Pergola 3

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

DISCLAIMER:

THIS PLAN IS NOT CONSIDERED


COMPLETE UNLESSN APPROVED BY
YTOUR LOCAL BUILDING INSPECTOR
OR STRUCTURAL ENGINEER BUILDER
ACCEPT ALL RESPONSIBILITY AND
LIABILITY ACCEPT NO LIABILITY
FOR THE USE OF THIS PLAN.

ONLY USE #2 OR BETTER PRESSURE


TREATED SOUTHERN YELLO PINE
2X10 FOR FRAMING MATERIALS
NEVER SUBSTITUTE COMPOSITE OR

4139 open way Hollywood FL 33026


SOFTWOODS FOR FRAMING MATERIALS

32' - 6"

EXISTING HOUSE

1' - 3"
7' - 2"
7' - 8"

Project Name:
1' - 6"
CONCRETE FOUNDATION FOOTING
0' - 6"

1' - 6"
0' - 6" 0' - 6"
29' - 0"
30' - 0" SEAL:

FLOOR PLAN VIEW


1 1/4" = 1'-0" Release for Construction

Drawn by:
Checked: Checker
Date: September/2023

Scale:
DISCLAIMER:
THIS PLAN IS NOT CONSIDERED
COMPLETE UNLESSN APPROVED BY
YTOUR LOCAL BUILDING INSPECTOR
OR STRUCTURAL ENGINEER BUILDER
ACCEPT ALL RESPONSIBILITY AND
LIABILITY ACCEPT NO LIABILITY
FOR THE USE OF THIS PLAN.

ONLY USE #2 OR BETTER PRESSURE


TREATED SOUTHERN YELLO PINE
2X10 FOR FRAMING MATERIALS
NEVER SUBSTITUTE COMPOSITE OR

4139 open way Hollywood FL 33026


SOFTWOODS FOR FRAMING MATERIALS

BOLTED TO HOUSE WITRH


1/2" BOLT ECVERY 16"
O.C

2'x 8" ALUMINUM


1' - 0"
HEADER BEAM
OVERHANG

2' x 8" STEEL


HEADER BEAM

6X6
SUPPORT
POST
(2) 1/2" BOLTS
ATTACHMENT FOR 6X6
Project Name:
SUPPORT POST TO
2X8 HEADER

4" ALUMINUM
FASCIA BOARD
SEAL:

ROOF LAYOUT
1 1/4" = 1'-0"
Release for Construction

Drawn by:
Checked: Checker
Date: September/2023

Scale:
DISCLAIMER: THIS PLAN IS NOT
CONSIDERED COMPLETE UNLESSN
APPROVED BY YTOUR LOCAL
BUILDING INSPECTOR OR 3" THICK INSULATED
STRUCTURAL ENGINEER BUILDER ALUMINIUM PANEL
ACCEPT ALL RESPONSIBILITY AND
LIABILITY ACCEPT NO LIABILITY
FOR THE USE OF THIS PLAN.
ROOF LAYOUT
8' - 8"
1' - 0"

4139 open way Hollywood FL 33026


2'x 8" ALUMINUM HEADER
BEAM

6'x 6" ALUMINUM


SUPPORT POST

Level 1
0' - 0"

Elevation 1
1 1/4" = 1'-0"

ROOF LAYOUT Project Name:


8' - 8"
1/2" BOLYS ATTCHMENT
FOR 6X6 SUPPORT POST
TO 2X8 HEADER BEAM
SEAL:
6" x 6" STEEL SUPPORT POST
ATTCHED TO CONCRETE DECK
FLOOR TWITH POST BASE
HARDWARE
Level 1
0' - 0"
Release for Construction

Elevation 2 Drawn by:

2 1/4" = 1'-0"
Checked:
Date:
Checker
September/2023

Scale:
DISCLAIMER: FOOTING SIZES
ADJUSTED FOR ADDITIONAL 25LBS
PER SQUARE FOOR SNOW/ROOF LOAD

USE ONLY 2,500 PSI CONCRETE FOR


FROST FOOTING FOUNDATION

4139 open way Hollywood FL 33026


THIS IS A
TRIANGULATION
REFRENCE POINT
MEASURE TO THE
CONETRE OF YOUR
FOOTINGS FROM HOUSE
THESE POINTS.
30' - 0"

30'
- 4
1/2"
1/2"
CONCRETE
7' - 2 1/2"

- 11
30'

7' - 8 1/2"
FOUNDATION FOOTING

1' - 6"

Project Name:

1' - 6"
0' - 6" 29' - 0" 0' - 6"

SEAL:

FOOTING LAYOUT
1 1/4" = 1'-0"
Release for Construction

Drawn by:
Checked: Checker
Date: September/2023

Scale:

You might also like