12 11 10 9 8 7 6 5 4 3 2 1

300
BR

BR
CONSTRUCTION NOTES
1. DRAWING DISCRIPANCY IN ARCHITECTURAL AND STRUCTURAL DRAWING SHALL

410

CANTILEVER

CANTILEVER
BE INTIMATED TO PSA OFFICE AND GET RE-CONCILED BEFORE EXECUTION.

REMARKS
B3 C08
C07 2. ALL DIMENSIONS ARE IN MILIMETERS UNLESS NOTED. IN CASE OF DISCREPANCY,
H

H
S2 (Lc) LENGTH DIMENSIONS MENTIONED ON SANCTIONED ARCHITECTURAL DRAWING SHALL BE
MAX. Lc / Ld FOLLOWED.
AS PER PLAN

-
-
-
-
3. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE AS PER IS:456-2000.

DEPTH
T8 & ABOVE REINFORCEMENT SHALL BE OF HYSD BARS GRADE Fe500D.

B5
125 THK

B5
REINFORCEMENT SHALL CONFIRM TO DUCTILITY REQUIREMENTS OF IS:13920. ALL
REINFORCING STEEL WILL BE OF TESTED QUALITY CONFIRMING TO IS :1786 LATEST.
4.
5. ALL LEVELS SHOWN IN STRUCTURAL DRG. ARE STRUCTURAL LEVELS ONLY UNLESS

CENTRAL ZONE
NOTED OTHERWISE.
C06

T8 @ 200 c/c
T8 @ 100 c/c
T8 @ 125 c/c
T8 @ 125 c/c
T8 @ 125 c/c
T8 @ 125 c/c
T8 @ 125 c/c
B3

ALT. BENT UP BARS


CONT. CURTAILED (LENGTH) CONT. LEFT EXTRA RIGHT EXTRA SIZE@ SPG.(NO) SIZE@ SPG.

NO BENT UP BARS
BEAM 6. GRADE OF MATERIAL SHALL BE AS FOLLOWS:
BEAM a) USE CONCRETE GRADE M25 FOR ALL RCC.
300 C05 300

REMARKS
REINFORCEMENT b) REINF : HYSD BARS (TOR) WITH MINIMUM YIELD STRENGTH OF 500 N/sqmm

S1
CONFIRMING TO IS : 1786-1985.
125 THK AS PER SCHEDULE c) BRICK : CLASS M15 BRICKS SHALL BE USED IN FOUNDATION AND CLASS M10
BRICKS SHALL BE USED IN FRAMED STRUCTURE & M15 BRICKS USED IN LOAD
BEARING STRUCTURE - FOUNDATION M15 & SUPERSTRUCTURE M10.
G

G
STIRRUPS
d) GRADED STONE AGGREGATE TO BE USE IN FOLLOWING RATIO : 20mm : 12mm
B2 : 6mm : 2 : 1 : 1
B5

B5
TYP. SEC. FOR CANTILEVER BEAM 6. FOUNDATIONS SHALL REST ON HARD STRATA HAVING NET SAFE BEARING
S2

T8 @100 c/c (12)


CAPACITY OF 30 T/SQM. BLACK COTTON SOIL IF PRESENT SHALL BE REMOVED
125 THK TOTALLY. SOIL STRATA SHALL BE GOT APPROVED PRIOR TO PLACEMENT OF FOOTINGS.

IF BACK BEAM IS AVAILABLE.

NEAR ENDS
7. UNLESS SPECIFIED OTHERWISE FOUNDATION ARE SYMMETRICALLY PLACED
C03 B3 C04 ABOUT THE COLUMN CENTRE LINES.

SPANNING

TWO WAY
ONE WAY
8. LAP LENGTH TO COLUMNS SHALL BE 60 x DIA OF SMALLEST BAR. THE LAPS SHALL

-
-
-
-
-

-
S1

BE AWAY FROM BEAM JUNCTIONS, AND SHALL BE STAGGERED. LAPS SHALL BE


L1/4 L2/4
B3

BEAM TOP STAGGERED AND NOT MORE THAN 50% OF BARS SHALL BE LAPPED ONE PLACE.
BEAM TOP B2 125 THK
PROJECTION
2S MIN 600 MIN 600
PROJECTION 9. SLAB BARS IN SHORTER DIRECTION, SHALL BE BELOW OF BARS IN LONGER
DIRECTION.
B4/MB

B4

10. IN BEAMS FIRST STIRRUPS SHALL BE AT NO MORE THAN 50mm (2") FROM FACE OF
2S S THE SUPPORTING MEMBER.
F

F
THICKNESS REINF. ALONG REINF. PERP. TO
UP

T8 @ 150 C/C

T8 @ 125 C/C
L1/5 CHAIRS @600c/c
L1/7 11. IN BEAMS TOP BARS NOT TO BE SPLICED IN THE END QUARTERS OF THE SPAN, AND
THE BOTTOM BARS ARE NOT TO BE SPLICED AT MIDDLE HALF OF THE SPAN.

1 - T12
1 - T12

MAIN SPAN
C01 B1 C02 B1a L1 L2
12. BACKFILLING NEAR WATER TANK SHALL BE DONE ONLY AFTER HYDRO TESTING OF

-
-
-
-

-
TANK HAS BEEN COMPLETED.

PLAN AT TERRACE FLOOR SLAB LVL TYPICAL SLAB SECTION 13. REINFORCEMENT SHALL BE CUT SUITABLY AT OPENING LOCATIONS & EXTRA BARS

(M25 & FE500)


SHALL BE PROVIDED AROUND OPENINGS
( S- REINF. SPACING AS PER SLAB SCHEDULE)
(SCALE - 1:100) (AREA - 409 SQFT) (M25 & FE500) 14. WATER PROOFING COMPOUND SHALL BE ADDED TO CONCRETE USED FOR TANK
PORTION IN SUITABLE PROPORTION AS PER MANUFACTURER'S INSTRUCTIONS

T8 @ 150 C/C
LONGITUDINAL REINFORCEMENT

T8 @ 125C/C
TOP
LEGENDS

1 - T12
15. SHUTTERING DESIGN IS CONTRACTORS RESPONSIBILITY. SHUTERING SHALL NOT BE
REMOVED BEFORE THE PERIOD MENTIONED BELOW OPC IF AMBIENT TEMPERATURE

MAIN SPAN
-
-
-
-
-

-
DOES NOT FALL BELOW 15°C & ADEQUATE CURING IS DONE. :
BEAM 230X450 BEAM 150X450 ELEMENT DURATION
E

E
VERTICAL FORMWORK BEAMS / COLUMNS / WALLS 16 - 24 HRS

BEAM TOP PROJECTION SOFFIT FORMWORK OF SLABS 3 DAYS

SLAB SCHEDULE
MAX. 300 SOFFIT FORMWORK OF BEAMS 7 DAYS

FRM B1a
MIN.

3 - T16

3 - T16
2 - T12
2 - T12
2 - T12

2 - T12
2 - T12
PROPS TO SLABS
450
SPANNING UPTO 4.5 M 7 DAYS
LEFT TOP RIGHT LAP 60xDIA. SPANNING OVER 4.5 M 14 DAYS

150
EXTRA CONT. EXTRA PROPS TO BEAMS

(INCHES)
SPANNING UPTO 6 M 14 DAYS
L1/4 L1/4 L2/4

125

125
SPANNING OVER 6 M 21 DAYS
60xDIA

SLAB
T8 @ 150 C/C 16. STRUCTURE IS DESIGNED FOR G + 1 FLOORS ONLY UNO.

2600
50 T8 @ 125 C/C

-
-
-
-
-

-
60xDIA

18. CONTRACTOR SHALL TAKE MIN. SIX CUBES DURING CONCRETING OF FOOTINGS,
COLUMNS, BEAMS AND SLABS & CUBE CRUSHING TEST FROM ISI APPROVED LAB
SHALL BE COMMUNICATED TO STRUCTURAL DESIGNER FOR 7 & 28 DAYS AFTER

SLAB
CASTING DATE.
TYPICAL BEAM TOP

NO.
D

D
S1
L2

S2
BOTTOM
L1 (END SPAN)
50
LOADING:

1 - T12
PROJECTION

BEAM SCHEDULE (M25 & FE500)


BOTTOM BOTTOM 1. DEAD LOADS : [ IS875-I-1987 ]

-
-
-
-
-

-
CONT. CURTAILED LAP 60xDIA.
a) WALLS - SIPOREX 230 (9") THK EXTERNAL
(SCALE - 1:25)
SIPOREX 150 (6") THK INTERNAL

TYPICAL BEAM END-SPAN DETAILS TERRACE SLAB b) FLOOR FINISH - 1.5 KN/SQM FOR ALL EXCEPT 2 KN/SQ.M ON ROOF
2. LIVE LOADS : [ IS875-II-1987 ]

2 - T12

2 - T12

2 - T12
2 - T12
2 - T12
2 - T12
3 - T12
LEFT B3 RIGHT
a) ALL ROOMS, TOILETS & BATH : 2.0 KN/SQ.M
LAP 60xDIA. LEFT TOP RIGHT
EXTRA CONT. EXTRA b) TERRACES, PASSAGES & STAIRCASE : 3.0 KN/SQ.M

FIRST FLR SLAB


LEFT B4 RIGHT

LEFT B5 RIGHT
L1/4 c) ROOF TERRACE : 1.5 KN/SQ.M
L2/4 L2/4 L3/4
LEFT B2 RIGHT

230X450
230X450
230X450
230X450
230X450
230X450
230X450
C

C
(INCHES)
50 50

(B X D)
SIZE
GROUND LVL
L1
BOTTOM
L2 (INTERIOR SPAN)
BOTTOM
L3
FOR CONSTRUCTION
LAP 60xDIA. LEFT B1 RIGHT
CONT. CURTAILED
FOUNDATION

BEAM

B1a
NO.
TYP. LEFT/RIGHT KEY SECTION

BR
B1

B2
B3
B4
B5
TYPICAL BEAM INTERIOR-SPAN DETAILS CONVENTION PLAN A3
SHEET NO. 01/01
REVISION
GENERAL NOTES - 9) MAXIMUM ALLOWABLE HEIGHT OF COLUMN WITHOUT ANY TIE OR BRACER. MATERIAL GRADE - GENERAL NOTES - DESCRIPTION CLIENT NAME ARCHITECT
B

B
& DATE
1) OUR RESPONSIBILITY SHALL REMAIN LIMITED TO SAFE AND STRUCTURAL DESIGN. NO. WIDTH OF COLUMN ALLOWABLE HEIGHT NO. WIDTH OF COLUMN ALLOWABLE HEIGHT 1) FOUNDATION TO BE REST ON HARD STRATA. MINIMUM DEPTH OF EXCAVATION MR.KIRAN DADA AR. PUNIT SIR
1 200 MM (8") 3400 MM (11'-3") 4 380 MM (15") 6500 MM (21'-3")
CONCRETE REINFORCEMENT R0-02/10/23 RELEASED FOR CONSTRUCTION
2) WE SHALL NOT REMAIN RESPONSIBLE FOR TO BE 1500 MM. SBC OF SOIL ASSUMED 30 T/SQ.MT.
2 230 MM (9") 4000 MM (13'-3") 5 450 MM (18") 7700 MM (25'-3") M25 FE 500D 2) FOUNDATION STRATA SHOULD BE APPROVED FROM OUR OFFICE BEFORE LAYING
a) CONCRETE MIX, QUALITY, SHUTTERING, CURING, SUBSTANDARD CONSTRUCTION
MATERIAL, WORKMANSHIP & FAULTY CONSTRUCTION PROCEDURE.
3 300 MM (12") 5100 MM (16'-9") OF PCC. DRAWING TITLE PROJECT TITLE
b) SAFETY OF OLD STRUCTURE DURING DEMOLITION AND SAFETY OF ABUTTING ALL COLUMNS OF FRAME SHOULD BE TIED IN BOTH THE DIRECTIONS WITH TIE/PLINTH
STAMP & SIGN- 3) BUILDING IS DESIGNED FOR GROUND + 1 FLOOR ONLY. RC DETAILS OF TERRACE G + 1 BUNGALOW, BARAMATI
BEAMS AT GROUND AR PLINTH LEVEL. EVEN IF THE HEIGHT OF COLUMN IN THE 4) CONCRETE AS PER DESIGN MIX UNLESS SPECIFIED. FLOOR SLAB
STRUCTURE/BUILDING. ANY ACCIDENT OCCURRING DURING CONSTRUCTION OF
ALLOWABLE HEIGHT LIMITS. 5) BASIC PREFERENCE CODE IS 456 : 2000
ELEMENT OF BUILDING NOT DESIGNED BY US.
10) IF FOOTINGS ARE OVERLAP EACH OTHER , NECESSARY PROVISION SHOULD OBTAINED 6) REINFORCEMENT TOR STEEL (T) - FE500D (N/mm2)
3) PROPER PRECAUTION SHOULD BE TAKE BY SHORING, STRUTTING. TO MAINTAIN STABILITY
OF THE STRUCTURE. FROM OUR OFFICE. 7) NOMINAL COVERS PROJ. NO : PSA9117-S-23 DWG.NO : PSA9117-S - 23 - S-03 R0
11) ALL LAPS SHALL BE STAGGERED & NOT MORE THAN 50% BARS TO BE LAPPED AT ANY SR. MILD MODERATE SEVERE ADOPTED
4) FORMWORK OF CANTILEVER CANOPY, CHAJJA ETC SHOULD NOT BE REMOVED DESCRIPTION SR. NO DRAWING STATUS SR. NO
GIVEN SECTION. NO [IN MM] [IN MM] [IN MM] FOR PROJ
SHOULD NOT BE REMOVED STRUCTURAL CONSULTANT.
1 FOOTING 50 50 50 1 FOR EXCAVATION PURPOSE
5) PROVIDE LINKS FOR COLUMN REINFORCEMENT IN JUNCTION OF COLUMN, BEAM AS GRADE OF REIN. BAR DIAMETER ( IN MM)
PER LINKS SPACING MENTIONED IN OUR DRAWING.
SR.
NO.
GRADE OF CONCRETE
FE500 8 10 12 16 20 2 COLUMNS 40 40 45 2 FOR TENDER PURPOSE PRADNYA SIKACHI & ASSO.

A
A

6) PROPER CHAIR TO BE PROVIDED TO ENSURE SPECIFIED THICKNESS OF SLAB TO RETAIN 1 M25 57 X D 456 570 684 912 1140 3 BEAMS 20 30 25 3 ADVANCE / APPROVAL COPY B.TECH (CIVIL), ME (STRUCTURE), M (ISSE)
TOP BARS IN THE PROPER POSITIONS & ALSO PROVIDE PROPER COVERING & PINS IN 2 M25 49 X D 392 490 588 784 980 4 SLABS 20 25 40 4 FOR CENTRELINE PURPOSE Structural Consultant, Pune
BEAM REINFORCEMENT. 3 M30 46 X D 368 460 552 736 920
5 LIFT WALL / SHEAR WALL 40 40 45 5 FOR STUDY PURPOSE
7) FOR WIDTH HAVING WIDTH 230 mm PROVIDE ONLY 3 BARS IN ANY ONE LAYER. 4 M35 40 X D 320 400 480 640 800
6 FOR EXECUTION PURPOSE
Mail us at - pradnyasikachi@yahoo.com
DRAWN BY DESIGNED BY CHECKED BY APPROVED BY DATE
8) DO NOT CAST ANY RCC WORK UNLESS IT IS CHECKED OR CONFIRM BY RCC DESIGNER. 5 M40 & ABOVE 36 X D 288 360 432 576 720 Mob.- +91 99 70 303 304
ASG ASG PRS PRS 02/10/23 7 FOR ESTIMATION PURPOSE