List No MODEC Dwg No Rev No TITLE Box No CD No

G-001 W1440-G-A-0310 2 Damage Stability Calculation G-1 1


G-002 W1440-G-A-0401 1 Stability Booklet & Loading Manual (Final) G-2 1
G-003 W1440-G-D-0100 4 General Arrangement G-1 1
G-004 W1440-G-D-0110 1 Hydrostatic Table (Modified) G-1 1
G-005 W1440-G-D-0120 1 Cross Curve Table (Modified) G-1 1
G-006 W1440-G-D-0200 1 Tank Capacity Plan (Modified) G-1 1
G-007 W1440-G-D-0210 1 Tank Calibration - Cargo Oil Tank (Modified Part) G-1 1
G-008 W1440-G-D-0220 1 Tank Calibration - Ballast Tank (Modified Part) G-1 1
G-009 W1440-G-D-0230 1 Tank Calibration - For Air Purge (Modified Part) G-1 1
G-049 W1440-G-D-0240 0 Tank Sounding Table for Machinery Space Small Tanks G-1 1
G-010 W1440-G-D-0500 1 Navigation Bridge Visibility G-1 1
G-011 W1440-G-L-0010 4 List of Document (As-Built) G-1 1
G-012 W1440-G-L-0100 2 2 Year Spare Parts List For New Equipment G-1 1
G-013 W1440-G-L-0500 3 Vendor List G-1 1
G-014 W1440-G-L-2001 1 Copy of Certificate G-3 1
G-015 W1440-G-L-6010 4 Equipment Tag Number List G-1 1
G-050 W1440-G-L-6040 1 Lifting Gear Register G-1 1
G-051 W1440-G-L-6050 1 Pressure Vessel Register G-1 1
G-052 W1440-G-L-6060 1 PSV Register G-1 1
G-016 W1440-G-P-8000 1 Operation Manual (IMO MODU code) G-1 1
G-017 W1440-G-R-0800 0 Record of Deadweight Survey G-1 1
G-018 W1440-G-R-5101 3 HAZID Report G-1 1
G-019 W1440-G-R-5103 1 HAZID Report (Turret Systems) G-1 1
G-020 W1440-G-R-5105 5 HAZID Close Out Report G-4 1
G-021 W1440-G-R-5131 2 HAZOP Report G-4 1
G-022 W1440-G-R-5133 2 HAZOP Report (Turret Systems) G-4 1
G-023 W1440-G-R-5134 2 HAZOP Report (Water Injection) G-4 1
G-024 W1440-G-R-5135 6 HAZOP Close Out Report G-4 1
G-025 W1440-G-R-5137 1 Design Review Report (Process) G-4 1
G-026 W1440-G-R-5138 2 HAZOP Report (Topside Process) G-4 1
G-027 W1440-G-R-5139 2 HAZOP Report (Topside Utilities) G-4 1
G-028 W1440-G-R-5140 3 Design Review Close Out Report G-4 1
G-029 W1440-G-R-5141 1 HAZOP Report (Chemical Injection) G-4 1
G-053 W1440-G-R-5200 2 FSA Action Item Close Out Report G-4 1
G-030 W1440-G-R-5202 4 Fire and Explosion Analysis G-4 1
G-031 W1440-G-R-5203 2 Temporary Refuge Assessment G-4 1
G-032 W1440-G-R-5204 1 Marine and External Accidents Study G-4 1
G-033 W1440-G-R-5205 3 Escape, Evacuation and Rescue Analysis G-4 1
G-034 W1440-G-R-5206 5 Emergency Systems Survivability Analysis G-4 1
G-035 W1440-G-R-5207 2 Dropped Objects Study G-4 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 1 of 14 G - General Part


List No MODEC Dwg No Rev No TITLE Box No CD No
G-036 W1440-G-R-5208 3 Transport Study G-4 1
G-037 W1440-G-R-5210 2 Quantitative Risk Assessment G-4 1
G-038 W1440-G-R-5220 2 ALARP Summary Report G-4 1
G-039 W1440-G-R-5230 1 SIL Review G-4 1
G-040 W1440-G-R-5900 1 MV Generator Exhaust Study Technical Note G-4 1
G-041 W1440-G-R-5901 2 Inert Gas Dispersion Assessment G-4 1
G-042 W1440-G-R-5902 1 Flare Gas Dispersion Assessment Technical Note G-4 1
G-043 W1440-G-R-9110 1 Asbestos Material Assessment for "M/T AIRWAY" G-4 1
G-044 W1440-G-S-5000 2 Safety Philosophy G-4 1
G-045 W1440-G-S-5100-1 3 Safety Case - Chapter 1 - Overview, Objectives & Conclusion G-4 1
G-046 W1440-G-S-5100-2 9 Safety Case - Chapter 2 - Facility Description G-4 1
G-047 W1440-G-S-5100-3 6 Safety Case - Chapter 3 - Safety Management System Description G-4 1
G-048 W1440-G-S-5100-4 4 Safety Case - Chapter 4 - Hazard Identification & Assessment G-4 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 2 of 14 G - General Part


List No MODEC Dwg No Rev No TITLE Box No CD No
H-001 W1440-H-D-3100 1 Construction Portfolio H-1 1
H-002 W1440-H-D-5015 5 Structure Drawing - Hull Modification for Internal Turret Installation H-1 1
H-003 W1440-H-D-5016 6 SAS Foundation H-1 1
H-004 W1440-H-D-5020 3 Structure Drawing - Helicopter Deck H-1 1
H-005 W1440-H-D-5030 5 Structure Drawing - Flare Tower H-1 1
H-006 W1440-H-D-5045 6 Structure Drawing - Foundation Stools for Topside H-1 1
H-007 W1440-H-D-5046 1 Structure Drawing - Underdeck Reinforcement For Topside H-1 1
H-008 W1440-H-D-5055 5 Structure Drawing - Deck Crane Pedestal & Boom Rest (Fore) H-1 1
H-009 W1440-H-D-5056 5 Structure Drawing - Deck Crane Pedestal & Boom Rest (Aft) H-1 1
H-010 W1440-H-D-5060 4 Structure Drawing - Pipe Rack & Passageway (Fore Part) H-1 1
H-011 W1440-H-D-5061 2 Structure Drawing - Pipe Rack & Passageway (Mid Part) H-1 1
H-012 W1440-H-D-5062 1 Guidance Drawing - Pipe Rack & Passageway (Aft Part) H-1 1
H-013 W1440-H-D-5110 6 Structure Drawing - MV Generator Building H-1 1
H-014 W1440-H-D-5120 5 Structure Drawing - Switchboard Building H-1 1
H-015 W1440-H-D-5130 3 Structure Drawing - ESP & MPP Module H-1 1
H-016 W1440-H-D-5150 6 Structure Drawing - Caisson Support & Stage for Seawater Lift Pump H-1 1
H-017 W1440-H-D-5160 2 Structure Drawing - Break Water & Stand-By Deluge Pump Room H-1 1
H-018 W1440-H-D-5170 2 Structure Drawing - Lay Down Decks H-1 1
H-019 W1440-H-D-5175 3 Structure Drawing - Chemical Storage & Well Service Container Deck H-1 1
H-020 W1440-H-D-6010 4 Foundation - Quick Release Hook & Mooring Chock for Tandem Mooring H-1 1
H-021 W1440-H-D-6020 1 Reinforcement for Quick Release Hook for Spider Buoy Retrieval H-1 1
H-022 W1440-H-P-4210 1 Life Extension Plan for Hull Structure H-1 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 3 of 14 H - Hull Part


List No MODEC Dwg No Rev No TITLE Box No CD No
F-001 W1440-F-D-0013 5 Arrangement of Chemical Tanks F-1 1
F-002 W1440-F-D-1000 5 Outfitting Arrangement (Upper Deck) F-1 1
F-003 W1440-F-D-1001 2 Outfitting Arrangement Around Deck House F-1 1
F-004 W1440-F-D-1010 3 Helicopter Deck Arrangement F-1 1
F-005 W1440-F-D-1100 12 Arrangement of Access Fitting F-1 1
F-006 W1440-F-D-1102 2 Arrangement of Access Fitting (Flare Tower) F-1 1
F-007 W1440-F-D-1200 2 Arrangement of Offloading Hose Handling F-1 1
F-008 W1440-F-D-1210 1 Arrangement of Quick Release Hook F-1 1
F-009 W1440-F-D-1211 1 Arrangement of Hawser Handling F-1 1
F-010 W1440-F-D-1230 4 Arrangement of Laydown Area F-1 1
F-011 W1440-F-D-1231 2 Arrangement of S. Water Lift Pump Handling F-1 1
F-012 W1440-F-D-1240 3 Arrangement of Rail Cart System F-1 1
F-013 W1440-F-D-1310 2 Arrangement of Work / Rescue Boat & Davit F-1 1
F-014 W1440-F-D-1320 2 Arrangement of Manhole (for Modification) F-1 1
F-015 W1440-F-D-1335 2 Coamings for Sea Chest Blanks F-1 1
F-016 W1440-F-D-2000 4 Safety and Fire Control Plan F-1 1
F-017 W1440-F-D-2010 2 Arrangement of TR F-1 1
F-018 W1440-F-D-2031 4 Arrangement of Safety Shower and Eye Wash F-1 1
F-019 W1440-F-D-2040 1 Arrangement of CO2 Fire Fighting System F-1 1
F-020 W1440-F-D-2100 1 Arrangement of Personnel Rescue (C. Pump Room) F-1 1
F-021 W1440-F-D-3010 4 Paint Schedule F-1 1
F-022 W1440-F-D-3011 2 Paint Color Scheme F-1 1
F-023 W1440-F-D-3020 4 Hull Marking Plan - Ships Name & Por of Registry F-1 1
F-024 W1440-F-D-3021 2 Hull Marking Plan - Company Logo, Funnel Marking F-1 1
F-025 W1440-F-D-3022 1 Hull Marking Plan - Under Water F-1 1
F-026 W1440-F-D-3023 2 Helideck Marking F-1 1
F-027 W1440-F-D-3024 1 Ships Nameboard F-1 1
F-028 W1440-F-D-3025 2 Arrangement of Safety Sign F-1 1
F-029 W1440-F-D-3030 3 Arrangement of Non-Slip Paint F-1 1
F-030 W1440-F-D-4010 6 Accommodation Arrangement F-1 1
F-031 W1440-F-D-4011 1 Arrangement of Gymnasium / Heli. Muster Room F-1 1
F-032 W1440-F-D-4020 1 Laboratory Arrangement F-1 1
F-033 W1440-F-D-4060 1 Key List F-1 1
F-034 W1440-F-D-4110 3 Arrangement of Structural Fire Protection (Modification) F-1 1
F-035 W1440-F-D-4120 2 Insulation & Joiner Work Schedule (Modification & New Construction) F-1 1
F-036 W1440-F-D-4130 2 Insulation & Joiner Work Schedule (Modification & New Construction) F-1 1
F-037 W1440-F-D-4131 1 Deck Covering Schedule (for Modification & New Construction) F-1 1
F-038 W1440-F-D-4132 1 Joiner Door Schedule (for Modification & New Construction) F-1 1
F-039 W1440-F-D-4140 3 Duct Diagram, Vent Head & Vent Cover (Modification & New Construction) F-1 1
F-040 W1440-F-D-4150 1 Arrangement of Fans, Dampers & Closing Devices F-1 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 4 of 14 F - Hull Outfitting Part


List No MODEC Dwg No Rev No TITLE Box No CD No
F-041 W1440-F-D-4220 1 Arrangement of Room Name Plate F-1 1
F-042 W1440-F-D-5000 3 Hull Inventory List F-1 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 5 of 14 F - Hull Outfitting Part


List No MODEC Dwg No Rev No TITLE Box No CD No
M-001 W1440-M-D-1110 3 Machinary Layout - MV Generator Room M-1 1
M-002 W1440-M-D-1120 2 Machinary Layout - Standby Deluge Pump Room M-1 1
M-003 W1440-M-D-1130 2 Machinery Layout - Sea Water Lift Pumps M-1 1
M-004 W1440-M-D-1140 1 Machinery Layout - Barrier Fluid System (BFS) Room M-1 1
M-005 W1440-M-D-1200 1 Machinery Layout - Engine Room - Modified Part M-1 1
M-006 W1440-M-D-2050 1 Scheme of Piping - Treated Crude Fuel Transfer System M-1 1
M-007 W1440-M-D-2100 6 Piping Diagram - Existing Engine Room - Modified Part M-1 1
M-008 W1440-M-D-2200 4 Piping Diagram - MV Gen. Room (Composite) M-1 1
M-009 W1440-M-D-2410 7 Piping Diagram - Utility - Fire, Foam & Deluge System M-1 1
M-010 W1440-M-D-2440 6 Piping Diagram - Utility - Cooling SW System M-1 1
M-011 W1440-M-D-2460 3 Piping Diagram - Utility - Steam & Condensate System M-1 1
M-012 W1440-M-D-2470 7 Piping Diagram - Utility - Compressed Air System M-1 1
M-013 W1440-M-D-2475 3 Piping Diagram - Instrument Pipes M-1 1
M-014 W1440-M-D-2500 5 Piping Diagram - Accommodation Piping System M-1 1
M-015 W1440-M-D-2810 6 Piping Diagram - Cargo Oil System M-1 1
M-016 W1440-M-D-2820 2 Piping Diagram - Ballast System M-1 1
M-017 W1440-M-D-2830 2 Piping Diagram - Crude Oil Washing (COW) System M-1 1
M-018 W1440-M-D-2840 8 Piping Diagram - Open & Closed Drain System M-1 1
M-019 W1440-M-D-2850 6 Piping Diagram - Tank Vent & Inert Gas System M-1 1
M-020 W1440-M-D-2860 1 Piping Diagram - Air Escape & Sounding System M-1 1
M-021 W1440-M-D-2870 6 Piping Diagram - Bilge, F.O. & FW System M-1 1
M-022 W1440-M-D-2880 4 Piping Diagram - Deck Machinery Hydraulic Oil System M-1 1
M-023 W1440-M-D-2890 3 Piping Diagram - Valve Remote Control Hydraulic Oil System M-1 1
M-024 W1440-M-D-2900 4 Piping Diagram - Deck Scupper Pipes M-1 1
M-025 W1440-M-D-2910 3 Piping Diagram - Cargo Tank Monitoring System M-1 1
M-026 W1440-M-D-2920 3 Piping Diagram - Bearing, Subsea & Swivel System M-2 1
M-027 W1440-M-D-2930 1 Piping Diagram - Freon Pipe for Air Conditioning System M-2 1
M-028 W1440-M-D-2940 1 Piping Diagram - Oil Content Monitoring System M-2 1
M-029 W1440-M-L-0110 1 Facility Equipment List - Marine Machinery System M-2 1
M-030 W1440-M-L-0610 2 Lubrication Oil Table M-2 1
M-031 W1440-M-L-9001 2 Automation & Instrumentation Table M-2 1
M-032 W1440-M-P-3910 1 Crude Oil Washing Operations and Equipment Manual (Cow Manual) M-2 1
M-033 W1440-M-P-3920 1 Oil Discharge Monitoring and Control System Operations Manual M-2 1
M-034 W1440-M-P-3930 1 Inert Gas and Vent System Manual M-2 1
M-035 W1440-M-V-8851 1 Deck Crane (Former Hose Handling Crane) M-2 1
M-036 W1440-M-V-8861 1 Elevator (Existing) M-2 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 6 of 14 M - Machinery Part


List No MODEC Dwg No Rev No TITLE Box No CD No
E-001 W1440-E-A-0100 1 Electrical Power Consumption Table E-1 1
E-002 W1440-E-D-0004 8 FPSO ESD and Fire & Gas System - Cause and Effect E-1 1
E-003 W1440-E-D-0010 2 Electrical Single Line Diagram E-1 1
E-029 W1440-E-D-0030 6 Overall Schematic Diagram for Onshore-Offshore Communication Link and WAN & LAN E-1 1
E-004 W1440-E-D-0100 9 One Line Diagram - Electric Power System E-1 1
E-005 W1440-E-D-0200 5 One Line Diagram - Lighting System E-1 1
E-006 W1440-E-D-0300 6 One Line Diagram - Interior Communication & Telecommunication System E-1 1
E-007 W1440-E-D-0400 9 One Line Diagram - Safety System E-1 1
E-008 W1440-E-D-0500 10 One Line Diagram - Control and Instrument System E-1 1
E-009 W1440-E-D-1100 1 Arrangement of Electrical Equipment - Engine Room (Converted Space) E-1 1
E-010 W1440-E-D-1210 7 Arrangement of Electrical Equipment - Central Control Room E-1 1
E-011 W1440-E-D-1230 2 Arrangement of Radio Antennas E-1 1
E-012 W1440-E-D-1310 1 Arrangement of Electrical Equipment - Boatsn Store E-1 1
E-013 W1440-E-D-1311 1 Arrangement of Electrical Equipment - BFS Room E-1 1
E-014 W1440-E-D-1312 2 Arrangement of Electrical Equipment - Stand By Deluge Pump Room E-1 1
E-015 W1440-E-D-1340 7 Arrangement of Electrical Equipment - Switchboard Room E-1 1
E-016 W1440-E-D-1800 2 Arrangement of Electrical Equipment - PA/GA and Fire/Gas Detector E-1 1
E-017 W1440-E-D-1900 2 Hazardous Area Arrangement E-1 1
E-018 W1440-E-D-2100 2 Connection Diagram - Electrical Power System E-1 1
E-019 W1440-E-D-2300 2 Connection Diagram - Interior Communication and Telecommunication System E-1 1
E-020 W1440-E-D-2400 4 Connection Diagram - Safety System E-1 1
E-021 W1440-E-D-2500 3 Connection Diagram - Control and Instrument System E-1 1
E-022 W1440-E-L-0500 5 FPSO ESD & DCS I/O List E-2 1
E-023 W1440-E-L-0900 1 List of Electrical Equipment in Hazardous Area E-2 1
E-024 W1440-E-L-0901 1 List of Electrical Equipment in Hazardous Area (Shipsides) E-2 1
E-025 W1440-E-L-0902 0 List of Electrical Equipment in Hazardous Area (Process Equipment) E-2 1
E-026 W1440-E-L-0903 1 List of Electrical Equipment in Hazardous Area (Water Injection System) E-2 1
E-027 W1440-E-L-0904 0 List of Electrical Equipment in Hazardous Area (Turret Area) E-3 1
E-028 W1440-E-L-0905 0 List of Electrical Equipment in Hazardous Area (Subsea Equipment) E-3 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 7 of 14 E - Electric and Instrument Part


List No MODEC Dwg No Rev No TITLE Box No CD No
P-001 W1440-P1-D-1300 2 Process System - P&ID - Process Drawing Index P-1 1
P-002 W1440-P1-D-1310 2 Process System - P&ID - Piping Symbols & Line Designation P-1 1
P-003 W1440-P1-D-1315 2 Process System - P&ID - Equipment Symbols P-1 1
P-004 W1440-P1-D-1320 2 Process System - P&ID - Instrumentation Symbols P-1 1
P-005 W1440-P1-D-1325 2 Process System - P&ID - Standard Instrument Details P-1 1
P-006 W1440-P1-D-1326 2 Process System - P&ID - Standard Piping Details P-1 1
P-007 W1440-P1-D-1327 1 Process System - P&ID - Standard Level Instrument Details P-1 1
P-008 W1440-P1-D-1330 3 Process System - P&ID - Inlet Metering & Manifolds - Mutineer P-1 1
P-009 W1440-P1-D-1335 3 Process System - P&ID - Inlet Metering & Manifolds - Exeter P-1 1
P-010 W1440-P1-D-1337 2 Process System - P&ID - Inlet Metering & Manifolds - Spare P-1 1
P-011 W1440-P1-D-1340 3 Process System - P&ID - First Stage Separator P-1 1
P-012 W1440-P1-D-1345 3 Process System - P&ID - Start Up Heaters P-1 1
P-013 W1440-P1-D-1350 3 Process System - P&ID - Second Stage Separator P-1 1
P-014 W1440-P1-D-1355 3 Process System - P&ID - Oil Transfer Pumps P-1 1
P-015 W1440-P1-D-1360 3 Process System - P&ID - Electrostatic Coalescer P-1 1
P-016 W1440-P1-D-1365 3 Process System - P&ID - Crude Rundown Cooler P-1 1
P-017 W1440-P1-D-1366 3 Process System - P&ID - Produced Water Transfer Pumps P-1 1
P-018 W1440-P1-D-1370 3 Process System - P&ID - Produced Water Collection P-1 1
P-019 W1440-P1-D-1375 3 Process System - P&ID - Hydrocyclone Feed Pumps P-1 1
P-020 W1440-P1-D-1380 3 Process System - P&ID - Produced Water Hydrocyclones P-1 1
P-021 W1440-P1-D-1385 3 Process System - P&ID - Produced Water Degasser P-1 1
P-022 W1440-P1-D-1386 3 Process System - P&ID - Recovered Oil Pumps P-1 1
P-023 W1440-P1-D-1390 3 Process System - P&ID - Produced Water Discharge Pumps P-1 1
P-024 W1440-P1-D-1395 3 Process System - P&ID - Produced Water Discharge Cooler P-1 1
P-025 W1440-P1-D-1400 2 Process System - P&ID - Produced Water Discharge P-1 1
P-026 W1440-P1-D-1610 0 Process System - Line List P-1 1
P-027 W1440-P1-D-1700 4 Process System - P&ID - Firewater System P-1 1
P-207 W1440-P1-D-1705 0 Process System - P&ID - Deluge valve Assembly / Control Panel Typical P-1 1
P-028 W1440-P1-D-1710 2 Process System - P&ID - Seawater Distribution Supply & Return P-1 1
P-029 W1440-P1-D-1715 3 Process System - P&ID - Fresh Water Distribution P-1 1
P-030 W1440-P1-D-1720 2 Process System - P&ID - LP Steam Distribution and Condensate Return P-1 1
P-031 W1440-P1-D-1721 3 Process System - P&ID - LP Steam Supply & Steam Condensate Return P-1 1
P-032 W1440-P1-D-1725 3 Process System - P&ID - Crude Fuel Oil Treatment Package P-1 1
P-197 W1440-P1-D-1726 0 Process System - P&ID - Crude Fuel Oil Treatment Package - Train U-0402 Sheet 1 of 4 P-1 1
P-198 W1440-P1-D-1727 0 Process System - P&ID - Crude Fuel Oil Treatment Package - Train U-0402 Sheet 2 of 4 P-1 1
P-199 W1440-P1-D-1728 0 Process System - P&ID - Crude Fuel Oil Treatment Package - Train U-0402 Sheet 3 of 4 P-1 1
P-200 W1440-P1-D-1729 0 Process System - P&ID - Crude Fuel Oil Treatment Package - Train U-0402/0422 Sheet 4 of 4 P-1 1
P-033 W1440-P1-D-1731 2 Process System - P&ID - Compressed Air Supply P-1 1
P-201 W1440-P1-D-1732 0 Process System - P&ID - Crude Fuel Oil Treatment Package - Train U-0422 Sheet 1 of 3 P-1 1
P-202 W1440-P1-D-1733 0 Process System - P&ID - Crude Fuel Oil Treatment Package - Train U-0422 Sheet 2 of 3 P-1 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 8 of 14 P - Process Part


List No MODEC Dwg No Rev No TITLE Box No CD No
P-203 W1440-P1-D-1734 0 Process System - P&ID - Crude Fuel Oil Treatment Package - Train U-0422 Sheet 3 of 3 P-1 1
P-034 W1440-P1-D-1735 3 Process System - P&ID - Nitrogen Generation Package P-1 1
P-035 W1440-P1-D-1740 2 Process System - P&ID - Nitrogen Distribution P-1 1
P-036 W1440-P1-D-1745 2 Process System - P&ID Chemical Injection - Topsides Corrosion Inhibitor Storage and Pump P-1 1
P-037 W1440-P1-D-1746 2 Process System - P&ID Chemical Injection - Subsea Chemical Storage and Pump P-1 1
P-038 W1440-P1-D-1747 2 Process System - P&ID Chemical Injection - Topsides Scale Inhibitor Storage and Pump P-1 1
P-039 W1440-P1-D-1748 2 Process System - P&ID Chemical Injection - Downhole Scale Inhibitor Storage and Pumps P-1 1
P-040 W1440-P1-D-1749 2 Process System - P&ID Chemical Injection - Biocide Storage and Pump P-1 1
P-041 W1440-P1-D-1750 2 Process System - P&ID Chemical Injection - FEB Storage and Pump P-1 1
P-042 W1440-P1-D-1751 2 Process System - P&ID Chemical Injection - REB Storage and Pump P-1 1
P-043 W1440-P1-D-1752 2 Process System - P&ID Chemical Injection - Antifoam Storage and Pump P-1 1
P-044 W1440-P1-D-1755 3 Process System - P&ID - Instrument Air Distribution P-1 1
P-045 W1440-P1-D-1765 3 Process System - P&ID - Closed Drains Collection Sheet 1 of 2 P-1 1
P-046 W1440-P1-D-1770 3 Process System - P&ID - Closed Drains Collection Sheet 2 of 2 P-1 1
P-047 W1440-P1-D-1771 4 Process System - P&ID - Closed Drains Sump P-1 1
P-048 W1440-P1-D-1775 3 Process System - P&ID - Flare KO Drum P-1 1
P-049 W1440-P1-D-1780 2 Process System - P&ID - Flare Vent & Relief Collection Header P-1 1
P-050 W1440-P1-D-1790 3 Process System - P&ID - Flare KO Drum Pumps & Slops Coolers P-1 1
P-051 W1440-P1-D-1795 6 Process System - P&ID - Flare & Ignition Package P-1 1
P-052 W1440-P1-D-1800 2 Process System - P&ID - Hazardous Open Drains Collection P-1 1
P-053 W1440-P1-D-1805 3 Process System - P&ID - Hazardous Open Drains Drum P-1 1
P-204 W1440-P1-D-1900 1 Process System - P&ID - Well Service Lines P-1 1
P-054 W1440-P1-D-7400 0 Process System - Shutdown Cause and Effect Matrix P-1 1
P-055 W1440-P1-D-8090 0 Water Injection System - Process Flow Diagram P-1 1
P-056 W1440-P1-D-8095 0 Water Injection System - Process Flow Diagram - Chemical Injection System P-1 1
P-057 W1440-P1-D-8100 3 Water Injection System - P&ID Piping Symbols P-1 1
P-058 W1440-P1-D-8110 6 Water Injection System - P&ID Seawater Coarse Filters P-1 1
P-059 W1440-P1-D-8120 6 Water Injection System - P&ID Seawater Fine Filters (1/3) P-1 1
P-060 W1440-P1-D-8125 6 Water Injection System - P&ID Seawater Fine Filters (2/3) P-1 1
P-061 W1440-P1-D-8126 6 Water Injection System - P&ID Seawater Fine Filters (3/3) P-1 1
P-062 W1440-P1-D-8130 6 Water Injection System - P&ID Injection Water Deoxygenation System (1/2) P-1 1
P-063 W1440-P1-D-8135 6 Water Injection System - P&ID Injection Water Deoxygenation System (2/2) P-1 1
P-064 W1440-P1-D-8140 7 Water Injection System - P&ID Water Injection Pumps (1/2) P-1 1
P-065 W1440-P1-D-8145 7 Water Injection System - P&ID Water Injection Pumps (2/2) P-1 1
P-066 W1440-P1-D-8150 6 Water Injection System - P&ID Water Injection Pumps Utilities (1/2) P-1 1
P-067 W1440-P1-D-8155 6 Water Injection System - P&ID Water Injection Pumps Utilities (2/2) P-1 1
P-068 W1440-P1-D-8160 3 Water Injection System - P&ID Chemical Injection System P-1 1
P-069 W1440-P1-D-8180 4 Water Injection System - P&ID Utility (IA, PA) & Overboard / Drain Distribution P-1 1
P-070 W1440-P1-D-8190 3 Water Injection System - Piping Tie-in Schematic P-1 1
P-071 W1440-P1-L-1000 0 Process System - Equipment List P-1 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 9 of 14 P - Process Part


List No MODEC Dwg No Rev No TITLE Box No CD No
P-205 W1440-P1-S-2100 2 Process System - Piping Specification P-1 1
P-072 W1440-P1-S-8050 2 Water Injection System - Control Description P-1 1
P-073 W1440-P1-S-8160 1 Water Injection System - Piping Tie-In Schedule P-1 1
P-074 W1440-P1-S-8210 2 Water Injection System - Painting Specification P-1 1
P-075 W1440-P2-S-8210 1 Water Injection System - Individual Specification for Injection Water Treatment Package P-1 1
P-076 W1440-P2-S-8230 1 Water Injection System - Individual Specification for Water Injection Pump Package P-1 1
P-077 W1440-P2-S-8240 1 Water Injection System - Individual Specification for Chemical Injection Package P-1 1
P-078 W1440-P3-D-0300 1 Process System - FPSO Production Facilities - Process Module A Plot Plan P-1 1
P-079 W1440-P3-D-0310 1 Process System - FPSO Production Facilities - Process Module B Plot Plan P-1 1
P-080 W1440-P3-D-0320 1 Process System - FPSO Production Facilities - Process Module C Plot Plan P-1 1
P-081 W1440-P3-D-7110 0 Process System - FPSO Production Facilities - Process Module A - Fire and Gas Layout P-1 1
P-082 W1440-P3-D-7115 0 Process System - FPSO Production Facilities - Process Module B - Fire and Gas Layout P-1 1
P-083 W1440-P3-D-7120 0 Process System - FPSO Production Facilities - Process Module C - Fire and Gas Layout P-1 1
P-084 W1440-P3-D-7200 0 Process System - FPSO Production Facilities - Process Module A - Escape Route & Safety Equipment Layout P-1 1
P-085 W1440-P3-D-7210 0 Process System - FPSO Production Facilities - Process Module B - Escape Route & Safety Equipment Layout P-1 1
P-086 W1440-P3-D-7220 0 Process System - FPSO Production Facilities - Process Module C - Escape Route & Safety Equipment Layout P-1 1
P-087 W1440-P3-D-8010 3 Water Injection System - Plot Plan P-1 1
P-088 W1440-P3-D-8011 3 Water Injection System - Plot Plan (Side View) P-1 1
P-089 W1440-P3-D-8020 2 Water Injection System - Equipment Layout for Water Injection Module P-1 1
P-090 W1440-P3-D-8030 2 Water Injection System - Equipment Layout for Water Treatment Module P-2 1
P-091 W1440-P4-D-2110 2 Process System - Module A - Plan at TOS EL +28900 Primary Steelwork Layout P-2 1
P-092 W1440-P4-D-2111 2 Process System - Module A - Plan at TOS EL +28900 Thru +36200 Secondary Steelwork Layout P-2 1
P-093 W1440-P4-D-2120 2 Process System - Module A - Framing Arrangement Sections & Elevations Sheet 1 P-2 1
P-094 W1440-P4-D-2121 2 Process System - Module A - Framing Arrangement Sections & Elevations Sheet 2 P-2 1
P-095 W1440-P4-D-2122 2 Process System - Module A - Framing Arrangement Sections & Elevations Sheet 3 P-2 1
P-096 W1440-P4-D-2123 2 Process System - Module A - Framing Arrangement Sections & Elevations Sheet 4 P-2 1
P-097 W1440-P4-D-2124 2 Process System - Module A - Framing Arrangement Sections & Elevations Sheet 5 P-2 1
P-098 W1440-P4-D-2125 2 Process System - Module A - Framing Arrangement Sections & Elevations Sheet 6 P-2 1
P-099 W1440-P4-D-2126 2 Process System - Module A - Framing Arrangement Sections & Elevations Sheet 7 P-2 1
P-100 W1440-P4-D-2127 2 Process System - Module A - Framing Arrangement Sections & Elevations Sheet 8 P-2 1
P-101 W1440-P4-D-2128 2 Process System - Module A - Framing Arrangement Sections & Elevations Sheet 9 P-2 1
P-102 W1440-P4-D-2130 NA Process System - Module A - Platform Framing Connection Details Sheet 1 NA NA
P-103 W1440-P4-D-2140 2 Process System - Module A - Pipe Rack Plan & Elevations P-2 1
P-104 W1440-P4-D-2141 0 Process System - Module A - Port Side Pipe Rack Plan & Elevations P-2 1
P-105 W1440-P4-D-2142 0 Process System - Module A - Piperack and Walkway Layout P-2 1
P-106 W1440-P4-D-3110 2 Process System - Module B - Plan at TOS EL +28900 Primary Steelwork Layout P-2 1
P-107 W1440-P4-D-3111 1 Process System - Module B - Plan at TOS EL +28900/+34700 Secondary Steelwork Layout P-2 1
P-108 W1440-P4-D-3120 2 Process System - Module B - Framing Arrangement Sections and Elevations Sheet 1 P-2 1
P-109 W1440-P4-D-3121 2 Process System - Module B - Framing Arrangement Sections and Elevations Sheet 2 P-2 1
P-110 W1440-P4-D-3122 2 Process System - Module B - Framing Arrangement Sections and Elevations Sheet 3 P-2 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 10 of 14 P - Process Part


List No MODEC Dwg No Rev No TITLE Box No CD No
P-111 W1440-P4-D-3123 2 Process System - Module B - Framing Arrangement Sections and Elevations Sheet 4 P-2 1
P-112 W1440-P4-D-3124 2 Process System - Module B - Framing Arrangement Sections and Elevations Sheet 5 P-2 1
P-113 W1440-P4-D-3125 2 Process System - Module B - Framing Arrangement Sections and Elevations Sheet 6 P-2 1
P-114 W1440-P4-D-3126 2 Process System - Module B - Framing Arrangement Sections and Elevations Sheet 7 P-2 1
P-115 W1440-P4-D-3140 2 Process System - Module B - Piperack Plan and Elevations P-2 1
P-116 W1440-P4-D-3141 1 Process System - Module B - Bow / Stern Piperack and Walkway Plan and Elevations P-2 1
P-117 W1440-P4-D-4110 2 Process System - Module C - Plan at TOS EL +27900 Primary Steelwork Layout P-2 1
P-118 W1440-P4-D-4111 2 Process System - Module C - Plan at TOS EL +27900 Secondary Steelwork Layout P-2 1
P-119 W1440-P4-D-4120 2 Process System - Module C - Framing Arrangement Sections and Elevations Sheet 1 P-2 1
P-120 W1440-P4-D-4121 2 Process System - Module C - Framing Arrangement Sections and Elevations Sheet 2 P-2 1
P-121 W1440-P4-D-4140 0 Process System - Module C - Piperack Plan and Elevations P-2 1
P-122 W1440-P4-D-8040 1 Water Injection System - Module Location Plan on FPSO P-2 1
P-123 W1440-P4-D-8610 2 Water Injection System - Water Injection Module Framing Plan at EL+28900 P-2 1
P-124 W1440-P4-D-8620 2 Water Injection System - Water Injection Module Framing Elevation (Longitudinal Framing) P-2 1
P-125 W1440-P4-D-8630 2 Water Injection System - Water Injection Module Framing Elevation (Transverse Framing) 1/2 P-2 1
P-126 W1440-P4-D-8640 2 Water Injection System - Water Injection Module Framing Elevation (Transverse Framing) 2/2 P-2 1
P-127 W1440-P4-D-8641 2 Water Injection System - Water Injection Module Hoist Support Structure (Framing Plan and Elevation) P-2 1
P-128 W1440-P4-D-8650 4 Water Injection System - Water Injection Module Grating & Handrail Plan (T.O.G. EL+28925) P-2 1
P-129 W1440-P4-D-8651 3 Water Injection System - Water Injection Module ST1 Stair Details P-2 1
P-130 W1440-P4-D-8652 4 Water Injection System - Water Injection Module Handrail Details P-2 1
P-131 W1440-P4-D-8653 1 Water Injection System - Water Injection Module Pipe Support Frame (Framing Plan & Elevation) P-2 1
P-132 W1440-P4-D-8660 3 Water Injection System - Water Injection Module Framing Details Sheet 1 P-2 1
P-133 W1440-P4-D-8661 3 Water Injection System - Water Injection Module Framing Details Sheet 2 P-2 1
P-134 W1440-P4-D-8662 3 Water Injection System - Water Injection Module Framing Details Sheet 3 P-2 1
P-135 W1440-P4-D-8663 3 Water Injection System - Water Injection Module Framing Details Sheet 4 P-2 1
P-136 W1440-P4-D-8700 5 Water Injection System - Injection Water Treatment Module Framing Plan at EL+28900 P-2 1
P-137 W1440-P4-D-8720 4 Water Injection System - Injection Water Treatment Module Framing Elevation (Longitudinal Framing) P-2 1
P-138 W1440-P4-D-8730 3 Water Injection System - Injection Water Treatment Module Framing Elevation (Transverse Framing) 1/2 P-2 1
P-139 W1440-P4-D-8740 3 Water Injection System - Injection Water Treatment Module Framing Elevation (Transverse Framing) 2/2 P-2 1
P-140 W1440-P4-D-8770 4 Water Injection System - Injection Water Treatment Module Grating Handrail Plan (T.O.G. EL+28925) P-2 1
P-141 W1440-P4-D-8780 4 Water Injection System - Injection Water Treatment Module ST2 & ST3 Stair Details P-2 1
P-142 W1440-P4-D-8781 4 Water Injection System - Injection Water Treatment Module Platform Details P-2 1
P-143 W1440-P4-D-8782 4 Water Injection System - Injection Water Treatment Module Handrail & Ladder Details P-2 1
P-144 W1440-P4-D-8783 1 Water Injection System - Injection Water Treatment Module Pipe Support Frame Sheet 1 P-2 1
P-145 W1440-P4-D-8784 1 Water Injection System - Injection Water Treatment Module Pipe Support Frame Sheet 2 P-2 1
P-146 W1440-P4-D-8785 2 Water Injection System - Injection Water Treatment Module Gate Details for Handrail Opening P-2 1
P-147 W1440-P4-D-8786 3 Water Injection System - Injection Water Treatment Module Pipe Handrail Details P-2 1
P-148 W1440-P4-D-8790 4 Water Injection System - Injection Water Treatment Module Framing Details Sheet 1 P-2 1
P-149 W1440-P4-D-8791 4 Water Injection System - Injection Water Treatment Module Framing Details Sheet 2 P-2 1
P-150 W1440-P4-D-8792 4 Water Injection System - Injection Water Treatment Module Framing Details Sheet 3 P-2 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 11 of 14 P - Process Part


List No MODEC Dwg No Rev No TITLE Box No CD No
P-151 W1440-P4-D-8793 4 Water Injection System - Injection Water Treatment Module Framing Details Sheet 4 P-2 1
P-152 W1440-P4-D-8794 4 Water Injection System - Injection Water Treatment Module Framing Details Sheet 5 P-2 1
P-153 W1440-P4-D-8795 4 Water Injection System - Injection Water Treatment Module Framing Details Sheet 6 P-2 1
P-154 W1440-P4-S-8020 1 Water Injection System - Design and Fabrication of Skids for Equipment P-2 1
P-155 W1440-P4-S-8025 4 Water Injection System - Module Lifting Plan P-2 1
P-156 W1440-P5-D-0100 NA Process System - FPSO Process Facilities Module Key Plan NA NA
P-157 W1440-P5-D-2160 0 Process System - Module A - Piping Elevation Looking Forward P-2 1
P-158 W1440-P5-D-2170 0 Process System - Module A - Piping Elevation Port Side P-2 1
P-159 W1440-P5-D-2180 0 Process System - Module A - Piping Elevation Starboard Side P-2 1
P-160 W1440-P5-D-3160 0 Process System - Module B - Piping GA Elevation - Starboard Side P-2 1
P-161 W1440-P5-D-3170 0 Process System - Module B - Piping GA Elevation - Port Side P-2 1
P-162 W1440-P5-D-3180 0 Process System - Module B - Piping GA Elevation Looking Forward P-2 1
P-163 W1440-P5-D-3190 0 Process System - Module B - Piping GA Elevation Looking Aft P-2 1
P-164 W1440-P5-D-4110 0 Process System - Module C - Piping GA Elevation - Port Side P-2 1
P-165 W1440-P5-D-4120 0 Process System - Module C - Piping GA Elevation Looking Forward P-2 1
P-166 W1440-P5-D-8610 2 Water Injection System - Piping Layout for Water Injection Module (EL+28900 over) P-2 1
P-167 W1440-P5-D-8611 2 Water Injection System - Piping Layout for Water Injection Module (EL+28900 under) P-2 1
P-168 W1440-P5-D-8612 2 Water Injection System - Piping Layout for Water Injection Module (EL+28900 under side view) P-2 1
P-169 W1440-P5-D-8710 2 Water Injection System - Piping Layout for Water Treatment Module (EL+28900 - EL+32400) P-2 1
P-170 W1440-P5-D-8711 2 Water Injection System - Piping Layout for Water Treatment Module (EL+32400 - EL+35500) P-2 1
P-171 W1440-P5-D-8712 2 Water Injection System - Piping Layout for Water Treatment Module (around V-6911, V-6912) P-2 1
P-172 W1440-P5-D-8713 2 Water Injection System - Piping Layout for Water Treatment Module (EL+28900 under) P-2 1
P-173 W1440-P5-D-8714 2 Water Injection System - Piping Layout for Water Treatment Module (EL+28900 under side view) P-2 1
P-174 W1440-P5-S-8040 1 Water Injection System - Pipeline Schedule P-2 1
P-175 W1440-P6-D-0100 0 Process System - FPSO Production Facilities Process Module A - Hazardous Area Classification P-2 1
P-176 W1440-P6-D-0110 0 Process System - FPSO Production Facilities Process Module B - Hazardous Area Classification P-2 1
P-177 W1440-P6-D-0120 0 Process System - FPSO Production Facilities Process Module C - Hazardous Area Classification P-2 1
P-178 W1440-P6-D-8010 2 Water Injection System - Layout of Electrical Cable Tray for Water Injection Pump Module P-2 1
P-179 W1440-P6-D-8020 2 Water Injection System - Layout of Electrical Cable Tray for Injection Water Treatment Module P-2 1
P-180 W1440-P6-D-8030 2 Water Injection System - Section and Elevation Drawing of Cable Tray P-2 1
P-181 W1440-P6-D-8040 1 Water Injection System - Wiring Drawing of Lighting System P-2 1
P-206 W1440-P6-L-0201 0 Process System - Hazardous Area Electrical Equipment List P-2 1
P-182 W1440-P6-S-0010 0 Process System - Hazardous Area Schedule for Topsides Modules P-2 1
P-183 W1440-P6-S-8060 3 Water Injection System - Electrical Load List P-2 1
P-184 W1440-P6-S-8120 1 Water Injection System - Specification for Induction Motor P-2 1
P-185 W1440-P6-S-8130 2 Water Injection System - Specification for Lighting Fixture P-2 1
P-186 W1440-P7-D-6410 0 Process System - Electronic Junction Box Wiring Diagrams P-2 1
P-187 W1440-P7-D-8220 1 Water Injection System - Instrument Pressure Tubing and Supply Air Hook Up P-2 1
P-188 W1440-P7-D-8230 1 Water Injection System - Layout of Instrument Supply Air Tubing P-2 1
P-189 W1440-P7-D-8240 1 Water Injection System - Layout of Instrument Cable Tray P-2 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 12 of 14 P - Process Part


List No MODEC Dwg No Rev No TITLE Box No CD No
P-190 W1440-P7-D-8250 1 Water Injection System - Instrument Cable List P-2 1
P-191 W1440-P7-D-8260 1 Water Injection System - Layout of Instrument Wiring P-2 1
P-192 W1440-P7-D-8270 1 Water Injection System - Instrument Wiring Connection Diagram P-2 1
P-193 W1440-P7-L-0110 1 Process System - Instrument Index P-2 1
P-194 W1440-P7-L-0210 0 Process System - Field Cable List P-2 1
P-195 W1440-P7-L-0310 1 Process System - Instrument I/O List P-2 1
P-196 W1440-P7-S-8040 1 Water Injection System - Instrument I/O List P-2 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 13 of 14 P - Process Part


List No MODEC Dwg No Rev No TITLE Box No CD No
S-001 W1440-SM-D-1011 1 DTM System - Project Assembly Elevation S-1 1
S-002 W1440-SM-D-1031 0 DTM System - Turret Shaft Structure Assembly Elevation S-1 1
S-003 W1440-SM-D-1032 1 DTM System - Turret Shaft Structure Assembly Plan S-1 1
S-004 W1440-SM-D-1051 1 DTM System - Swivel Access Structure Assembly Elevation S-1 1
S-005 W1440-SM-D-1052 2 DTM System - Swivel Access Structure Assembly Plan S-1 1
S-006 W1440-SM-D-1111 3 DTM System - General Arrangement - Elevation at Center S-1 1
S-007 W1440-SM-D-1112 4 DTM System - General Arrangement S-1 1
S-008 W1440-SM-D-1481 1 DTM System - Emergency Escape Routes S-1 1
S-009 W1440-SM-D-1482 2 DTM System - General Safety Equipment Location S-1 1
S-010 W1440-SM-D-1493 4 DTM System - Hazardous Area Classification S-1 1
S-011 W1440-SM-D-2111 3 DTM System - Anchor Leg Arrangement S-1 1
S-012 W1440-SM-D-2113 1 DTM System - Anchor Leg System Assembly S-1 1
S-013 W1440-SM-D-2114 1 DTM System - Anchor Leg System Assembly Details S-1 1
S-014 W1440-SM-D-5160 2 DTM System - Spider Buoy Marking Plan S-1 1
S-015 W1440-SM-D-5163 7 DTM System - Spider Buoy, Structure Plan S-1 1
S-016 W1440-SM-D-6200 3 DTM System - Well Service Risers P&ID S-1 1
S-017 W1440-SM-D-6211 7 DTM System - Utility Swivel Interface P&ID S-1 1
S-018 W1440-SM-D-6215 4 DTM System - Utility Air System P&ID S-1 1
S-019 W1440-SM-D-6217 3 DTM System - Lower Turret Ballast System P&ID S-1 1
S-020 W1440-SM-D-6218 4 DTM System - Lower Turret Ventilation System P&ID S-1 1
S-021 W1440-SM-D-6220 3 DTM System - Water Injection System P&ID S-1 1
S-022 W1440-SM-D-6222 5 DTM System - Production Risers, Swivels & Turret Manifold P&ID S-1 1
S-023 W1440-SM-D-6223 1 DTM System - PFD Swivel Interface Production System S-1 1
S-024 W1440-SM-D-6233 3 DTM System - Oil Based Hydraulic System P&ID, One Line Diagram and Schematic S-1 1
S-025 W1440-SM-D-6251 2 DTM System - Lubrication System Main Bearing Schematic S-1 1
S-026 W1440-SM-D-6255 3 DTM System - Lubrication System P&ID S-1 1
S-027 W1440-SM-D-6266 4 DTM System - Instrument Air System P&ID S-1 1
S-028 W1440-SM-D-6277 2 DTM System - Fire Water System P&ID S-1 1
S-029 W1440-SM-D-6288 4 DTM System - Turret Drain System P&ID S-1 1
S-030 W1440-SM-D-7111 5 DTM System - Electrical Diagrams S-1 1

W1440-G-L-0010 List of Document (As-Built) Rev. 4 14 of 14 S - Station Keeping Part