3006-391C-DM833004 - Vdu Cooling Water Pump Datasheet
3006-391C-DM833004 - Vdu Cooling Water Pump Datasheet
3006-391C-DM833004 - Vdu Cooling Water Pump Datasheet
D 18-03-13 FOR REVIEW / Comments Incorporated 23 YKL / JGS / HJK N/A N/A
(G-9104A/B)
UNIT 91
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
CONTENT
Item No. Service Sheet No. Rev. Date Description
1 1. The G-9104 A is driven by Steam Turbine and the spare G-9104 B is driven by Motor.
2 2. Discharge pressure at rated flow at GL. The maximum allowable shut-off pressure above minimum continuous flowrate is 120 psig.
3 3. Auto start provision is only for motor driven pump.
4 4. Design temperature is 170 °F.
5 5. Turbine back pressure shall be minimum 50 psig, normal 60 psig and maximum 70 psig (MLP Steam Header).
6 6. Bases on four cycles of concentration.
7 7. To be finalized based on final cooling water pit size.
8 8. Minimum pump submerge level confirmed by vendor as 5 ft from impeller center.
9 9. Cooling water pit levels shall be decided as per cooling tower vendor information.
10 10. Horizontal turbine with right angle bevel gear shall be provided.
11 11. For site data and utility condition, refer to the basic engineering design data 3006-500A-DG140001.
12 12. Minimum level under the suction bell confirmed by vendor as 1.83 ft.
13
14
15
16
17
18
19
20
21
22
23 DRAWING
24
25
26 This sketch will be changed based on final pit drawing and pump general arrangement drawing.
27
28
29
30
31
M
32
Top
33
34 HLL 7.5 ft (NOTE 9)
35
36 Oily Sewer
NLL
37
38
39
40 LLL 2.25 ft (NOTE 8)
41
42
43 GL 0.0 ft
44
45 Suction
46 Bottom (NOTE 12)
47
48
49
50
51
52
53
54
55
56
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
API 610 10TH Centrifugal pump data sheet ITEM NO. G-9104 A/B
Vertically suspended (type VS)
1 CONSTRUCTION SURFACE PREPARATION AND PAINT
2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)
3 PUMP TYPE: (1.3) PUMP:
4 VS1 VS2 VS3 VS4 VS5 VS6 VS7 3006-500A-DM115891
5 CASING MOUNTING: SUMP COVER PLATE PUMP SURFACE PREPARATION
6 INLINE SEPARATE MOUNTING PLATE (8.3.8.3.1) PRIMER
7 SEPARATE SOLE PLATE (8.3.8.3.3) FINISH COAT
8 CASING SPLIT: BASEPLATE / COLUMN:(6.3.17)
9 AXIAL RADIAL BASEPLATE SURFACE PREPARATION
10 CASING TYPE: PRIMER
11 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER FINISH COAT
12 CASE PRESSURE RATING: SHIPMENT: (7.4.1)
13 MAX ALLOWABLE WORKING PRESSURE 150 (PSIG) DOMESTIC EXPORT EXPORT BOXING REQUIRED
14 @ 170 (°F) OUTDOOR STORAGE MORE THAN 12 MONTHS
15 HYDROTEST PRESSURE 225 (PSIG) SPARE ROTOR ASSEMBLY PACKAGED FOR:
16 SUCTION PRESS. REGIONS MUST BE DESIGNED FOR MAWP (5.3.6) HORIZONTAL STORAGE VERTICAL STORAGE
17 NOZZLE CONNECTIONS: (5.4.2) TYPE OF SHIPPING PREPARATION
18 SIZE (IN) FLANGE FACING POSITION
19 RATING (LBS) HEATING AND COOLING
20 SUCTION HEATING JACKET REQ'D. (5.8.9) COOLING REQ'D.
21 DISCHARGE 26" 300 # RF SIDE COOLING WATER PIPING PLAN (6.5.3.1)
22 BALANCE DRUM C.W. PIPING:
23 PIPE TUBING; FITTINGS
24 PRESSURE CASING AUX. CONNECTIONS: (5.4.3) C.W. PIPING MATERIALS:
25 NO. SIZE (NPS) TYPE S. STEEL C. STEEL GALVANIZED
26 DRAIN COOLING WATER REQUIREMENTS:
27 VENT 1 2" RF/ Vertical BEARING HOUSING (USGPM) @ (PSIG)
28 WARM-UP HEAT EXCHANGER (USGPM) @ (PSIG)
29 BALANCE / LEAK-OFF STEAM PIPING: TUBING PIPE
30 MACHINED AND STUDDED CONNECTIONS (5.4.3.8) BEARINGS AND LUBRICATION
31 CYLINDRICAL THREADS REQUIRED (5.4.3.3) BEARING (TYPE/NUMBER):
32 ROTOR: RADIAL Sleeve /
33 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) THRUST Anti-Friction /
34 SHRINK FIT -LIMITED MOVEMENT IMPELLERS (8.2.2.3) LUBRICATION (5.11.3, 5.11.4):
35 COUPLINGS: GREASE FLOOD PURGE OIL MIST
36 MANUFACTURER MODEL FLINGER PRODUCT LUBRICATED
37 RATING (HP/100 r/min) CONSTANT LEVEL OILER (5.10.2.2)
38 SPACER LENGTH (IN) SERVICE FACTOR OIL VISC. ISO GRADE
39 RIGID REVIEW AND APPROVE THRUST BEARING SIZE
40 THROUGH COUPLINGS: OIL HEATER REQUIRED: STEAM ELECTRIC
41 MANUFACTURER MODEL
42 RATING (HP/100 r/min) LUBE INSTRUMENTATION (6.4.2)
43 SPACER LENGTH (IN) SERVICE FACTOR ACCELEROMETER (6.4.2.1 One(1) on radial bearing/ one(1) thrust bearing
44 RIGID PROVISION FOR MOUNTING ONLY (5.10.2.11)
45 DRIVER HALF COUPLING MOUNTED BY: FLAT SURFACE REQ'D (5.10.2.12)
46 PUMP MFR. DRIVER MFR. PURCHASER PRESSURE GAUGE TYPE
47 COUPLING BALANCED TO ISO 1940-1 G.6.3 (6.2.3)
48 COUPLING PER ISO 14691(6.2.4)
49 COUPLING PER ISO 10441(6.2.4)
50 COUPLING PER API 671(6.2.4)
51 NON SPARK COUPLING GUARD (6.2.14c) (6.2.14a) REMARKS: See 3006-500A-DI116003
52 COUPLING GUARD STANDARD
53 ASME B15.1
54 OTHER 3006-500A-DM115615
55 WEIGHTS (LBS)
56 MECHANICAL SEAL: PUMP
57 SEE ATTACHED ISO 21049/API 682 DATA SHEET DRIVER
58 GEAR
59 BASEPLATE
60 TOTAL
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
API 610 10TH Centrifugal pump data sheet ITEM NO. G-9104 A/B
Vertically suspended (type VS)
1 SPARE PARTS (TABLE 18) VERTICAL PUMPS (CONT.)
2 START-UP NORMAL MAINTENANCE PUMP AND STRUCTURE DYNAMIC ANALYSIS (8.3.5)
3 SPECIFY AS PER PURCHASE SPECIFICATION DRAIN PIPED TO SURFACE (8.3.13.4)
4
5 OTHER PURCHASER REQUIREMENTS QA INSPECTION AND TESTING
6 COORDINATION MEETING REQUIRED (9.1.3) SHOP INSPECTION (7.1.4) PERFORMANCE CURVE APPROVAL
7 MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) TEST WITH SUBSTITUTE SEAL (7.3.3.2)
8 MAX RELATIVE DENSITY TEST (7.3.1.2) NON-WIT WIT OBSERVE
9 MAX DIA. IMPELLERS AND/OR NO OF STAGES HYDROSTATIC TEST OF BOWLS
10 OPERATION TO TRIP SPEED AND COLUMN (8.3.13.2)
11 CONNECTION DESIGN APPROVAL (5.12.3.4) HYDROSTATIC (7.3.2)
12 TORSIONAL ANALYSIS REQUIRED (5.9.2.1) PERFORMANCE (7.3.3)
13 TORSIONAL ANALYSIS REPORT (5.9.2.6) RETEST ON SEAL LEAKAGE (7.3.3.2d)
14 PROGRESS REPORTS (9.3.3) NPSH (7.3.4.2)
15 OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5) COMPLETE UNIT TEST (7.3.4.3)
16 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2.1f) SOUND LEVEL TEST (7.3.4.4)
17 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) CLEANLINESS PRIOR TO
18 VENT VENT COOLING WATER FINAL ASSEMBLY (7.2.2.2)
19 MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) NOZZLE LOAD TEST (6.3.6)
20 FLANGES REQUIRED IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) 4 HR. MECHANICAL RUN TEST(7.3.4.7.1)
21 CONNECTION BOLTING PTFE COATING SS MECHANICAL RUN UNTIL OIL
22 PAINTED ASTM A153 GALVANIZED TEMP. STABLE (7.3.4.7.1)
23 INSTALLATION LIST IN PROPOSAL (9.2.3L) 4 HR. MECHANICAL RUN AFTER
24 VERTICAL PUMPS OIL TEMP. STABLE (7.3.4.7.3)
25 PUMP THRUST: (+) UP (-) DOWN TRUE PEAK VELOCITY
26 AT MIN. FLOW (LBS) (LBS) DATA (7.3.3.4.d)
27 AT RATED FLOW (LBS) (LBS) RESONANCE TEST (8.3.9.2)
28 AT MAX. FLOW (LBS) (LBS) PUMP STRUCTURAL RESONANCE TEST (8.3.9.2)
29 MAX THRUST (LBS) (LBS) AUXILIARY EQUIPMENT
30 SOLEPLATE REQ'D. (8.3.8.3.3) (IN) X (IN) TEST (7.3.4.5)
31 MOUNTING PLATE REQUIRED (3006-500A-DM115606, 8.3.8.3.4) CHARPY TEST (EN 13445/ASME VIII)
32 SOLEPLATE THICKNESS (IN) VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c)
33 COLUMN PIPE: FLANGED THREADED VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5)
34 DIAMETER (IN) LENGTH (FT) VENDOR SUBMIT TEST DATA WITHIN 24 HOURS (7.3.3.3e)
35 GUIDE BUSHINGS INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3)
36 NUMBER RECORD FINAL ASSEMBLY RUNNING CLEARANCES
37 LINE SHAFT BEARING SPACING (IN) COMPLETION OF INSPECTION CHECK LIST (7.1.6)
38 GUIDE BUSHINGS LUBE: MATERIAL CERTIFICATION REQUIRED (5.12.1.8)
39 WATER OIL CASING IMPELLER SHAFT
40 GREASE PUMPAGE OTHER
41 LINESHAFT: OPEN ENCLOSED CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5)
42 LINE SHAFT DIAMETER: (IN) INSPECTION REQUIRED FOR CONNECTION
43 TUBE DIAMETER: (IN) WELDS (5.12.3.4) (5.12.1.5)
44 LINESHAFT COUPLING: MAG PARTICLE LIQUID PENETRANT
45 LINE SHAFT DIAMETER: SLEEVE & KEY THREADED RADIOGRAPHIC ULTRASONIC
46 SUCTION CAN THICKNESS (IN) INSPECTION REQUIRED FOR CASTINGS (7.2.1.3) (5.12.1.5)
47 LENGTH (FT) MAG PARTICLE LIQUID PENETRANT
48 DIAMETER (FT) RADIOGRAPHIC ULTRASONIC
49 SUCTION STRAINER TYPE HARDNESS TEST REQ'D. (7.2.2.3)
50 FLOAT & ROD FLOAT SWITCH ADDITIONAL SUBSURFACE EXAMINATION (7.2.1.3)
51 IMPELLER COLLETS ACCEPTABLE (5.6.3) FOR
52 HARDENED SLEEVES UNDER BEARINGS (8.3.10.5) METHOD
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
69
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 8 of 23
Category 1 & 2 Seals
MECHANICAL SEAL DATA SHEET ITEM NO. G-9104 A/B
FOR CENTRIFUGAL AND ROTARY PUMPS PAGE 8 OF 23
U.S. CUSTOMARY UNITS
01 DATA SUPPLIED CUSTOMARY UNITS SI UNITS HARDWARE SUPPLIED CUSTOMARY UNITS SI UNITS
02 INDICATES DATA COMPLETED BY PURCHASER BY SEAL VENDOR BY SEAL VENDOR OR PURCHASER
03 DEFAULT SELECTION
04 SEAL SPECIFICATION - (REF 4.1, FIGURE 1 TO 6)
05 CATEGORY SEAL CATEGORY 1(4.1.1) SEAL CATEGORY 2(4.1.1) SEAL CODE(ANNEX D)
06 TYPE TYPE A(3.72) TYPE B(3.73) ALTERNATE STATIONARY (TYPE A & B)
07 (CODE CW) TYPE C(3.74) ALTERNATE ROTATING (TYPE C) SINGLE SPRING (TYPE A)
08 ARR'G'T DEFAULT CONFIGURATION ALTERNATE DESIGN FLUSH PLANS (ANNEX D)
09 1(3.2) 1 CW-FX 1 CW-FL DIST FLUSH 01 11 14 23 32 50 61
10 ALTERNATE BUSH 02 13 21 31 41 61 62
11 LIQUID 2 CW-CW FX DIST FLUSH 01 13 23 41 62 75
BUFFER
23 Maximum allowable noise level not to exceed overall 85 dB @ 1m from the skid edge
24 (Sketch the equipment plot plan with relation to the console location here)
24 Winterize Tropicalize
25 Area classification: Class 1 Group D Division 2
26
27 Equipment oil required:
27 Lube oil: Normal After trip Seal oil: Normal After trip
28 PSIG supply pressure gpm gpm flow/pressure flow/pressure
29 gpm / psig gpm / psig
30 Pump Seal oil at: / /
30 Driven equipment Seal oil at: / /
31 Driven equipment Seal oil at: / /
32 Steam Turbine
33 Gears
33 Couplings
34
35 Total:
36
36 Control oil (normal) Oil type and viscosity
37
38 Control oil (transient) Required heat load _______ (Btu/hr)
39
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 11 of 23
40 Interstage separator
41 Discharge separator
42
43
44
45
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 15 of 23
10 3. Designations in ( ) are applicable portions of the standard; numbers without a prefix are paragraph
11 numbers; those prefixed “T” are text figure numbers; those prefixed “A” are Appendix “A” Figure
12 numbers.
18 Oil Requirements: See Chapter 1 data sheet (1.2.5, 1.2.7, 1.2.8, 1.2.10, 1.2.11, and 1.2.13)
21 Epoxy grout/primer pre-coat (1.3.5) _______ ft min. clearance for components (1.2.12)
22
23 Basic system details:
26 Sound level __85__ Db max. @ 1m from the equipment surface (1.2.6) Welding and special fabrication requirements
30 Carbon steel slip-on flanges not allowed (Table 1D) Utilities manifolded to common connections
40 Model Trim
41
42
43
44
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 16 of 23
27 Insulation clips (1.4.8) Motor driven start-up w/shaft drive main (1.5.4.1)
35 Siphon breaker
38
39 Submerged components and materials
41
42
43
44
45
46
47
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 17 of 23
36 Model Trim
37 Spectacle blinds (1.8.5)
38
39
40
41
42
43
44
45
46
47
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 18 of 23
4 NOTE: INDICATES INFORMATION COMPLETED BY PUMP VENDOR BY MANUFACTURER BY MFGR IF NOT BY PURCHASER
5 OPERATING CONDITIONS PERFORMANCE
6 POWER, SPEED, OPERATING POINT/ NO. HAND VALVES STEAM RATE,
7 OPERATING POINT BHP RPM STEAM CONDITION OPEN (5.4.1.5) LBS/HP-HR
8 NORMAL NORMAL/NORMAL
1210 5250 23.7
9 (CERTIFIED SR)
10 RATED 1331 5250 RATED/NORMAL 1 24.1
15 SLOW ROLL REQ. (4.10.4) HAND VALVES REQ. (5.4.1.5) API-611 OTHER AND PROJECT SPECIFICATION.
16 DUTY CONTINUOUS STANDBY
39 ALLOW SPEEDS, RPM, MAX 5512 MIN 4462 BEARING MFGR's ULTIMATE RATING PSI
40 MAX CONT SPEED, RPM (3.1.10) 5512 THRUST COLLAR (4.9.10.2) REPLACEABLE INTEGRAL NONE
41 TRIP SPEED, RPM 6063 BLADE TIP VEL, FPS LUBE OIL VISCOSITY (4.10.3) ISO GRADE ISO VG 32
42 FIRST CRITICAL SPEED, RPM (4.8.2.1) LUBRICATION RING OILED PRESSURE GREASE
43 EXH. TEMP 。F NORMAL NO LOAD OIL MIST (4.9.19)
44 POTENTIAL MAX POWER, BHP (3.1.20) PURGE OIL MIST PURE OIL MIST
45 MAX. NOZZLE STEAM FLOW, LBS/HR BEARING HOUSING OILER TYPE
46 ROTATION FACING GOVERNOR END CCW CW CASING DESIGN INLET EXHAUST
47 DRIVEN EQUIPMENT THRUST, LBS (4.9.11) MAX. ALLOW. PRESS, PSIG 770 110
48 (VERTICAL TURBINE) (4.9.3) MAX ALLOW. TEMP, 。F 750 600
49 WATER PIPING FURN. BY VENDOR OTHERS HYDRO TEST PRESS., PSIG
50 OIL PIPING FURN. BY VENDOR OTHERS
51
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
10 REMARKS:
11
13 HYDROSTATIC (6.3.2.1)
14 MECH. RUN (6.3.3)
15
16 PERFORMANCE (6.3.4.1)
37 REMARKS:
38
39
40
41
42
43
44
45
46
47
48
49
50
51
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 22 of 23
Client PDVSA Project RPLC DEEP CONVERSION Item
G-9104 BM
Unit COOLING WATER SYSTEM (U-91) Service VDU COOLING WATER PUMP No.
Parallel operation Auto start Continuous Intermittent Manufacturer: Mfr's
No. of Unit Main driven by GE Model
Spare 1 driven by Elec. Motor Motor serial No.
REQUIREMENTS AND CONDITIONS DRIVEN MACHINE DATA
1 Service Outdoor / Indoor 41 Type Pump / Comp. / Blower / Fan / Mixer
26 Finish Color Bluish green (RAL-6017) 72 Efficiency F.L. % 3/4 Load % 1/2 Load %
29 Thread Size lf T.B. for C.T. 75 Pull-up / Breakdown Torque Pull-up % Breakdown %
32 78
33 79 Motor Rotor Inertia (WR2) kg-m2
Note 13. Terminal box and bearing housing shall be IP55. 82 End Play DE mm NDE mm
84 Space Heater V ph HZ W
* The Data marked * will be advised after receipt of vendor’s
data filled in this format
REFINING MAJOR PROJECTS GENERAL MANAGEMENT
PROJECT: RPLC DEEP CONVERSION PROJECT PDVSA DOC. No.
SUBPROJECT: UTILITY UNITS
3006-391C-DM833004
UNIT: COOLING WATER SYSTEM (U-91) - VDU AREA
AREA: GENERAL CONFEED DOC. No.
PHASE: DETAILED ENGINEERING
S-091-1224-5516
DISCIPLINE: MECHANICAL
TITLE: VDU COOLING WATER PUMP DATA SHEET (G-9104A/B) REV. 0 DATE:29-03-13
PDVSA PROJECT NO.: 3006; HYUNDAI-WISON PROJECT NO.: VERE Sheet 23 of 23
FREQUENCY [Hz] 62.5 125 250 500 1000 2000 4000 8000 dBA
Ma 14 K.Y./K.O./N.T. [dB(Lin)] 85
Lp std. equipment [dB(Lin)]
Lp with noise treatment [dB(Lin)]
FREQUENCY [Hz] 62.5 125 250 500 1000 2000 4000 8000 dBA
Max allowable Lp [dB(Lin)]
Lp std. equipment [dB(Lin)]
Lp with noise treatment [dB(Lin)]
FREQUENCY [Hz] 62.5 125 250 500 1000 2000 4000 8000 dBA
Measured Background SPL [dB(Lin)]