Q.1 COCOMO stands for


a) Constructive cost model
b) Comprehensive cost model
c) Constructive cost estimation model
d) Complete cost estimation model

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.2 Which one is not a size measure for software product?


a) LOC
b) Cocomo model
c) Function Count
d) Cyclomatic Complexity

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.3 Estimation of size for a project is dependent on


a) Cost
b) Time
c) Schedule
d) None of the mentioned

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.4 Which of the following are parameters involved in computing the total cost of a software development project?
a) Hardware and software costs
b) Effort costs
c) Travel and training costs
d) All of the mentioned

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.5 Which technique is applicable when other projects in the same analogy application domain have been completed?
a) Algorithmic cost modelling
b) Expert judgement
c) Estimation by analogy
d) All of these

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.6 Why is decomposition technique required?


a) Software project estimation is a form of problem solving
b) Developing a cost and effort estimate for a software project is too complex
c) All of the mentioned
d) None of the mentioned

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.7 If a Direct approach to software project sizing is taken, size can be measured in
a) LOC
b) FP
c) LOC and FP
d) None of the mentioned

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.8 Which software project sizing approach develop estimates of the information domain characteristics?
a) Function point sizing
b) Change sizing
c) Feature point matric
d) Loc

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.9 How many forms exists of Barry Boehm’s COCOMO Model?


a) Two
b) Three
c) Four
d) No form exists

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.10 Which of the following is an important factor that can affect the accuracy and efficacy of estimates?
a) Project size
b) Planning process
c) Project complexity
d) Degree of structural uncertainty

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.11 Which of the following is NOT a recognized software project type under COCOMO model?
a) embedded
b) semidetached
c) detached 1
d) organic

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.12 The COCOMO model is used for


a) software analysis
b) software cost 'approximation
c) software cost estimation
d) software design

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.13 Estimation of software development effort for organic software in basic COCOMO is
a) E = 2.0(KLOC) 1.05 Per Month
b) E = 3.4(KLOC) 1.06 Per Month
c) E= 2.4(KLOC) 1.05 Per Month
d) E = 2.4(KLOC) 1.07 Per Month

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.14 In Delphi cost estimation, estimation is performed by a


(a) Group expert
(b) Individual expert
(c) Review team
(d) Programmer

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.15 If a project manager tries to complete a project in a time shorter than the estimated time, then the cost will
(a) Decrease slightly /थोड़ा कम करें
(b) Increase drastically/अत्यधिक वृद्धि
(c) Remain unaffected /अप्रभ़ाधवत रहऩा
(d) Increase minimally /न्यूनतम वृद्धि

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.16 Which of the following metric does not depend on the programming language used?
(a) Lines of code
(b) Function count
(c) Token count
(d) Feature point metric

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.17 According to the COCOMO model, for estimating a project, the manager needs to consider
(a) Characteristics of the product
(b) Experience of the development team
(c) Characteristics of the development environment
(d) All of the above

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.18 Which feature do feature point metrics incorporate that is not present in the function point metrics?
(a) Number of inputs
(b) Number of outputs
(c) Algorithmic complexity
(d) Number of interfaces

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.19 Which of the following unit considers the features of a software project for size measurement? 3
(a) Lines of Code (LOC)
(b) Function point
(c) Feature point
(d) Object point

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.20 Which of the following metrics is based on operators and operands?


(a) Lines of code
(b) Function point
(c) Object point
(d) Token count

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.21 Which of the following is not responsible for the failure of a software development
(a) Inadequate user involvement /अपऱ्ााप्त उपर्ोगकत़ाा भ़ागीद़ारी
(b) Size of the company
(c) Continuation of project that should have been cancelled/उस पररर्ोजऩा को ज़ारी रखऩा धजसे रद्द कर धदऱ्ा ज़ाऩा च़ाधहए थ़ा
(d) Failure to integrate components

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.22 Phase-wise effort and time distribution can be obtained through


(a) Basic COCOMO
(b) Intermediate COCOMO
(c) COCOMO-II
(d) Detailed COCOMO

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.23 The function point metric depends on


(a) Number of functions needed
(b) Number of external inputs and outputs
(c) Number of users
(d) Time required to transform input into output

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.24 The correct precedence order of project planning activities is


(a) Size estimation > Effort estimation > Cost estimation
(b) Size estimation > Cost estimation > Effort estimation
(c) Cost estimation > Size estimation > Effort estimation
(d) Effort estimation > Size estimation > Cost estimation

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.25 The development of a data processing program in which team members are inexperienced & experience in developing a similar
product can be classified as project.
(a) Organic
(b) Semidetached
(c) Embedded
(d) Multiplicative

8949174075 7014528940
Programmer 2024 INFIQUE
A UNIQUE TECHNICAL SOLUTION

Q.26 Which of the following are direct measures?


(i) Size (ii) Effort (iii) Schedule (iv) Quality
(a) Both (i) and (ii)
(b) Both (i) and (iv)
(c) Both (ii) and (iii)
(d) (i), (ii), and (iii)