Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Casework C01A Quotation

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)


A TENAGA
1 Tukang rakit m2 13.77 350,000.00 4,818,905.00
2 Tukang tempel HPL m2 13.77 350,000.00 4,818,905.00
JUMLAH TENAGA KERJA 9,637,810.00
B BAHAN
1 Plywood 18 mm Lembar 27.00 300,000.00 8,100,000.00
2 Hollow 20 x 20 Batang 27.00 125,000.00 3,375,000.00
3 Lem HPL Pile 2.00 500,000.00 1,000,000.00
4 HPL Lembar 27.00 425,000.00 11,475,000.00
5 Paku Kilogram 10.00 24,000.00 240,000.00
JUMLAH HARGA BAHAN 24,190,000.00
Harga Casework C01A (Tenaga + Bahan) 33,827,810.00
Harga Casework C01A Dibulatkan 33,820,000.00

Casework C01B Quotation


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
1 Tukang rakit m2 13.77 350,000.00 4,818,905.00
2 Tukang tempel HPL m2 13.77 350,000.00 4,818,905.00
JUMLAH TENAGA KERJA 9,637,810.00
B BAHAN
1 Plywood 18 mm Lembar 25.00 300,000.00 7,500,000.00
2 Hollow 20 x 20 Batang 32.00 125,000.00 4,000,000.00
3 Lem HPL Pile 2.00 500,000.00 1,000,000.00
4 HPL Lembar 25.00 425,000.00 10,625,000.00
5 Paku Kilogram 10.00 24,000.00 240,000.00
JUMLAH HARGA BAHAN 23,365,000.00
Harga Casework C01B (Tenaga + Bahan) 33,002,810.00
Harga Casework C01B Dibulatkan 33,000,000.00

You might also like