รายงานการทดสอบเครื่องเป่ าลมขนาดใหญ่

AIR HANDLING UNIT START UP REPORT


Project

Project No
EQUIPMENT DATA
Unit No : Manufacture:
Model : Type :
Serial No : Service Ar :
Control Valve Typ: Manufacture:
Fan Wheel Diamet: No of Fa :
Fan Shaft Size : Fan Pulley :
Belt Size Length : No of Bel:
Motor Type : Manufacture:
Serial No : HP : FLA :
Service Factor : RPM : Shaft S :
Motor Pulley Size : Power Sup :
Type of Starter :

PRE-START UP CHECK
Bearing Greasing Free Rotation
Control Wiring Rotating Direction
Motor Insulation Coupling Alignment

OPERATING DATA
Entering Water Temperature (F ) :
Leaving Water Temperature (F ) :
Inlet Water Pressure (PSIG) :
Outlet Water Pressure (PSIG) :
Water Flow Rate (GPM) :
Entering Air Temperature,FDB/FWB :
Leaving Air Temperature,FDB/FWB:
Air Flow (CFM) :
Total Static Pressure, IN. WG. :
Supply Voltage :
Actual Current :
Noise :