LOCATION :HOT STRIP MILL #3 AGENCY:- RAY Constructions Ltd Page No 1-7
Activity : Civil works for Hot Strip Mill #3 Project :-Shuttering,De-shuttering ,Work at height, Scaffolding, Reinforcement, Concreting Welding ,Gas cutting and Material handling
Severity Rating
Condition: Normal/
Non-Routine / Non
Direct / Indirect
Legal
Non-Routine
/Emergency
Probability
requir Risk
Abnormal
ement Accepta
Sub Activities / Potential Risk Additional Control
SN applica Risk Involved Consequence Current Control Measures ble
Basic Job Steps Hazard P E A R Level measures
ble (Yes/No
(Yes / )
No)
placing or
Normal
Direct
Dir
Rou
Nor
Persons and 1.Ensure inspection conduct before start the
structures can activity.
struck by boom 2.Ensure free from Electric over head power
placer trunk and line/Existing structures of boom slewing
Choking of boom radius.
placer 3.Ensure experianced signal man should
be appoint .
4.Guide rope should be provide for
Body injury boom placer trunk avoid direct contact with
persorn.
5.Remove everyone from the discharge area
whenever choke the pipe line and cleaning .
Normal
Direct
Normal
Direct
Erection and
Normal
Direct
N
R
1.Ensure safe access and agress provide.
2.Provide safe and
adequate landing platforms and ladders.
3.Never block the walk Same as current control
Acess and Agress Fall, trip and slip Bodily Injury way/access with scaffolding materials. 1 0 1 0 2 2 Yes
measures
4.Ensure proper material
stacking and good housekeeping.
Normal
Boom placer
/Transist miller
Boom placer 6.Ensure free from Electric over head power
/Transist miller line/Existing structures of boom slewing
radius.
7.Ensure experianced signal man should be
appoint .
Persons and
8.Guide rope should be provide for boom placer
structures can
trunk avoid direct contact with persorn.
struck by boom
body injury 9.Remove everyone 2 1 1 1 2 4 Yes
placer trunk and
from the discharge area whenever choke the
Choking of boom
pipe line and cleaning .
placer
10.Ensure use of apropriate PPE.
Normal
Direct
shall be routed through 30 ma ELCB Same as current control
6 Dewatering No Electrical Pump Elecric shock body injury 3 1 2 2 2 6 Yes
measures
5.Ensure
electric connection given by electrician only.
Normal
Direct
Normal
Direct
Approved by:
Prepared by:
Signature: