Risk Assessment For Excavation Works of Water Intake Pumphouse Chamber
Risk Assessment For Excavation Works of Water Intake Pumphouse Chamber
Document
0323PE-N-WM-QA01-HS-JSA-5010 Rev A06
Number:
Document Title: RISK ASSESSMENT FOR EXCAVATION WORKS OF WATER INTAKE PUMPHOUSE
CHAMBER
ProjectTitle : EPC QA INTAKE AND 1st STAGE LIFT PUMP REPLACEMENT
Tag No’s
(if applicable)
Contractor: PEG ENGINEERING & CONTRACTING - DMCC
Contractor
PE21504AD-040-A099-046 Rev A06
Document No:
☐ 1 APPROVED
☐ 4 FOR INFORMATION
ITEM: BY:
DDR Doc. CODE:
DATE:
A06 Issued for Company Review 08/04/2024 Ramzi Raad Salman Steven Wilson
Saad Al-
A05 Issued for Company Review 01/03/2024 hassnawy
Raad Salman Steven Wilson
B02 Approved for Use 03/01/2024 Ammar Abbas Ahmed Gazguz Steven Wilson
A04 Issued for Company Review 26/12/2023 Ammar Abbas Ahmed Gazguz Steven Wilson
A03 Issued for Company Review 19/12/2023 Ammar Abbas Ahmed Gazguz Steven Wilson
Saad Al-
A02 Issued for Company Review 14/12/2023 hassnawy Raad Salman Steven Wilson
Yousif Ahmed
B01 Approved for Use 23/11/2023 Saad
Hasan Gazguz
Yousif
A01 Issued for Company Review 09/11/2023 Saad Zak
Hasan
Rev. Revision Description Date Originated Reviewed Approved
6. 9.
INITIAL
1. SUB-TASK No
2. SUB-TASK 3. HAZARD 4. HAZARD 5. EXISTING RISK 7. LIST ALL CONTROL MEASURES RESIDU
8. PERSON OR
RESPONSIBLE
AL RISK
ACTIVITY / DESCRIPTION EFFECT CONTROL REQUIRED
ALARP?
DESCRIPTION MEASURES
10.
Likelihood
Likelihood
ROLE
Severity
Severity
Risk
Risk
1. Access and Machine Fatality/ Safe access 4 3 12 A wide and slope stability for Site Sup 2 3 6 Y
Egress for people overturning Serious and egress. machinery entrance (Ramp 6m wide).
and/ or falling injury/ Asset Permit to work. Safe access and egress points for
and Machinery Damage. workers IN and Out of the excavation.
inside the Competent and
(excavator) inside skilled This will include stairways, ramps, or
excavation.
the Water intake personnel stairways.
Weather Machines’ operators shall be
Pump house Person Certified
adverse Injury/fatalit competent, trained, and certified.
machines.
chamber. People trip, y All involved equipment shall be
supervision
slip and fall Communicatio certified and safe to use and checked
(Into the deep n daily by the operators.
excavation) Barricade and The work supervisor, PA, and safety
People falling signage officer shall be monitoring the access
of the equipment, and access and
from the Method
egress of the workforce regularly and
access/egress statement for
after weather conditions.
(scaffolding/sta excavation
A flagman, or watchman shall be in
ircase) place to control the movement of
equipment and people.
Toolbox talk to be conducted to all
involved in the operation.
Hard Barriers shall also be installed.
Appropriate warning signs to be
placed at the site and around the
excavation.
2. Mechanical excavation Collision People Serious Only authorized 4 4 16 Only Confined Space Entry (CSE) Site Sup 2 2 4 Y
works. with excavators injury/Fatality personnel shall Awareness trained and authorized
Failure of the Asset Damage be involved. personnel are allowed to enter the
machines Training and excavation area.
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet
3. Confined space entry Fire or explosion. People Injury/ Gas test 4 4 16 Ensure that the gas test is conducted Site Sup 2 3 6 Y
(inside the Water Asphyxiation is due fatality ERP/Rescue by AGT before entering confined
intake Pump house to gas, fumes, Health ill due to plan space. The gas test certificate will be
vapour or lack of toxic/ Insufficient Training and attached to the PTW. Two multi-gas
chamber. Approx. 8
oxygen. Oxygen competency detectors will be continuously inside
meters). the CS.
Drowning due to Property Watchman
increased levels of damage Air ventilation The gas testing shall be undertaken
underground water. and circulation at least twice per shift.
Health impact due (if required) All entrant and involved teams shall be
to body increased Continue inducted and undergo excavation
temperature. dewatering. and CSE awareness training.
Engulfment due to Regular rest Passport and training stickers on a
soil collapsing. time, and helmet.
Dropped objects on ventilation. , ERP, and rescue plan available.
people inside Shoring/sloping Specific TBT
confined space Barricades and A rescue team shall be present.
(deep excavation). Regular Confined space entry attendant shall
Slip, trip, and fall. housekeeping be controlling the access/egress by
fall from height due PPE using an IN/OUT log sheet.
to working on the Method Communication devices: radios,
platform or scaffold. statement for mobiles and whistles shall be in
Platform collapse excavation of place, (communication method shall
water intake be clear)
pump house Ensure ventilation and sufficient
chamber. oxygen are available.
Supervision shall be in place; AA, PA,
and HSE supervisor.
An adequate dewatering system shall
be used as per the volume of the
water.
The rescue team shall be present at
the site with all the required rescue
equipment. (Tripod, self-contained
breathing apparatus, multi gas
detector, rescue skid, first aid kit,
stretcher and radio)
Every person should know the PEG
emergency number 07830170306.
4. Soil transfer Collision People Property PTW 3 3 9 Valid DDT to be checked for the Site Sup 3 2 6 Y
with Shovel, Dump damage DDT dump truck Driver/ shovel Operator.
truck Fatality/Injury Flagman Shovel inspected on daily by driver
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet
construction.
Proper hand tools handling.
In case of using ladders, it should be
inspected before use. apply the rule 3
table steps.
Inspect tools before use it.
Inspect stability of the ground before
erection.
Cover sharp edges or mark it. Wear
cutting resistance gloves.
6. Lifting operation Unfamiliar worksite All lifting team or Lifting plan/PTW 3 3 9 Approved Lifting plan should attach to Lifting 2 2 4 Y
Poor access to site people working ERP the PTW to lift. Sup
and working area(s) near to the lifting Crane and All lifting equipment including
Incompetent operation operator’s 3rd accessories shall be certified from
personnel and Poor injury/fatality. party certificate, 3rd party and lifting eyes of
knowledge of the Asset or and ATO. equipment must be tested/certified.
task equipment Competent and All lifting teams shall be qualified and
Setting up crane(s) damage. certified lifting certified for the task.
Adjacent cranes or team (riggers, The ground condition shall be checked
other plant lifting supervisor, and inspected for crane bearing
Unsecured crane banksman) capacity.
Poor ground Ground bearing All loads shall be properly secured
conditions capacity and levelled prior to lift.
Fixed proximity certificate. All lifting equipment shall be visually
hazards Securing the load inspected before use.
Rain and high Inspection of Taglines shall be used to direct the
winds other lifting equipment load safely.
weather adverse and accessories. The lifting operation area shall be fully
Poor housekeeping Barricade and
Manual handling cordoned off and only authorized
Signage personnel shall be allowed to enter,
Working at height Supervision
Dropped objects. all required warning signs shall be
Visibility and available and visible.
Blind-lift, and poor
proper Lifting operation shall be supervised
communications. communication
Defective lifting and communicated by lifting
Prioritize the Supervisors.
equipment
work activities. Daily SIMOPS/PTW meeting.
Offset load Centre
of gravity including Method
statement for
unknown position
excavation
Integrity of load.
Uncertainty of
magnitude of load;
suction, adhesion,
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet
jammed etc.
Dynamic affects
the crane.
High surface area
/drag coefficient.
Load stability.
Load fragility &
Load sharp
edges.
Simultaneous
activities
7. Hot work Fire. Or explosion Person injury/ Hot work PTW 4 3 12 A hot work permit shall be applied. Work 2 3 6 Y
Hot surface. fatality TBT Qualified and certified operators are Sup
Electrical shock. Health affected: Fire Watchman only authorized to execute the work.
Slip, trip, and fall. (Eye, ears, and Conduct a gas test before starting
Gas test
Pinch point. back pain) the work. and during the work
ERP & Rescue
Improper storage Skin burn Use a flashback arrestor.
team and
and transport of the Breathing Fire watch and fire extinguishers
equipment
gas cylinders difficulties. must be in place.
PPE
Leak hoses.
Equipment Regular Keep the flammables and
Use a defective combustibles away from the ignition
damage. inspection
grinding machine or source.
Heat burns. Training and
incorrect discs.
Burn skin. competency Use of appropriate welding face
Flying particles, and
Eye-damaging Barricade and shield
with high noise
light during Signage Isolate the power (unplug from the
Loss of control of
electric arc Maintain power connection) before
the grinding
welding housekeeping maintenance.
machine
Noxious or Ensure earthing is installed. or
poisonous fumes E.L.C.B. is fitted to the power source.
Ensure electrical outlets are not
overloaded before you plug your
hand tools in
Maintain grinders regularly and
inspect them before each use, only
operate grinder according to
manufacturer recommendations.
Ensure you are wearing the correct
PPE before the hot work.
Never use a tool with frayed cords/
defective switches
Housekeeping shall be done
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet
regularly.
Every person should know the PEG
emergency number 07830170306.
8. Environmental Chromium 6(Soil Health impact Chromium VI 4 4 16 Chromium VI safety measures shall Env. Eng. 3 2 6 Y
exposure and water) Carcinogenic safety mitigation be operated and followed (as per
Environmental effects Soil waste Injury (according to monitoring and reporting plan)
Water waste monitoring and contaminated water or soil will be
Pollution
reporting disposed of outside project area
General waste Neighborhood plan(0323PE-N- according to PEG waste
Dust disturbance WM-QA01-EN- management plan to ROO
Noise and PLN-0003-A06) Temporary waste storage area
vibration Toolbox talks RWTSS
Erosion about local Provision and use of disposable
Oil spillage of natural personal protective equipment (PPE)
equipment. conditions. appropriate to the hazards and risk
Contaminated soil, Regular test and identified: Safety glasses, rubber
Contaminated monitoring gloves, disposal coverall and shoes,
water system. and FFP3 mask to be worn.
Specific PPE People shall use shower facilities
Periodic brakes before taking off the disposal coverall
Spill kit and drip and make sure
tray should be in Don’t enter to the site office you are
place. wearing CR-VI PPE and make sure
Waste taking off them at the shower
management facilities (Dressing room)
plan(0323PE-N- Work area to be barricaded and only
WM-QA01-EN- personnel who have undergone HSE
PLN-0002-B01) induction and Chromium VI are
Appropriate PPE authorized to approach the project
shall be used area.
when carrying out Personnel have to practice safe
excavation and manual handling.
soil management Reduce exposure to Chromium VI
activities (taking rest frequently)
Follow PEG waste management
plan.
Report any spot raised up on the site.
Monitor and test the noise according
to PEG ESMP
shielding of equipment and use of
enclosures to reduce noise;
regular maintenance of equipment to
protect from noise;
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet
10. Equipment Refueling Facilities/Engines Personal injury/ Fire extinguisher 3 3 9 Ensure the refueling process of the HSE/ Env 3 2 6 Y
damages Fatality available at the machine before the start of work or sup.
Leak oil, gasoil. damage to the site. after the stop of the machine. PA
Fire environment Trained Fire extinguisher available at the site.
firefighter Ensure workers understand the
Spill kit/Drip tray hazards and controls by doing a pre-
job toolbox talk.
Area to be barricaded.
Operator/End User must shut the
engine of the Vehicle/Plant &
Equipment before refueling.
Ensure that there are No Naked
Flames in the area.
Refueling must take place in a well-
ventilated area.
Ensure suitable fire extinguishers
and First Aid Kit are available near
the refueling activity.
Full inspection of equipment before it
is used.
Suitable PPE available. (Plastic
Gloves, Eyes protection...etc.)
Smoking is prohibited while fueling
engines.
Diesel MSDS to be available and well
explained by the supervisor on duty
11 Casting concrete Vehicle Injury. Hit Procedures 4 4 16 Setting pump truck on stable PEG site 2 3 6 Y
using pump trucks movement. Explosion Toolbox earth. and balance it. rep and
and mixer and Topping hazard Fatalities talks Use Nylon sheet in case of AYA Site
basin. of Injury / shall discuss concrete spill. Rep.
transit mixer Fatality all Ensure that no overhead power
due Slips, trips hazards lines.
to improper and involved in Flagman should control pump
approach falls Injury activity movement.
Falling hazard Damage of All personnel Control hose by competent
due hearing. to workers. and FTW.
to improper Contaminate have passed Full outrigger and using Pad
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet
12 Pile trimming (head Sharp edges. Injury. hands, Barricade 4 4 16 Conducted TBT on daily base. 3 2 6 Y
and wall). Using Air pressure. back, legs. Control air flow Competent persons only.
hydraulic Electric shock eyes. Isolation. Tools inspection before and after
jackhammer Flying objects. Fatality. PPE. used.
(mechanical, Air & Noise. Ear damage. Hearing Remove or cover sharp edges
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet
Electric). Defective tools. Respiratory. protection Using caution tap to mark it.
slip trip fall. Burns. devices. Inspect air compressor on daily
Dust. Damage of Trained person base and stop activity in case of
Fire. property. only any air leaks.
incompetent Air compressor should be of
persons. stabile sold ground and no slip or
Weather. (Rain. unusual movements.
high wind speed, Check hoses and air taps.
humidity. Air flow clutch.
cold/hot). Using web lash arrester
PPE, besides masks. face shield
and ear muffs.
Inspect and check list for the
generator.
Apply isolation cords.
Earthing.
Cable management.
Proper PPE. use hearing
protection. test noise. take rest
whenever exposure to high
sounds.
Cover distributing boards by
sunshade.
Provide Lock with safety sign
(Authorized person only).
Earth the board.
Use cable holder to lift cables and
wire up on ground.
Stop activity in case of raining
weather.
Clear access and egress.
Barricades and safety signs.
Authorized persons only.
Should take rest in case of fatigue.
1st Aider with kit in place.
Inspected fire extinguisher type
(Co2) in place.
Spill tray should be under the
generator.
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet
13 Dewatering activity Electrical/mechanical Personal injury/ Isolation 4 4 16 Ensure permit to work, RA, and PEG 3 2 6 Y
inside the Pump house Equipment failure or Fatality process Isolation and testing system are in HSE/AA
excavation. damage Noise (lockout/ tagout place. and E&I
Electrical shock system) Specific toolbox talks to be
Fire Awareness conducted daily before the task
Trip, slip, and fall training starts.
hazards. Regular Only qualified and competent
Weather adverse inspection and personnel are authorized to deal with
maintenance the electricity.
program. Ensure that electrical equipment
Emergency meets the standard, is secured at the
equipment site, and protected against adverse
Supervision weather conditions such as moisture
PPE or rain.
Equipment Provide awareness training sessions.
quality and Ensure specific fire extinguisher
protection (CO2) is in place.
Ensure that the equipment is
inspected and labeled with valid color
code.
Ensure availability of safety system
and activate such as earthing
system, RCD braker, junction box,
and ...etc.
Cable management and
housekeeping should be in always
maintained.
Ensure that sufficient and full time
supervision is available.
Ensure appropriate PPE; electrical
gloves, safety glasses, helmet, and
…etc.
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet
illness or severe
can result in serious
requires doctors or
capable of causing
imminent danger
requires first aid
Catastrophic –
Trivial – injury
Minor – injury
or treatment
Moderate –
attendance
wide scale
treatment
hospital
injury
a
1 2 3 4 5
Likelihood of Occurrence
This document is property of PEG ENGINEERING & CONTRACTING - DMCC, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Company: RUMAILA OPERATING ORGANISATION (ROO)
Contract: QAWIS / CN:102908
Location: RUMAILA – IRAQ
Project PO N° DDR Code Serial n° Rev. Sheet