WATERPROOFING - CHRYSTALLINE CLEAR REF.

NO……………………

DRAWING NO. INSPECTION DATE/ TIME

REVISION APPLICATION DATE

DATE CONTRACTOR

CONTRACTOR CORNERSTONE
ITEM COMMENTS
SIGNATURE DATE SIGNATURE DATE

PRE-WATERPROOFING

1 MARK EXTENT OF TREATMENT WATER LEVEL

2 CHECK CLEANLINESS

3 CHECK APPLICATION 100% VISUAL

4 CHECK AROUND DRAINS

POST-WATERPROOFING

5 CURING TIME / SETTING TIME

6 POND TEST 24 HOURS

7 POND TEST 48 HOURS

8 POND TEST 72 HOURS

9 PROTECTION

NOTE: VISUAL INSPECTION REQUIRED AFTER REMOVAL OF PROTECTION BEFORE APPLICATION OF FINISH.