Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KEY PLAN

- - -

COL. WIDTH COL. WIDTH COL. WIDTH


TOP MAIN BAR TOP MAIN BAR
TOP EXTRA BAR TOP EXTRA BAR

A A C B A A C B A A
TOP EXTRA BAR TOP EXTRA BAR
TOP MAIN BAR 1.5 X L3 L/3 1.5 X L2 TOP MAIN BAR B B B
ENCHORAGEMENT LENGTH 50 Ø LAP 50 Ø LAP ENCHORAGEMENT LENGTH TOP MAIN. TOP MAIN. TOP MAIN.

TOP EXTRA TOP EXTRA


L3 L/4 L/2 L/4 L1/4 L1/2 L1/4 L2 STIRRUPS STIRRUPS STIRRUPS
D

D
STIRRUPS 50 Ø LAP STIRRUPS AT SUPPORT STIRRUPS AT MID SPAN STIRRUPS AT SUPPORT 50 Ø LAP STIRRUPS AT SUPPORT STIRRUPS AT MID SPAN STIRRUPS AT SUPPORT 50 Ø LAP STIRRUPS
BOTT. EXTRA BOTT. EXTRA
GENERAL NOTES:
L/10 L/10 L/10 L/10 BOTT. MAIN BOTT. MAIN BOTT. MAIN
BOTTOM MAIN BAR BOTTOM MAIN BAR BOTTOM MAIN BAR
BOTTOM MAIN BAR
BOTTOM EXTRA BAR BOTTOM EXTRA BAR
COLUMN REINF. SPACERS 25mm DIA (OR) MAIN BAR DIA COLUMN REINF. SECTION A-A SECTION B-B SECTION C-C
AS PER DETAILS WHICHEVER IS GREATER AS PER DETAILS
A A C A A C B A A
B
L3 COL. WIDTH L COL. WIDTH L1 COL. WIDTH L2 ADDED LINKS SHOWN
SUPPORTING BEAM
W1 DOTTED. (SEE NOTE W1
1)
TYPICAL BEAM DETAILS (OVERHANGING)

W2
- - - H

ht

h1
ADDED LINKS (SEE NOTE 2)

B A B A REFER TO BEAM
SHEDULE FOR LINKS
TOP MAIN BAR TOP MAIN BAR b

hb
SUPPORTED BEAM
L/4 TOP EXTRA BAR L/3 L/3 TOP EXTRA BAR L/4 B B
b hb = h1 - ht > 75mm
50 Ø LAP 50 Ø LAP

BE
D

TOP MAIN. TOP MAIN. W1 = b +2(hb)


STANDARD BEN

ND
W2 = (ht - 75)

STANDARD
TOP EXTRA
4
L/4 L/2 L/4 L1/4 L1/2 L1/4
STIRRUPS STIRRUPS
PLAN SECTION - H
D

D
STIRRUPS AT SUPPORT STIRRUPS AT MID SPAN STIRRUPS AT SUPPORT STIRRUPS AT SUPPORT STIRRUPS AT MID SPAN STIRRUPS AT SUPPORT 4a 4b
BOTT. EXTRA
L/10 L/10 L/10 L/10 BOTT. MAIN BOTT. MAIN
BOTTOM MAIN BAR BOTTOM MAIN BAR
COLUMN REINF. BOTTOM EXTRA BAR BOTTOM EXTRA BAR 04 EXTRA LINKS AT BEAM INTERSECTIONS
AS PER DETAILS
SECTION A-A SECTION B-B (NO COLUMN SUPPORT)
B A B A
NOTES:

COL.WIDTH L COL.WIDTH L1 COL.WIDTH


NOTE:- 1. ADD LINKS IN SUPPORTING BEAM WHEN NOTED IN BEAM SHEDULE.
1. CONTRACTOR TO PREPARE SHOP DRAWINGS FOR BAR BENDING SCHEDULES & LINKS TO BE PLACED WITHIN WIDTH 'W1', AS DEFINED ABOVE.
SHAPES FOR ENGINEER'S APPROVAL. 2. ADD LINKS IN SUPPORTED BEAM, EQUAL TO ONE HALF THE
ADDITIONAL STIRRUPS NOTED IN THE SUPPORTING BEAM. LINKS TO
TYPICAL BEAM DETAILS (CONTINUOUS) 2. MAXIMUM CLEAR DISTANCE BETWEEN LONGITUDINAL BARS = 155mm U.N.O.
BE PLACED WITHIN DISTANCE 'W2' AS DEFINED ABOVE.
3. CRANKING OF REBARS SHOULD BE ADOPTED AT LAP LOCATIONS IN BEAMS TO
PROVIDE ADEQUATE CLEAR SPACE BETWEEN REBARS FOR PROPER COMPACTION
LAP
- - OF OCNCRETE.
4. SIDE REINFORCEMENT LAP LAP 1
FOR ALL BEAMS DEEPER THAN 750 (OVERALL) U.N.O. IN BEAM SCHEDULES
WIDTH OF BEAM SIDE REINF. LAP
200 T12-250
B A 300 T12-200 LAP
LAP
GREATER THAN 400 T12-150 ADDITIONAL STIRRUPS
TOP MAIN BAR EACH SIDE OF THE STEP
5. MAXIMUM CLEAR DISTANCE BETWEEN LONGITUDINAL BARS = 155mm U.N.O.
B B
TOP EXTRA BAR
L/4 L/4 2a AT SPAN 2b AT SUPPORT
BE
D

TOP MAIN. TOP MAIN.


STANDARD BEN

ND

TOP EXTRA LAP


STANDARD

0.25 LI 0.5 LI 0.25 LI


L/4 L/2 L/4 STIRRUPS STIRRUPS LAP 1
D

0.5h
STIRRUPS AT SUPPORT STIRRUPS AT MID SPAN STIRRUPS AT SUPPORT
BOTT. EXTRA LAP

h
L/10 L/10 BOTT. MAIN BOTT. MAIN

0.5h
L1 LAP
COLUMN REINF.
BOTTOM MAIN BAR
BOTTOM EXTRA BAR COLUMN REINF. TYPICAL INTERNAL SPAN
LAP LAP LAP TENDER
AS PER DETAILS AS PER DETAILS
SECTION A-A SECTION B-B PURPOSE OF ISSUE
B A 1e BEAM LAP LOCATIONS 2c AT SUPPORT 2d AT SUPPORT

COL.WIDTH L COL.WIDTH
NOTE: 02 BEAM STEP DETAILS
WHERE REINFT. IS TO BE DETAILED CONTINUOUSLY LAPS IN REINFT. MAY NOTE: 00 TENDER SUBMISSION 26/08/2022

TYPICAL BEAM DETAILS (SIMPLY SUPPORTED) OCCUR ONLY IN SHADED AREAS SHOWN
1. COLUMN REINFORCEMENT OMITTED FOR CLARITY
REV REVISION DETAILS DATE

CLIENT:

LEFT END RIGHT END 2 LEGS SECONDARY BEAM REFT. - T2 PRIMARY BEAM REFT. - T1
OF B2 OF B2 PRIMARY BEAM REFT. - T1 SECONDARY BEAM REFT. - T2
CLIENT:
(MIN 100mm)

B2
(MIN 75mm)
(M

9D

12 DIA
RIGHT END

I
D

I
N
OF B5
END
LEFT

6 DIA
N

10
B3 T E

0 m
OF IGH

3 LEGS LAP LAP


OF B1

CONSULTANT: BURO KLING


)

BEAM 2
BEAM 2

INDICATES PRIMARY
R

33rd Floor C(C6-C8) I-Rise Tower,


PRIMARY BEAM REFT. Barsha Heights
BEAM 1 ORIENTATION SECONDARY BEAM REFT. P.O. Box 120082 Dubai, U.A.E.
OR SECONDARY BEAM REFT. Tel: +971 4 554 0035 /
PRIMARY BEAM REFT. Fax: +971 4 554 0034
B1

B5

SLAB EDGE
B3

info@burokling.com /
B3 END

4 LEGS BEAM 1 D BEAM 1 F MAIN CONTRACTOR:


www.burokling.com

3c SECTION - D 3d SECTION - E
OF FT

OF B5
RIGHT END

12 DIA
LEFT END

LE

TORSION LINK
(MIN 100mm)
OF B1

(WHERE CALLED UP IN BEAM SCHEDULE) BEAM 1 - PRIMARY BEAM BEAM 1 - PRIMARY BEAM
6 LEGS BEAM 2 - SECONDARY BEAM BEAM 2 - SECONDARY BEAM
HOOK DIMENSIONS DOWNSTAND BEAMS MEP CONSULTANT:

B4
RIGHT END LEFT END E G
INTERNAL END SUPPORT
SUPPORT OF B4 OF B4 8 LEGS PRIMARY & SECONDARY BEAMS OF SECONDARY BEAM REFT. - T2 PRIMARY BEAM REFT. - T1
OR PRIMARY BEAM DEEPER THAN PROJECT
SECONDARY BEAM REFT. - T2
24 DIA

SECONDARY BEAM SAME DEPTH PRIMARY BEAM REFT. - T1


G+5TYP+R HOTEL APARTMENTS
NOTE:
DUBAI POLICE OFFICER'S CLUB
ORIENTATION OF LEFT AND RIGHT REINFORCEMENT IN THE BEAM SCHEDULES IS BAND BEAMS
DETERMINED BY THE LEFT OR RIGHT END OF THE BEAM WHEN VIEWING THE BEAM 10 LEGS PLOT NO. 3260580 - DUBAI , UAE
MARK FOR NORMAL READING. LAP LAP
PRIMARY BEAM REFT. -B1 DRAWING TITLE

BEAM INTERSECTION SPLICE BAR FOR SECONDARY BEAM-B2


SECONDARY BEAM REFT. - B1
STANDARD DETAILS-BEAM
SPLICE BAR FOR SECONDARY BEAM - B2
ORIENTATION OF 03 (NO COLUMN SUPPORT)

8/26/2022 5:00:33 PM
LINK SHAPES & ARRANGEMENT SECTION - F
PRIMARY BEAM REFT. - B1
05 BEAM REINFORCEMENT 06 IN BEAMS AND WALL 3a
3b SECTION - G DRAWN: SEL CHECKED: RAG APPROVED YOD
SCALE: As indicated DATE: 26/08/22 PROJ. No:

DRAWING No. PAPER SIZE REV

S026 A1 00

You might also like