ONGC
Contractor : M/s. LTHE
Sub‐Contractor : M/s DOEPL
PROJECT : Balance work for Pipeline Replacement Project ‐ 4
Welding (Field Joints) Inch Dia 228.25 20.00% 0 228.25 0.00% 0.00% 20.00%
4
Welding (Modification joints) Inch Dia 0.00% 0 0 0.00% 0.00% 0.00%
5 Welding of Additional work Inch Dia N/A N/A N/A NA N/A N/A
B) STRUCTURAL
C) DEMOLITION
5 Instrument air/ signal tubing mtr 100 1.00% 0 100 0.00% 0.00% 1.00%
Activities performed
1 Attended meeting with ONGC Team at NQ Platform for N7 & NH Platform Topside modification work discussion
2 Barge is at Outer anchorage . Awaiting clearance from Leighton Eclipse for approaching N7 platform for anchor handling and gangway installation.
2 Temporary staircase preparation from spider deck to Sub cellar deck by scaffolding pipes.
1 According to ONGC Specification 2009F Rev.7 Clause No. 1.3 " Gamma rays can be used with permission from Company". LTHE yet to be submit the ONGC Approval for using Gamma rays at Barge Ocean303
According to BID Document , ONGC Specification No. 2005 Rev.No. 5.1 to be followed for Protective Coating. But the existing Blasting & Protective coating procedure No.PRP4‐DAS‐GN00‐QUA‐PRC‐0013 Rev.No.1 follows the ONGC Specification
2
No. 2005 Rev.No.4. LTHE yet to submit the updated approved Painting procedure.
3 N7‐PSV‐5201‐52 & NH‐PSV‐7601 are found faulty during calibration. PSV sent back to DAS yard for rectification.