3006-391C-DM833004 - Vdu Cooling Water Pump Datasheet

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 23

REFINING MAJOR PROJECTS GENERAL MANAGEMENT

PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.

SUBPROJECT: UTILITY UNITS


3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.

PHASE: DETAILED ENGINEERING


S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 1 of 23

HYUNDAI-WISON PDVSA PDVSA


TOTAL
REV. DATE ISSUE PURPOSE / DESCRIPTION OF CHANGE PREP'D/CHK'D CHECKED APPROVED
PAGES
/APR'D BY BY BY

0 29-03-13 FOR CONSTRUCTION 23 YKL / JGS / HJK N/A N/A

D 18-03-13 FOR REVIEW / Comments Incorporated 23 YKL / JGS / HJK N/A N/A

C 05-03-13 FOR REVIEW / Comments Incorporated 23 YKL / JGS / HJK T. M. J. D. C.

B 05-09-12 FOR REVIEW / Comments Incorporated 14 HKC / BSS / IGC T. M. J. D. C.

A 17-01-12 FOR APPROVAL / Fiist Issue 14 MJJ / SRK / IGC M. L. G. J. D. C.

HYUNDAI-WISON PDVSA CHECKED BY PDVSA APPROVED BY

PREPARED BY: Young Kyu Lee SIGNATURE SIGNATURE


CHECKED BY: Je Gyeom Sung N/A N/A
APPROVED BY: Hyeon Joong Kim
NAME: Takanobu Mitono NAME: Jose Domingo Castro
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
PHASE: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 2 of 23

RPLC DEEP CONVERSION PROJECT


VDU COOLING WATER PUMP DATA SHEET

(G-9104A/B)

UNIT 91
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.

SUBPROJECT: UTILITY UNITS


3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.

PHASE: DETAILED ENGINEERING


S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13

PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 3 of 23

CONTENT
Item No. Service Sheet No. Rev. Date Description

G-9104 A/B VDU COOLING WATER PUMP 4, 5 0 29-03-13 PROCESS DATA

6, 7 0 29-03-13 CONSTRUCTION FEATURES

8, 9 0 29-03-13 MECHANICAL SEAL DATA SHEET

10 ~ 14 0 29-03-13 LUBE OIL SYSTEM (CH.1)

15 ~ 18 0 29-03-13 LUBE OIL SYSTEM (CH.3)

G-9104 AT 19, 20, 21 0 29-03-13 STEAM TURBINE DATA SHEET

G-9104 BM 22 0 29-03-13 MOTOR DATA SHEET

23 0 29-03-13 NOISE DATA SHEET


REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 4 of 23
ISO 13709 (API 610 10TH)

Centrifugal pump process ITEM NO. G-9104 A/B


data sheet PAGE 4 OF 23
US customary units

1 APPLICABLE TO: PROPOSALS PURCHASE AS BUILT


2 FOR RPLC DEEP CONVERSION PROJECT UNIT COOLING WATER SYSTEM (U-91)
3 SITE PUERTO LA CRUZ SERVICE VDU COOLING WATER PUMP
4
5 NOTES: INFORMATION BELOW TO BE COMPLETED: BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER
6 DATA SHEETS (6.1.1) REVISIONS
7 ITEM NO. ATTACHED ITEM NO. ATTACHED ITEM NO. ATTACHED NO. DATE BY
8 PUMP G-9104A/B
9 MOTOR G-9104 BM
10 GEAR
11 TURBINE G-9104 AT
12 APPLICABLE OVERLAY STANDARD(S):
13 OPERATING CONDITIONS (5.1.3) LIQUID (5.1.3)
14 CAPACITY, NORMAL 19350 (GPM) RATED 21380 (GPM) LIQUID TYPE OR NAME WATER
15 OTHER HAZARDOUS FLAMMABLE (5.1.5)
16
17 SUCTION PRESSURE MAX./RATED 5 (NOTE 7) / 1 (NOTE 7) (PSIG) MIN. NORMAL MAX.
18 DISCHARGE PRESSURE AT NOZZLE 71.0 (NOTE 2) (PSIG) PUMPING TEMP (°F) 90 NOTE 4
19 DIFFERENTIAL PRESSURE 70 (NOTE 7) (PSI) VAPOR PRESS. (PSIA) 0.699
20 DIFF. HEAD 163 (NOTE 7) (FT) NPSHA (NOTE 8) (FT) RELATIVE DENSITY (SG): 0.99
21 PROCESS VARIATIONS (5.1.4) VISCOSITY (cP) 0.761
22 STARTING CONDITIONS (5.1.4) NOTE 3 SPECIFIC HEAT, Cp 0.998 (BTU/LB °F)
23 SERVICE: CONT. INTERMITTENT (STARTS/DAY) CHLORIDE CONCENTRATION 12-220 (NOTE 6) (PPM)
24 PARALLEL OPERATION REQ'D (5.1.13) H2S CONCENTRATION (6.5.2.4) - (PPM) WET (5.2.1.12c)
25 SITE DATA (5.1.3) CORROSIVE / EROSIVE AGENT - (5.12.1.9)
26
27 LOCATION: (5.1.30) MATERIALS
28 INDOOR HEATED OUTDOOR UNHEATED ANNEX H CLASS (5.12.1.1) I-2
29 ELECTRICAL AREA CLASSIFICATION (5.1.24 / 6.1.4) MIN DESIGN METAL TEMP (5.12.4.1) 70 (°F)
30 CL I GR D DIV 2 REDUCED HARDNESS MATERIALS REQ'D. (5.12.1.12)
31 WINTERIZATION REQ'D TROPICALIZATION REQ'D. BARREL/CASE CI/CS Bronze
32 SITE DATA (5.1.30) (NOTE 11) CASE/IMPELLER WEAR RINGS Bronze
33 ALTITUDE 78.8 (FT) BAROMETER 14.7 (PSIA) SHAFT 12% Cr (A 479 type 410 HT)
34 RANGE OF AMBIENT TEMPS: MIN/MAX. 70 / 100 (°F) DIFFUSERS
35 RELATIVE HUMIDITY: MIN / MAX 80 / 84 (%)
36 UNUSUAL CONDITIONS: (5.1.30) DUST FUMES PERFORMANCE:
37 OTHER PROPOSAL CURVE NO. 12HM0217N-C r/min 885
38 IMPELLER DIA. RATED 28.2 MAX. 31.3 MIN. 26.3 (IN.)
39 IMPELLER TYPE Semi-open
40 DRIVER TYPE RATED POWER 1003 (BHP) EFFICIENCY 87 (%)
41 INDUCTION MOTOR STEAM TURBINE GEAR MINIMUM CONTINUOUS FLOW:
42 OTHER THERMAL (USGPM) STABLE 16,028 (USGPM)
43 PREFERRED OPER. REGION 16,028 TO 27,207 (USGPM)
44 DRIVER (6.1.1 / 6.1.4) ALLOWABLE OPER. REGION 16,028 TO 27,207 (USGPM)
45 MANUFACTURER GE MAX HEAD @ RATED IMPELLER 250 (FT)
46 1120 (HP) 885 (r/min) MAX POWER @ RATED IMPELLER 1009 (kW/ HP)
47 FRAME ENCLOSURE IP54(M) / IP55(TB) NPSHR AT RATED CAPACITY 30.5 (FT) (5.1.10)
48 HORIZONTAL VERTICAL SERVICE FACTOR 1.0 MAX. SUCTION SPECIFIC SPEED: 11000 (US UNIT) (5.1.11)
49 VOLTS/PHASE/HERTZ 4000 / 3 / 60 MAX. SOUND PRESS. LEVEL REQ'D 85 (dBA) (5.1.16)
50 TYPE SQUIRREL CAGE INDUCTION MOTOR EST. MAX. SOUND PRESS. LEVEL (dBA) (5.1.16)
51 MINIMUM STARTING VOLTAGE (6.1.5) EST MAX SOUND POWER LEVEL (dBA) (5.1.16)
52 INSULATION F TEMP. RISE B UTILITY CONDITIONS (NOTE 11)
53 FULL LOAD AMPS ELECTRICITY VOLTAGE PHASE HERTZ
54 LOCKED ROTOR AMPS DRIVERS 4000 3 60
55 STARTING METHOD DOL HEATING 120 1 60
56 LUBE OIL-FLOOD SYSTEM VOLTAGE DIP 80% OTHER (6.1.5)
57
58 BEARINGS (TYPE/NUMBER): STEAM (5) MAX. PRESS. MAX. TEMP. MIN. PRESS. MIN. TEMP.
59 RADIAL Anti-Friction / DRIVERS 715 psig (5) 695 °F 655 psig (5) 675 °F
60 THRUST Anti-Friction / HEATING
61 VERTICAL THRUST CAPACITY COOLING WATER: (5.1.19) SOURCE
62 UP (LBS) DOWN (LBS) SUPPLY TEMP. 90 (°F) MAX. RETURN TEMP. 120 (°F)
63 NORM. PRESS. 65 (PSIG) DESIGN PRESS. 185 / FV (PSIG)
64 MIN. RET. PRESS. 30 (PSIG) MAX. ALLOW. D.P. 10 (PSI)
65 CHLORIDE CONCENTRATION: 12-220 (NOTE 6) (PPM)
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 5 of 23
ISO 13709 (API 610 10TH)

Centrifugal pump process ITEM NO. G-9104 A/B


data sheet PAGE 5 OF 23
US customary units

1 1. The G-9104 A is driven by Steam Turbine and the spare G-9104 B is driven by Motor.
2 2. Discharge pressure at rated flow at GL. The maximum allowable shut-off pressure above minimum continuous flowrate is 120 psig.
3 3. Auto start provision is only for motor driven pump.
4 4. Design temperature is 170 °F.
5 5. Turbine back pressure shall be minimum 50 psig, normal 60 psig and maximum 70 psig (MLP Steam Header).
6 6. Bases on four cycles of concentration.
7 7. To be finalized based on final cooling water pit size.
8 8. Minimum pump submerge level confirmed by vendor as 5 ft from impeller center.
9 9. Cooling water pit levels shall be decided as per cooling tower vendor information.
10 10. Horizontal turbine with right angle bevel gear shall be provided.
11 11. For site data and utility condition, refer to the basic engineering design data 3006-500A-DG140001.
12 12. Minimum level under the suction bell confirmed by vendor as 1.83 ft.
13
14

15

16

17

18

19

20

21

22

23 DRAWING
24

25

26 This sketch will be changed based on final pit drawing and pump general arrangement drawing.
27

28

29

30

31
M
32
Top
33
34 HLL 7.5 ft (NOTE 9)
35

36 Oily Sewer
NLL
37
38

39
40 LLL 2.25 ft (NOTE 8)
41
42

43 GL 0.0 ft
44

45 Suction
46 Bottom (NOTE 12)
47
48

49
50
51

52

53
54
55

56
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13

PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 6 of 23

API 610 10TH Centrifugal pump data sheet ITEM NO. G-9104 A/B
Vertically suspended (type VS)
1 CONSTRUCTION SURFACE PREPARATION AND PAINT
2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)
3 PUMP TYPE: (1.3) PUMP:
4 VS1 VS2 VS3 VS4 VS5 VS6 VS7 3006-500A-DM115891
5 CASING MOUNTING: SUMP COVER PLATE PUMP SURFACE PREPARATION
6 INLINE SEPARATE MOUNTING PLATE (8.3.8.3.1) PRIMER
7 SEPARATE SOLE PLATE (8.3.8.3.3) FINISH COAT
8 CASING SPLIT: BASEPLATE / COLUMN:(6.3.17)
9 AXIAL RADIAL BASEPLATE SURFACE PREPARATION
10 CASING TYPE: PRIMER
11 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER FINISH COAT
12 CASE PRESSURE RATING: SHIPMENT: (7.4.1)
13 MAX ALLOWABLE WORKING PRESSURE 150 (PSIG) DOMESTIC EXPORT EXPORT BOXING REQUIRED
14 @ 170 (°F) OUTDOOR STORAGE MORE THAN 12 MONTHS
15 HYDROTEST PRESSURE 225 (PSIG) SPARE ROTOR ASSEMBLY PACKAGED FOR:
16 SUCTION PRESS. REGIONS MUST BE DESIGNED FOR MAWP (5.3.6) HORIZONTAL STORAGE VERTICAL STORAGE
17 NOZZLE CONNECTIONS: (5.4.2) TYPE OF SHIPPING PREPARATION
18 SIZE (IN) FLANGE FACING POSITION
19 RATING (LBS) HEATING AND COOLING
20 SUCTION HEATING JACKET REQ'D. (5.8.9) COOLING REQ'D.
21 DISCHARGE 26" 300 # RF SIDE COOLING WATER PIPING PLAN (6.5.3.1)
22 BALANCE DRUM C.W. PIPING:
23 PIPE TUBING; FITTINGS
24 PRESSURE CASING AUX. CONNECTIONS: (5.4.3) C.W. PIPING MATERIALS:
25 NO. SIZE (NPS) TYPE S. STEEL C. STEEL GALVANIZED
26 DRAIN COOLING WATER REQUIREMENTS:
27 VENT 1 2" RF/ Vertical BEARING HOUSING (USGPM) @ (PSIG)
28 WARM-UP HEAT EXCHANGER (USGPM) @ (PSIG)
29 BALANCE / LEAK-OFF STEAM PIPING: TUBING PIPE
30 MACHINED AND STUDDED CONNECTIONS (5.4.3.8) BEARINGS AND LUBRICATION
31 CYLINDRICAL THREADS REQUIRED (5.4.3.3) BEARING (TYPE/NUMBER):
32 ROTOR: RADIAL Sleeve /
33 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) THRUST Anti-Friction /
34 SHRINK FIT -LIMITED MOVEMENT IMPELLERS (8.2.2.3) LUBRICATION (5.11.3, 5.11.4):
35 COUPLINGS: GREASE FLOOD PURGE OIL MIST
36 MANUFACTURER MODEL FLINGER PRODUCT LUBRICATED
37 RATING (HP/100 r/min) CONSTANT LEVEL OILER (5.10.2.2)
38 SPACER LENGTH (IN) SERVICE FACTOR OIL VISC. ISO GRADE
39 RIGID REVIEW AND APPROVE THRUST BEARING SIZE
40 THROUGH COUPLINGS: OIL HEATER REQUIRED: STEAM ELECTRIC
41 MANUFACTURER MODEL
42 RATING (HP/100 r/min) LUBE INSTRUMENTATION (6.4.2)
43 SPACER LENGTH (IN) SERVICE FACTOR ACCELEROMETER (6.4.2.1 One(1) on radial bearing/ one(1) thrust bearing
44 RIGID PROVISION FOR MOUNTING ONLY (5.10.2.11)
45 DRIVER HALF COUPLING MOUNTED BY: FLAT SURFACE REQ'D (5.10.2.12)
46 PUMP MFR. DRIVER MFR. PURCHASER PRESSURE GAUGE TYPE
47 COUPLING BALANCED TO ISO 1940-1 G.6.3 (6.2.3)
48 COUPLING PER ISO 14691(6.2.4)
49 COUPLING PER ISO 10441(6.2.4)
50 COUPLING PER API 671(6.2.4)
51 NON SPARK COUPLING GUARD (6.2.14c) (6.2.14a) REMARKS: See 3006-500A-DI116003
52 COUPLING GUARD STANDARD
53 ASME B15.1
54 OTHER 3006-500A-DM115615
55 WEIGHTS (LBS)
56 MECHANICAL SEAL: PUMP
57 SEE ATTACHED ISO 21049/API 682 DATA SHEET DRIVER
58 GEAR
59 BASEPLATE
60 TOTAL
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13

PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 7 of 23

API 610 10TH Centrifugal pump data sheet ITEM NO. G-9104 A/B
Vertically suspended (type VS)
1 SPARE PARTS (TABLE 18) VERTICAL PUMPS (CONT.)
2 START-UP NORMAL MAINTENANCE PUMP AND STRUCTURE DYNAMIC ANALYSIS (8.3.5)
3 SPECIFY AS PER PURCHASE SPECIFICATION DRAIN PIPED TO SURFACE (8.3.13.4)
4
5 OTHER PURCHASER REQUIREMENTS QA INSPECTION AND TESTING
6 COORDINATION MEETING REQUIRED (9.1.3) SHOP INSPECTION (7.1.4) PERFORMANCE CURVE APPROVAL
7 MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) TEST WITH SUBSTITUTE SEAL (7.3.3.2)
8 MAX RELATIVE DENSITY TEST (7.3.1.2) NON-WIT WIT OBSERVE
9 MAX DIA. IMPELLERS AND/OR NO OF STAGES HYDROSTATIC TEST OF BOWLS
10 OPERATION TO TRIP SPEED AND COLUMN (8.3.13.2)
11 CONNECTION DESIGN APPROVAL (5.12.3.4) HYDROSTATIC (7.3.2)
12 TORSIONAL ANALYSIS REQUIRED (5.9.2.1) PERFORMANCE (7.3.3)
13 TORSIONAL ANALYSIS REPORT (5.9.2.6) RETEST ON SEAL LEAKAGE (7.3.3.2d)
14 PROGRESS REPORTS (9.3.3) NPSH (7.3.4.2)
15 OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5) COMPLETE UNIT TEST (7.3.4.3)
16 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2.1f) SOUND LEVEL TEST (7.3.4.4)
17 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) CLEANLINESS PRIOR TO
18 VENT VENT COOLING WATER FINAL ASSEMBLY (7.2.2.2)
19 MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) NOZZLE LOAD TEST (6.3.6)
20 FLANGES REQUIRED IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) 4 HR. MECHANICAL RUN TEST(7.3.4.7.1)
21 CONNECTION BOLTING PTFE COATING SS MECHANICAL RUN UNTIL OIL
22 PAINTED ASTM A153 GALVANIZED TEMP. STABLE (7.3.4.7.1)
23 INSTALLATION LIST IN PROPOSAL (9.2.3L) 4 HR. MECHANICAL RUN AFTER
24 VERTICAL PUMPS OIL TEMP. STABLE (7.3.4.7.3)
25 PUMP THRUST: (+) UP (-) DOWN TRUE PEAK VELOCITY
26 AT MIN. FLOW (LBS) (LBS) DATA (7.3.3.4.d)
27 AT RATED FLOW (LBS) (LBS) RESONANCE TEST (8.3.9.2)
28 AT MAX. FLOW (LBS) (LBS) PUMP STRUCTURAL RESONANCE TEST (8.3.9.2)
29 MAX THRUST (LBS) (LBS) AUXILIARY EQUIPMENT
30 SOLEPLATE REQ'D. (8.3.8.3.3) (IN) X (IN) TEST (7.3.4.5)
31 MOUNTING PLATE REQUIRED (3006-500A-DM115606, 8.3.8.3.4) CHARPY TEST (EN 13445/ASME VIII)
32 SOLEPLATE THICKNESS (IN) VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c)
33 COLUMN PIPE: FLANGED THREADED VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5)
34 DIAMETER (IN) LENGTH (FT) VENDOR SUBMIT TEST DATA WITHIN 24 HOURS (7.3.3.3e)
35 GUIDE BUSHINGS INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3)
36 NUMBER RECORD FINAL ASSEMBLY RUNNING CLEARANCES
37 LINE SHAFT BEARING SPACING (IN) COMPLETION OF INSPECTION CHECK LIST (7.1.6)
38 GUIDE BUSHINGS LUBE: MATERIAL CERTIFICATION REQUIRED (5.12.1.8)
39 WATER OIL CASING IMPELLER SHAFT
40 GREASE PUMPAGE OTHER
41 LINESHAFT: OPEN ENCLOSED CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5)
42 LINE SHAFT DIAMETER: (IN) INSPECTION REQUIRED FOR CONNECTION
43 TUBE DIAMETER: (IN) WELDS (5.12.3.4) (5.12.1.5)
44 LINESHAFT COUPLING: MAG PARTICLE LIQUID PENETRANT
45 LINE SHAFT DIAMETER: SLEEVE & KEY THREADED RADIOGRAPHIC ULTRASONIC
46 SUCTION CAN THICKNESS (IN) INSPECTION REQUIRED FOR CASTINGS (7.2.1.3) (5.12.1.5)
47 LENGTH (FT) MAG PARTICLE LIQUID PENETRANT
48 DIAMETER (FT) RADIOGRAPHIC ULTRASONIC
49 SUCTION STRAINER TYPE HARDNESS TEST REQ'D. (7.2.2.3)
50 FLOAT & ROD FLOAT SWITCH ADDITIONAL SUBSURFACE EXAMINATION (7.2.1.3)
51 IMPELLER COLLETS ACCEPTABLE (5.6.3) FOR
52 HARDENED SLEEVES UNDER BEARINGS (8.3.10.5) METHOD
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
69
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 8 of 23
Category 1 & 2 Seals
MECHANICAL SEAL DATA SHEET ITEM NO. G-9104 A/B
FOR CENTRIFUGAL AND ROTARY PUMPS PAGE 8 OF 23
U.S. CUSTOMARY UNITS
01 DATA SUPPLIED CUSTOMARY UNITS SI UNITS HARDWARE SUPPLIED CUSTOMARY UNITS SI UNITS
02 INDICATES DATA COMPLETED BY PURCHASER BY SEAL VENDOR BY SEAL VENDOR OR PURCHASER
03 DEFAULT SELECTION
04 SEAL SPECIFICATION - (REF 4.1, FIGURE 1 TO 6)
05 CATEGORY SEAL CATEGORY 1(4.1.1) SEAL CATEGORY 2(4.1.1) SEAL CODE(ANNEX D)
06 TYPE TYPE A(3.72) TYPE B(3.73) ALTERNATE STATIONARY (TYPE A & B)
07 (CODE CW) TYPE C(3.74) ALTERNATE ROTATING (TYPE C) SINGLE SPRING (TYPE A)
08 ARR'G'T DEFAULT CONFIGURATION ALTERNATE DESIGN FLUSH PLANS (ANNEX D)
09 1(3.2) 1 CW-FX 1 CW-FL DIST FLUSH 01 11 14 23 32 50 61
10 ALTERNATE BUSH 02 13 21 31 41 61 62
11 LIQUID 2 CW-CW FX DIST FLUSH 01 13 23 41 62 75
BUFFER

12 2(3.3) TANGENTIAL LBO CONNECTIONS 02 14 31 52 71 76


13 GAS 2 CW-CS 2NC-CS FX DIST FLUSH 11 21 32 61 72
14 LIQUID 3CW-FB 3CW-BB FX 01 13 53A 54 74
BARRIER

15 3(3.4) 3CW-FF TANG LBO 02 14 53B 61


16 GAS 3NC-BB 3NC-FF 3NC-FB 11 32 54C 62 (NOTE 7, 8)
17 SLEEVE-S 14 K.Y./K.O./N.T. SET SCREW ONTO SHAFT ALTERNATIVE(6.1.3.13) - SPECIFY
18
19 MATERIALS (REFERENCE 6.1.6 & ANNEX B)
20 SECONDARY SEALS SEAL FACES METAL BELLOWS SPRINGS METAL PARTS
21 FKM FFKM CARBON VS SIC UNS N10276 (TYPE B) UNS N10276 OR N06455 UNS S31600/S31635
22 SPIRAL - W GASKET SIC VS SIC UNS N07718 (TYPE C) UNS N10276
23 NBR SS- SIC RB- SIC UNS 08020 UNS S31600 OR S31635 UNS N 08020
24 OTHER: VS OTHER: OTHER:
25 MECHANICAL SEAL DATA
26 SEAL VENDOR Flowseve ALTERNATE SEAL FOR PUMP PERFORMANCE TEST
27 DATA REQUIREMENTS FORM (ANNEX J) DYNAMIC SEALING PRESSURE RATING (3.19) PSIG
28 SIZE/TYPE STATIC SEALING PRESSURE RATING (3.69) PSIG
29 SEAL DRAWING NUMBER MAXIMUM ALLOWABLE TEMPERATURE (3.40) °F
30 VENDOR'S SEAL CODE MINIMUM DESIGN METAL TEMPERATURE (6.1.6.11.1) 70 °F
31 MODIFIED FACES FOR PUMP PERFORMANCE TEST
32
33 SEAL CHAMBER DATA (REFERNCE 6.1.2.4)
34 ASME B 73.1&2 CYLINDRICAL TAPERED ISO 13709 ISO 3069-C OTHER, SPECIFY
35 BOLT ON CHAMBER (6.1.2.5) SEAL CHAMBER FLUSH PORT REQ'D SEAL CHAMBER VENT REQ'D
36 FLOATING THROAT BUSH FIXED THROAT BUSH CHAMBER HEATING REQ'D
37
38 PUMP DATA SEE PUMP DATA SHEET
39 PUMP DESIGN MANUFACTURER Flowserve MODEL 42 KXL 1 stg. VCT FRAME/SIZE CASE MATERIAL CS
40 PUMP OPERATING PRESSURE SUCTION PRESSURE(RATED) 1 PSIG DISCHARGE PRESSURE 84 PSIG
41 SEAL CHAMBER NORMAL PSIG MIN/MAX / PSIG MSSP(3.44) PSIG
42 SHAFT HORIZONTAL VERTICAL DIA IN. SHAFT SPEED 885 RPM
43 SHAFT DIRECTION (FROM DRIVER): CW CCW
44
45 FLUID DATA-( FOR QUENCH, BUFFER AND BARRIER FLUID DATA)
46 PUMPED STREAM HAZARDOUS FLAMMABLE
47 TYPE OR NAME Water CONCENTRATION % FLUID SOLID @ AMBIENT
48 DISSOLVED CONTAMMINANT H2S PPM CCW SOLIDIFIES @ °F POUR POINT °F
49 Cl2 12~220 PPM OTHER @ PPM PUMPED STREAM SOLIDIFIES UNDER SHEAR
50 SOLID CONTAMINANT PUMPED STREAM CONTAINS AGENTS THAT POLYMERIZE
51 CONCENTRATION (% BY WT. OR PPM) SPECIFY AGENTS
52 PUMPING TEMPERATURE PUMPED STREAM CAN PLATE OUT OR DECOMPOSE
53 MIN °F NORMAL 90 °F MAX °F SPECIFY CONDITIONS
54 SPECIFIC GRAVITY AT TEMPERATURE INDICATED PUMPED STREAM IS REGULATED FOR FUGITIVE OR OTHER EMISSIONS
55 @ NORMAL TEMPERATURE 0.99 @ MAX. TEMP. REGULATION LEVEL PPMV
56 VAPOUR PRESSURE AT TEMPERATURE INDICATED SPECIAL PUMP CLEANING PROCEDURES
57 NORMAL TEMP 0.699 PSIA MAX. TEMP. PSIA SPECIFY
58 ATMOSPHERIC BOILING POINT °F ALTERNATE PROCESS FLUIDS & CONCENTRATION
59 VISCOSITY @ NORMAL PUMPING TEMPERATURE 0.761 Cp (INCL. COMMISIONING)
60
61 FLUSH FLUID (PLAN 32) If flush fluid is pumpage, then flush fluid data is not required
62 TYPE OR NAME CONCENTRATION % VAPOR PRESSURE AT TEMPERATURE INDICATED
63 SEAL VENDOR REVIEW REQUIRED NORMAL TEMP PSIA MAX. TEMP. PSIA
64 FLUID TEMPERATURE ATMOSPHERIC BOILING POINT °F
65 MIN °F NORMAL °F MAX °F VISCOSITY @ NORMAL PUMPING TEMPERATURE Cp
66 SPECIFIC GRAVITY AT TEMPERATURE INDICATED FLOW REQUIRED MAX/MIN '/ GPM
67 @NORMAL TEMP '@MAX. TEMP. PRESSURE REQUIRED MAX/MIN '/ PSIG
68
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 9 of 23
Category 1 & 2 Seals
MECHANICAL SEAL DATA SHEET ITEM NO. G-9104 A/B
FOR CENTRIFUGAL AND ROTARY PUMPS PAGE 9 OF 23
U.S. CUSTOMARY UNITS
01 INDICATES DATA COMPLETED BY PURCHASER BY SEAL VENDOR BY SEAL VENDOR OR PURCHASER
02 DEFAULT SELECTION
03 FLUID DATA ( QUENCH , BUFFER, AND BARRIER FLUID DATA, LIQUID AND GAS)
04 QUENCH MEDIUM (PLAN 32,62) SUPPLY TEMPERATURE MAX/MIN / °F
05 TYPE OR NAME FLOW RATE REQUIRED MAX/MIN / GPM/SCFH
06 BUFFER/BARRIER MEDIUM RELATIVE DENSITY(TO WATER @25 C)AT REF.TEMP.
07 TYPE OR NAME @NORMAL TEMP @ MAX TEMP.
08 PURCHASER SELECTION SEAL VENDOR SELECTION VAPOR PRESSURE AT TEMPERATURE INDICATED (LIQUID)
09 SEAL VENDOR REVIEW PURCHASER REVIEW NORMAL TEMP PSIA MAX TEMP. PSIA
10 FLOW RATE REQUIRED MAXIMUM / GPM/SCFH ATMOSPHERIC BOILING POINT (LIQUID) °F
11 SUPPLY PRESSURE MAX/MIN / PSIG VISCOSITY @ NORMAL TEMP (LIQUID) cP
12 FLUID OPERATING TEMPERATURE SPECIFIC HEAT @ NORMAL TEMP Btu/h.ft.°F
13 MIN °F NORMAL °F MAX °F COOLING HEATING REQUIRED (+OR-) Btu/h
14 SITE AND UTILITIES ( See 3006-500A-DG140001)
15 CONTROL VOLTAGE 120 V PHASE 1 HERTZ 60 COOLING WATER SUPPLY TEMP. °F CHLORIDE PPM
16 ELECTRICAL AREA CL 1 GR D DIV 2 COOLING WATER PRESS. NORM. /DESIGN. / PSIG
17 DESIGN AMBIENT MIN/MAX 70 / 100 (°F) EXPLOSIVE AREA CLASSIFICATION
18 ACCESSORIES (CLAUSES 8 AND 9)
19 GENERAL PLAN 52 AND 53 SYSTEMS CONTINUED
20 JOINT USER/VENDOR LAYOUT OF EQUIPMENT EQUIPMENT SUPPORT SUPPLIER
21 PIPE TAPER THREAD (8.1.9) ISO 7 ASME B1.20.1 FILLING SYSTEM SUPPLIER
22 SPECIAL REQUIREMENTS FOR HAZARDOUS SERVICE ASME CODE STAMP REQUIRED
23 EN 13445 OR OTHER CODE APPLICABLE
24 SPECIAL CLEANING AND DECONTAMINATION REQUIREMENTS RESERVOIR CAPACTY (8.5.4.3) GAL.
25 UTILITY MANIFOLD CONNECTIONS REQUIRED (8.4.4) NLL TO GLAND PLATE HEIGHT (8.5.4.2) FT
26 TYPE AND SPEC. OF HEAT TRACING (8.6.5.8) RESERVOIR MAWP (3.41) PSIG @ °F
27 SET PRESSURE RANGE, MAX/MIN / PSIG
28 THERMAL RELIEF VALVES REQUIRED (9.8.3) SYSTEM HOLD-UP PERIOD (PLAN 53B & 53C) DAYS
29 COOLING SYSTEM (PLAN 21, 22, 23, 41, 53B, 53C) PRESSURE SWITCH(8.5.4.2.h) TO ACTIVATE ON;
30 HEAT EXCHANGER SUPPLIER RISING PRESSURE (ARR 2)SET @ PSIG
31 WATER COOLED AIR COOLED ISO 15649 FALLING PRESSURE (ARR 3) SET @ PSIG
32 EQUIPMENT REFERENCE / CODE HIGH LEVEL ALARM REQUIRED (8.5.4.2.j)
33 COOLING WATER LINES SUPPLIER H/Q CURVE FOR INTERNAL CILCULATING DEVICE
34 TUBING GALVANISED PIPING (8.4.2) TEST BASED H/Q CURVE FOR INTERNAL CIRC, DEVICE
35 COOLING WATER FLOW RATE GPM EXTERNAL CIRCULATING PUMP (8.6.3.1)
36 SIGHT FLOW INDICATORS(8.4.3) OPEN CLOSED PLAN 72 AND 74 SYSTEMS
37 PLAN 11, 13,14,21,23, 31,32 AND 41 SYSTEMS EQUIPMENT SUPPLIER
38 CONNECTING LINES SUPPLIER BY VENDOR HIGH FLOW ALARM SWITCH (8.6.6.5)
39 TUBING PIPING(8.5.2.2) PLAN 75 AND 76 SYSTEMS
40 RESTRICTION ORIFICE NIPPLEIN FLUSH LINE (8.5.2.4) EQUIPMENT SUPPLIER
41 CYCLONE SEPARATOR SUPPLIER HIGH LEVEL FLOW ALARM SWITCH FOR PLAN 75 (8.6.5.3)
42 PLAN 32 REQUIREMENT SUPPLIER TEST CONNECTION (8.6.5.4)
43 PLAN 32 FLOW INDICATOR PLAN 32 TEMPERATURE INDICATOR INSTRUMENTATION
44 PLAN 52 AND 53 SYSTEMS USER SPECIFICATION REFERENCE FOR
45 STANDARD (FIG G.27) ALTERNATE (FIG G.28) INSTRUMENTATION / CONTROLS See 3006-500A-DI116003
46 DIMENSIONAL VARIATIONS TO STANDARD (FIG G.27) PRESSURE GAUGES (9.4)
47 OIL FILLED PRESSURE GUAGES (9.4.3)
48 DIMENSIONAL VARIATIONS TO ALTERNATE (FIG G.28) PRESSURE SWITCHES (9.5.2); TRANSMITTER (9.5.2.3)
49 LEVEL SWITCHES (9.5.3); TRANSMITTER (9.5.3.2)
50 ALTERNATIVE FABRICATION STANDARD HYDROSTATIC CAPACITANCE ULTRASONIC
51 PRIMARY EQUIPMENT SUPPLIER LEVEL INDICATORS (9.6);
52 SUPPLIER REFERENCE /CODE WELD PAD EXTERNAL, REMOVABLE (9.6.2)
53 CONNECTING LINES SUPPLIER BY VENDOR FLOW INSTRUMENTS (9.7); TRANSMITTER (9.7.3)
54 TUBING SCH 80 PIPING (8.5.4.4.9)
55 INSPECTION AND TESTING
56 PURCHASER PARTICIPATION IN INSPECTION & TEST 100% INSPECTION OF ALL WELDS (6.1.6.10.5) USING;
57 SPECIFY; MAGNNETIC PARTICLE LIQUID PENETRANT
58 INSPECTOR'S CHECK LIST (10.1.7 & ANNEX H) RADIOGRAPHIC ON BUTT WELDS ULTRASONIC
59 PURCHASER APPROVAL REQUIRED FOR WELDED OPTIONAL QUALIFICATION TESTING REQUIRED (10.3.1.1.2)
60 CONNECTION DESIGNS, (6.1.6.10.5) MODIFIED FACES FOR PUMP TEST (10.3.5.1), SEE PAGE 1, LINE 30
61 HARDNESS TEST (10.2.3 k) REQUIRED FOR: ALTERNATIVE SEAL PUMP TEST (10.3.5.2), SEE PAGE 1 LINE 25
62
63 REMARKS / SPECIAL REQUIREMENTS:
64
65
66
67
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 10 of 23

API 614—Chapter 1 DATA SHEET


SCOPE AND ATTACHMENTS ITEM NO. G-9104 A/B
U.S. CUSTOMARY UNITS
1 Applicable to Proposal Purchase As built
2 For RPLC DEEP CONVERSION PROJECT Site PUERTO LA CRUZ
3 Oil System for VDU COOLING WATER PUMP
4 Supplier Flowserve Manufacturer
5 Purchase Order No. Date Inquiry no. Requisition No.

6 NOTES: 1. The party to complete the information is indicated as follows:


7 Purchaser Vendor Either, but by vendor if not by purchaser.
8 2. A dot * indicates the standard specifies a requirement, value, or criterion.
9 3. Designations in ( ) are applicable portions of the standard; numbers without a prefix are paragraph
9 numbers; those prefixed “T” are text figure numbers; those prefixed “A” are Appendix “A” Figure
10 numbers.
11
12 Applicable documents:
12 Local Instruments and Panel Items (Chapter 1) Pumps
13 Instrument Suppliers (Chapter 1) Pump Drivers (Motor)
14 Special Purpose Oil Systems (Chapter 2) Pump Drivers (Turbine)
15 General Purpose Oil Systems (Chapter 3) Referenced standards Table A-1 (4.1)
15 Dry Gas Seal Support Modules (Chapter 4) Additional documents ____________________
16 Additional documents 3006-500A-DM115612 Additional documents ____________________
17 Additional documents ____________________
18
18 Installation data: (also see page 2)
19 * General site data included in specification. (SEE 3006-500A-DG140001)
GEAR
20 * Utility data included in specification. (SEE 3006-500A-DG140001) TURBINE

21 * If blank, provide on page 2 of this specification OIL UNIT


P
21 Space available for oil system: L _____ W _____ H _____ (ft) U
M
22 Plot plan showing console location in relation to main equipment: P

23 Maximum allowable noise level not to exceed overall 85 dB @ 1m from the skid edge
24 (Sketch the equipment plot plan with relation to the console location here)
24 Winterize Tropicalize
25 Area classification: Class 1 Group D Division 2
26
27 Equipment oil required:
27 Lube oil: Normal After trip Seal oil: Normal After trip
28 PSIG supply pressure gpm gpm flow/pressure flow/pressure
29 gpm / psig gpm / psig
30 Pump Seal oil at: / /
30 Driven equipment Seal oil at: / /
31 Driven equipment Seal oil at: / /
32 Steam Turbine
33 Gears
33 Couplings
34
35 Total:
36
36 Control oil (normal) Oil type and viscosity
37
38 Control oil (transient) Required heat load _______ (Btu/hr)
39
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 11 of 23

API 614—Chapter 1 DATA SHEET


SCOPE AND ATTACHMENTS ITEM NO. G-9104 A/B
U.S. CUSTOMARY UNITS
1 * Site data: (SEE 3006-500A-DG140001) Utility data: (SEE 3006-500A-DG140001)
2 Ambient conditions Electrical Cooling water: water source
3 Min/max temperature (°F) 70 / 100 Volts 460 Inlet temperature (°F) 90 Maximum return (°F) 120
4 Relative humidity (%) 80 / 84 Hertz 60 Normal pressure 75 Design pressure 185/FV
5 Corrosive atmosphere Phase 3 (psig) (psig)
6 Min. return 40 Maximum Delta p 10
7 (psig) (psi)
8 Steam Heating
9 Inlet Pressure (psig) Temperature (°F) Pressure Temperature
10 Minimum Pressure Temperature
11 Normal Pressure Temperature
12 Maximum Pressure Temperature
13 Design Pressure Temperature
14 Exhaust Pressure (psig) Temperature (°F) Pressure Temperature
15 Minimum Pressure Temperature
16 Normal Pressure Temperature
17 Maximum Pressure Temperature
18 Design
19
20 Location:
21 Indoor Heated Under roof
22 Outdoor Unheated
23 Painting: Weights Dimensions L W H
24 (lb.) (ft)
25 Component supplier standard Console Console
26 Unified per system supplier standard Panel Panel
27 Purchaser standard per
28 3006-500A-DM115891
29 ________________________
30 Preparation for shipment Miscellaneous documentation
31 Install new filter elements and tag Spare parts quotation with proposal
32 Include 200% sets of extra filter elements Spare parts quotation after contract
33 Box extra sets with the _______ system Above based on normal supply for __24____ months
34 Other spares
35 _________________________ Complete inspector’s checklist
36 _________________________ Progress reports
37 _________________________ Component selection review
38 _________________________ _________________________
39 System and components Spare parts
40 Vendor std. Purch. spec. Vendor std. Purch. spec.
41 Domestic
42 Export 3006-500A-PGB30001 3006-500A-PGB30001
43 Extended storage 3006-500A-DM115892 3006-500A-DM115892
44 __12__ months
45 Comments:
46
47
48
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 12 of 23

API 614—Chapter 1 DATA SHEET


INSTRUMENT SUPPLIERS ITEM NO. G-9104 A/B

1 Applicable to Proposal Purchase As built


2 For RPLC DEEP CONVERSION PROJECT Site PUERTO LA CRUZ
3 Oil System for VDU COOLING WATER PUMP
4 Supplier Flowserve Manufacturer
5 Purchase Order No. Date Inquiry no. Requisition No.
6
7 Instrument suppliers: Manufacturer Description
8 Pressure gauges
9 Temperature gauges
10 Level gauges
11 Differential pressure gauges
12 Pressure switches
13 Differential pressure switches
14 Temperature switches
15 Level switches
16 Control valves
17 Pressure relief valve
18 Thermal relief valve
19 Sight flow indicators
20 Pressure transmitter
21 Vibration equipment
22 Tachometer
23 Solenoid valves
24 Annunciator
25 Thermocouples
26 RTDs
27 Thermowells
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 13 of 23

API 614—Chapter 1 DATA SHEET LOCAL


INSTRUMENTS AND PANEL ITEM NO. G-9104 A/B

1 Applicable to Proposal Purchase As built


2 For RPLC DEEP CONVERSION PROJECT Site PUERTO LA CRUZ
3 Oil System for VDU COOLING WATER PUMP
4 Supplier Flowserve Manufacturer
5 Purchase Order No. Date Inquiry no. Requisition No.
6
7 NOTES: 1. The party to complete the information is indicated as follows:
8 Purchaser Vendor Either, but by vendor if not by purchaser.
9 2. A dot * indicates the standard specifies a requirement, value, or criterion.
10 3. Designations in ( ) are applicable portions of the standard; numbers without a prefix are paragraph
11 numbers; those prefixed “T” are text figure numbers; those prefixed “A” are Appendix “A” Figure
12 numbers.

13 Service Lube Oil Console Turbine Remote Equipment


Gauge Board Local Panel Control Panel
14
15 Panel identification
16 Supplied by PUMP VENDOR PUMP VENDOR
17 Type: free standing
18 Mounted on BASEPLATE BASE PLATE
19 Open or fully enclosed OPEN ENCLOSED
20 Weather tight WEATHER TIGHT WEATHER TIGHT
21 Purged or pressurized
22 Purge or pressure gas
23 Shutoff valves for shutdown
24 sensing devices
25 Annunciator system
26 Rear access doors
27 Walk-in facility
28 Sun and weather roof extension YES YES
29 Light panel front/interior
30 Limits: max height above floor
31 Lowest item above floor
32 Spare terminals required Required
33 Minimum wire size
34 Material: front panel
35 Other panels and doors
36 Chassis
37 Vibration isolator
38 Electrical area classification CLASS: 1 /GR: B&D / DIV: 2 CLASS: 1 /GR: B&D / DIV: 2
39 Panel power supply 120 VAC
40 Extra cutouts required
41
42
43
44
45
46
47
48
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 14 of 23

API 614—Chapter 1 DATA SHEET


LOCAL INSTRUMENTS AND PANEL ITEM NO. G-9104 A/B

1 Applicable to Proposal Purchase As built


2 Supplier Flowserve Manufacturer
3 Purchase Order No. Date Inquiry no. Requisition No.

4 Panel mounted item details:


5 Use the following code letters to show details (refer to the general notes on page 1 of this appendix).
6 F - Flush mount on front H - Purchaser remote mount (control room) CP - Cutout to purchaser item
7 S - Surface mount on front P - Purchaser supply and mount M - Mount by vendor of purchaser
8 R - Rear of panel mount V - Vendor supply and mount supplied item
9 L - Locally mount on piping B - Local equipment panel C - Remote equipment panel
10 Equipment instrumentation
11 Panel identification L B C Panel identification L B C

12 Pressure indicator Push button stations

13 Main turbine inlet Turbine start V

14 Main turbine first stage Turbine stop V

15 Main turbine extraction Compressor block in

16 Main turbine exhaust V Compressor unblock

17 Steam chest Miscellaneous

18 First stage after extraction Equipment speed indicator V

19 Nozzle bowl Equipment speed control V

20 Steam seal Equipment ammeter

21 Ejector/Eductor steam Compressor inlet controller

22 Compressor suction Annunciation system

23 Compressor discharge Equipment flow meter

24 Each compressor section Guide vane positioner

25 Balance chamber Suction throttle valve


26 Differential pressure gauges Anti-surge equipment

27 Compressor air filter Capacity control equipment

28 Buffer gas Other

29 Balance chamber Other

30 Other : Lube oil filter V Other


31 Temperature indicator Other

32 Main turbine inlet steam Other

33 Main turbine exhaust Other

34 Main turbine extraction/induction Other

35 Compressor suction (each section) Monitors

36 Compressor discharge (each section) Vibration H

37 Other Axial position H

38 Level indicators/controllers Thrust bearing metal temp H

39 Suction separator Journal bearing metal temp H

40 Interstage separator

41 Discharge separator

42
43
44
45
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 15 of 23

API 614—Chapter 3 DATA SHEET


GENERAL PURPOSE OIL SYSTEM ITEM NO. G-9104 A/B
U.S. CUSTOMARY UNITS

1 Applicable to Proposal Purchase As built


2 For RPLC DEEP CONVERSION PROJECT Site PUERTO LA CRUZ
3 Oil System for VDU COOLING WATER PUMP
4 Supplier Flowserve Manufacturer
5 Purchase Order No. Date Inquiry no. Requisition No.
6
7 NOTES: 1. The party to complete the information is indicated as follows:

8 Purchaser Vendor Either, but by vendor if not by purchaser.

9 2. A dot * indicates the standard specifies a requirement, value, or criterion.

10 3. Designations in ( ) are applicable portions of the standard; numbers without a prefix are paragraph

11 numbers; those prefixed “T” are text figure numbers; those prefixed “A” are Appendix “A” Figure

12 numbers.

13 NOTE: For definition of General Purpose basic system, see 1.1.1.

14 Overall system typical schematics: Figure No. Option Nos. Comment

15 Basic oil supply module

16 Lube module at equipment

17 Drawing requirements Component review

18 Oil Requirements: See Chapter 1 data sheet (1.2.5, 1.2.7, 1.2.8, 1.2.10, 1.2.11, and 1.2.13)

19 Baseplate/layout: Combined with equipment base (1.4.11.2)

20 Grout hole/vent holes (1.3.5) Point support (1.3.6)

21 Epoxy grout/primer pre-coat (1.3.5) _______ ft min. clearance for components (1.2.12)

22
23 Basic system details:

24 Equipment coast-down time ______ minutes Shop test conditions

25 Minimum start-up oil temperature ______°F Field start-up/run-in conditions

26 Sound level __85__ Db max. @ 1m from the equipment surface (1.2.6) Welding and special fabrication requirements

27 Components: All steel external components (1.2.14)

28 Piping and Tubing:

29 Tubing fittings—Mfg. _______ Model _______ Additional special requirements, see

30 Carbon steel slip-on flanges not allowed (Table 1D) Utilities manifolded to common connections

31 Through studs required Air

32 Heat tracing required by Purch. Vendor Cooling water

33 Valve heads vented to reservoir Instrument test valves required

34 Radiographic examination (2.1.2.2)

35 Continuous flow transfer valves

36 Separate for coolers and filters with lifting jack

37 Tight shutoff required Rating: psig

38 Type Two-way, six-ported Materials: body CS

39 Manufacturer Plug or ball

40 Model Trim

41
42
43
44
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 16 of 23

API 614—Chapter 3 DATA SHEET


GENERAL PURPOSE OIL SYSTEM ITEM NO. G-9104 A/B
U.S. CUSTOMARY UNITS

1 Applicable to Proposal Purchase As built


2 Supplier Flowserve Manufacturer
3 Purchase Order No. Date Inquiry no. Requisition No.
4
5 Oil conditioners: (if required)
6 Purchaser’s item no. Driver for

7 Type HP and enclosure

8 Portable or mounted on Volts/PH/Hz

9 Rated GPM of oil ____/____/____

10 Manufacturer Water removal rate

11 Model Material of construction

12 Reservoir (1.4) Pumps and drivers (1.5):

13 Figures no. 3A-2 Purchaser item nos.

14 Include options no. 1, 2, 3, 4, 5, 6 Full details on data sheet

15 Electric heater (1.4.7.1) Pump type and material (1.5.1)

16 Special heater sizing (1.4.7.1.2) Supplier standard

17 Oil level glass (1.4.5.1.4) ANSI/ASME B73.1 horizontal

18 Low level alarm (1.4.6.2) ANSI/ASME B73.2 vertical

19 2-inch fill opening (1.4.5.1.6) Rotary positive displacement

20 Sloped bottom (1.4.4.3) In-line

21 Free surface—ft2 Submerged

22 Working capacity (min/gal) Steel casing (1.2.14)

23 Retention capacity (min/gal) API 610

24 Rundown capacity Pump quantity and driver(s)

25 Normal operating range Single-shaft driven

26 Charge capacity Single-motor driven

27 Insulation clips (1.4.8) Motor driven start-up w/shaft drive main (1.5.4.1)

28 Ladder with handrail (1.4.10.1) Full-sized motor-driven start-up to double

29 as auxiliary pump (1.5.4)

30 Handrails on top (1.4.10.2) Dual motor drive

31 Non-skid decking (1.4.10.3) Dual steam turbine main/motor aux. (1.5.4)

32 Flanged vent Pump installation

33 Flanged drain (1.4.4.4) Removable strainer (1.5.14)

34 Extra connection (1.4.9) Mounting pads (1.5.19.1)

35 Siphon breaker

36 Top mounted components permitted

37 Top mounted components are:

38
39 Submerged components and materials

40 Dimensions of tank L x W x H _____/_____/_____ (ft)

41
42
43
44
45
46
47
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 17 of 23

API 614—Chapter 3 DATA SHEET


GENERAL PURPOSE OIL SYSTEM ITEM NO. G-9104 A/B
U.S. CUSTOMARY UNITS
1 Applicable to Proposal Purchase As built
2 Supplier Flowserve Manufacturer
3 Purchase Order No. Date Inquiry no. Requisition No.

4 Filters: Lube oil rundown tanks

5 Purchaser item no. Required, yes or no (1.9.1) No


6 Duplex (1.7.3) Per Figure 2A-13a or 2A-13b (1.9.1)
7 10 Micron filtration level (1.7.2) Purchaser item no.
8 Manufacturer Capacity (mins)
9 Model Capacity (gal.)
10 Design/test (psig) / Material (1.9.1)
11 Code construction/stamp / Design/test (psig)
12 Material: case and top CS Code construction/stamp for /
13 Cartridges: (1.7.6.3) 2A-13a (1.2.17, 1.9.4)
14 Thermal relief valves (1.7.3.8)

15 Nonhydroscopic elements (1.7.6.2)


16 Furnish _2_ extra sets of cartridges. Per filter (extra over other spares).
17 Coolers: None required (1.6.1) Single Connections only for off-base cooler (1.6.1.3)

18 Type: Shell and tube Fin fan Plate frame (1.6.1.3)

19 Refer to specification Supplier std.

20 Purchaser item no(s) Duty: (Btu/hr) (KW)


21 Twin units (1.6.1) Manufacturer
22 Details on data sheet Model
23 Shell and tube:
24 Water side for steam heating Design/test shell side (psig)
25 Water side corrosion allowance Design/test tube side (psig)
26 TEMA class TEMA C Code construction/stamp (1.2.17) /
27 Fouling factor water/oil side Tube water velocity and capacity (fps/gpm)
28 Tube: L/OD/BWG Material: shell CS

29 Removable bundle (1.6.3.4.1) Channels and covers CS


Brass/ Inhibited
Oil temperature control valve Tube sheets and tubes
30 admiralty brass
31 Thermal relief valve (1.6.1.7) Removable tube bundle

32 Continuous flow transfer valves (1.8)

33 Separate for coolers and filters (1.8.1.1) Rating: _______ psig

34 Type Two-way, six-ported Materials: body CS

35 Manufacturer Plug or ball SS

36 Model Trim
37 Spectacle blinds (1.8.5)

38
39
40
41
42
43
44
45
46
47
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 18 of 23

API 614—Chapter 3 DATA SHEET


GENERAL PURPOSE OIL SYSTEM ITEM NO. G-9104 A/B
U.S. CUSTOMARY UNITS

1 Applicable to Proposal Purchase As built


2 Supplier Flowserve Manufacturer
3 Purchase Order No. Date Inquiry no. Requisition No.

4 Shop inspection Shop test

5 Compliance with inspector’s checklist (4.1.1) Required Witness


Required for system assemblies Cleanliness
6 Cleanliness prior to closure Unit console test (4.3.1.3)
7 Required for major components Check controls
8 Material certifications to be furnished Changeover filters/coolers
9 Special examinations One and two pump operation
10 Code construction/stamp Sound level
11 Certified copies of all test logs and data Hydro test assembled system
12 Check pipe strain (4.3.1.4) Use for complete unit shop test (4.3.1.2)
13 Pipe radiography (2.1.2.2) Certified copies of all test logs and data
14 Sound level recorded during test
15 Comments:
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.

SUBPROJECT: UTILITY UNITS


3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.

PHASE: DETAILED ENGINEERING


S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13

PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 19 of 23

GENERAL-PURPOSE STEAM TURBINE


DATA SHEET ITEM NO. G-9104 AT
U.S. CUSTOMARY UNITS PAGE 19 OF 23

1 APPLICABLE TO: PROPOSAL PURCHASE AS BUILT


2 SERVICE VDU COOLING WATER PUMP DRIVEN EQUIPMENT PUMP
3 MANUFACTURER ELLIOTT MODEL DYR SERIAL NO.

4 NOTE: INDICATES INFORMATION COMPLETED BY PUMP VENDOR BY MANUFACTURER BY MFGR IF NOT BY PURCHASER
5 OPERATING CONDITIONS PERFORMANCE
6 POWER, SPEED, OPERATING POINT/ NO. HAND VALVES STEAM RATE,
7 OPERATING POINT BHP RPM STEAM CONDITION OPEN (5.4.1.5) LBS/HP-HR
8 NORMAL NORMAL/NORMAL
1210 5250 23.7
9 (CERTIFIED SR)
10 RATED 1331 5250 RATED/NORMAL 1 24.1

11 OTHER (4.1.4) 1331 5250 (1) MIN. INLET -


1 25.2
12 DUTY, SITE AND UTILITY DATA MAX EXHAUST
13 APPLICATION IS (SPARED, UNSPARED) (1) RATED ______% RATED NORMAL (4.1.4)

14 WIDE SPEED RANGE RAPID START APPLICABLE SPECIFICATION

15 SLOW ROLL REQ. (4.10.4) HAND VALVES REQ. (5.4.1.5) API-611 OTHER AND PROJECT SPECIFICATION.
16 DUTY CONTINUOUS STANDBY

17 UNATTENDED AUTO START (4.1.6) CONSTRUCTION

18 LOCATION (4.1.14) INDOOR HEATED UNHEATED TURBINE TYPE HORIZ VERTICAL


19 OUTDOOR ROOF W/O ROOF NO STAGES 1 WHEEL DIA., IN.
20 AMBIENT TEMP., 。F: MIN. 70 MAX 100 ROTOR: BUILT UP SOLID OVERHUNG
21 UNUSUAL CONDITIONS DUST SALT ATMOSPHERE BETWEEN BRGS
22 (4.1.14) OTHER BLADING 2 ROW 3 ROW RE-ENTRY
23 ELECT. AREA (4.1.13) CLASS 1 GROUP D DIV 2 CASING SPLIT AXIAL RADIAL
24 NON-HAZARDOUS CASING SUPPORT CENTERLINE FOOT
25 CONTROL POWER V 120 PH. 1 HZ 60 VERT. JACKSCREWS (4.2.13)
26 AUX. MOTORS V 460 PH. 3 HZ 60 VERTICAL TURBINE FLANGE
27 COOLING WATER: PRESS, PSIG D P, PSI NEMA "P" BASE OTHER (4.4.9)
28 FLOW, GPM D T, 。F: TRIP VALVE INTEGRAL SEPARATE
31 ALLOW. SOUND PRESS LEVEL (4.1.12) 82 dBA @ FT INTERSTAGE SEALS LABYRINTH CARBON

32 STEAM CONDITIONS END SEALS CARBON RING, NO/BOX


33 MIN. NORMAL MAX Des. LABYRINTH MATERIAL
34 INLET PRESS, PSIG 655 685 715 770/F.V. MECHANICAL MFR
35 INLET TEMP,。F 675 685 695 750
36 EXHAUST PRESS (PSIG) (IN. HGA) 50 60 70 95/ F.V. TYPE RADIAL BEARINGS (4.9.1)
37 STEAM CONTAMINANTS (4.11.1.7) TYPE THRUST BEARING (4.9.2)
38 TURBINE DATA CALCULATED THRUST LOAD PSI (4.9.15)

39 ALLOW SPEEDS, RPM, MAX 5512 MIN 4462 BEARING MFGR's ULTIMATE RATING PSI

40 MAX CONT SPEED, RPM (3.1.10) 5512 THRUST COLLAR (4.9.10.2) REPLACEABLE INTEGRAL NONE
41 TRIP SPEED, RPM 6063 BLADE TIP VEL, FPS LUBE OIL VISCOSITY (4.10.3) ISO GRADE ISO VG 32
42 FIRST CRITICAL SPEED, RPM (4.8.2.1) LUBRICATION RING OILED PRESSURE GREASE
43 EXH. TEMP 。F NORMAL NO LOAD OIL MIST (4.9.19)
44 POTENTIAL MAX POWER, BHP (3.1.20) PURGE OIL MIST PURE OIL MIST
45 MAX. NOZZLE STEAM FLOW, LBS/HR BEARING HOUSING OILER TYPE
46 ROTATION FACING GOVERNOR END CCW CW CASING DESIGN INLET EXHAUST

47 DRIVEN EQUIPMENT THRUST, LBS (4.9.11) MAX. ALLOW. PRESS, PSIG 770 110
48 (VERTICAL TURBINE) (4.9.3) MAX ALLOW. TEMP, 。F 750 600
49 WATER PIPING FURN. BY VENDOR OTHERS HYDRO TEST PRESS., PSIG
50 OIL PIPING FURN. BY VENDOR OTHERS
51
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.

SUBPROJECT: UTILITY UNITS


3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.

PHASE: DETAILED ENGINEERING


S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13

PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 20 of 23

GENERAL-PURPOSE STEAM TURBINE


DATA SHEET ITEM NO. G-9104 AT
U.S. CUSTOMARY UNITS PAGE 20 OF 23
1 MATERIALS ACCESSORY EQUIPMENT BY VENDOR
2 HIGH PRESSURE CASING A216 WCB GRADE REMOTE TRIP SOLENOID
3 EXHAUST CASING A216 WCB GRADE VACUUM BREAKER (5.4.2.9)
4 NOZZLES AISI 410 GRADE AUTOMATIC STEAM SEALING SYSTEM (4.7.5)
5 BLADING 403 SS GRADE GLAND VACUUM DEVICE WITH: (4.7.4)
6 WHEELS AISI 4340 GRADE WATER EDUCTOR STEAM EJECTOR
7 SHAFT AISI 4340 GRADE SENTINEL WARNING VALVE (5.4.5.2)
8 SHAFT COATING UNDER PACKING (4.6.2.3) INSULATION, TYPE:
9 MATERIAL 400 Sr. SS TACHOMETER (5.4.4.1), TYPE electrical
10 APPLICATION METHOD MFR. Woodward MODEL PEAK 150
11 THICKNESS MOUNTED BY Pump Vendor
12 GOV. VALVE TRIM THERMAL RELIEF VALVES (5.4.4.7.3)
13 INLET STRAINER MESH SIZE SHUTOFF VALVES FOR SHUTDOWN SENSORS
14 COUPLING SPACER/HUBS LOCAL GAUGE BOARD WITH FOLLOWING PRESSURE GAUGES: (5.4.3.1)
15 COUPLING DIAPHRAGMS (DISKS) THROTTLE STEAM FIRST STAGE
16 STEAM CONTROL NOZZLE RING EXHAUST
17 SPEED CHANGER MANUAL PNEUM. ELECT (5.4.2.3) LIQUID FILLED GAUGES (5.4.4.5.2)
18 MFR. Woodward MODEL PEAK 150 INSTRUMENT PANEL (5.4.3.2.1)
19 CONTROLLED OPERATING CONTROL BASEMOUNT
20 VARIABLE RANGE SIGNAL FREE STANDING
21 SPEED TO RPM TO PSIG/mA EXTERNAL LUBE OIL SYSTEM

22 TO RPM TO PSIG/mA CIRCULATING (4.10.5) PRESSURE (4.10.6)


23 CONNECTIONS (4.4.1) VENDOR FURNISH SYSTEM FOR: TURBINE
24 SIZE RAT'G FAC'G POS. MATING PARTS OTHER BY PUMP MANUFACTURER
25 FURNISHED (4.4.6.5) OIL SYSTEM TO BE: CONSOLE TYPE
26 INLET 4" #600 RF Right MOUNTED ON BASEPLATE
27 EXHAUST 12" #150 RF Right OIL SYSTEM TO INCLUDE FOLLOWING EQUIPMENT: (4.10.5)(4.10.7)
28 DRAINS STANDBY OIL PUMP: TYPE DRIVER Electric Motor
29 LEAK OFFS LOW OIL PRESS ALARM SWITCH
30 C.W. LOW OIL PRESS TRIP SWITCH
31 COUPLINGS (5.2) SEE SEPARATE DATA SHEET HEATER (4.10.8) ELECTRIC STEAM
32 LOCATION TURBINE DRIVEN OIL DRAIN SIGHT FLOW INDICATORS
33 MAKE HAND OPERATED STANDBY PUMP
34 MODEL
35 RATING (HP/100RPM)
36 LUBRICATION
37 LIMITED END FLOAT VIBRATION AND POSITION DETECTORS (5.4.6)

38 SPACER LENGTH FURNISH PROVISIONS FOR MOUNTING NON-CONTACTING


39 SERVICE FACTOR VIBRATION PROBES (4.9.32)
40 TURBINE VENDOR MOUNTS HALF COUPLING FURN. AXIAL POSITION PROBES NO. OF PROBES :
41 MFR. MODEL
42 DYN. BALANCE CL (5.2.8) FURN. RADIAL PROBES NO. OF PROBES PER BEARING :
43 AGMA CLASS 8 OTHER MFR. MODEL
44 TURBINE SHAFT TAPER STRA'T HYDRAULIC FIT HUB FURNISH BEARING METAL TEMP SENSORS FOR:
45 MOUNTING PLATES RADIAL BEARINGS THRUST BEARINGS
46 TYPE: (5.3.1.1) BASEPLATE SOLEPLATE TURBINE VENDOR SUPPLIES AND CALIBRATES MONITORS FOR:
47 FURN. BY: TURBINE VENDOR AXIAL AND RADIAL PROBES
48 DRIVEN EQUIPMENT VENDOR OTHER BEARING TEMPERATURE SENSORS
49 EQUIPMENT TO BE MOUNTED: (5.3.2.1) SEE SEPARATE DATA SHEETS FOR DETAILS
50 TURBINE GENERATOR GEAR
51 PUMP OTHER
52 UNGROUTED BASEPLATE (5.3.2.4)
53 SUITABLE FOR COLUMN MOUNTING
54 TURBINE VENDOR FURNISHES SUBPLATES
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.

SUBPROJECT: UTILITY UNITS


3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.

PHASE: DETAILED ENGINEERING


S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13

PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 21 of 23

GENERAL-PURPOSE STEAM TURBINE


DATA SHEET ITEM NO. G-9104 AT
U.S. CUSTOMARY UNITS PAGE 21 OF 3
1 G REQUIREMENTS PREPARATION FOR SHIPMENT
2 SUPPLY ENGR. DATA FOR LATERAL/TORSIONAL ANALYSES TURBINE AUX. EQUIPMENT AND SPARE ROTOR PREPARED FOR (6.4.1):
3 (4.8.1.7)
4 CALCS AND/OR DATA FOR SEPARATION MARGIN (4.8.2.2) DOMESTIC SHIPMENT EXPORT SHIPMENT
5 TRAIN TORSIONAL VIBRATION ANALYSIS (4.8.3.5)
6 WEIGHT OF HALF KEYS (4.8.4.2)
7 RESIDUAL UNBALANCE CHECK (4.8.4.3) REMARKS:
8

10 REMARKS:

11

12 TESTS (6.3) REQ'D. WITN. OBSVD. (6.1.5)

13 HYDROSTATIC (6.3.2.1)
14 MECH. RUN (6.3.3)
15

16 PERFORMANCE (6.3.4.1)

17 INSPECTION REQUIREMENTS COMPLETE UNIT (6.3.4.2)


18 100% ULTRASONIC INSPECTION AFTER ROUGH MACHINING GEAR (6.3.4.3)
19 (6.2.2.3.1) SOUND LEVEL (6.3.4.4)
20 USE INSPECTOR'S CHECK LIST AUX. EQUIPMENT (6.3.4.5)
21 CASTING SURFACE INSPECTION (6.2.2.1.1) MSS SP-55
22 OTHER SSPC-SP6
23 WELD INSPECTION (6.2.2.1.2) REMARKS:
24 SPECIAL NDT INSPECTION (6.2.1.3)
25

26 MAG. DYE RADIO- ULTRA- OBSER- WEIGHTS

27 COMPONENT PART. PENET. GRAPHIC SONIC VED WITN- TURBINE LB


28 T&T VALVE ROTOR LB
29 STM CHEST TURBINE UPPER HALF CASING LB
30 CASING MAX MAINTENANCE (IDENTIFY) LB
31 PIPING T & T VALVE LB
32 ROTOR BASEPLATE LB
33 MISC. LB
34 TOTAL SHIPPING WEIGHT LB
35 REMARKS:
36

37 REMARKS:

38

39

40

41

42

43

44

45

46

47

48

49

50

51
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 22 of 23
Client PDVSA Project RPLC DEEP CONVERSION Item
G-9104 BM
Unit COOLING WATER SYSTEM (U-91) Service VDU COOLING WATER PUMP No.
Parallel operation Auto start Continuous Intermittent Manufacturer: Mfr's
No. of Unit Main driven by GE Model
Spare 1 driven by Elec. Motor Motor serial No.
REQUIREMENTS AND CONDITIONS DRIVEN MACHINE DATA
1 Service Outdoor / Indoor 41 Type Pump / Comp. / Blower / Fan / Mixer

2 Area Classification Div 2 Group D 42 Centrif. / Recipro. / Rotary


3 Ambient Temperature MAX 100 oF 43 Driven Machine Manufacturer FLOWSERVE
4 Altitude 78.8 ft 44 Counter Torque
5 Rated Voltage 4000 V 3 ph 60 Hz 45 B.H.P. kW
6 Cooling Method TEAAC (IEC 60034-6) 46 Moment of Inertia (WR2) kg-m2
7 Degree of Protection IP 54 (Note 13) 47 Req’d End Play DE mm NDE mm
Type of Protection
8 for Hazardous Areas
48 Thrust UP kg Down kg

9 Temperature Class T3 (IEC 60079-0) 49 Coupling Method Direct / Belt / Gear

10 Time Rating Continuous / Intermittent 50 Half Coupling Supplied by Manufacturer


At Motor Side
11 Required Output 836 kW 51 Fitted by Manufacturer

12 Service Factor 1.0 52


13 Insulation Class F (Rise B) MOTOR MANUFACTURER'S DATA
14 No. of Poles 10 61 Motor Manufacturer
15 Type of Mounting Horizontal / Vertical 62 Manufacturer Order No.
Direction of Rotation
16 (Viewed from coupling side)
CW / CCW 63 Serial No.
17 Starting Method Direct-on-line 64 Motor Dwg. No.
Construction for
18 Hazardous Areas
Main Terminal Box 65 Standard
19 Thread Size * Performance Dimensions
Main Terminal Box 2
20 Cable Type & Size * mm 66 Type and/ or Frame Size
21 67 Stator Winding Connection Star / Delta, DOL
T.B. Thread
22 Size 68 Insulation Class & Temp. Rise Insulation Class F Temp. rise 80 K

23 Space Heater Required / Not Required * 69 Rated Output / Current 836 kW A


Winding Temp
24 Detectors
Required / Not Required * 70 Rated Speed 891 rpm

25 Noise 82 dBA 71 Power Factor F.L. % 3/4 Load % 1/2 Load %

26 Finish Color Bluish green (RAL-6017) 72 Efficiency F.L. % 3/4 Load % 1/2 Load %

27 C.T. for Diff. Relay Required/Not Required 73 Locked Rotor Current %

28 A.T. Rato 74 Locked Rotor Torque %

29 Thread Size lf T.B. for C.T. 75 Pull-up / Breakdown Torque Pull-up % Breakdown %

30 76 Starting Time sec. at 80% Volt sec. at 100% Volt

31 77 Permissible Locked Rotor Time sec.(Cold) sec.(Hot)

32 78
33 79 Motor Rotor Inertia (WR2) kg-m2

34 80 Bearing Type and/or No. DE NDE

Remarks : 81 Lubrication System Grease / Oil / Self Lub. / Forced Lub.

Note 13. Terminal box and bearing housing shall be IP55. 82 End Play DE mm NDE mm

Vendor shall complete the Data Sheet. 83 Weight Rotor kg Total kg

84 Space Heater V ph HZ W
* The Data marked * will be advised after receipt of vendor’s
data filled in this format
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 23 of 23

NOISE DATA SHEET


EQUIPMENT DESIGN DATA

Equipment No.: G-9104 A/B Req. No.:


Equipment Description : VDU COOLING WATER PUMP
Size : Power : [HP] [kW]
Speed : [RPM]

SOUND PRESSURE LEVEL (SPL) (Lp)

Measured on actual equipment [ ]


Extrapolated from equivalent equipment [ ]
Calculated [ ]

FREQUENCY [Hz] 62.5 125 250 500 1000 2000 4000 8000 dBA
Ma 14 K.Y./K.O./N.T. [dB(Lin)] 85
Lp std. equipment [dB(Lin)]
Lp with noise treatment [dB(Lin)]

SOUND POWER LEVEL (PWL) (Lw)

Calculated from Lp Measurements from actual equipment [ ]


Lp Measurements from equivalent equipmen [ ]
Lp Calculated [ ]

FREQUENCY [Hz] 62.5 125 250 500 1000 2000 4000 8000 dBA
Max allowable Lp [dB(Lin)]
Lp std. equipment [dB(Lin)]
Lp with noise treatment [dB(Lin)]

BACKGROUND NOISE LEVEL SPECTRUM (SPL) (Lp)


(Measured immediately before the test of the equipment)

FREQUENCY [Hz] 62.5 125 250 500 1000 2000 4000 8000 dBA
Measured Background SPL [dB(Lin)]

Vendor Name: Signature : Date :