Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Machine Translated by Google

PROMOTELEC technical information

STANDARDIZED SYMBOLS

Standardized symbols for electrical installation diagrams,


premises subject to special regulations.

The purpose of this document is to facilitate the The decree of October 31, 1973 (art.25)
production of electrical installation diagrams. (1) applicable to establishments open to the
In fact, these diagrams are required by standards public:
and regulations.
“Plans must include schematic layouts of the
Let us quote: general high and low voltage protection and
electricity distribution bodies…

The NF C 15-100 standard
(article 514.5 - Rules) applicable to all work on Said plans, various layouts and their presentation
installations powered by low voltage: must comply with the standards in force”.

“The electrical installation must be the subject of Furthermore, when commissioning the electrical
a diagram or table indicating installation of any new construction, the electrical
in particular: ÿ energy distributor must require a certificate of
the nature and constitution of the circuits (points of use compliance of the installation with the standards and
served, number and section of conductors, nature of the regulations in force, established by the installer and
pipes), ÿ the characteristics of the devices ensuring the endorsed by the CONSUAL.
protection, sectioning
and control functions”.
However, for premises with special regulations, this
body can only obtain the certificate of conformity if it
is in possession of the inspection report and the plan
or diagram of the installation.
The decree of November 14, 1988 (art. 55)
concerning the protection of workers against
electrical currents, in application of the Labor The symbols relating to the equipment and protection
Code: devices indicated below are those which have been
adopted internationally and taken up by the Union
“Establishment heads must keep a file available Technique de l'Electrcité in the standards of the NF
to the Labor Inspector including: a schematic C 03-201 to 211 series.
plan…”
(1) Codified R123.24 in the construction and housing code

FEB. 2000
Machine Translated by Google

STANDARDIZED SYMBOLS

DEVICES
DEVICES DEVICES
PRODUCTION AND PIPELINES
MEASUREMENT OF USE
TRANSFORMATION

Indicators
Generator phase
Lighting lamp (general
conductor
Voltmeter symbol)

Neutral Fluorescence tube


Battery of batteries
or batteries Ammeter

Protective (earth)
Engine

Wattmeter
Transformer 5 conductors
(3 P + N + T) Alarm

Varmeter
Three-phase delta/ Terminal connection Resistance
star
transformer
Frequency meter Strip
Capacitor
connection

Power transformer Crossing of 2


conductors with Impedance
2 Recorders
connection

Without connection
Active Safety
Toroid transformer lighting on
Wh energy meter (watt
hour meter) special circuit
Derivation

Autonomous
Active
Autotransformer energy meter (var Junction box security
not buried lighting unit
hour meter)

INSTALLATION EQUIPMENT

Switchgear Single function Multi-function Surge protection


functions switchgear equipment equipment

Circuit
breaker function Disconnector Switch Splasher
fuse Discontactor

Disconnector function
Double
Switch- interval spark gap
disconnector
function Switch Fuse Isolator switch
(control) disconnector
Automatic Surge
trigger function limiter

Fuse
(overcurrent Surge protector
NO protection) Switch-
contact
disconnector Circuit breaker
(working contact) fuse
Switchgear
NC Contactor
contact
(order) Striker Power socket
(rest contact)
plug
fuse
Three-pole Power socket
circuit base
Breaker breaker
Control coils with magnetothermic relays
(command) Associated plug
and socket

Differential
Thermal
Push button to circuit breaker Other forms
close and
protection automatic Male plug
element
return
Socket
Magnetic Three-pole contactor
Automatic with two-way auxiliary
protection
element opening contact Associated plug
and return pull tab and socket
Machine Translated by Google

ELECTRICAL INSTALLATION OF A PREMISES


ARTISANAL (1)

Connection circuit breaker 4 x 30/60 A


IR: 3 x 50 A

Main board

4 x 30/60 A 2 x 15/45 A
IR: 40 A IR: 30 A
U 1000 R2V 300mA 300mA

Class
in
5 x 25 mm2

II
completed
Part
Secondary table
16A+N

16A+N

16A+N

16A+N

16A+N
A*
10

10

10
A*

A*

A*
6
Free

aM
aM

aM
x12

x10

A
x8
3
x16

A
3

3
N
A
+3

** ** ** ** ** **
30 mA30 mA30 mA30 mA 30mA30mA
1.5mm2
2.5mm2

2.5mm2

2.5mm2

2.5mm2

2.5mm2

2.5mm2

2.5mm2
mm2

mm2
mm2

mm2

mm2

mm2

mm2
1.5

1.5

1.5

1.5

1.5
4

autonomous
Workshop

Workshop

lighting
Remote
security

Office
lighting

bases

bases
Motor

Motor

Motor
control
lighting

lighting

office

office
force

force

force
bases

bases

bases

bases

Stand-
blocks

Blocks
alone

pc2

pc2
Pc2

Pc2

Pc2

unit
PC

P
N
P

T
+

+
P

P
T
+

T
3

Example of installation diagram

ELECTRICAL INSTALLATION OF A PREMISES


COMMERCIAL (1)

Connection circuit breaker 2 x 15/45 A


IR: 1 x 30 A
Differential 500 mA

16 mm2

5 A* 10 A* 10 A* 5 A* 16A 16A 16A 10 A* 10 A* 16A 10 A*


+N

30m A**
A**30m A**30m 30m A** Stop
emergency
2 x 10 A
mm2
1.5

(on facade)
BT/
SELV C1 II

LV/HT
2.5mm2

2.5mm2

2.5mm2

2.5mm2
mm2

mm2

mm2

mm2

mm2

mm2

mm2
1.5

1.5

1.5

1.5

1.5

1.5

1.5
lighting

lighting

Reserve

Reserve
bases

bases
Outdoor

Window

Exterior
Shop

Shop

Remote

lighting

lighting

lighting
Alarm

Shop

Shop
theft

control

bases
blocks

bases
Stand-
blocks

Free
alone
fire

pc

pc
PC

PC

Example of installation diagram


(1) See Promotelec memo “artisanal and commercial premises”. Promote
*
Protective device (circuit breaker or fuse circuit breaker) with two-pole cutoff to ensure
neutral disconnection.
**
Recommended for protection when using portable or mobile devices.
Machine Translated by Google

IT DIET. CONNECTED GROUNDS, NEUTRAL


NOT DISTRIBUTED (1)

High voltage public distribution 20 kV

Isolator switch
Fuses

Transformer 20 kV / 400 V
630 kVA Ucc 4%

1000 / 5 Wh Counting
Limiter
surge gG gG
Post lighting

Withdrawable circuit breaker


3 x 800 A . Ir 700 A
Icu 30 kA

4 3 x 315 A 3 x 100 A 3 x 250 A


Circuit breaker 3 x100 A
gG gG gG
board

Ir 70 A
Main

Differential 0.3 A
3 x 350 A 3 x 125 A 3 x 250 A
U-1000 R2V U-1000 R2V U-1000 R2V
Autotransformer
400 V / 230 V 50 kVA
4 x 185 mm2 4 x 25 mm2 4 x 150 mm2 U-1000 R2V 4 x 25 mm2

gG 3 x 125 A gG 3 x 40 A D150 Ir 3 x 125 A Switch 3 x 150 A


2

2
2

2
4x6mm
Secondary
tables

35mm

25mm
mm2

mm2

mm2

mm2
mm2

mm2
x35

x35

25

25
4

4
x

4
6
4

6
4

x
x

mm

mm
mm

mm

mm

gG

gG
D3

D3

D3

40

40
50

50

50
A

A
x6
4

x6
4

x6
4

3
x6
4

3
x6
4
U-1000

U-1000

U-1000

U-1000

U-1000

U-1000

U-1000

U-1000

U-1000

U-1000
R2V

R2V

R2V

R2V

R2V

R2V

R2V

R2V

R2V

R2V
U-1000

U-1000

U-1000

U-1000
R2V

R2V

R2V

R2V

Workshops Heating Sheaths Power socket and


motor force prefabricated office-workshop lighting

To terminal circuit distribution boards


(diagrams not shown in this example but which must be shown to comply with regulations)

Example of installation diagram


Such. :
88
90
17
34
01
LAGOPUS

(1) See Promotelec memo “artisanal and commercial premises”.


(February
2000)
PRO
949
-4

ESPACE ELEC - CNIT - BP 9 - 92053 PARIS LA DÉFENSE - TEL. : 01 41 26 56 60

You might also like