Mud Report Geotermal 11.04.2024
Mud Report Geotermal 11.04.2024
TIME DISTRIBUTION Last 24 hrs MUD VOL ACCTG (m3) SOLIDS ANALYSIS RHEOLOGY & HYDRAULICS
Drilling Water Added NaCl mg/l n
Trip Total water 289 KCl mg/l k
Reaming Formation Losses Low Gravity %vol 6.0 Tauy
Run casing Total form Losses Bentonite %vol 0.5 Bit loss/%, psi/%
Cementing op Surface Losses Drill Solids kg/m3 8.7 Bit HHP/HIS
WOC Tot surf losses 64 Weight Material kg/m3 Jet Velocity, m/s
Other Mud disposed 32 Chemical Conc %vol 1.1 Va Pipe, m/min
Drill out ciment Total disposed 32 Inert/React 5.7 Va Collars, m/min
Circulation Cuttings disposed 40 Average SG Solids 1.8 CVa Pipe, m/min
Total Cutt disposed 40 CVa Collars, m/min
ECD at Shoe, kg/l
ECD at TD, kg/l
Total
M-I Engineer Phone email Whse Phone Rig Phone Daily cost Cumulative Cost
Cristian Jugaru 0744 338 087 cristianjugaru@yahoo.com