Inventory Management of Fast Moving Spares Parts of Veh Eqpt Plants A Practical Approach For Field Workshops Base Workshops of Border Roads Organisation Ijariie13344
2621 Arjan_PC_Fiber_TASC (2621) SMART RO2 P4 Rejected 3136 U_Zarqa_Highway_MGS_PF_TASC_O (3136) Cellcom RO2 P1 Rejected Site ID Date SubCon. SubCon SME CoE SME Tab 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Cover 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Site 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Site 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Site 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Access 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Access 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Access 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar BTS 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar BTS 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar BTS 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Power 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Power 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Power 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar RF 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar RF 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar RF 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar CIVIL 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Layout 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Layout 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Layout 3136 4/8/2024 Cellcom Ahmad Almomani Rahul kumar Tower Loa 2621 4/8/2024 Smart MOMEN Lakshay Cover 2621 4/8/2024 Smart MOMEN Lakshay Site 2621 4/8/2024 Smart MOMEN Lakshay Site 2621 4/8/2024 Smart MOMEN Lakshay Site 2621 4/8/2024 Smart MOMEN Lakshay Site 2621 4/8/2024 Smart MOMEN Lakshay Access 2621 4/8/2024 Smart MOMEN Lakshay Access 2621 4/8/2024 Smart MOMEN Lakshay Access 2621 4/8/2024 Smart MOMEN Lakshay BTS 2621 4/8/2024 Smart MOMEN Lakshay BTS 2621 4/8/2024 Smart MOMEN Lakshay BTS 2621 4/8/2024 Smart MOMEN Lakshay Power 2621 4/8/2024 Smart MOMEN Lakshay Power 2621 4/8/2024 Smart MOMEN Lakshay Power 2621 4/8/2024 Smart MOMEN Lakshay Power 2621 4/8/2024 Smart MOMEN Lakshay Planned S 2621 4/8/2024 Smart MOMEN Lakshay RF 2621 4/8/2024 Smart MOMEN Lakshay Civil 2621 4/8/2024 Smart MOMEN Lakshay RF 2621 4/8/2024 Smart MOMEN Lakshay Layout 2621 4/8/2024 Smart MOMEN Lakshay Layout 2621 4/8/2024 Smart MOMEN Lakshay HW & Tran 2621 4/8/2024 Smart MOMEN Lakshay HW & Tran 2621 4/8/2024 Smart MOMEN Lakshay Site Prepa 2621 4/8/2024 Smart MOMEN Lakshay Site Prepa 2603 8-Apr SMART MOMEN Harvinder Rana Cover 2603 8-Apr SMART MOMEN Harvinder Rana Cover 2603 8-Apr SMART MOMEN Harvinder Rana Site 2603 8-Apr SMART MOMEN Harvinder Rana Site 2603 8-Apr SMART MOMEN Harvinder Rana Site 2603 8-Apr SMART MOMEN Harvinder Rana Site 2603 8-Apr SMART MOMEN Harvinder Rana Site 2603 8-Apr SMART MOMEN Harvinder Rana Access 2603 8-Apr SMART MOMEN Harvinder Rana Access 2603 8-Apr SMART MOMEN Harvinder Rana Access 2603 8-Apr SMART MOMEN Harvinder Rana Access 2603 8-Apr SMART MOMEN Harvinder Rana BTS 2603 8-Apr SMART MOMEN Harvinder Rana BTS 2603 8-Apr SMART MOMEN Harvinder Rana BTS 2603 8-Apr SMART MOMEN Harvinder Rana BTS 2603 8-Apr SMART MOMEN Harvinder Rana BTS 2603 8-Apr SMART MOMEN Harvinder Rana Power 2603 8-Apr SMART MOMEN Harvinder Rana Power 2603 8-Apr SMART MOMEN Harvinder Rana Power 2603 8-Apr SMART MOMEN Harvinder Rana Power 2603 8-Apr SMART MOMEN Harvinder Rana Power 2603 8-Apr SMART MOMEN Harvinder Rana RF 2603 8-Apr SMART MOMEN Harvinder Rana RF 2603 8-Apr SMART MOMEN Harvinder Rana RF 2603 8-Apr SMART MOMEN Harvinder Rana RF 2603 8-Apr SMART MOMEN Harvinder Rana Planned Site 2603 8-Apr SMART MOMEN Harvinder Rana Civil 2603 8-Apr SMART MOMEN Harvinder Rana Civil 2603 8-Apr SMART MOMEN Harvinder Rana Civil Requir 2603 8-Apr SMART MOMEN Harvinder Rana Layout 2603 8-Apr SMART MOMEN Harvinder Rana Layout 2603 8-Apr SMART MOMEN Harvinder Rana Layout 2603 8-Apr SMART MOMEN Harvinder Rana Site Preparat 2603 8-Apr SMART MOMEN Harvinder Rana Site Preparat 2603 8-Apr SMART MOMEN Harvinder Rana HW & Transmi 2603 8-Apr SMART MOMEN Harvinder Rana HW & Transmi 2603 8-Apr SMART MOMEN Harvinder Rana Tower load GSD Comments Approve Record, Operator and share type details are missing Address details wrong fill as per NPO Data BTS Cabinet Type can not verify the details due to BTS snap missing Equipment Room Size details not matching with Layout Building Stairs diaminssion detila not fill in snap Key Obtaining details Required Manaseer group contact person details missing Huawei // RBS cabinet Leabling snap Required Sector wise details can not verify due to details Not Avaibale in NPO data Proposed RRH Height details not matching with Layout Number of CBs Not Used details missing DCDU Fuse Need to recheck Load capacity details are not visible in snap antenna base from roof top level Height details need to Recheck Sector -A Mech Tilt details not matching with snap Sector -B Mech Tilt details not matching with snap picutres of full site details from all angles in summar snap and details missing Pent House Height details wrong fill Proposed Antenna Height need to Recheck GPS Loaction Height wrong mention as per Nokia Guideline Proposed RRH Model no and Port type details Required Approve Record and Operator details are not filled correctly. Need to fill in the proper site address Need to recheck grounding bar information Need to mention penthouse height with building height. Whether site shared other operator information is not mentioned. Key obtaining detail is not mentioned. Available access time information not marked. Contact person detail is not mentioned. Existing RRU height is not mentioned. New RRH height not mentioned. Need to recheck proposed RRH location we can't install behind the RF antenna Cable size & Power cable routing information is not mentioned. Need to provide the AC&DC AMPS with the help of the multimeter. Battery information is not filled properly & Mentioned FPFH information is not match with power sheet. Need to recheck the filled-in number of CBs free and number of CBs used in LLVD and BLVD. Need to recheck grounding bar is required near antenna or not. The Tilt (mech.) is not visible in the provided pictures. pictures of full site details from all angles in summary are missing. Need to provide more close pictures of Tilt (mech.) to verify. Need to show the parapet wall in the layout. Need to show the GPS location in the layout. Need to mark the proposed port for the transmission in pictures. Need to fill in the all existing HW info. Need to mention the transmission info, grounding and lighting info. Need to mention LC-LC cable information required. Approve Record and Operator date are missing Need to recheck Swap type Need to recheck grounding bar information Need to correct Site Location (height) and correct Tower information mast there are only one mast in elevation Need to correct Equipment Room Size Need to attach different or visible angle Outdoor Grounding Bar leave tower body picture Need to mention free and use Feeder Window correctly. Contact Person for Accessing /Tel is not found need to mention all details Need to attch lift picture and mark dimension Need to tick and recheck given details in Existing RRU installation location Attached all given picture has not lat long Need to recheck ACOC Outdoor Cabinet with AMIA and BB cards (ASIB, ABIO & ABIA) Need to correct New RRU/RRH installation location height and number of BTS sector. Need to mention or attach Feeder Lightning-Proof Grounding Clip Proposed all sectors 3,4 details proposed on same leg D in elevation need to correct them Need to recheck proposed/reused RRH location we can't install behind the RF antenna Site power Scenario is not found in given power sheet Need to mention battery brand name as well Need to mention all battery capacity Battery 2,3,4 Capcity(AH) Need to recheck and correct Number of Standy Modules and Number of Active Module Used and available CBs in BLVD LLVD is not filled correctly and mark all reuse CBs Need to recheck and correct all antenna base from roof top level Need to recheck all New Jumper Length for 3G RRU (from 3G RRU to Antenna Location) Need to recheck and fill all Tilt (Elec.) The Tilt (mech.) is not visible in the provided pictures. Need to correct need Expantion concret install new Nokia Cabinet (ACOC) its indoor side Existing Equipment on site is not matching with RRU Type update sheet need to recheck all leg no in Proposed Solution Need to correct Dp if Needed because in BTS tab only 3 new DP require need to correct information Need to correct SA 2g antenna to SB 2g antenna on mast 9m in existing elevation Need to mention leg abcd for proposed sec in elevation and there are two proposed 10 port antenna and RRH on same sec need to correct them in elevation view Need to mention parapet wall Need to recheck Equipments Transportation because in front tabs mentioned by lift Need to correct Civil work pole detail and correct AQQL by AQQY Need to mention and attach all required picture or details Need to mark the proposed port for the transmission in pictures. Need to provide RRU label picture Status (1st review) Severity GSD feedback Status (2nd review) Status (3rd review) Status (4rd review) Open Minor Open Major Open Major Open Major Open Major Open Major Open Major Open Major Open Major Open Major Open Major Open Major Open Major Open major Open major Open major Open major Open major Open major Open major Open major Open Minor Open Open Major Open Open Major Open Open Major Open Open Major Open Open Major Closed Open Major Closed Open Major Closed Open Minor Open Open Minor Open Open Minor Open Open Major Open Open Major Open Open Major Open Open Major Open Open Major Open Open Major Open Open Minor Open Open Major Open Open Major Open Open Major Open Open Minor Open Open Minor Open Open Minor Open Open Minor Open Open Minor Open Open Minor Close Open Major Open Open Major Close Open Minor Open Open Minor Open Open Minor Open Open Minor Open Open Minor Open Open Minor Open Open Minor Open Open Minor Open Open Minor Open Open Major Open Open Major Open Open Minor Open Open Major Open Open Minor Open Open Major Close Open Minor Open Open Major Open Open Major Open Open Major Open Open Minor Open Open Minor Open Open Major Open Open Major Close Open Major Open Open Major Open Open Major Open Open Major Open Open Major Open Open Major Close Open Major Open Open Minor Open Open Minor Open Open Major Close Final Status Date Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected Rejected
Inventory Management of Fast Moving Spares Parts of Veh Eqpt Plants A Practical Approach For Field Workshops Base Workshops of Border Roads Organisation Ijariie13344