Professional Documents
Culture Documents
Firm Profile
Firm Profile
PROJECT AT A GLANCE
2. Brief Profile:
3. Promoters Background
PERSONAL PROFILE
Age : 71 years
Designation : Proprietor
PERSONAL PROFILE
Mr. Sanjeev Kumar Agrawal has played a cabalistic role in the success of
M/s Mamraj & Sons. At present he has a transport business. He also engaged in
the business of rice as well He would actively engaged in day to day operations
of the firm and will play a key supporting role in all the decision making and
policy framing process of the firm. He has a successful track record throughout
his business career. He is playing a vital role in decision making process in the
business so as to monitor and control the activities of the Firm accurately.
Future Planing
Mr. Phool Chand Agrawal is aged now as he has crossed the age of 70.00. He is
not able to participate in the business actively so he wants that his sons would
be introduced as partners in the firm actively. Since it’s a repudiate business
family in the Raipur therefore they are planning that their son who is well
experienced in the above line of rice will participate in the business actively
with additional capital infusion under the guidance of Mr. Phool Chand
Agrawal.
Present Banker :
MARKET :-
Agricultural plays a part vital role in the Economy of C.G. as well as India,
contributiig a major of National Income. It is the major occupation of about
75% of the working force. The formost objective of the Government is not only
to increase the production of Food Grains to Feed the growing population but
also to provide greater employment opportunities specifically in backward
areas. Government is trying its efforts to increase the level of employment by
setting up new small scale and medium scale industrial units.
Since rice constitutes the main part of our food, agriculture is paid more
attention. People use rice as food and prepare different dishes, thus it has always
healthy demand in the market. Another factor which circulates the demand is
the overgrowing population.
The family is already running a rice mill in the name of Shree Om rice Tech
(P) Ltd. since last 08 years & looking at the demand this project is planned. The
experience gained in last 08 years & relation developed with the customers,
traders will play the main role for the success of the unit.
RAW MATERIAL REQUIREMENT :-
The main raw material required for the proposed unit is paddy. Kharora
Mandi is one of the biggest Mandi for food grains and paddy. The unit set up
in the Chhattisgarh area which is well known for its paddy production. As such
there will not be any problem in procurement of raw material.
As per the machine capacity requirement of paddy on at 100% capacity
utilization is as under-
Machine capacity - 16 M.T. paddy/10 hours.
We are supposed to run our unit at least 300 days.
Our capacity at 100% is 48000 MT per year for 300 days.
Yield is estimated as under:
Rice 65 % of input
Broken Rice 4 % of input
Bran 4 % of input
Husk 25 % of input
Wastage 2 % of input .
MANUFACTURING PROCESS :-
ii) Shelling: Shelling is done in the rubber roll sheller. Paddy is put into the
sheller, during which process husk is separated from rice.
iii) Paddy Separation: The paddy and rice are segregatrd by the paddy separator
when the mix of separated rice and paddy from the sheller is passed through
the paddy separator.
iv) Polishing: The segregated rice is then passed through the polisher where
the bran and rice are clearly separated from each other. After this operation rice
looks white. This operation is repeated through polishers until rice gets its
white form.
v) Weighting & Packing: The rice from the polisher is weighted in platform
balance and packed in jute bags for sale.
Utilities and services are the facilities required for successful and efficient
operation of the plant. such as Electric power, water, fuel, steam etc. for
this unit utilities required are mainly
i) power
ii) water.
i) Power supply:
The proposed unit is electrical power based unit. The total connected
load for the unit is estimated to be 320 KVA.