Submission Inspection Location Side Item Signed by IE Status

S No. RFI NO Description of Activity From CH: To CH: Length (M)


Date Date
101 KHPL/TK/NH-66/LAB/101 8-Nov-2023 9-Nov-2023 Core Cutting for BC (service Road) 377+210 377+460 250 RHS Core cutting Work Done
102 KHPL/TK/NH-66/LAB/102 9-Nov-2023 10-Nov-2023 Calibration of RMC Plant CP30. 384+600 Perijenam. RHS Calibration Work Done
103 KHPL/TK/NH-66/LAB/103 14-Nov-2023 14-Nov-2023 Core Cutting for DBM (MCW) 370+500 370+710 210 RHS Core cutting Spot Work Done