Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

INSPECTION REPORT

Customer CV. Amandira Teknik Date 07 February 2024


WO No. 6005 Job No. -
Location Workshop Amandira Kariangau Balikpapan Report No WGU-1289-AM

Name of Equipment Pivot Shaft D375 RHS Material Cond. New Used Rebuilt
Serial Number 9040123338

Type of insp.
Visual MPI

Acceptance criteria ASME V ART 7 API DS-1 Customer Spec Other

Procedure Ref. Code 3.01.02- (NDT) Non Destructive Test General Requirements

A. NDE Inspection Results


AREA INSPECTED Welding Area REMARKS : Accepted
Time Taken Time Taken : 1 Hours

Mag.
Surface Preparation Insp. System Equipment
Current

Blasting Solvent Cleaned Active Dry Water Visible AC Yoke WCP


Grinding Water Brush Contrast Solvent Visible Coil 7 HF
Permanent
Wire Brushing Mag. Fluorescent Black Light Penetrant
Residual Water Fluorescent Test Block Developer
Paint Remover

Inspection Results MPI Full Length Body the tool above was performed
No relevant indication detected at the time of inspection.

Inspector

Andy Maulana Pasha


ASNT NDT LEVEL II MT/PT
This materials results just for good condition of services only, accordance with the standard above, and are not to be warranties or guarantes of quality

PT. WELDAN GEMILANG UTAMA


Jl. Merak, Perum BDS II, Block-B, No.24, Balikpapan Selatan, Kalimantan Timur – 76114, Indonesia.
P: +62 811 5030 180, O: 0542 757 0667, E-mail: marketing@welgama.co.id / info@welgama.co.id. Website: www.welgama.co.id

You might also like