Professional Documents
Culture Documents
Group 5 Project
Group 5 Project
Me SLrver fabrication
Process Blok Diarans of rot
Malemal selectiGn Mere but he Marte out lha leng b|
Share of be lengh of he
- Stainlecs Stee/
Compon en t rectang ulqr Plate
|yloder red and plate Shoft for he
Techa:cal
(utling sain
3 Weldng Ssti
keg wy
Hend fle the Sharf Weld fh e (ut GutA the (re ate ateyuy
on the Shaft fo
Plates to he plates
edses of he Shre Shafl Jhe Gear
Te thn:cal
(utling suin
3
20 6F Rejavry kettle Body
Vew
hole
[ront Vic w
To Vew
7of Vew
|Dill holes on (ut Qut the De form the bal sitns Weld the hollowcd Pace the 6al
Pates and plate nto a |flange flate to
jlonge fater Gasket (ave fon the f t and >fipe and
hird pipe weld
Hond fle He Plae he gaskel
|Sharp edges in bebween and boll Place the ball Plae the
0f he dran the frst and tbrd on the C'ttn 5 3ude plate
Plate and weld 2 Pipe
Ppe Ppe to the fanged the tkree pipes
Valve and weld
togeher
RDOF Sland rame
Bo/king plale
Top view
SEirrer
Heater
Dwanpfe
Yalve s