B1 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 49.79 0.082 4.07 48.00 195.00 42.86 174.00 21.00
Tower B3 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
100mm Lintel
200mm Lintel
Kitchen Platform
Tower B1 Sqm 2.64 0.434 1.15 48.00 55.00 42.86 49.00 6.00
Tower B2 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 13.28 0.073 0.96 48.00 46.00 42.86 41.00 5.00
Tower B2 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
0.00
Page 29 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
100mm Lintel
200mm Lintel
Kitchen Platform
Tower B1 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 4.44 0.434 1.93 48.00 92.00 42.86 83.00 9.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 6.39 0.080 0.51 49.00 25.00 42.86 22.00 3.00
Tower B2 Sqm 6.28 0.080 0.50 49.00 25.00 42.86 21.00 4.00
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 3.85 0.073 0.28 48.00 13.00 42.86 12.00 1.00
Tower B2 Sqm 43.08 0.073 3.13 48.00 150.00 42.86 134.00 16.00
Tower B3 Sqm 144.30 0.073 10.47 48.00 503.00 42.86 449.00 54.00
0.00
100mm AAC Block Work -Nito Bond 0.00
Packing & Sill Band Concrete
Tower B1 Sqm 264.67 0.082 21.63 48.00 1038.00 42.86 927.00 111.00
Tower B2 Sqm 347.13 0.082 28.36 48.00 1361.00 42.86 1216.00 145.00
Tower B3 Sqm 595.59 0.082 48.67 48.00 2336.00 42.86 2086.00 250.00
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 44.40 0.910 40.40 48.00 1939.00 42.86 1732.00 207.00
Tower B3 Sqm 20.73 0.910 18.86 48.00 905.00 42.86 808.00 97.00
100mm Lintel
200mm Lintel
Kitchen Platform
Tower B1 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Page 30 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
Tower B3 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond 0.00
Packing
Tower B1 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 67.41 0.073 4.89 48.00 235.00 42.86 210.00 25.00
Tower B3 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond 0.00
Packing & Sill Band Concrete
Tower B1 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 40.30 0.082 3.29 48.00 158.00 42.86 141.00 17.00
Tower B3 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
100mm Lintel
200mm Lintel
Kitchen Platform
Tower B1 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B2 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
Tower B3 Sqm 0.00 0.434 0.00 48.00 0.00 42.86 0.00 0.00
300mm AAC Block Work -Nito Bond
Packing
Tower B1 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.080 0.00 49.00 0.00 42.86 0.00 -
0.00
250mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.110 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm AAC Block Work -Nito Bond
0.00
Packing
Tower B1 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.073 0.00 48.00 0.00 42.86 0.00 -
0.00
100mm AAC Block Work -Nito Bond 0.00
Packing & Sill Band Concrete
Tower B1 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.082 0.00 48.00 0.00 42.86 0.00 -
0.00
200mm Solid Block work 0.00
Tower B1 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B2 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Tower B3 Sqm 0.00 0.910 0.00 48.00 0.00 42.86 0.00 -
Page 31 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
100mm Lintel
200mm Lintel
Kitchen Platform
Page 32 of 45
RA Bill M Sand Total M Sand Approved Amount on Basic Amount on Basic Difference in
Description Unit Qty
No Constant Consumption Rate Approved Rate Rate Rate Amount
100mm Lintel
200mm Lintel
Kitchen Platform
Page 33 of 45
100mm Lintel for 1RM 200mm Lintel for 1RM
Coefficient -for 1RM L B D Qty Coefficient -for 1RM L B D Qty
1.00 0.10 0.175 0.0175 0.138 1.00 0.20 0.15 0.0300
Cement Constant Per RM 0.138 Bags Cement Constant Per RM 0.236 Bags
M Sand Constant Per RM 0.253 cft M Sand Constant Per RM 0.434 cft
1 - 1.5 - 3 1 - 1.5 - 3
BBS of Lintel
Size of Steel Bar
Sl Cutting
Description Dia N O M No P M
No Length 8 Tor 10 Tor 12 Tor 16 Tor 20 Tor 25 Tor 32 Tor
Main Rods
Bottum rod 950 10 1 2 0.950 0.00 1.90 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
Top rod 950 10 1 2 0.950 0.00 1.90 0.00 0.00 0.00 0.00 0.00
Rings @ Ends C/C 150 50 125 950 - - - - - 8 1 6 0.414 2.62 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
Main Rods
Bottum rod 950 10 1 2 0.950 0.00 1.90 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
Top rod 950 10 1 2 0.950 0.00 1.90 0.00 0.00 0.00 0.00 0.00
Rings @ Ends C/C 150 150 100 950 - - - - - 8 1 6 0.564 3.57 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Kitchen Platform -Slab Rod 2600 600 1NOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00
L span - C/C 250 635 8 1 10 0.635 6.57 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
S span- C/C 200 2585 8 1 3 2.585 8.21 0.00 0.00 0.00 0.00 0.00 0.00
Kitchen Platform -Slab Rod 2060 600 1NOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00
L span - C/C 250 635 8 1 8 0.635 5.32 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
S span- C/C 200 2095 8 1 3 2.095 6.65 0.00 0.00 0.00 0.00 0.00 0.00
0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Wall Rod -3Nos 800 600 0.00 0.00 0.00 0.00 0.00 0.00 0.00
600mm Width 100 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Vertical Rod - C/C 150 865 8 3 4 0.965 11.58 0.00 0.00 0.00 0.00 0.00 0.00
Vertical Rod - C/C 150 865 8 2 4 0.965 6.82 0.00 0.00 0.00 0.00 0.00 0.00
M 20 Grade Concrete
1 - 1.5 - 3
For 1Sqm
Coefficient -for 1Sqm L B D Qty
1.00 1.00 0.05 0.0500
M 20 Grade Concrete
1 :; 2:; 4;:
Cement:
1st Coat - 12mm Thick C: M - 1 : 6
Cement Constant for 1Sqm 0.074 Bags
2nd Coat - 8mm Thick C: M - 1 : 3 0.084 Bags
P Sand :
1st Coat - 12mm Thick C: M - 1 : 6
0.544 Cft
2nd Coat - 8mm Thick C: M - 1 : 3 0.309 Cft
Sher wall change 250mm Wall Sqm 1 0.960 2.780 2.669 h- 2.95-0.5 =2.45
Bed Room -3 & Bed Room -2 250mm Wall Sqm 1 0.960 2.450 2.352
Deduction of Window W4 -0.750mX 1.50m -1Nos 250mm Wall Sqm -1 0.710 1.500 -1.065
Shear wall change 250mm Wall Sqm 1 0.960 2.780 2.669 h- 2.95-0.5 =2.45
Toilet door D2 sqm 1 0.960 2.780 2.669
Deduction for door Sqm -1 0.750 2.100 -1.575
Lintel sqm -1 1.000 0.200 -0.200
Total Quantity for one 3BHK Flat 4.850 Sqm
Bed Room
Sqm 1 4.690 2.450 11.491
Deduction of Window W3 -1.060mX 1.50m -1Nos Sqm -1 1.060 1.500 -1.590
Deduction of Window W4 -1.500mX 1.50m -1Nos Sqm -1 1.500 1.500 -2.250
Master Bedroom
Long Wall Sqm 1 3.600 2.450 8.820 3.55
Deduction of Window W4 -1.500mX 1.50m -1Nos Sqm -1 1.500 1.500 -2.250
Short Wall Sqm 1 1.940 2.450 4.753
Deduction of W1 - 0.750mX1.50m -1Nos Sqm -1 0.750 1.500 -1.125
Bath-1
Short Wall Sqm 0.50 2.060 2.450 2.524
Long Wall Sqm 2 2.380 2.450 11.662
Deduction of V1 - 0.60mX0.90m -1Nos Sqm -1 0.600 0.900 -0.540
Master Bedroom
Long Wall Sqm 1 3.600 2.450 8.820 3.55
Deduction of DW1 - 2.00mX2.40m -1Nos Sqm -1 2.000 2.400 -4.800
Short Wall Sqm 1 1.940 2.450 4.753
Deduction of W4 - 0.750mX1.50m -1Nos Sqm -1 0.750 1.500 -1.125
Bath-1
Short Wall Sqm 0.50 2.060 2.450 2.524
Long Wall Sqm 2 2.380 2.450 11.662
Deduction of V1 - 0.60mX0.90m -1Nos Sqm -1 0.600 0.900 -0.540
COMMON AREA
Flat-2 kitchen 200mm Wall with Shear Wall Sqm 1 1.620 2.450 3.969
Flat-4 kitchen 200mm Wall with Shear Wall Sqm 1 1.850 2.450 4.533
Flat-5 kitchen 200mm Wall with Shear Wall Sqm 1 1.850 2.450 4.533
MeterBoard Main Raising Shaft & Garbage Room Sqm 1 3.475 2.450 8.514
Deduction of D3 -0.750mX 2.10m -1Nos Sqm -1 0.750 2.100 -1.575
Deduction of Cut Lintel Sqm -1 1.050 0.150 -0.158
Duct opening Sqm -1 0.750 1.200 -0.900
MeterBoard Main Raising Shaft Sqm 1 1.215 2.780 3.378
Bath-2
2.480 +1.720m Wall 100mm Wall Sqm 1 4.300 2.780 11.954 4.275
Deduction of D3 -0.750mX 2.10m -1Nos 100mm Wall Sqm -1 0.750 2.100 -1.575
Deduction of Cut Lintel 100mm Wall Sqm -1 1.050 0.200 -0.210
Master Bedroom Passage Wall 100mm Wall Sqm 1 0.960 2.780 2.669
Deduction of D2 -0.900mX 2.10m -1Nos 100mm Wall Sqm -1 0.900 2.100 -1.890
Deduction of Cut Lintel 100mm Wall Sqm -1 1.200 0.200 -0.240
Bath-1
Short Wall 100mm Wall Sqm 1 1.660 2.450 4.067 1.61
Deduction of D3 -0.750mX 2.10m -1Nos 100mm Wall Sqm -1 0.750 2.100 -1.575
Deduction of Cut Lintel 100mm Wall Sqm -1 1.050 0.200 -0.210
Kitchen Wall
Long Wall 100mm Wall Sqm 1 2.760 2.780 7.673
Deduction of Open -0.90mX 2.10m -1Nos 100mm Wall Sqm -1 0.900 2.100 -1.890
Deduction of Cut Lintel 100mm Wall Sqm -1 1.200 0.200 -0.240
Partirion Wall 100mm Wall Sqm 1 0.900 2.780 2.502
Shaft Wall 100mm Wall Sqm 1 0.760 2.780 2.113
Deduction of MS Louver -0.76mX0.80m -1Nos 100mm Wall Sqm -1 0.760 0.800 -0.608
Bath-2
Toilet wall 100mm Wall Sqm 1 2.580 2.780 7.172 2.405
Bed Room -3 & Bed Room -2 100mm Wall Sqm 1 9.400 2.780 26.132
Deduction of D2 -0.900mX 2.10m -1Nos 100mm Wall Sqm -1 0.900 2.100 -1.890
Deduction of Cut Lintel 100mm Wall Sqm -1 1.050 0.200 -0.210
Deduction of D2 -0.900mX 2.10m -1Nos 100mm Wall Sqm -1 0.900 2.100 -1.890
Deduction of Cut Lintel 100mm Wall Sqm -1 1.050 0.200 -0.210
Master Bedroom Door Wall 100mm Wall Sqm 1 0.960 2.780 2.669
Deduction of D2 -0.900mX 2.10m -1Nos 100mm Wall Sqm -1 0.900 2.100 -1.890
Deduction of Cut Lintel 100mm Wall Sqm -1 1.200 0.200 -0.240
Bath-1
Short Wall 100mm Wall Sqm 1 1.660 2.450 4.067 1.61
Deduction of D3 -0.750mX 2.10m -1Nos 100mm Wall Sqm -1 0.750 2.100 -1.575
Deduction of Cut Lintel 100mm Wall Sqm -1 1.050 0.200 -0.210
Bed Room Balcony Shaft 100mm Wall Sqm 1 0.860 2.780 2.391
Master Bed Room Balcony Shaft 100mm Wall Sqm 1 0.550 2.780 1.529
Common Area
FHC Shaft 100mm Wall Sqm 1 1.620 2.470 4.001 1.57
Deduction of Open 100mm Wall Sqm -1 1.200 1.200 -1.440