ARCHITECTURE STUDIO

CLIENT NAME :- DR ANIL JI


ADD:- LIG NEAR CHL HOSPITAL

FURNITURE WROK , POP CEILING WORK , ELECTRIC LIGHT WORK , PLUMBING WORK ,
GLASS WORK , AC LINE

material rate /sqf or unite unite amount


18mm plywood 60rssqf 1920 22 42240
12mm plywood 45sqf 1440 25 36000
25 mm board for door 85sqf 0 0 0
mdf 12mm 35rs 1120 6 6720
25mm mdf 3d cnc cutting 0 0 0
inner mica 550 20 11000
outer mica 1500 15 22500
fevicole 80 250 20000
hardware 10000 1 10000
labour 70000 1 70000
mirror 0 0 0
GLASS 4 DOOR WITH FITTING 30000 1 30000
wallpaper 1 0 0
bhadha + lift 5000 1 5000
POP FALL CEILING 400 70 28000
ELECTRIC WORK 40000 1 40000
COLOR 400 60 24000
COUSION FOR SITTING 7000 1 7000
chair 4 3000 12000
PLUMBING WORK WITH MATERIAL 1 10000 10000
murals and wall art , wall panting 1 0 0
ac line 300 0
interior design fees 0
total amount 374460

Price will vary depending on material rate or selection.


206
material rate /sqf or unite unite amount
18mm plywood 60rssqf 1920 70 134400
12mm plywood 50sqf 1600 22 35200
25 mm board for door 85sqf 2720 6 16320
mdf 12mm 40rs 1280 8 10240
inner mica 550 50 27500
outer mica 1500 32 48000
fevicole 250 160 40000
hardware 35000 1 35000
labour 170000 1 170000
mirror 2 2500 5000
wallpaper 1 6000 6000
bhadha + lift 5000 1 5000
CEILING IN ENTRY 15000 1 15000
electric work 40000 1 40000
HOUSE COLOR 1000 95 95000
HALL COUCH MATERIAL + LABOUR 7000 1 7000
sofa cloth cange 13000 1 13000
bed cousion work cloth change 1 15000 15000
murals and wall art , wall panting 1 30000 30000
cnc partition 1 15000 15000
interior design fees 0
total amount 762660

Price will vary depending on material rate or selection.


material unite rate amount

18 mm ply 60rs sqf 10 1920 19200


inner mica 45 rs sqf 15 550 8250
outer sheet 7 1200 8400
6 trolly 6 1100 6600
2 pullout 2 1500 3000
chennal 8 350 2800
kabje 35 90 3150
fevicole 20 3000
other hardware 1 1500
handle 35 50 1750
labour 1 1 18000
total amount 75650
DATE AMOUNT DETAILS
12/7/2023 150000 BY CASH AT GARDEN BEHAIND SCHOOL

TOTAL RECIVE 150000


EXPANCES FOR MATERILA
12/7/2023 76700 FOR PLY 18MM30,8MM10,30INNER,50KG FEVICOLE
12/7/2023 1300 BHADHA
12/7/2023 1700 LIFITNG 5TH FLOOR
8-Dec 530 PACKING TAP
8-Dec 220 ABRO TAP
9-Dec 700 HARDWARE
9-Dec 300 WIRE
9-Dec 580 hardware
13-Dec 2650 reti churi cement
13-Dec 900 PLUMBER MATERIAL
13-Dec 200 PLUMBER MATERIAL
13-Dec 3820 ELECTRIC MATERIAL
13-Dec 480 HITEX FEVICOLE
13-Dec 30 JOINT PATTI
13-Dec 50 END CAP
14-Dec 120 FLEXIBLE PIPE
14-Dec 10100 TILE 2000+7000+1100
14-Dec 2650 1100+1550
14-Dec 7750 HARDARE
14-Dec 1000 PROFILE PATTI
15-Dec 70 alan key
15-Dec flash door mohit bhayya
15-Dec 200 ply lift
16-Dec 11000 outer laminte jain plywood
16-Dec 3180 hardware
16-Dec 60 JOINT PATTI

TOTAL 126290
GRAND TOTAL 130290
REMAIN 19710
civil labour way date plumber way date
1000 cash 13-Dec 1000 cash 11-Dec
500 upi 14-Dec
500 upi 16-Dec

2000 1000
carpenter way date electrictionway
CASH 1000 CASH 14-Dec
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
CASH
UPI
CASH
CASH
UPI
UPI
CASH
UPI
CASH
CASH
CASH
UPI
remain to 0 1000
UPI
cash
cash
upi