https://methvin.org/estimating-production-rates/building-constants/54-lifts-and-escalators 1/3
4/15/24, 1:00 AM Lifts and Escalators
Truss type, Stop-Work for surrounding finishes 8.0 6.0 4.0 wks
Truss type, Phase B decking and glazing etc - 5.0 - wks Estimating Production
Rates
Truss type, Phase C performance testing - 2.0 - wks
Building
Truss type, Phase D full load testing - 2.0 - wks Constants
Truss type, Phase E final test and inspection - 2.0 - wks Carpentry
Interior
Plumbing
Roof, Ceiling
You are here: Home Estimating Production Rates Building Constants and Framing
Lifts and Escalators Suspended
Ceilings
Tiling
Tower Cranes
Concrete Work
Demolition
Mechanical &
Electrical
Structural Steel
Excavation
Foundation
Plant Productions
Road and Rail
Tunneling &
Mining
Retaining
structures
https://methvin.org/estimating-production-rates/building-constants/54-lifts-and-escalators 2/3
4/15/24, 1:00 AM Lifts and Escalators
The Experts
Client Reviews
Estimating Manual
Takeoff Manual
Gantt Manual
Project Proverbs
Student Portal
Estimating Software
Contact Us
Training Courses
Company Policies
Glossary
Methvin's Advantage
Support Ticket
Methvin is a leading provider of online applications for the construction industry and our evolution is rooted in our commitment to offer only the
most functional, flexible and easy to use cloud-based estimating and tendering solution since 2018.
Contact Us
Login to the server
331 Rosedale Rd, Albany Auckland, New Zealand
support@methvin.org
https://methvin.org/estimating-production-rates/building-constants/54-lifts-and-escalators 3/3