9 Appendix A
KTN2-MAT- Sheet 2023-11-30 Welding Electrode Lincol Innershield 2023-12-04 A: Approved 2023-12-04 E: Approved
FD025 Pile NR-232 (ELS)
KTN2-MAT- Piling: 2023-11-01 RUNFENG - Bulk Portland Cement 2023-11-08 A: Approved 2023-11-21 E: Approved
FD024 SHP
KTN2-MAT- Piling: 2023-11-01 Welding Electrode: Lincol Innershield 2023-11-07 A: Approved 2023-11-21 E: Approved
FD023 SHP NR-232
KTN2-MAT- Piling: 2023-11-01 Welding Electrode: "LC-600" (3.2mm, 2022-11-07 A: Approved 2023-11-21 E: Approved
FD022 SHP 4.0mm and 5.0mm Dia.)
KTN2-MAT- Piling: 2023-11-01 Cebex 100 - Plasticising Agent 2023-11-08 A: Approved 2023-11-21 E: Approved
FD021 SHP
KTN2-MAT- Piling: 2023-10-24 Welding Electorde: Kobelco OW- 2023-10-31 A: Approved 2023-11-08 E: Approved
FD018 LDBP S50H
KTN2-MAT- Piling: 2023-10-24 Welding Electorde: Chosun CR-13 2023-11-03 A: Approved 2023-11-08 E: Approved
FD017 LDBP
KTN2-MAT- Piling: 2023-10-27 1.2mm Tie Wire 2023-11-03 A: Approved 2023-11-08 E: Approved
FD010A LDBP
KTN2-MAT- Piling: 2023-10-27 Toe Spacer (150x⌀155mm thk. with 2023-10-31 A: Approved 2023-11-08 E: Approved
FD009A LDBP (220+75)Y40))
KTN2-MAT- Piling: 2023-10-27 Sonic Assess Tube 2023-10-31 A: Approved 2023-11-08 E: Approved
FD008A LDBP
KTN2-MAT- Piling: 2023-10-27 Roller Spacer (175 x 40mm thickness 2023-10-31 A: Approved 2023-11-08 E: Approved
FD007A LDBP with 25mm hole)
KTN2-MAT- Piling: 2023-10-24 U-bolt (1/2" & 5/8") 2023-11-03 A: Approved 2023-11-08 E: Approved
FD006A LDBP
KTN2-MAT- Piling: 2023-10-16 Welding Electrode (Kobelco Lb52 - 2023-10-18 A: Approved 2023-11-08 E: Approved
FD001A LDBP 3.2mm, 4.0mm & 5.0mm)
KTN2-MAT-014 Concrete 2023-09-26 60/20D Tremie concrete, 200mm 2023-09-27 B1: Approved with 2023-09-27 E: Approved
slump, 25%PFA,Taisheng Quarry, Sai comments (no need
Tao Wan Plant (A1360D521) re-submission)
KTN2-MAT-012 Concrete 2023-09-26 60/20D Tremie concrete, 200mm 2023-09-27 B1: Approved with 2023-10-27 E: Approved
slump, 25%PFA,Taisheng Quarry, Sai comments (no need
Tao Wan 2 Plant (A1660D131) re-submission)
3
QCM Report No.9 Appendix A
4
QCM Report No.9 Appendix A
KTN2-MST- Piling 2023-11-20 Method Statement of Site 2023-11-23 B1: Approved with 2024-01-11 A: Approved
011 Procedure for Handling of High comments (no need re-
Arsenic Content Soils submission)
KTN2-MST- Piling - SHP 2024-01-17 Method Statement of Socketed-H 2024-01-23 B1: Approved with P: Pending for
009D Pile Construction comments (no need re- Approval
submission)
KTN2-MST- Piling - SHP 2023-12-06 Method Statement of Socketed-H 2023-12-07 B1: Approved with P: Pending for
009C Pile Construction comments (no need re- Approval
submission)
KTN2-MST- Piling - SHP 2023-12-02 Method Statement of Socketed-H 2023-12-04 B1: Approved with P: Pending for
009B Pile Construction comments (no need re- Approval
submission)
KTN2-MST- Piling - SHP 2023-11-17 Method Statement of Socketed-H 2023-12-07 C: Acknowledge / note /
009A Pile Construction
KTN2-MST- Piling - SHP 2023-11-04 Method Statement of Socketed-H 2023-11-15 B2: Approved with /
009 Pile Construction comments (re-
submission required)
KTN2-MST- Piling - 2024-12-08 Method Statement of Bored Pile P: Pending for Approval 2024-01-11 A: Approved
004C LDBP Construction
5
QCM Report No.9 Appendix A
6
QCM Report No.9 Appendix A
7
QCM Report No.9 Appendix A
KTN2-SUB- SHP 2023-12-21 Submission for Approved Welding 2023-12- A: Approved 2024-01-03 A: Approved
0034 Procedure and Welder Cert for 28
SHP
S00344 SHP 2023-12-20 Test Boring Report for Blk 7 8 2023-12- C: Acknowledge / note /
20
KTN2-SUB- LDBP 2023-12-20 Concreting Plan for Bored Pile 2023-12- A: Approved P: Pending for
0033 Works - T11BP10 20 Approval
KTN2-SUB- LDBP 2023-12-18 Concreting Plan for Bored Pile 2023-12- A: Approved P: Pending for
0030 Works - T10BP28 18 Approval
KTN2-SUB- SHP 2023-12-18 Proposed Laboratory for 2023-12- A: Approved P: Pending for
0031 compressive strength Test 22 Approval
(Socket H-Pile Works)
KTN2-SUB- LDBP 2024-01-03 Alternative Casing Toe Proposal 2024-01- A: Approved P: Pending for
0029A (Block 9) 03 Approval
KTN2-SUB- LDBP 2023-12-14 Alternative Casing Toe Proposal 2023-12- D: Rejected /
0029 (Block 9) 27
KTN2-SUB- LDBP 2024-01-22 Alternative Casing Toe Proposal 2024-01- B1: Approved with P: Pending for
0027B (Block 8) 24 comments (no need Approval
re-submission)
KTN2-SUB- LDBP 2024-01-03 Alternative Casing Toe Proposal 2024-01- D: Rejected /
0027A (Block 8) 03
KTN2-SUB- LDBP 2023-12-13 Alternative Casing Toe Proposal 2023-12- D: Rejected /
0027 (Block 8) 27
KTN2-SUB- LDBP 2023-12-13 Concreting Plan for Bored Pile P: Pending for /
0028 Works - T11BP30 Approval
KTN2-SUB- LDBP 2023-12-11 Concreting Plan for Bored Pile 2023-12- A: Approved P: Pending for
0026 Works - T10BP4 14 Approval
KTN2-SUB- Sheet 2023-12-11 Preliminary Welding Procedure 2023-12- B1: Approved with P: Pending for
0021A Pile Specification for Sheet Pile 12 comments (no need Approval
Construction Works re-submission)
KTN2-SUB- LDBP 2023-12-07 Concreting Plan for Bored Pile P: Pending for /
0025 Works - T10BP12 Approval
KTN2-SUB- LDBP 2023-12-05 Concreting Plan for Bored Pile P: Pending for /
0024 Works - T10BP23 Approval
KTN2-SUB- Concrete 2023-10-31 Alternative Casing Toe Proposal 2023-11- B1: Approved with P: Pending for
0005 (Block 10 & 11) 01 comments (no need Approval
re-submission)
KTN2-SUB- Concrete 2023-10-31 Submission of Test Report of 2023-11- B1: Approved with P: Pending for
0006 Compression Strength of 04 comments (no need Approval
Concrete Cubes re-submission)
- 28 days Result (Mix IDs:
A1660D131, A1660D141,
A1360D521 & A1360D531)
KTN2-SUB- LDBP 2023-11-08 Concreting Plan for Bored Pile 2023-11- A: Approved P: Pending for
0008 Works - T11BP3 11 Approval
KTN2-SUB- SHP 2023-11-10 Preliminary Welding Procedire 2023-11- D: Reject /
0009 Specification for Socketed H-Pile 10
Construction Works
KTN2-SUB- SHP 2023-11-17 Preliminary Welding Procedire 2023-11- B1: Approved with P: Pending for
0009A Specification for Socketed H-Pile 20 comments (no need Approval
Construction Works re-submission)
KTN2-SUB- SHP 2023-11-16 Proposed Laboratory for Welding 2023-11- A: Approved P: Pending for
0012 Procedures (Socketed H-Pile 17 Approval
Works)
KTN2-SUB- LDBP 2023-11-17 Concreting Plan for Bored Pile 2023-11- A: Approved P: Pending for
0013 Works - T11BP5 17 Approval
KTN2-SUB- SHP 2023-11-17 Proposal for reduction of the 2023-11- D: Reject /
0014 holding time of weld test (NDT) for 20
Socketed H-Pile Works
KTN2-SUB- SHP 2023-11-23 Proposal for reduction of the 2023-11- B1: Approved with P: Pending for
0014A holding time of weld test (NDT) for 23 comments (no need Approval
Socketed H-Pile Works re-submission)
KTN2-SUB- SHP 2023-11-17 Proposal of Trial Grout Mix for 2023-11- B1: Approved with P: Pending for
0015 Socketed H-Pile 20 comments (no need Approval
re-submission)
KTN2-SUB- SHP 2023-11-18 Proposal of Trial Grout Mix for 2023-11- B1: Approved with P: Pending for
0016 Socketed H-Pile (ADD) 20 comments (no need Approval
re-submission)
KTN2-SUB- LDBP 2023-11-21 Concreting Plan for Bored Pile 2023-11- A: Approved P: Pending for
0017 Works - T11BP32 21 Approval
KTN2-SUB- LDBP 2023-11-23 Concreting Plan for Bored Pile 2023-11- A: Approved P: Pending for
0019 Works - T10BP1 23 Approval
8
QCM Report No.9 Appendix A
KTN2-SUB- Sheet 2023-11-28 Proposed lab for welding (sheet 2023-11- A: Approved P: Pending for
0020 Pile pile) 28 Approval
KTN2-SUB- Sheet 2023-11-28 Preliminary Welding Procedure 2023-11- D: Reject /
0021 pile Specification for Sheet Pile 28
Construction Works
KTN2-SUB- Concrete 2023-11-28 Concreting Plan for Bored Pile 2023-11- A: Approved P: Pending for
0022 Works - T10BP14 28 Approval
KTN2-SUB- LDBP 2023-12-01 Concreting Plan for Bored Pile 2023-12- A: Approved P: Pending for
0023 Works - T10BP2 01 Approval
KTN2-SUB- Concrete 2023-10-31 Alternative Casing Toe Proposal 2023-11- B1: Approved with P: Pending for
0005 (Block 10 & 11) 01 comments (no need Approval
re-submission)
KTN2-SUB- Concrete 2023-10-31 Submission of Test Report of 2023-11- B1: Approved with P: Pending for
0006 Compression Strength of 04 comments (no need Approval
Concrete Cubes re-submission)
- 28 days Result (Mix IDs:
A1660D131, A1660D141,
A1360D521 & A1360D531)
KTN2-SUB- LDBP 2023-11-08 Concreting Plan for Bored Pile 2023-11- A: Approved P: Pending for
0008 Works - T11BP3 11 Approval
9
QCM Report No.9 Appendix A
10