Download as pdf or txt
Download as pdf or txt
You are on page 1of 26

ASSEMBLY LIST

DATE

MARK DESCRIPTION PROFILE LENGTH(mm) Q'TY AREA(sqm) WEIGHT(kg)


A10001 PLATE PL20*240 599 4 0.36 94.1
BY

A10004 BEAM HEB160 4967 2 4.92 434.5


A10007 BEAM HEB360 10069 1 157.24 9084.2
DISCIPLINE

A10008 BEAM HEB160 1628 1 6.36 244.9


A10016 BEAM UNP160 4988 1 3.03 102.0
A10019 BEAM IPE160 1149 1 0.88 22.6
A10041 PLATE PL20*200 379 4 0.21 50.5
C10001 COLUMN HEB360 6449 1 14.82 1037.1
DATE

C10002 COLUMN HEB360 6449 1 14.11 1003.4


C10003 COLUMN HEB360 6449 1 14.30 1013.7
C10004 COLUMN HEB360 6449 1 14.60 1025.8
BY

C10005 COLUMN HEB180 3674 3 4.80 636.7


C10006 COLUMN HEB180 3000 6 3.60 981.8
DISCIPLINE

C10007 COLUMN HEB180 3000 2 3.60 327.3


C10008 COLUMN HEB180 3674 1 4.80 212.2
FR10001 BEAM HEB160 3975 4 3.68 664.5
FR10002 BEAM HEB160 3659 4 3.39 612.7
DATE

FR10003 COLUMN HEB180 5180 1 72.33 2702.0


FR10004 BEAM HEB200 3063 1 3.56 183.0
FR10005 BEAM HEB200 2231 1 3.16 161.1
BY

FR10006 BEAM HEB200 2231 1 3.16 161.1


FR10007 BEAM HEB200 3491 2 4.05 416.5
DISCIPLINE

FR10008 BEAM HEB200 2397 2 2.79 287.2


FR10009 BEAM HEB200 2878 1 3.90 199.1
FR10010 BEAM HEB200 4464 2 5.17 531.7
FR10011 BEAM HEB200 2934 1 3.97 202.4
DATE

FR10012 BEAM HEB180 5380 1 41.10 1922.2


FR10013 BEAM HEB200 3063 1 3.56 183.0
Total Area(Sqm): 401.45 Total weight(kg): 24497.31
BY
DISCIPLINE
DATE
BY
DISCIPLINE
DATE
BY
DISCIPLINE

D2
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

D1

DB
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:
N

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC

DA 3D VIEW CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

Sk. 10 STEEL SUPPORT STRUCTURES PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 STEEL SUPPORTS STRUCTURES
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 1of26 0

A0
DATE

HEB180 HEB180
2 - Ø 14 HOLES 1 - Ø 14 HOLES
1200 2 - Ø 14 HOLES DET - 3 3 - Ø 14 HOLES D1
DET - 2
BY

C10004 832.5 367.5 600 500 950 500 750 440 1270 590 775 FR10012
HEB360 HEB180
DISCIPLINE

122.5
HEB160 HEB180
HEB180 UNP160
UNP160 HEB180

200

200
D1
HEB160 D1
L150*100*12 UNP160
DATE

UNP160 R R

38

38
FR10003
HEB180 HEB180

1600
UNP160 31 200 27
BY

A10016 IPE160 25 200 25 HEB160


UNP160
DISCIPLINE

IPE160 IPE160 HEB180 HEB180


HEB180 IPE160 268 250 494 217 HEB160 HEB180
A10008

3167.5
UNP160

4247
IPE160 IPE160

500
IPE160 IPE160 HEB160 W
DATE

5000
IPE160
5000

HEB180
S S

5000

1100
IPE160 HEB160 IPE160
BY

IPE160
HEB160 DET - 4 DET - 6
IPE160 HEB160
HEB160 1 - Ø 30 HOLES
DISCIPLINE

A10004
IPE160 IPE160 351 351 330 200 426
HEB160 HEB180 HEB180
Q Q

125
T T W

350

350

350
IPE160 1 - Ø 30 HOLES
DATE

HEB180 IPE160 225


IPE160
320

1767.5

1800

85
IPE160

140
IPE160 1 - Ø 30 HOLES

12 280 12
L150*100*12 HEB180 HEB160
PL10*80 100 100

1480
BY

HEB160

304
IPE160

767.5
L100*10 HEB180
N HEB160 UNP160 HEB180
HEB180

692.5
V DET - 5

140
Z1 U U
DISCIPLINE

D2 DET - 7

215
HEB180
D2 HEB180

678
C10001 HEB160

350

350
UNP160 UNP160 V D2

122.5
HEB360 HEB180 UNP160 HEB180
N P P HEB180 HEB180
Z1 90 459 HEB180
1830
DATE

90
229
351 100 100 1 - Ø 30 HOLES
367.5 600 500 950 537.3 787.3 365.3 1860 975 351 326
DA 200
8750
BY

1156 1480 1459 1105


PLAN VIEW AT EL.+4130 (T.O.S) DB
Sk. 10 STEEL SUPPORT STRUCTURES PLAN VIEW AT EL.+10900 (T.O.S) DA
DISCIPLINE

Sk. 10 STEEL SUPPORT STRUCTURES 5200


PLAN VIEW AT EL.+15325 (T.O.S) DA
Sk. 10 STEEL SUPPORT STRUCTURES
DATE
BY

750 750 800 1000 1180 980 990 1260 1040 1130
DISCIPLINE

1125 5925 1700


C10002
HEB360 H A10007 HEB360
HEB360 F Z HEB180
HEB360
HEB180 HEB160
D1
D1

506.5
C10004 H
HEB360 F Z PL10*80

DET - 1 PL10*80

1445
L75*6
TYP (TYP) 502.6 677.4 592.5 667.5 UNP160
HEB360

2250
HEB200
HEB360 HEB200 HEB160
IPE160 HEB200 L75*6

1743.5
L75*6 IPE160

HEB360
X HEB240
IPE160 L L

805
HEB200
G HEB240 Y
J HEB200

5000 HEB200

2385
E E J L75*6
IPE160
IPE160

1350
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

IPE160 IPE160
G

1580
IPE160

300
HEB240 HEB240
HEB200
HEB200 L75*6 IPE160
2750

X Y

HEB200 HEB200 K K HEB160


IPE160

1393

1170
C10003 HEB360 L75*6
HEB360
HEB360
D HEB160 M
D2
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

D2
C10001 65
HEB360 HEB360 HEB360
C C HEB180 M
1125 5925 1700 CLIENT:

D PetroChina International Iraq FZE Iraq Branch


750 750 800 900 1280 1080 890 1260 2170

DB DA 8750 CONTRACTOR:

PLAN VIEW AT EL.+550 (T.O.S)


Sk. 10 STEEL SUPPORT STRUCTURES
DB PLAN VIEW AT EL.+7600 (T.O.S) DA CC
Sk. 10 STEEL SUPPORT STRUCTURES
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 STEEL SUPPORTS STRUCTURES
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 2of26 0

A0
FILLER PLATE
DATE

SP10001
PL3*135
FR10012
HEB180 8 - Ø 24
HEB180 HEB180 40
BY

HOLES FOR

32
+15325 65 M 22 x 76 LG BOLTS

.5
+15325 65 65
DISCIPLINE

590

32
HEB200

.5
HEB180

590
HEB180
FR10012 65 90 45
HEB180 HEB180 HEB180 PL10*90 FILLER PLATE
65 65
PL10*90 2 45 SP10001
17 PL3*135
DATE

HEB200
PL15*135
10 PL15*135

207
BY

PL15*313.3

90 5 65
C10005 42 8 - Ø 24
DISCIPLINE

HEB180 C10008 0 HOLES FOR

4425

65
HEB180 M 22 x 76 LG BOLTS

6
4425

3315

3315
10

45
C10005
C10005 HEB180 73 PL10*90

65
10 TYP.
HEB180 PL10*90 10
DATE

45
65
65
PL15*348.1

40
PL15*135
1100 950 PL15*135
BY

100 100 HEB200


1650 100 100
DISCIPLINE

32.5 16 - Ø 24
HOLES FOR
2300 UNP160 32.5 M 22 x 76 LG BOLTS

140

140
FR10003 HEB180 HEB180

520
PL10*80 PL10*80 PL10*80
HEB180 HEB180 UNP160
140

140
UNP160 HEB180

520

520
PL10*80
UNP160 +10900 PL10*80 FILLER PLATE
SP10001
DATE

+10900 PL10*80
UNP160 PL3*135
IPE160
FR10003 UNP160
UNP160 UNP160 UNP160 FILLER PLATE
SP10001
BY

PL3*135
DETAIL - 12
DISCIPLINE

+9750
+9750 1500 2050 1690 3510

3300
C10006
3300

C10006 C10006 C10007 C10006 C10007


C10006
DATE

HEB180 HEB180 HEB180 HEB180 HEB180 C10006 HEB180


HEB180
HEB180
SP10001
1500 2050 1690 3510 1130 PL3*135 SP10001 HEB180 1700 1130
BY

DET - 9 SP10001 A10007 PL3*135


1125 SP10001 SP10001 1700 HEB360 PL3*135 HEB360 SP10001

300
(TYP) PL3*135
DISCIPLINE

PL3*135 A10007 SP10001 PL3*135


300

123

123
HEB360 PL10*80
HEB180 PL3*135 HEB180

180
HEB360 HEB180
123

123
HEB180 HEB180 PL10*80
180

180
HEB180 HEB180 +7600

845
+7600 64
6 1 HEB160
69
DATE

980

980
HEB160 SP10001
78 78

980
29 SP10001 FR10006 PL3*135
29

9
5 35 HEB200 FR10005 HEB360

234
SP10001
96
293 PL3*135
BY

HEB200

2182

2182
PL3*135 27 FR10009 SP10001
23
2182

1 8 PL3*135

190
50 95° HEB200 89°
DISCIPLINE

FR10013 FR10004 SP10001

4
DET - 8 FR10008 FR10008 DET - 11 HEB200 HEB200 PL3*135

3470
HEB200 HEB200 95°
(TYP) FR10011 (TYP)
3470

7 SP10001 9 372 C10001


HEB200 41 2

400
SP10001 SP10001 DET - 10 PL3*135 3 7 9 HEB360
30 PL3*135
PL3*135 0 (TYP)

134°
SP10001 SP10001 SP10001
107°

SP10001
107°

PL3*135 PL3*135 PL3*135 1830


PL3*135


1030
15

DET - 12 SP10001

13

C10003 415 1225


15

(TYP) SP10001 820 210 PL3*135 SP10001


PL3*135 HEB360 PL3*135 HEB160 10
2229 2146 PL10*80
SP10001 10

80
+4130 SP10001
PL3*135 SP10001 PL3*135
+4130
SP10001 UNP160 PL3*135 A10008
SP10001 SP10001

720
PL3*135 HEB160 SP10001 FR10007 HEB160
PL3*135 FR10007
800

PL3*135 PL3*135 HEB200


HEB200
SP10001 FR10010
SP10001 PL3*135 HEB200 HEB160 HEB160
535

820

4868

4868
4

PL3*135
535
4868

4
65°

5021

5021
C10002
3580
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

HEB360 FR10010
3580

HEB360
HEB200 SP10001
SP10001 PL3*135
PL3*135 SP10001
SP10001 SP10001 PL3*135
PL3*135 SP10001 PL3*135
PL3*135
SP10001
PL3*135 SP10001
PL3*135 +550
+550
550
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

550

0.00
0.00 1229 3146 3146 1229
8750 CLIENT:

8750
PetroChina International Iraq FZE Iraq Branch
DB ELEVATION ALONG GRID-D1 DA DB DA
Sk. 10 STEEL SUPPORT STRUCTURES ELEVATION ALONG GRID-D2
Sk. 10 STEEL SUPPORT STRUCTURES
CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 STEEL SUPPORTS STRUCTURES
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 3of26 0

A0
DATE

4 - Ø 21
HOLES FOR 6 4 - Ø 21
HEB160 HOLES FOR
M 19 x 70 LG BOLTS 6
BY

304 583 M 19 x 70 LG BOLTS


PL10*80
12 276 12 +4130
DISCIPLINE

FR10012

20
20

2
HEB180
+15325

50

50
DATE

590

590

35
35
70

70
HEB180
HEB180
HEB180

50

50
BY

35
35
4 - Ø 21
HOLES FOR
M 3/4" x 70 LG BOLTS
DISCIPLINE

PL10*202.3
22 .5
.5 PL15*115 PL15*115 22 HEB160
22 PL15*115 PL15*115 .5
HEB160 .5 22
DATE

4425

4 - Ø 21
C10005 HOLES FOR
HEB180 M 19 x 70 LG BOLTS
C10008
BY

HEB180 DETAIL - 12
DISCIPLINE

UNP160 4 - Ø 21
HOLES FOR
.5
+10900 22 M 19 x 70 LG BOLTS
4 - Ø 21
2.5 HOLES FOR PL15*115 HEB160
2 M 19 x 70 LG BOLTS 22
DATE

PL15*115 .5
HEB180
FR10003 HEB180 HEB160
22
520

520
HEB180PL10*80 .5

10
PL15*115

P.
PL10*203.6
BY

TY
+10900 PL15*115 4 - Ø 21
+9750 HOLES FOR
M 19 x 70 LG BOLTS
DISCIPLINE

35
1150

35
3300

50

50
70

35

70
35
+4130

50
DATE

+9750

50
HEB360

20

6
8 - Ø 21

6
BY

20
HOLES FOR A10007 8 - Ø 21
M 19 x 70 LG BOLTS HOLES FOR
HEB360 M 19 x 70 LG BOLTS PL10*80 4 - Ø 21
DISCIPLINE

6
2150

HOLES FOR
C10007 +7600 DETAIL - 13 6 M 19 x 70 LG BOLTS
HEB180

180

180
980

980
HEB360 HEB180
300

300

A10007
DATE

PL10*80 HEB360 PL10*80


HEB360
+7600 HEB180
BY

HEB360
180

180

FR10002 FR10002 +7600


DISCIPLINE

3470
DET - 14 8 - Ø 21 HEB360 HEB160 HEB160
HOLES FOR


4 - Ø 21

180
M 19 x 70 LG BOLTS

10900

53.
HOLES FOR

54.
M 19 x 70 LG BOLTS


8 - Ø 21
FR10002
3470

39
FR10002 HOLES FOR

1
HEB160 M 19 x 70 LG BOLTS
HEB160

8 - Ø 21
53.

HOLES FOR
53.

A10004 M 19 x 70 LG BOLTS
DET - 13 HEB160

+4130 .5
22 PL10*265.5

50
80

8 - Ø 21 8 - Ø 21

35
HOLES FOR HOLES FOR 8 - Ø 21 .5

70
M 19 x 70 LG BOLTS M 19 x 70 LG BOLTS
8 - Ø 21
HOLES FOR HOLES FOR 22
M 19 x 70 LG BOLTS

50
M 19 x 70 LG BOLTS
A10004 HEB360

35
HEB160 C10002 C10003
+4130 HEB360
HEB360 HEB160
80

8 - Ø 21 6
8 - Ø 21 HOLES FOR 6
HOLES FOR M 19 x 70 LG BOLTS
3580

M 19 x 70 LG BOLTS
FR10001 FR10001 4 - Ø 21
C10001 HEB160 HEB160 HOLES FOR
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

D1 PL15*115 M 19 x 70 LG BOLTS
HEB360
DET - 12 4 - Ø 21
54.

HOLES FOR PL15*115


C10004 M 19 x 70 LG BOLTS

54.
HEB360 FR10001 FR10001 DETAIL - 14
3580

HEB160 HEB160
8 - Ø 21
HOLES FOR
M 19 x 70 LG BOLTS

54.

54.

+550

8 - Ø 21
550

HOLES FOR
M 19 x 70 LG BOLTS
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

8 - Ø 21 8 - Ø 21 0.00
HOLES FOR HOLES FOR
M 19 x 70 LG BOLTS M 19 x 70 LG BOLTS
+550 5000
D1 D2
550

CLIENT:

STRUCTURAL ELEVATION "FRAME DB"


Sk. 10 STEEL SUPPORT STRUCTURES PetroChina International Iraq FZE Iraq Branch
0.00
5000 CONTRACTOR:

D1 D2 CC
STRUCTURAL ELEVATION "FRAME DA" CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

Sk. 10 STEEL SUPPORT STRUCTURES PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 STEEL SUPPORTS STRUCTURES
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 4of26 0

A0
HEB360
C1 C1
DATE

PL20*143.8 PL10*80 HEB200 TYP.


IPE160 5 TYP.
HEB160 5
550
PL10*80
PL15*115
165 110 165 G1 G1
BY

HEB360 6
PL15*115 22

25
110 .5 3 SIDES 6 IPE160 HEB360
HEB360
DISCIPLINE

B 40 40 PL10*216.2 22 6 TYP.
2 - Ø 30 HOLES .5 4 - Ø 21 HEB360 HEB360 HEB360 IPE160 PL25*94.5 6
PL20*143.8 HEB200
110
HOLES FOR
HEB360 M 19 x 70 LG BOLTS PL20*143.8 8 HEB360 PL25*94.5 HEB200
PL25*550 8 SECTION G - G
PL25*550 10
8 PL10*143.8

35
3 SIDES

30
DATE

10
75 180 75

25
PL15*314.5
50
6

50

138
+550 SECTION C - C 95 95 3 SIDES TYP.

35
5 HEB200 6
550

D1 6

178
3 SIDES TYP.

150
6

50
70
HEB360 5 6

138
TYP. 3 SIDES 6 IPE160
HEB360 6 IPE160 8
BY

50

A A TYP. TYP.

4
6

18
8 PL20*143.8 8
8 6
HEB160

102

102
8 6 PL10*137.5
DISCIPLINE

4 - Ø 21 PL10*143.8 8
HOLES FOR HEB360 10 PL10*143.8 SECTION H - H
110

B M 19 x 70 LG BOLTS 10 PL10*137.5 PL10*143.8


8 Ø 28 HOLES HEB360 PL25*94.5 10 TYP.
HEB160
FOR M 24 BOLT 10
SECTION D - D SECTION E - E SECTION F - F
DB 0.00 PL25*94.5
DATE

DETAIL - 1 D1 PL20*143.8
TYP SECTION G1 - G1
SECTION B - B
SECTION C1 - C1
BY

IPE160
DISCIPLINE

HEB200
HEB200 +7600 D2 TYP.
2 - Ø 18
32.5 J1 J1 HOLES FOR 2 60
M 16 x 44 LG BOLTS L100*10 UNP160 PL10*80 UNP160
32.5
DATE

6 66 40 PL10*80

67.5
6 5

25
HEB200 6 L100*10
TYP. HEB160
8 - Ø 24 5 6 2 10
HOLES FOR 6 HEB160 TYP. UNP160
PL10*80

55
PL10*80
BY

M 22 x 76 LG BOLTS 6 HEB360 UNP160


+7600 +4130
SECTION J - J HEB160 HEB160 UNP160 UNP160
40

60
DISCIPLINE

+7600 +7600 L100*10


2 - Ø 18
N1 N1 6

50
95 PL25*94.5 HOLES FOR 2 - Ø 18 TYP.
65

6 PL10*80 M 16 x 44 LG BOLTS 6
TYP. D2 HOLES FOR
HEB200 L100*10 12
65

6 3 SIDES 6 6 M 16 x 57 LG BOLTS
65

10 TYP.
6 TYP. 6 TYP. 2 - Ø 18 GAP
10 TYP. 6 HOLES FOR HEB160
DATE

90

TYP. 6 M 16 x 57 LG BOLTS
65

PL10*143.8 D2

102
PL10*143.8
SECTION N1 - N1 SECTION P - P
65
65

DA SECTION M - M SECTION N - N
IPE160 SECTION L - L
BY

HEB360 8 - Ø 24 SECTION K - K
HOLES FOR
M 22 x 76 LG BOLTS HEB200 10
DISCIPLINE

10
PL15*135 SECTION J1 - J1
762

PL15*135
PL25*550
DATE

6 5 HEB180
+550 TYP.
6
TYP. TYP. TYP.
UNP160 5 HEB180
TYP.
PL15*314.5 UNP160 HEB180 IPE160
HEB160 +10900 IPE160
+10900
BY

TYP.
S1 S1 T1 T1 HEB160
IPE160 R1 R1 IPE160
DISCIPLINE

UNP160 TYP.
6 HEB180
+10900

6
TYP. UNP160 3 SIDES

6
5

6
PL6*85 TYP. 6 6
PL6*85 5 +10900
0.00 TYP. SECTION T - T

60
6 TYP. SECTION S - S
5
HEB180 6 PL10*85.8
5 85 HEB180 L100*10
SECTION A - A HEB180
SECTION R - R HEB180 85
PL6*85
85 5
85 5 TYP. TYP. 6
TYP. PL6*85 TYP. PL6*85 5 6
PL6*85 5 TYP. 5
PL6*85 HEB160
5

TYP.
IPE160 SECTION U - U SECTION V - V

10

102
SECTION Q - Q
85

85
D1

102

102

180
UNP160 IPE160
UNP160
IPE160 5
HEB180 TYP. 5
85 85 5 TYP. 5
TYP.
5 PL6*85
5
SECTION R1 - R1 SECTION S1 - S1 SECTION T1 - T1
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

PL10*57.5 HEB180 PL15*80


UNP160 3 - Ø 14 HOLES HEB180 PL15*260.1
2A PL15*150

15
27
UNP160 +15325
PL10*57.5 2 - Ø 14 HOLES
33

200 D1

51
1160 D1 PL15*80
PL10*200 TYP.
UNP160 PL15*150

200
66 3 SIDES 6

245
10

HEB160 2 - Ø 18 PL10*200 6
+10900
195
265

HOLES FOR L100*10 65 6


IPE160 106 3 SIDES

350
2 10 M 16 x 51 LG BOLTS IPE160 L100*10 IPE160 HEB180 6
2 - Ø 14 HOLES
PL10*57.5 SECTION 4A - 4A
145

+10900 6
50 55

50 55

38
6 PL15*260.1
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

6 3 SIDES

105
6
38

2A PL10*150 PL10*200 108 108


PL10*150 PL15*80
125 125 1 - Ø 14 HOLES

15
31 200 68
L100*10 2 - Ø 18 D1 4A 4A
HOLES FOR 25 200 25 1 - Ø 30 HOLES CLIENT:

L100*10 M 16 x 51 LG BOLTS 299 15


SECTION W - W SECTION 2A - 2A PL15*150 245 PetroChina International Iraq FZE Iraq Branch
250 DETAIL - 3
351 CONTRACTOR:

DETAIL - 2
DETAIL - 4 CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 STEEL SUPPORTS STRUCTURES
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 5of26 0

A0
130
DATE

8 - Ø 24
TYP.
7B 90 40 HOLES FOR
HEB160
HEB180 M 22 x 76 LG BOLTS
DA 304

15
PL10*80
+15325
BY

6A PL15*80 PL15*80 34 12 134 +7600


12 280 12 PL12*180 HEB360 457

51
HEB180 HEB180 PL12*180
HEB180 DA
DISCIPLINE

PL15*125.8 PL12*34 PL15*80 PL15*40 48 12 158 12 PL12*134


PL12*180
180 PL15*125.8 TYP. 50 PL12*34 65
PL15*80 PL15*40 PL12*134 6

12
12
65 65
8 3 SIDES TYP. HEB180
3 SIDES
8 34 12 134 PL12*180
6 6 3 SIDES

90
+15325 65

48
6 90 45

100
DATE

HEB180

12
65 65

138

12
HEB360
1 - Ø 30 HOLES +15325 SECTION 5A - 5A
45

200
40

125

158
280
100
PL15*80 PL15*155.4 PL12*34

210
90
BY

180
156
300 PL12*134 PL12*180

138
PL10*200 PL15*340
90 210

12
54

85
PL15*125.8 PL12*134 PL12*156.5
DISCIPLINE

5A 5A 7A 7A PL10*200 PL12*180 PL15*135

12 50
TYP. 8 4 SIDES
1 - Ø 30 HOLES PL15*135

12
PL15*155.4 PL12*180 HEB180 PL12*180 8

10

32
12
100 100 PL12*180
6A +15325

.5
90 40 1 - Ø 30 HOLES PL12*34
SECTION 7B - 7B 8 - Ø 24
PL12*34 HEB180 HOLES FOR
200

32
PL12*156.5 TYP. M 22 x 76 LG BOLTS
DATE

PL15*80

.5
DETAIL - 5 PL12*134
SECTION 7A - 7A
DETAIL - 6 3 SIDES 6 PL15*155.4 HEB200
7B DETAIL - 7 6
BY

6 3 SIDES DETAIL - 11
SECTION 6A - 6A 6
DISCIPLINE

PL10*180 HEB180 PL10*60


1800 120 WIRE TO SHIP HEB180 WIRE TO SHIP
1800 6 - Ø 21 PL10*60 Z2
145 1510 145 30 60 30 HOLES FOR PL10*180

35
145 1510 145 WIRE TO SHIP WIRE TO SHIP 240
M 19 x 57 LG BOLTS
DATE

120 1270 120 HEB180 PL10*120


1520 15
120 1270 120 WIRE TO SHIP 120 120

55 55
PL20*240

30
PL10*180

180
110
359 276 276 359 359 276 276 359 PL10*180 D1
TYP. Ø45
X1 X1 6 - Ø 21 10 PL15*118.5
BY

Y1 Y1 PL10*120
PL20*300 HOLES FOR PL15*118.5

60 60 60 60 60
PL20*300
20

WIRE TO SHIP

20
M 19 x 57 LG BOLTS PL15*118.5
PL15*118.5
DISCIPLINE

35

117

120
9A 9A 25 25

30
25 PL20*280 PL20*280 PL10*60
PL20*280 25 PL20*280 PL20*280 25
280

25 PL20*280 PL10*60 WIRE TO SHIP

280
PL10*120 25 50 25 PL20*120

360
WIRE TO SHIP TYP.
PL10*120 12 T&B

123
100 HEB360

30
DATE

20

HEB360

20

223
12 12 PL20*115 12 12
TYP. 12
TYP.
12
TYP. TYP. PL20*115 SECTION 9A - 9A +7600 +7600
12
1000

PL20*115 12
1000
PL20*115
980

100
980 PL20*115 PL20*115 6
PL20*115 TYP.
HEB240 PL20*300 PL20*300 HEB180 6 12

30
BY

PL20*115 HEB180 TYP.


HEB240 12
10 HEB240 TYP. 10

80
9B

80
TYP. 10 HEB200 HEB360
DISCIPLINE

10 10 6 - Ø 28 HOLES
TYP. +7600 +7600 PL20*120 FOR 1" BOLTS A307
HEB240 10 PL10*143.8 PL10*80
12

80

80
TYP. HEB360 HEB200 HEB360
12 12 TYP. HEB360 PL10*143.8
12 6
+7600 +7600 TYP.

100
PL20*240

100
PL10*140 6
DATE

PL10*140
PL20*240
PL10*143.8 PL10*140 12
TYP. PL20*240
PL10*143.8 12 PL20*120 60 120 60
HEB200
130 20
BY

6 3 SIDES
PL10*137.5 PL10*137.5 6
120 120
PL10*143.8 PL10*143.8 PL10*137.5
PL10*143.8 PL10*143.8 PL10*137.5 PL10*137.5 PL10*143.8 SECTION Z - Z
DISCIPLINE

PL10*143.8 PL10*137.5 SECTION Y - Y PL10*143.8


PL10*143.8 PL10*143.8 PL10*143.8 PL10*137.5 PL10*143.8 Z2 SECTION Z2 - Z2
SECTION X - X DETAIL - 9
9B

1800 DB SECTION 9B - 9B
3 - Ø 21 HEB360
520 208 344 208 520 HOLES FOR PL10*143.8
M 19 x 83 LG BOLTS PL10*140 PL10*143.8 PL10*140 Z3 200
HEB240 PL20*280 PL20*280 PL20*280 200 PL15*115 PL10*140 PL10*143.8
PL10*143.8 HEB360 PL10*140 20 65
HEB240 PL10*143.8
PL15*300 50 100 50 PL15*115 100 100
44 +7600 10 10
150

8A 8A PL10*140 PL20*200 TYP.


50 50
PL10*140 446 6 6 PL20*200 Ø45 PL10*118.5
40

PL10*118.5
PL10*118.5
150

PL10*118.5
65
65

80
80
65 65 65 65
75

PL20*300 4 - Ø 39 HOLES 6 - Ø 21 T&B TYP.


SECTION X1 - X1 HOLES FOR 12
45 90 65
65 90 45

140
M 19 x 70 LG BOLTS PL10*143.8
75

UNP160
65 65
40

140
PL20*144.2 UNP160
65 65 45
40 45 40 PL10*80 HEB160
+10900
460

1800
80

+10900

50 60 50
520 208 344 208 520

160
40

HEB240

50 60
PL10*142.5
75

PL10*142.5

160
HEB240 PL15*300
PL10*142.5 PL10*142.5
8 - Ø 24
150
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

75

PL15*348.5

.5
3 - Ø 21 HOLES FOR

32
PL15*135
32
HOLES FOR M 22 x 76 LG BOLTS 6 TYP. PL10*35 50 100 50 4 - Ø 22 HOLES
8 - Ø 24
.5
150

M 19 x 83 LG BOLTS PL15*135 6 FOR 3/4" BOLTS A307


HOLES FOR PL15*135

.5
40

32
M 22 x 76 LG BOLTS Z3 PL10*35 100 100
32
HEB360 PL15*135
3 - Ø 21 20 45
.5
PL20*300 PL20*280 PL20*280 PL20*280 4 - 4*D39(39x75) PL20*144.2
HOLES FOR HEB200
M 19 x 83 LG BOLTS 6 - Ø 21 8 - Ø 24
HOLES FOR SECTION Z3 - Z3
SECTION Y1 - Y1 PL15*200 HOLES FOR HEB200
M 19 x 70 LG BOLTS
DETAIL - 10 M 22 x 76 LG BOLTS D2
PL15*200
DETAIL - 8 SECTION Z1 - Z1

PL15*115
WIRE TO SHIP
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

HEB360 PL15*115
PL15*300 WIRE TO SHIP
WIRE TO SHIP 200
PL15*300
50 100 50 WIRE TO SHIP
75

CLIENT:

100
PL15*200 PetroChina International Iraq FZE Iraq Branch
WIRE TO SHIP
300
150
150

CONTRACTOR:

PL15*200 CC
WIRE TO SHIP CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.
75

PL15*115 PEG ENGINEERING & CONTRACTING DMCC

WIRE TO SHIP PL15*115


WIRE TO SHIP VENDOR: FABTECH International Ltd.

SECTION 8A - 8A P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI


UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 STEEL SUPPORTS STRUCTURES
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 6of26 0

A0
ASSEMBLY LIST
DATE

MARK DESCRIPTION PROFILE LENGTH(mm) Q'TY AREA(sqm) WEIGHT(kg)


10-SP10033 SUPPORT HEA160 2153 1 2.54 81.0
BY

10-SP10034 SUPPORT HEA160 1964 2 2.20 140.7


10-SP10035 SUPPORT HEA100 349 1 0.38 10.7
DISCIPLINE

10-SP10036 SUPPORT HEA100 400 2 0.41 22.9


10-SP10037 SUPPORT HEA100 399 1 0.50 14.0
10-SP10038 SUPPORT L65*6 625 1 0.16 3.7
10-SP10039 SUPPORT UNP160 900 1 0.49 16.8
10-SP10040 SUPPORT UNP100 846 1 0.31 8.8
DATE

10-SP10041 SUPPORT UNP100 321 2 0.12 6.7


10-SP10042 SUPPORT L75*6 308 1 0.22 4.9
10-SP10043 SUPPORT L65*6 466 1 0.12 2.7
BY

10-SP10044 SUPPORT UNP100 357 2 0.13 7.5


10-SP10045 SUPPORT L75*6 653 1 0.38 8.7
DISCIPLINE

10-SP10046 SUPPORT L75*6 340 1 0.23 4.6


10-SP10047 SUPPORT L75*6 338 1 0.25 5.8
10-SP10048 SUPPORT UNP100 525 1 0.84 23.5
10-SP10050 SUPPORT HEA100 1364 1 1.82 50.8
DATE

10-SP10051 SUPPORT L75*6 339 1 0.23 5.0


10-SP10052 SUPPORT UNP100 570 1 0.37 10.2
10-SP10053 SUPPORT UNP160 625 1 0.56 19.1
BY

10-SP10054 SUPPORT L50*6 422 1 0.08 1.9


10-SP10055 SUPPORT L75*6 840 1 0.34 8.0
DISCIPLINE

10-SP10056 SUPPORT L50*6 422 1 0.12 2.6


10-SP10057 SUPPORT L50*6 422 1 0.08 1.9
10-SP10058 SUPPORT L50*6 422 1 0.08 1.9
10-SP10059 SUPPORT L50*6 399 2 0.08 3.5
DATE

10-SP10060 SUPPORT L50*6 357 1 0.11 2.5


10-SP10061 SUPPORT L65*8 355 1 0.09 2.7
10-SP10062 SUPPORT UNP160 812 1 0.44 15.1
10-SP10063 SUPPORT L75*6 616 1 0.29 6.5
BY

10-SP10064 SUPPORT L75*8 399 1 0.12 3.6


10-SP10065 SUPPORT L75*8 545 1 0.16 4.6
DISCIPLINE

10-SP10066 SUPPORT HEA100 1668 1 1.14 31.3


10-SP10067 SUPPORT L50*6 336 1 0.13 3.0
10-SP10068 SUPPORT HEA100 599 1 0.61 17.1
10-SP10069 SUPPORT UNP100 451 1 0.35 9.8
DATE

10-SP10070 SUPPORT UNP100 399 1 0.15 4.2


10-SP10071 SUPPORT L75*8 395 1 0.12 3.5
10-SP10072 SUPPORT UNP160 795 1 1.17 37.7
BY

10-SP10100 SUPPORT L50*6 422 1 0.11 2.6


10-SP10101 SUPPORT L50*6 402 1 0.08 1.8
DISCIPLINE

10-SP10102 SUPPORT L65*6 625 1 0.16 3.5


Total Area(Sqm): 18.25 Total weight(kg): 617.34
DATE
BY
DISCIPLINE

D2
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

D1

DB
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

DA ISOMETRIC VIEW
Sk. 10 PIPE SUPPORT STRUCTURE
CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 PIPE SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 7of26 0

A0
DATE

DB DA
8750

128

138

126
BY

A B
D1
DISCIPLINE

22

12

24
A B

1594
DATE

10-SP10051 10-SP10052 10-SP10053


L75*6 UNP100 UNP160
BY

667
DISCIPLINE

8 8 D2 10-SP10069
UNP100
12

100
10-SP10068
HEA100
DATE

5000
BY

487
1340
DISCIPLINE

10-SP10063 5
10-SP10050
L75*6 10-SP10066 +7600
HEA100
HEA100
DATE

6
3350 C C

2
M D D
BY

10-SP10069
4 10-SP10037 UNP100
HEA100 143 746 SECTION 1A - 1A
DISCIPLINE

10-SP10065 K G 463

1548

1544
10-SP10043

1251
L75*8 J 10-SP10047 10-SP10048 L65*6 1A F
32 L75*6 UNP100
L H E
550

751

44
17
DATE

402
D2

97
545
150

247

148
K 131
629

629
L 1A
BY

850
10-SP10038 1401 10-SP10040
10-SP10046 10-SP10044
L65*6 UNP100
DISCIPLINE

10-SP10102 L75*6 J H G UNP100


L65*6 M
PLAN VIEW AT EL.+7600 (T.O.S) F E
SKID-10 PIPE SUPPORT STRUCTURE
DATE

D1
BY
DISCIPLINE

1029
818

1633
N N

10-SP10062
UNP160

3233
P P
400
10-SP10036
2481 HEA100
2445
5000

400 565
10-SP10056 10-SP10036 10-SP10060
L50*6 HEA100 R L50*6
10-SP10033
1536 HEA160 10-SP10100 287 10-SP10067
L50*6

212
L50*6
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

S S
10-SP10101
L50*6 10-SP10034 10-SP10034 R
7 404 396 7 HEA160 HEA160 Q Q
5
180

10-SP10057 2 2 10-SP10058 396


4 L50*6 L50*6
1068 2498 1 Z 578
5 3 3 10-SP10035
3035 HEA100

1599
Y

1527
310

U U 10-SP10071
4
1589

1148

L75*8
175 175
968

968

6
310
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

807

T T
636
324

W W

32
D2 CLIENT:
V V
7

165

33
2468 6 10-SP10059 1 10-SP10059
L50*6 Z Y 10-SP10054 446 PetroChina International Iraq FZE Iraq Branch
L50*6 L50*6
1068 4263 10-SP10055 578 10-SP10061
L65*8
CONTRACTOR:

L75*6 169 1767


8750 CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

DB PLAN VIEW AT EL.+10900 (T.O.S) DA


SKID-10 PIPE SUPPORT STRUCTURE PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 PIPE SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 8of26 0

A0
DATE

8750
BY

DB 2968 3337 2445 DA


DISCIPLINE

2596
DATE

10-SP10051 10-SP10053
L75*6 6 UNP160
+7600
BY

699
DISCIPLINE

929
EL.+6976

984
445
6
EL.+6776 6
EL.+6771
10-SP10052
DATE

UNP100
451 61
472 90
BY
DISCIPLINE

ELEVATION ALONG GRID-D1


SKID-10 PIPE SUPPORT STRUCTURE
DATE

DB DA

8750
BY
DISCIPLINE

10-SP10054
L50*6
5000
D1 D2
10-SP10071
+10900
L75*8
DATE

467
583
13

83

924
+10900 15
6 10-SP10061
BY

467
517

446 L65*8

1631
10-SP10062 410
996 UNP160 6 488
DISCIPLINE

10-SP10061 3535 10-SP10059


10-SP10067
32 L65*8
+9750 L50*6
L50*6

1631
22

1495

3300
DATE

+9750 10-SP10070
38 10-SP10064 UNP100
L75*8
400 EL.+9269 6
3300
BY

10-SP10069
UNP100 10-SP10039
10-SP10070
28 10-SP10038 32 32 UNP160
UNP100 10-SP10039
DISCIPLINE

10-SP10065 L65*6
UNP160 L75*8 10-SP10102 6
6 900 4 L65*6 6

1111
10-SP10043
L65*6 379
6 EL.+8300 284
10-SP10040
UNP100

587
518

518
TYP 6
6 47

119

102
6
10-SP10041 +7600
700

UNP100

517
6 10-SP10041

698
701
119

826
88 UNP100
+7600 EL.+6974 10-SP10046

414
L75*6 EL.+6826

1414
10-SP10042
517

328 EL.+7083 L75*6

1800
6
10-SP10047 10-SP10048 10-SP10044
UNP100
308

L75*6 UNP100
1414

EL.+6186
1800

6 10-SP10042
463 L75*6
6
3470

97 538

10-SP10045
EL.+5800 2521 2897 324 1351 1061 596 L75*6
319

10-SP10044
3470
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

UNP100
54
10-SP10045
L75*6
254 6

654

+4130
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

848
+4130
530
EL.+3282
848

99 CLIENT:

10-SP10044
6 UNP100 PetroChina International Iraq FZE Iraq Branch
10-SP10044 CONTRACTOR:
UNP100 6

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

STRUCTURAL ELEVATION "FRAME DA" ELEVATION ALONG GRID-D2


SKID-10 PIPE SUPPORT STRUCTURE SKID-10 PIPE SUPPORT STRUCTURE PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 PIPE SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 9of26 0

A0
DATE

D1
BY

D1
+7600
DISCIPLINE

+7600

DA
DATE

128 129
EL.+9269
5110
DA
381
BY

EL.+8218
22 918
624
DISCIPLINE

10-SP10063

824
L75*6

1082
6

618
24

829
6
6 250 350
6 +7600
DATE

10-SP10053 10-SP10050 EL.+8187


UNP160 HEA100
10-SP10051 6 D2
L75*6
76
BY

6 6
L65*6 850

1450
6

587
10-SP10066
DISCIPLINE

764 2211 667 HEA100 +7600

102
12 EL.+6150 +7600

10-SP10052
DATE

160
UNP100 10-SP10040

19
UNP100
100

SECTION D - D
BY

SECTION B - B SECTION C - C SECTION E - E


SECTION A - A
DISCIPLINE
DATE

6
D2
BY

900
EL.+8300
DISCIPLINE

10-SP10039
UNP160
DATE

700

D2
10-SP10041 629
UNP100
BY

328
EL.+7481 6
6 D2
DISCIPLINE

+7600 D2 EL.+8118 200 200


EL.+8187
119

10-SP10042
517

L75*6
463 +7600
D2 10-SP10038 10-SP10037
EL.+7083 L65*6 HEA100

+7600 D2

518
308

1414

+7600

587
6
252
1875

+7600
623

6
886

10-SP10044 5
UNP100
394 260
EL.+6119 97 31 +7600

699
6
514
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

97 338 6
10-SP10048 10-SP10046
UNP100 EL.+6977 L75*6 21
394

6
EL.+5725

10-SP10045 EL.+6714
L75*6 10-SP10047
L75*6

SECTION H - H SECTION J - J SECTION K - K


SECTION F - F SECTION L - L

SECTION G - G
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 PIPE SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 10of26 0

A0
DATE

D2 6
6
BY

10-SP10102 10-SP10065 EL.+8119


DISCIPLINE

L65*6 L75*8
DATE

629 550 DA
201 199 475
EL.+11325
BY

DA

519
DISCIPLINE

21
+10900
+10900
10-SP10036
DATE

HEA100

425
+7600 DA
817
BY

467
10-SP10062

467
EL.+10887 6
UNP160 63 6
DISCIPLINE

13
6
+10900
+10900 10-SP10067
L50*6 10-SP10060
L50*6
EL.+10433 EL.+10433
DATE

6
6
BY

SECTION N - N
SECTION Q - Q SECTION R - R
DISCIPLINE

SECTION M - M SECTION P - P
D2
DA
DATE

+10900
201 199
BY

174 176 EL.+11325


+10900
+10900
DISCIPLINE

439
6
10-SP10036
DATE

HEA100
DA
425

10-SP10035
400 6 HEA100

467

425
187

583
BY

925
6
+10900 446
6
DISCIPLINE

83

10-SP10061 6
EL.+10433

841
+10900 10-SP10058 6 L65*8
L50*6 +10900
10-SP10055
10-SP10071 L75*6
L75*8

SECTION S - S SECTION U - U
SECTION T - T
SECTION W - W EL.+9975
SECTION V - V

621
310 310
EL.+12865
336 75

SECTION Y - Y
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

10-SP10034
HEA160
1965

D2
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

603

CLIENT:

PetroChina International Iraq FZE Iraq Branch


TYP 6
6 TYP CONTRACTOR:

+10900 CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

SECTION Z - Z VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 PIPE SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 11of26 0

A0
DATE

A1
BY

EL.+12865 310 310


DISCIPLINE

D2
DATE

TYP. 6
6
BY
DISCIPLINE

10-SP10034
HEA160

1965
DATE
BY
DISCIPLINE

D2
EL.+13055 404 396
10-SP10034
HEA160
+10900
601
DATE

151 165
6 6
6 6 +10900
+10900 6

1965
+10900
BY

+10900
+10900

161
DISCIPLINE

159

924
A1

2155
10-SP10033
DATE

6 6
924

HEA160

583
583
6
6 6 6
6 6

422
BY

10-SP10101
400 206

423
10-SP10057 L50*6
L50*6 400 EL.+9976
10-SP10056
DISCIPLINE

6 L50*6 10-SP10100
L50*6 EL.+10317 6
+10900 EL.+10317
A2 A2
10-SP10059
10-SP10059 L50*6 +10900
L50*6
DATE

SECTION 2 - 2 SECTION 3 - 3 SECTION 4 - 4 SECTION 5 - 5 SECTION 6 - 6 SECTION 7 - 7


SECTION A1 - A1
SECTION 1 - 1
BY
DISCIPLINE

250 350
EL.+8187 D2
DA
10-SP10068 10-SP10059
180

HEA100 L50*6
587

667

400
6
+7600 SECTION A2 - A2
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

SECTION 8 - 8
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 PIPE SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 12of26 0

A0
ASSEMBLY LIST
DATE

MARK DESCRIPTION PROFILE LENGTH(mm) Q'TY AREA(sqm) WEIGHT(kg)


10-SP10001 SUPPORT L50*6 380 1 0.15 3.5
BY

10-SP10002 SUPPORT L50*6 150 1 0.11 2.5


10-SP10003 SUPPORT L50*6 225 1 0.13 2.9
DISCIPLINE

10-SP10004 SUPPORT L50*6 365 1 0.07 1.6


10-SP10005 SUPPORT L50*6 250 1 0.10 2.2
10-SP10006 SUPPORT L50*6 470 3 0.09 6.2
10-SP10007 SUPPORT L50*6 245 1 0.12 2.6
10-SP10008 SUPPORT L50*6 245 1 0.15 3.5
DATE

10-SP10009 SUPPORT L50*6 424 2 0.08 3.8


10-SP10010 SUPPORT L50*6 244 1 0.11 2.4
10-SP10011 SUPPORT L50*6 745 1 0.50 11.1
BY

10-SP10012 SUPPORT L50*6 745 1 0.21 4.9


10-SP10013 SUPPORT L50*6 739 2 0.14 6.6
DISCIPLINE

10-SP10014 SUPPORT L50*6 870 1 0.24 5.4


10-SP10015 SUPPORT L50*6 274 2 0.14 6.4
10-SP10016 SUPPORT L50*6 274 1 0.18 4.0
10-SP10017 SUPPORT L50*6 264 1 0.05 1.2
DATE

10-SP10018 SUPPORT L50*6 340 1 0.12 2.6


10-SP10019 SUPPORT L50*6 500 1 0.25 5.1
10-SP10020 SUPPORT L50*6 475 1 0.17 3.7
BY

10-SP10021 SUPPORT L50*6 285 1 0.10 2.2


10-SP10022 SUPPORT L50*6 285 1 0.09 2.0
DISCIPLINE

10-SP10023 SUPPORT L50*6 455 1 0.13 2.8


10-SP10024 SUPPORT L60*5 1000 2 0.23 9.0
10-SP10025 SUPPORT L60*5 880 1 0.29 5.7
10-SP10026 SUPPORT L60*5 975 1 0.23 4.4
DATE

10-SP10027 SUPPORT L60*5 134 1 0.03 0.6


10-SP10028 SUPPORT L60*5 294 2 0.07 2.7
10-SP10029 SUPPORT L60*5 399 1 0.09 1.8
10-SP10030 SUPPORT L60*5 730 1 0.20 3.9
BY

10-SP10031 SUPPORT L60*5 1250 1 0.29 5.6


10-SP10032 SUPPORT L50*5 255 2 0.11 4.7
DISCIPLINE

10-SP10041 SUPPORT UNP100 321 2 0.12 6.7


Total Area(Sqm): 5.12 Total weight(kg): 134.37
DATE
BY
DISCIPLINE
DATE
BY
DISCIPLINE

D2
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

D1

DB
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

ISOMETRIC VIEW
CC
DA CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

Sk. 10 E&I SUPPORT STRUCTURE


PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 E&I SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 13of26 0

A0
DATE
BY
DISCIPLINE
DATE
BY
DISCIPLINE

10-SP10009
L50*6

DB DA S T
DATE

8750
D1

8
H G 41 U U

329

342

342
10-SP10018
L50*6 122 203
BY

P P 10-SP10010 25 10-SP10011

25
L50*6 25
DISCIPLINE

D1 L50*6
10-SP10032 S T

111
475
10-SP10017 L50*5
25

625
L50*6

1300
G
DATE

10-SP10019
N 10-SP10021 100 L50*6
F F
25
L50*6
10-SP10015 41
H1 R
BY

150 10-SP10027 30 L50*6 10-SP10003


150 10-SP10020 L50*6
L60*5 L50*6 Q Q 80
30
H 20 10-SP10012
10-SP10024 10-SP10028 10-SP10024
DISCIPLINE

10-SP10028 10-SP10032 L50*6


L60*5 L60*5 30 L60*5 L60*5 H1 L50*5
V V

181
L

1225
995
K K

130
M M

24
10-SP10015
10-SP10031
W W
L50*6
581

581
J J
521

521

521
L L60*5
DATE

395
25
100

5000
R

25
E E 211

337
10-SP10022

5000
N
BY

L50*6
N1 N1
DISCIPLINE

29
10-SP10023 100
L50*6 6 6
D
10-SP10005
L50*6
DATE

381
10-SP10026 10-SP10030
L60*5 L60*5 7

80
B B 10-SP10008 137
L50*6
BY

25 25

350
511 25 25 2
C C 25
A 10-SP10006 W1 W1
DISCIPLINE

10-SP10029 L50*6 3
L60*5 10-SP10004 4 10-SP10007 Y Y
10-SP10016 L50*6 L50*6
10-SP10006 25

667
L50*6 10-SP10025

705

548
D L50*6 10-SP10014

633
L60*5 10-SP10006
L50*6 5 L50*6

92
25
D2 D2 Z Z
5 5

32
25
100 A 4 3 2 1 175 1

7
PLAN VIEW AT EL.+10900 (T.O.S) DA
PLAN VIEW AT EL.+7600 (T.O.S) SKID-10 PIPE SUPPORT STRUCTURE
SKID-10 E&I SUPPORTS STRUCTURE
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

D2
91

+10900
355

6
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

350

10-SP10007 CLIENT:
L50*6
SECTION 7 - 7 PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 E&I SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 14of26 0

A0
DATE
BY
DISCIPLINE

190 EL.+8335
DATE

DA
DA
BY

+7600 +7600
DISCIPLINE

10-SP10025 +7600

975
L60*5
735

10-SP10026 DA
DATE

L60*5
+7600
50

575
575
BY

575
DISCIPLINE

360
A1 111 400 6 6
10-SP10025 10-SP10016
+7600 L60*5 6 10-SP10015
6 6 L50*6
10-SP10029 10-SP10015 EL.+7025 L50*6
80

+7600 L60*5 EL.+7025


DATE

+7600 227 EL.+7025 L50*6


80
65
BY

A1 L65*6 6 450
450 50
SECTION D - D
DISCIPLINE

SECTION A - A SECTION A1 - A1 SECTION B - B SECTION C - C


SECTION E - E SECTION F - F
DATE

10-SP10024
L60*5
BY
DISCIPLINE

EL.+7940
DATE

10-SP10018 D1

340
L50*6

1000
BY

50 111
D1
DISCIPLINE

6 100
+7600
+7600 +7600
+7600 150

6
25 25 6 6
6
10-SP10020
+7600
575

575

L50*6 10-SP10019
L50*6

585
625

+7600

585
10-SP10017 489 6
6

495
L50*6 10-SP10021
EL.+7025 EL.+7025 L50*6 6
EL.+7015 250 10-SP10022
L50*6
200
85

EL.+7015 10-SP10028

60
L60*5
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

SECTION G - G

60
SECTION H - H
SECTION H1 - H1
SECTION J - J SECTION K - K SECTION L - L
30

+7600
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

495

6
10-SP10028 CLIENT:
L60*5
PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
SECTION M - M CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 E&I SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 15of26 0

A0
DATE
BY
DISCIPLINE
DATE

10-SP10024
L60*5
BY
DISCIPLINE

1000
DATE
BY

+7600
DISCIPLINE

D1

100
DATE

1250
10-SP10031
6 L60*5
+10900
BY

+10900
+7600 +10900

755
41 41
DISCIPLINE

356
356

355
10-SP10023 181
DATE

L50*6 10-SP10010 6
10-SP10032 L50*6
10-SP10032
L50*5 EL.+10544 L50*5 EL.+10544 342 EL.+10545
224
+10900
BY

EL.+6845
DISCIPLINE

6 320
135

320
10-SP10027 SECTION P - P SECTION Q - Q SECTION S - S
L60*5 SECTION N1 - N1 SECTION R - R
DATE

SECTION N - N

D1
BY
DISCIPLINE

+10900
+10900

160
DA
6
6 5

25
+10900 DA

500
+10900
10-SP10011 10-SP10030
855

L50*6 +10900 10-SP10012 L60*5


L50*6

695
355

80

355
137
352 22
+10900 5
355

10-SP10009
L50*6 6
10-SP10008

160
435 50 L50*6
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

6
50 360
EL.+10045 515 10-SP10003 50 535
L50*6

50
SECTION U - U 6
SECTION Y - Y
SECTION W - W SECTION W1 - W1

SECTION T - T SECTION V - V
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 E&I SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 16of26 0

A0
DATE
BY
DISCIPLINE

DA
DATE
BY

+10900
DA
DISCIPLINE

375 50 90

DA

35
DATE

D2 425 90

555
10-SP10002 6
BY

10-SP10001 L50*6

35
425 90 L50*6

345
DISCIPLINE

855
D2

539
10-SP10001
L50*6 6

115
1055
1A 1A
DATE

48
SECTION 1B - 1B
SECTION 1A - 1A
425 90
BY

10-SP10002
DISCIPLINE

1605
L50*6
1B 1B
Z1 10-SP10041
35

UNP100
DATE

+10900
740 90
1C 1C
BY

D2
DISCIPLINE

10-SP10013 +9750 D2
Z1 L50*6 6
D2
DATE

10-SP10014 +10900 +10900


+10900
L50*6
820
BY

740 90

355
355
DISCIPLINE

D2

355
474
6 1C 10-SP10013 1C 474
L50*6 474 10-SP10006
+10900
L50*6 10-SP10006
L50*6
35

50
50
50 360

50
10-SP10014 6 10-SP10006
L50*6 L50*6
6
6
50

SECTION Z1 - Z1 SECTION 1 - 1 SECTION 3 - 3 SECTION 4 - 4


SECTION Z - Z
SECTION 2 - 2
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

+10900 DA
10-SP10013
+10900 L50*6
D2
355

355

85
366 90
355

157 740
10-SP10004
L50*6 25 25 6
SECTION 1C - 1C
250 10-SP10005
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

50

L50*6
10-SP10006
L50*6
50

6
CLIENT:
SECTION 6 - 6
SECTION 5 - 5
PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 E&I SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 17of26 0

A0
ASSEMBLY LIST
DATE

MARK DESCRIPTION PROFILE LENGTH(mm) Q'TY AREA(sqm) WEIGHT(kg)


HR10001 RAIL PIPE42.4*3.6 4905 1 4.05 92.5
BY

HR10003 RAIL PL6*75 4905 1 4.09 93.5


HR10004 RAIL PIPE42.4*3.6 2405 1 2.67 60.9
DISCIPLINE

HR10005 RAIL PIPE42.4*3.6 4174 1 3.47 79.4


HR10006 RAIL PIPE42.4*3.6 2352 1 2.27 51.7
HR10007 RAIL PIPE42.4*3.6 4905 1 4.78 109.0
HR10008 RAIL PIPE42.4*3.6 3613 1 3.41 78.0
HR10009 RAIL PIPE42.4*3.6 4725 1 4.21 96.3
DATE

HR10010 RAIL PIPE42.4*3.6 4003 1 4.11 94.0


HR10011 RAIL PIPE42.4*3.6 4725 1 4.05 92.6
HR10012 RAIL PIPE42.4*3.6 5252 1 4.72 107.9
BY

HR10013 RAIL PIPE42.4*3.6 887 1 1.45 32.9


HR10008 HR10014 RAIL PIPE42.4*3.6 2814 1 2.55 58.2
DISCIPLINE

PIPE42.4*3.6 HR10015 RAIL PIPE42.4*3.6 1036 1 5.36 122.2


HR10016 RAIL PIPE42.4*3.6 3953 1 3.34 76.3
HR10006
PIPE42.4*3.6 HR10005 LD10001 PIATTO FL10*65 4370 1 3.53 98.7
PIPE42.4*3.6 LD10002 PIATTO FL10*65 4831 1 3.76 106.8
DATE

LD10003 PIATTO FL10*65 4540 1 3.66 103.0


SG10002 SG10001 BEAM ROD25 780 1 0.11 4.6
HR10007 ROD25 SG10002 BEAM ROD25 780 2 0.11 9.1
PIPE42.4*3.6 LD10001
BY

FL10*65 Total Area(Sqm): 65.69 Total weight(kg): 1567.48


DISCIPLINE
DATE

HR10001
PIPE42.4*3.6
HR10004
HR10009
BY

PIPE42.4*3.6
PIPE42.4*3.6
DISCIPLINE

HR10003
PL6*75
DATE

HR10015 HR10010
PIPE42.4*3.6 PIPE42.4*3.6
BY

HR10014
DISCIPLINE

PIPE42.4*3.6

HR10013
DATE

PIPE42.4*3.6

SG10002
ROD25
BY

LD10002
DISCIPLINE

FL10*65
SG10001
ROD25

HR10012
PIPE42.4*3.6

LD10003
FL10*65

HR10011
PIPE42.4*3.6
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

DB

D2 HR10016
PIPE42.4*3.6
N
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

D1
DA
CLIENT:

3D VIEW PetroChina International Iraq FZE Iraq Branch


Sk. 10 HANDRAIL & LADDER
CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 HANDRAIL & LADDERS
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 18of26 0

A0
DATE DB DA
3609 283 5221
496 650 370 1100 943 200 1480 1450 420 1250 421 C
LADDER FROM EL.+7600 L OF LADDER
BY

TO EL.+10900 580
C
LADDER FROM EL.+4130
DISCIPLINE

371
D1 TO EL.+7600

181

280
50 SG10001
ROD25
LD10003
DATE

FL10*65

1000
LD10001 HR10014 HR10012
FL10*65 PIPE42.4*3.6 PIPE42.4*3.6

110
BY

164

365
DISCIPLINE

HR10010 181 980

1300

1300
PIPE42.4*3.6
DATE

C
BY
DISCIPLINE

181

4031
1300

1300
DATE
BY

64
DISCIPLINE

1105
HR10015

1210
HR10008 HR10003 PIPE42.4*3.6
PIPE42.4*3.6 PL6*75
DATE

111
D2

216
BY

181
200 625 855 1450 426 1144 200
175 320 650 370 1100 943 50 25 835 96
DISCIPLINE

3608 283 4900 345 956

1036 2374 300 4900 140


PLAN VIEW AT EL.+7600 (T.O.S)
Sk. 10 HANDRAILS AND LADDERS
DATE

LADDER FROM EL.+7600 A 154 1200 370 650


TO EL.+10900 200 1480 1500 1720
668 400

140
BY

D1 580 LADDER FROM EL.+4130

56
293

64
DISCIPLINE

HR10004 TO EL.+7600

140

140
PIPE42.4*3.6
233
200

HR10001 D1

50

50
LD10001

280
PIPE42.4*3.6

663
639

FL10*65
HR10009
PIPE42.4*3.6
LD10003

1000

1000
FL10*65
A

500
SG10002
ROD25
HR10011
1319

PIPE42.4*3.6

1131

1300

1300
D HR10016

3948
PIPE42.4*3.6
5000

4720

4720
5000
HR10005
64 PIPE42.4*3.6
D
1400
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

4168

1300
1300

1594
64

64 B

121 SG10002

4
1000
ROD25 LD10002
1200

1000
FL10*65
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

280
HR10006 HR10007

70
PIPE42.4*3.6 PIPE42.4*3.6 D2

140
CLIENT:
249

480 160

111
70

D2 B PetroChina International Iraq FZE Iraq Branch


25 700 131
140

27 HR10013
27

64

64

64

64

PIPE42.4*3.6 LADDER FROM EL.+300


205 856
CONTRACTOR:
154 1173 376 644 23 395 50 811 1500 370 705 226 419 TO EL.+4130
2346 300 469 400 4031 140 CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

8750 PEG ENGINEERING & CONTRACTING DMCC

DA
PLAN VIEW AT EL.+10900 (T.O.S) VENDOR: FABTECH International Ltd.

PLAN VIEW AT EL.+4130 (T.O.S)


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
Sk. 10 HANDRAILS AND LADDERS UNITED ARAB EMIRATES
DB DA TEL : +971 (4) 883 8833
Sk. 10 HANDRAILS AND LADDERS FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 HANDRAIL & LADDERS
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 19of26 0

A0
DATE

SG10002 D2 PL10*110
BY

D1 HR10013 D2 B3
ROD25 120 30
PIPE42.4*3.6
DISCIPLINE

66
233 B4
HR10004 SG10002 HR10005 PL6*75
A4 PIPE42.4*3.6 D1

50
PIPE42.4*3.6 ROD25 A3 HR10016

38
PIPE42.4*3.6 B2 B2
DATE

1 - Ø 18 HOLES
FOR M 16 BOLT

480
PL10*110

50
BY

A2 A2

1100
STANCHION
DISCIPLINE

200 L50*6

480
1100

50
DATE

A2 A2
B1 B1 SECTION B1 - B1 +4130

50
+4130

1769
BY

A1 A1 D2
280 LD10002
+10900
DISCIPLINE

FL10*65
SECTION A1 - A1 2 - Ø 21 HOLES
FOR M 19 BOLT
PL10*110
+4130

50 55
DATE

200 D1 2 - Ø 21 HOLES
FOR M 19 BOLT

55
BY

+10900 B4 B3 SECTION B4 - B4
860
DISCIPLINE

A4 A3

50
860 280
200 SECTION B2 - B2
DATE

232
+9750 LD10002
SECTION A2 - A2 FL10*65
25
BY

FLAT6*75

78
LD10001
DISCIPLINE

FL10*65 TYP.
STANCHION 5
30 1 - Ø 18 HOLES L50*6

443
FOR M 16 BOLT
3300

3740
38

461
DATE

FLAT6*50

461

75
FLAT6*75
2570
BY

3031

1100
STANCHION 1 - Ø 18 HOLES
FOR M 16 BOLT
DISCIPLINE

L50*6 TYP.
5

561
1 - Ø 18 HOLES FLAT6*50

582
FOR M 16 BOLT TYP.
5
570

+4130

151
A5

60
+10900 +4130

30
145

50
30
2 - Ø 18 HOLES
FOR M 16 BOLT

SECTION B3 - B3 SECTION D - D
+7600
+550
EL.+390
A5
SECTION A3 - A3 SECTION B - B
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

SECTION A - A
PL6*75 30
45
37

LD10001
FL10*65
1 - Ø 18 HOLES
FLAT10*65 FLAT10*65 FOR M 16 BOLT
1 - Ø 18 HOLES 1 - Ø 18 HOLES
FOR M 16 BOLT FOR M 16 BOLT
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

EL.+7630
81

81

LD10001
T.O.G FL10*65 STANCHION
30

L50*6
+7600
1 - Ø 21 HOLES 588 CLIENT:

FOR M 19 BOLT 1 - Ø 21 HOLES


FOR M 19 BOLT PetroChina International Iraq FZE Iraq Branch
SECTION A5 - A5
+10900 CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

SECTION A4 - A4
PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 HANDRAIL & LADDERS
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 20of26 0

A0
DATE
BY

SG10001 D1
ROD25 D1
280 HR10012
DISCIPLINE

C4 PIPE42.4*3.6
C5 D1
280
DA

55
+7600
DATE

PL10*110

50
50
BY

C2 C2 2 - Ø 21 HOLES
FOR M 19 BOLT

1100
280
DISCIPLINE

PL10*110

480
PL10*110 SECTION C2 - C2
DATE

50
C1 C1
+7600
BY
DISCIPLINE

SECTION C1 - C1

1 - Ø 18 HOLES
DA
DATE

FLAT10*65 FOR M 16 BOLT


FLAT10*65
1 - Ø 18 HOLES
54 FOR M 16 BOLT 54
BY

C5 C4
EL.+4160
T.O.G
DISCIPLINE

81

81
30
+4130
1 - Ø 21 HOLES
FOR M 19 BOLT
1 - Ø 21 HOLES
DATE

FOR M 19 BOLT

SECTION C3 - C3
BY
DISCIPLINE

1 - Ø 18 HOLES
DA FOR M 16 BOLT 1 - Ø 18 HOLES DA
3470

FLAT6*75 FOR M 16 BOLT


PL6*75 30
30

69
38
66

LD10003
DATE

LD10003 FL10*65
FL10*65

37
38

190
BY

461
STANCHION
L50*6
DISCIPLINE

STANCHION
1100

L50*6

570
+7600
+7600

C3

+4130

C3
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

SECTION C - C
SECTION C4 - C4 SECTION C5 - C5
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 HANDRAIL & LADDERS
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 21of26 0

A0
ASSEMBLY LIST
DATE

MARK DESCRIPTION PROFILE LENGTH(mm) Q'TY AREA(sqm) WEIGHT(kg)


10-SP10049 BEAM UNP100 1329 1 1.11 31.7
BY

10-SP10073 SUPPORT UNP200 717 1 0.82 29.0


10-SP10074 SUPPORT PIPE48.3*3.68 3453 1 0.95 24.6
DISCIPLINE

10-SP10075 SUPPORT PIPE48.3*3.68 3453 1 0.95 24.6


10-SP10076 SUPPORT PIPE48.3*3.68 3431 1 0.96 24.7
10-SP10077 PLATE PL10*250 393 1 0.53 19.4
10-SP10078 PLATE PL10*250 393 2 0.53 38.8
10-SP10079 PLATE PL10*250 288 1 0.27 9.6
DATE

10-SP10080 BEAM UNP100 1082 1 0.46 12.9


10-SP10081 SUPPORT UNP100 279 4 0.10 11.7
10-SP10082 SUPPORT UNP100 279 1 0.14 3.6
BY

10-SP10083 SUPPORT UNP100 279 4 0.14 14.2


10-SP10084 SUPPORT UNP100 279 4 0.14 14.2
DISCIPLINE

10-SP10085 SUPPORT UNP100 279 1 0.14 3.6


10-SP10086 SUPPORT PL6*50 125 2 0.03 1.3
10-SP10087 SUPPORT PL6*50 125 2 0.03 1.3
10-SP10088 BEAM UNP100 513 1 0.47 12.5
DATE

10-SP10089 SUPPORT UNP100 279 2 0.10 5.8


10-SP10090 SUPPORT UNP100 279 2 0.10 5.8
10-SP10091 SUPPORT PL6*50 160 2 0.06 2.5
BY

10-SP10092 SUPPORT PL6*50 160 2 0.06 2.5


10-SP10093 BEAM UNP100 659 3 0.39 32.6
DISCIPLINE

10-SP10094 BEAM UNP100 659 1 0.40 10.9


10-SP10095 SUPPORT UNP100 279 4 0.10 11.7
10-SP10096 SUPPORT PL6*50 160 4 0.06 5.0
10-SP10097 SUPPORT UNP100 604 1 0.29 7.6
DATE

10-SP10098 SUPPORT UNP100 604 1 0.29 7.6


10-SP10099 SUPPORT L75*6 385 1 0.24 5.5
Total Area(Sqm): 9.89 Total weight(kg): 375.04
BY
DISCIPLINE
DATE
BY
DISCIPLINE
DATE
BY
DISCIPLINE

D2
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

D1

DB
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

ISOMETRIC VIEW CC
DA Sk. 10 LIGHT SUPPORT STRUCTURE CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 LIGHT SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 22of26 0

A0
DATE

DB DA
BY

8750
DISCIPLINE

D1
DATE
BY
DISCIPLINE

4 - Ø 18 HOLES
FOR M 16 BOLT
97
150 215 150 215 10-SP10080
DATE

4 - Ø 18 HOLES UNP100
FOR M 16 BOLT

45

45

22
BY

150

150
250

250
E 209 71 E
D D
DISCIPLINE

55

55
D 10-SP10078 D 10-SP10083
10-SP10078 F UNP100 F

579

577

403
PL10*250 PL10*250
246 34
DATE

G G
10-SP10081

5000
699
UNP100
BY

10-SP10081 246 34
UNP100
DISCIPLINE

G G
10-SP10088 4 - Ø 18 HOLES 215 150
4 - Ø 18 HOLES 30 UNP100 FOR M 16 BOLT
FOR M 16 BOLT
DATE

C 10-SP10077

957
PL10*250
25

45
275

150

250
10-SP10049
BY

H H
125

UNP100
B B

55
DISCIPLINE

C 246 140

80
879
50 100

A 4 4
1517

10-SP10099
DATE

L75*6

973
480
2 - Ø 18 HOLES
FOR M 16 BOLT 140 140
BY
DISCIPLINE

D2
135 135

10-SP10073
UNP200

PLAN VIEW AT EL.+7600 (T.O.S)


SKID-10 LIGHT SUPPORT STRUCTURE 299 301
A

D1 D2
5000
1770 403 699 D1 D2
5000
10-SP10081
J K UNP100 K
125 575 125 951
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

171

146 134

6 705
5 10-SP10086 5
10-SP10086
PL6*50
109

PL6*50

140
10-SP10081 L
J K UNP100 K M L
10-SP10083 1805
UNP100
1030

DB
10-SP10083 125 575 125 951
UNP100 5 5

140
6 10-SP10082
171
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

PLAN VIEW AT EL.+4130 (T.O.S) UNP100


DA
SKID-10 LIGHT SUPPORT STRUCTURE
10-SP10087 10-SP10087
109

PL6*50 PL6*50
CLIENT:

M L L PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

PLAN VIEW AT EL.+4130 (T.O.S)


SKID-10 LIGHT SUPPORT STRUCTURE CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 LIGHT SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 23of26 0

A0
DATE
BY
DISCIPLINE
DATE

10-SP10091
PL6*50 Y 10-SP10076
BY

3 2 - Ø 18 HOLES PIPE48.3*3.68
2 - Ø 12 HOLES W 10-SP10092 V 10-SP10091
V FOR M 10 BOLT FOR M 16 BOLT PL6*50 Z
DISCIPLINE

W 10-SP10084 PL6*50 Z
2 - Ø 12 HOLES 10-SP10092 10-SP10084
10-SP10093
10-SP10084 Y UNP100 1 10-SP10093
FOR M 10 BOLT UNP100 UNP100 2 - Ø 12 HOLES 2 - Ø 12 HOLES 10-SP10093 UNP100
PL6*50 25 Y 10-SP10074 UNP100 FOR M 10 BOLT FOR M 10 BOLT UNP100
PIPE48.3*3.68 444 25

180
170

170

47

48
48
47
455 500
DATE

199
180

180
D1

60

60
60

60
80 80

81
10-SP10090
BY

80 80

100

100

100
110

110
10-SP10089 266 25 UNP100
UNP100 306 2 - Ø 18 HOLES
25 304 10-SP10089 355 FOR M 16 BOLT
DISCIPLINE

80 80
10-SP10090 UNP100 456 244
104 UNP100
Y Y
299 275 176 W V Z Z
W V Y
DATE

3
BY
DISCIPLINE

144 136

10-SP10079 T 10-SP10083
PL10*250 45 150 55 4 - Ø 18 HOLES UNP100
DATE

FOR M 16 BOLT
S S

150
1

355
2 - Ø 18 HOLES
BY

FOR M 16 BOLT
DISCIPLINE

106
10-SP10094
250 88

299
UNP100
80

574
T
U U
5000
DATE

80
80

2 2
80
BY

10-SP10075
PIPE48.3*3.68
DISCIPLINE

2 - Ø 18 HOLES
FOR M 16 BOLT

10-SP10096
PL6*50
Q N N
10-SP10096
2 - Ø 12 HOLES PL6*50
FOR M 10 BOLT 10-SP10096
P PL6*50 2 - Ø 12 HOLES R
N N 2 - Ø 12 HOLES FOR M 10 BOLT 10-SP10098
FOR M 10 BOLT 10-SP10085 346 302 302 UNP100
197 UNP100 126 10-SP10097
441 25 10-SP10096
25 25 25 UNP100
PL6*50

140
105

105

86
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

60
60

60
D2

194
10-SP10095
175

175
85

85

85
3 10-SP10084 UNP100
UNP100 Q N 10-SP10095 N R
10-SP10095 N 10-SP10095 UNP100
UNP100 UNP100 N P 621
8750

DB PLAN VIEW AT EL.+10900 (T.O.S) DA


SKID-10 LIGHT SUPPORT STRUCTURE
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 LIGHT SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 24of26 0

A0
DATE
BY

EL.+8930
DISCIPLINE
DATE
BY
DISCIPLINE

B1

1330
D2 +7600 275 10-SP10049
DATE

81 642 +7600 UNP100


4 - Ø 18 HOLES

200
6 FOR M 16 BOLT
BY

200
10-SP10073 10-SP10078
PIPE73*5.16 4 - Ø 18 HOLES PL10*250 150 215
DISCIPLINE

75 75 FOR M 16 BOLT
+7600 +7600
77

10-SP10088

114
+7600

348
DATE

UNP100

348

338
2 - Ø 18 HOLES 10-SP10088
BY

10-SP10073 FOR M 16 BOLT UNP100


UNP200
DISCIPLINE

B1 3SIDES 6
SECTION B1 - B1 6
SECTION B - B
DATE

SECTION D - D
SECTION A - A SECTION C - C
BY

DA
DISCIPLINE

270
128 129 DA 4 - Ø 18 HOLES
EL.+9269 215 150 FOR M 16 BOLT 109 171
209 71 246 34 146 134 10-SP10087
DATE

+7600 +4130 PL6*50

183
+7600 +7600 +4130
10-SP10077
PL10*250 6
BY

+4130

338
6 6 6
DISCIPLINE

10-SP10083
10-SP10083
1082

10-SP10081 UNP100 10-SP10081


UNP100 UNP100 6 UNP100
3SIDES
10-SP10080 SECTION H - H 6
UNP100 SECTION F - F SECTION G - G SECTION J - J SECTION K - K
251
6
1669

SECTION L - L
D2
161 119
D2
10-SP10068 +10900 D2
DA 142 138
HEA100 175 105
109 171 60 48 6
10-SP10095
UNP100 6 +10900
+4130 +10900

160
160
6 6
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

+7600 10-SP10083 10-SP10096 10-SP10084 10-SP10085


UNP100 PL6*50 2 - Ø 12 HOLES UNP100 UNP100
FOR M 10 BOLT
SECTION Q - Q
SECTION P - P
SECTION M - M SECTION N - N

SECTION E - E
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 LIGHT SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 25of26 0

A0
DATE
BY
DISCIPLINE

EL.+11434
DATE

D2
BY

D1
D1
DISCIPLINE

+10900
DA 10-SP10079 110 170 6 110 170 D1
PL10*250

534
144 136 6 +10900
238 +10900
DATE

62 60 100 180
4 - Ø 18 HOLES

160
+10900 106 150 FOR M 16 BOLT 10-SP10094 62 60 6

160
UNP100 +10900
780
BY

180
+10900 10-SP10089

160
100
UNP100
DISCIPLINE

100
196 +10900

153
10-SP10090

50 66
UNP100

91
10-SP10098 6 10-SP10092

100
10-SP10083 PL6*50

160
UNP100 10-SP10084
UNP100 6 3SIDES 10-SP10091 UNP100
DATE

6 2 - Ø 18 HOLES PL6*50 2 - Ø 12 HOLES 4 - Ø 12 HOLES


SECTION S - S FOR M 16 BOLT FOR M 10 BOLT FOR M 10 BOLT
6 SECTION T - T
SECTION W - W SECTION Y - Y
SECTION U - U SECTION V - V
325
BY

10-SP10097
UNP100
DISCIPLINE

+9750
DATE

D1 1340
1340
BY

SECTION R - R
1340
DISCIPLINE

EL.+11445
DATE

774
774

774
DA
BY

10-SP10093
UNP100 +7600
DISCIPLINE

545

360

246 140
D1
198
2 - Ø 18 HOLES
FOR M 16 BOLT 6
116
+10900 10-SP10099
460

L75*6
50 55
80

10-SP10075 10-SP10074
PIPE48.3*3.68 PIPE48.3*3.68

2537
SECTION 4 - 4

2537
SECTION Z - Z

2526
DB
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

270 DB 10-SP10076
PIPE48.3*3.68
140 140

+4130 116
183

2 - Ø 18 HOLES 2 - Ø 18 HOLES 2 - Ø 18 HOLES


FOR M 16 BOLT FOR M 16 BOLT
160

6 FOR M 16 BOLT
+4130

80
10-SP10086 +10900
80

50 55
91
PL6*50 +10900
50 55

10-SP10082 +10900
100

66

UNP100
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

50

SECTION 1 - 1 D1
SECTION 5 - 5 SECTION 6 - 6
SECTION 2 - 2 SECTION 3 - 3
CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1501-STR-DWG-0023_1 Tail Gas Treatment Unit - Skid 10 Steel Support Structures - Structural GA & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS CVS RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK10 - General Arrangement (Unit 1501)
HFY-3800-1501-PIP-DWG-0009_B
3) FCAW & SMAW WELDING PROCESS FOR STRUCTURES. TAIL GAS TREATMENT UNIT
4) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. HFY-3800-0000-STR-DWG-0005_1 STD - Grating SKID-10 LIGHT SUPPORT STRUCTURE
5) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005.
6) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
7) LIFTING LUGS SHALL BE RED PAINTED AND SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE. HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings
8) ALL COMPONENTS SHIPPED LOOSE SHALL BE MARKED AND ALL ITEMS
SHALL BE INDICATED ON THIS DRAWING.ALL ITEMS SHALL BE WITH PREFIX 91501-SK10-..... HFY-3800-1501-PIP-ISO-0001_B Isometrics Drawings for Skid Mounted Equipment (Unit 1501) STAGE DRAWING NO. SHT. REV.
9) ALL BOLTS RED PAINTED SHALL BE REMOVED AFTER SKID INSTALLATION AT SITE.
Tekla Structures

HFY-3800-0000-STR-DWG-0005_1 Standard Drawing Grating, Chequered Plate DETAIL DESIGN FAB-3021117-01-SK10-ER-001 26of26 0

A0

You might also like