DPR BWPRP4 Ocean303 02.04.18

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CLIENT : M/s.

ONGC
Contractor : M/s. LTHE
Sub‐Contractor : M/s DOEPL
PROJECT : Balance work for Pipeline Replacement Project ‐ 4

CA : M/S. ABSIV (India) Pvt.Ltd. PRODUCTION DATE: 02.04.2018

TPI : M/S. DNV‐GL REPORTING DATE : 03.04.2018


Location : N7 Platform ( Outer Anchorage)
Barge: Ocean303
Achieved Cumulative Balance Achieved % Cumulative
Sr. no Description UOM Scope Alloted % Balance % Remarks
Qty.Today Qty. Qty. Today %
Over all Progress ( A+B+C) 100.00% 0.00% 0.00% 100.00%
A) Piping
1 Erection of piping spools Nos 36 15.00% 0 36 0.00% 0.00% 15.00%

Fit up of (Field Joints) Nos 67 20.00% 0 67 0.00% 0.00% 20.00%


2
Fit up of (Modification joints) Nos 0.00% 0 0 0.00% 0.00% 0.00%

3 Fit up Adiitional work Nos N/A N/A N/A NA N/A N/A

Welding (Field Joints) Inch Dia 228.25 20.00% 0 228.25 0.00% 0.00% 20.00%
4
Welding (Modification joints) Inch Dia 0.00% 0 0 0.00% 0.00% 0.00%

5 Welding of Additional work Inch Dia N/A N/A N/A NA N/A N/A

6 Installation of Piping Supports Nos. 21 10.00% 0 21 0.00% 0.00% 10.00%


NDT of (Field Joints)
Nos 67 12.00% 0 67 0.00% 0.00% 12.00%
7
NDT of (Modification Joints) Nos 0.00% 0 0 0.00% 0.00% 0.00%

8 Hydrotesting of Piping Loops Nos. 5 3.00% 0 5 0.00% 0.00% 3.00%

9 Hook up/Tie in points Nos. 7 3.00% 0 7 0.00% 0.00% 3.00%

10 Painting Touch-up work lot 1 1.00% 0 1 0.00% 0.00% 1.00%

11 Insulation lot 1 1.00% 0 1 0.00% 0.00% 1.00%

TOTAL-C 85.00% 0.00% 0.00% 85.00%

B) STRUCTURAL

1 Deck Extension/Strenghtening MT 2 3.00% 0 2 0.00% 0.00% 3.00%

2 NDT for Extension/Strenghtening lot 1 1.00% 0 1 0.00% 0.00% 1.00%

TOTAL-B 4.00% 0.00% 0.00% 4.00%

C) DEMOLITION

A) Demolition of existing Segment 12"WF N7-


1 NQO, lot 1 1.00% 0 1 0.00% 0.00% 1.00%
B) 8"GL NQO-N7, associated piping

TOTAL- A 1.00% 0.00% 0.00% 1.00%

D) ELECTRICAL & INSTRUMENTATION

1 F&G support Installation No 2 1.00% 0 2 0.00% 0.00% 1.00%

2 Instrument Installation No 10 1.00% 0 10 0.00% 0.00% 1.00%

3 F&G detector Installation No 4 1.00% 0 4 0.00% 0.00% 1.00%

4 JB installation No 2 1.00% 0 2 0.00% 0.00% 1.00%

5 Instrument air/ signal tubing mtr 100 1.00% 0 100 0.00% 0.00% 1.00%

6 Cable laying mtr 350 1.00% 0 350 0.00% 0.00% 1.00%

7 Cable termination and glanding No 16 1.00% 0 16 0.00% 0.00% 1.00%

8 Calibration No 10 0.50% 0 10 0.00% 0.00% 0.50%

9 F&G Panel installation No 1 1.00% 0 1 0.00% 0.00% 1.00%

10 SDP Installation NO 1 1.00% 0 1 0.00% 0.00% 1.00%

11 Loop checking No 8 0.50% 0 8 0.00% 0.00% 0.50%

TOTAL-C 10.00% 0 0 0.00% 0.00% 10.00%

Distribution and Contact List


ABSIV sekumaran@eagle.org, pramanathan@absconsulting.com, dbhujbal@absconsulting.com
ONGC pandey_ak5@ongc.co.in, khanra_Rajat@ongc.co.in, Thakur_Ashish@ongc.co.in
DNV‐GL birju.jaiswal@dnvgl.com, mani.choudhary@dnvgl.com, merlyn.menezes@dnvgl.com

Activities performed
1 Attended meeting with ONGC Team at NQ Platform for N7 & NH Platform Topside modification work discussion

2 Barge is at Outer anchorage . Awaiting clearance from Leighton Eclipse for approaching N7 platform for anchor handling and gangway installation.

Planned activities(Next Day) :‐

1 Material & Man‐power transfer from Crew boat to N7 platform

2 Temporary staircase preparation from spider deck to Sub cellar deck by scaffolding pipes.

3 Pre‐construction survey at N7 Platform.

Area of Concern if any :

1 According to ONGC Specification 2009F Rev.7 Clause No. 1.3 " Gamma rays can be used with permission from Company". LTHE yet to be submit the ONGC Approval for using Gamma rays at Barge Ocean303
According to BID Document , ONGC Specification No. 2005 Rev.No. 5.1 to be followed for Protective Coating. But the existing Blasting & Protective coating procedure No.PRP4‐DAS‐GN00‐QUA‐PRC‐0013 Rev.No.1 follows the ONGC Specification
2
No. 2005 Rev.No.4. LTHE yet to submit the updated approved Painting procedure.

3 N7‐PSV‐5201‐52 & NH‐PSV‐7601 are found faulty during calibration. PSV sent back to DAS yard for rectification.

Bhabesh Porel Vipin James EL.Krishnan


DNV ‐Mech. ( ONGC‐TPI) DNV‐E&I (ONGC‐TPI) ABSIV‐Mech. (ONGC‐CA) ABSIV‐E & I (ONGC‐CA) (ONGC REP.)

You might also like