CBQ 30a

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

COMMERCIAL BAR QUANT

(CBQ v3.0.42018N)

NOTES AND INSTRUCTIO


1.) This CBQ shall be used in submitting your future rebar requirements, effective on the day you r
2.)Rebar requirements submitted using any CBQ template other than this version will not be recei
3.)Please fill up the necessary fields completely. Important fields contains a tiny red triangle in the
4.)By default, the Date field returns the current system date you are editing the template, you are f
5.)You can start filling in your rebar requirements from ROW 15 up to ROW 2001. Rows 13 and 1
6.)For the "STIRRUPS OR TIES" sheet, the "TOTAL ADD" column under "STIRRUPS/TIES DIMENSIO
7.)By default, ROW 51 to ROW 1994 is HIDDEN to save print page, if additional rows are needed,
again unused rows to save print page. BE CAREFUL WHEN HIDING ROWS, some rows might c
8.)You can freely adjust the print area by using the page break preview in the View tab.
9.)Margins and other page layout settings are preset for convenience.
10.)Any form of modifications are prohibited on the protected fields.
11.)This is a template, therefore it is READ-ONLY, to save your work after filling in, you can Save a
this template in your system which you can use for another rebar requirement.
12.)The Rebar Department expects a full cooperation to maintain a smooth workflow process, plea
13.)If you have any queries/issues regarding this template, please do contact the Rebar Departmen
MMERCIAL BAR QUANTIFIER
(CBQ v3.0.42018N)

OTES AND INSTRUCTIONS


effective on the day you received the letter about the revisions and this template.
version will not be received by the Rebar Department and therefore will not be entertained.
a tiny red triangle in the corner of the cell/field.
g the template, you are free to modify this field in special cases.
OW 2001. Rows 13 and 14 are intentionally hidden, please don't make changes.
TIRRUPS/TIES DIMENSIONS" should be the TOTAL ADDITIONAL LENGTH for HOOKS.
itional rows are needed, just unhide the said rows and continue filling in, afterwhich, please hide
OWS, some rows might contain data you have filled in.
the View tab.

filling in, you can Save as and then input the desired file name. This is to maintain a blank copy of
ment.
h workflow process, please be guided accordingly.
act the Rebar Department for assistance.
ined.

please hide

ank copy of
MCPI-REBAR CBQrev3.0.42018N

MONOCRETE CONSTRUCTION PHILIPPINES, INC.


888 Cayetano Ave., C-5 Extension, Diversion Rd., Brgy. Palingon Tipas, Taguig City

COMMERCIAL BAR QUANTIFIER


PROJECT: VELARIS RESIDENCES TOWER 1
LOCATION: BLOCK 5 BRIDGETOWNE EAST BRGY. ROSARIO, PASIG CITY
DATE PREPARED : April 15, 2024

CBQ #: 30A
SUBJECT: MAINBARS FOR MONOWALL (37 FLOOR - 42ND FLOOR TC1 BLOCK-OUT)

COMMERCIAL
MEMBER/ BEND BEND BEND BEND TOTAL WT (CUT TOTAL WT (COMM.
GRID LINE FLR. LEVEL BAR DESC BAR Ø CUT LEN #PCS SETS TOTAL PCS WT / LM
STRUCTURE END1 LEN1 END2 LEN2 PCS/B QTY LEN LENGTH) CUT)

- - -
TOWER 42ND MONOWALL MAINBAR 12 3.15 326 1 326 4 81.5 13.50 0.888 911.89 977.02
MAINBAR 12 0.3 390 1 390 30 13.0 9.00 0.888 103.90 103.90
COMMERCIAL 12 12 70 1 70 1 70.0 12.00 0.888 745.92 745.92
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
TOTALS : 1,761.70 kg 1,826.84 kg
WASTE: 3.9%

SUMMARY:
COMMERCIAL LENGTHS Note: 1. Commercial length adjustment is cm.
BAR Ø 9 10.5 12 13.5 15 UNIT WT. TOTAL WEIGHT 2. If in case cut length can be acquired from multiple
10 mm 0 0 0 0 0 0.616 - lengths such as 9.0m, 10.5m, 12.0m, 13.5m, & 15.0m,
12 mm 13 0 70 82 0 0.888 1,832.83 prefered commercial length is m.
16 mm 0 0 0 0 0 1.578 -
20 mm 0 0 0 0 0 2.466 -
25 mm 0 0 0 0 0 3.853 -
28 mm 0 0 0 0 0 4.834 -
32 mm 0 0 0 0 0 6.313 -
36 mm 0 0 0 0 0 7.990 -
TOTAL 1,832.83

Prepared by: Checked by: Noted by:

ENGR. JONATHAN A. OROT ENGR. ZANDRO DAÑES


MONOWALL IN-CHARGE PROJECT-IN-CHARGE

Page 4 of 7
1
Cayetano Avenue, C5 Tipas,
Road, Brgy. Extension, Diversion 888
628-8228 )02Palingon,
( Taguig City

Date : March 7, 2015 Job Order No. :


Project : ORTIGAS TECHNOPOINT
Location : Julia Vargas, Corner Meralco Ave. Ortigas, Pasig City
Subject : JOB ORDER FOR REBAR WORKS OF ELEVATOR AND SHEAR WALL
Reference CC No. :

Service Provider : Roger Madrona


JOB ORDER

BUDGET CODE WORK ITEM QTY. UNIT LABOR UNIT COST TOTAL COST
-
REBAR WORKS -
INSTALLATION OF GRADE 60 REBARS -
Elevator and Shear Wall Main Bar 71,595.80 kgs 2.21 158,226.72
INSTALLATION OF GRADE 40 REBARS -
Elevator and Shear Wall Ties 28,999.92 kgs 2.21 64,089.82
REBAR HAULING AT JOBSITE -
Hauling 100,595.72 kgs 0.11 11,065.53
GRAND TOTAL 233,382.07
JOB SITE PCD Management
Prepared by: Checked by: Checked by: Validated by: Approved by:

Engr. Julie A. Albior Engr. Pipo G. Lumanao


Cadet Engineer Project-in-Charge PCD Engineer Director for Engineering Chairman
FM-PCD-003, Rev.01
MCPI-REBAR CBQrev3.0.42018N

MONOCRETE CONSTRUCTION PHILIPPINES, INC.


888 Cayetano Ave., C-5 Extension, Diversion Rd., Brgy. Palingon Tipas, Taguig City

COMMERCIAL BAR QUANTIFIER


PROJECT: VELARIS RESIDENCES TOWER 1
LOCATION: BLOCK 5 BRIDGETOWNE EAST BRGY. ROSARIO, PASIG CITY
DATE PREPARED : April 15, 2024

CBQ #:
SUBJECT:

STIRRUPS/TIES DIMENSIONS COMMERCIAL


MEMBER / TOTAL WT (CUT TOTAL WT (COMM.
GRID LINE FLOOR LEVEL STRUCTURE
STRP TYPE BAR Ø #PCS SETS TOTAL TOTAL PCS WT / LM LENGTH) CUT)
WIDTH DEPTH CUT LEN PCS/B STUB QTY LENGTH
ADD
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
0.00 0.000 - -
TOTALS : 0.00 kg 0.00 kg
WASTE:

SUMMARY:
COMMERCIAL LENGTHS Note: 1. Commercial length adjustment is cm.
BAR Ø 9 10.5 12 13.5 15 UNIT WT. TOTAL WEIGHT 2. If in case cut length can be acquired from multiple
10 mm 0 0 0 0 0 0.616 - lengths such as 9.0m, 10.5m, 12.0m, 13.5m, & 15.0m,
12 mm 0 0 0 0 0 0.888 - prefered commercial length is m.
16 mm 0 0 0 0 0 1.578 -
20 mm 0 0 0 0 0 2.466 -
25 mm 0 0 0 0 0 3.853 -
28 mm 0 0 0 0 0 4.834 -
32 mm 0 0 0 0 0 6.313 -
36 mm 0 0 0 0 0 7.990 -
TOTAL 0.00 kg

Prepared by: Checked by: Noted by:

ENGR. JONATHAN A. OROT 0 ENGR. ZANDRO DAÑES


REBAR-IN-CHARGE PROJECT-IN-CHARGE

Page 6 of 7
MCPI-REBAR CBQrev3.0.42018N

MONOCRETE CONSTRUCTION PHILIPPINES, INC.


888 Cayetano Ave., C-5 Extension, Diversion Rd., Brgy. Palingon Tipas, Taguig City

COMMERCIAL BAR QUANTIFIER


PROJECT: VELARIS RESIDENCES TOWER 1
LOCATION: BLOCK 5 BRIDGETOWNE EAST BRGY. ROSARIO, PASIG CITY
DATE PREPARED : April 15, 2024

CBQ #:
SUBJECT:

COMMERCIAL
MEMBER/ BEND BEND BEND BEND TOTAL WT (CUT TOTAL WT (COMM.
GRID LINE FLR. LEVEL BAR DESC BAR Ø CUT LEN #PCS SETS TOTAL PCS WT / LM
STRUCTURE END1 LEN1 END2 LEN2 PCS/B QTY LEN LENGTH) CUT)

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
TOTALS : 0.00 kg 0.00 kg
WASTE:

SUMMARY:
COMMERCIAL LENGTHS Note: 1. Commercial length adjustment is cm.
BAR Ø 9 10.5 12 13.5 15 UNIT WT. TOTAL WEIGHT 2. If in case cut length can be acquired from multiple
10 mm 0 0 0 0 0 0.616 - lengths such as 9.0m, 10.5m, 12.0m, 13.5m, & 15.0m,
12 mm 0 0 0 0 0 0.888 - prefered commercial length is m.
16 mm 0 0 0 0 0 1.578 -
20 mm 0 0 0 0 0 2.466 -
25 mm 0 0 0 0 0 3.853 -
28 mm 0 0 0 0 0 4.834 -
32 mm 0 0 0 0 0 6.313 -
36 mm 0 0 0 0 0 7.990 -
TOTAL -

Prepared by: Checked by: Noted by:

ENGR. JONATHAN A. OROT 0 ENGR. ZANDRO DAÑES


REBAR-IN-CHARGE PROJECT-IN-CHARGE

Page 7 of 7

You might also like