Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

NOTE

C C

D3.b D3.b 2650


NO. R E VI SION DATE

PROJECT
H I H I 2110

THE PROPOSED CONSTRUCTION OF


A NEW INTEGRATED REFINERY COMPLEX
AT KEK SEI MANGKEI, KAB. SIMALUNGUN
SUMATERA UTARA

CLIENT

PT. Sime Darby Oils Sei Mangkei Refinery


The City Tower Lt. 12 Unit 1N
JL. MH. Thamrin No. 81
Kecamatan Menteng, Jakarta Pusat

APPROVED BY CLIENT

C C
F.F.L Elv +44.900

KONSULTAN
D3.a
PT. LYDUMA INTERMAS CONSULTANT
Soil and Foundation, Architecture and Civil Engineering
Planning & Designing and Project Management

DETAIL D3 SECTION D3.a-D3.a Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id

SCALE 1:20 SCALE 1:20 APPROVED BY KONSULTAN

Name D3
1720 KONTRAKTOR
Total 1 Unit
PT. MALIGO MAS UTAMA
A UPVC Frame Soil and Foundation, Architecture and Civil Engineering

B Solid Wood Frame (Damar Laut)


Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
North Sumatera-Indonesia

860 860 C Wood Panel (Engineered Particle Board) DRAWN BY CHECKED BY

MATERIAL D UPVC Panel

SECTION D3.b-D3.b E Panasap Euro Green 8mm


DODI. A AZMI AREF

SCALE 1:20 F Panasap Euro Green 6mm


TITLE
G Clear Glass 6mm
H Clear Glass 8mm MAIN OFFICE
I Tempered Glass 12mm
SUB TITLE
J Sundblasting Sticker
DETAIL DOOR 3
Completeness
Lock 3 Unit D RAWING CODE DATE

Hinge 3" - SDOSMR-OFF-A 007 DESEMBER 2023


Hinge 4" 6 Unit SCALE PAGE R EVIS ION

1:20 07 R.00

THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA


TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.
NOTE

C C

H H

C C

D4.b H H D4.b NO. R EVISION DATE

PROJECT

C C
2110

THE PROPOSED CONSTRUCTION OF


H H A NEW INTEGRATED REFINERY COMPLEX
AT KEK SEI MANGKEI, KAB. SIMALUNGUN
SUMATERA UTARA

CLIENT
C C
PT. Sime Darby Oils Sei Mangkei Refinery
The City Tower Lt. 12 Unit 1N
JL. MH. Thamrin No. 81
Kecamatan Menteng, Jakarta Pusat

H H
APPROVED BY CLIENT

C C
F.F.L Elv +44.900
KONSULTAN

PT. LYDUMA INTERMAS CONSULTANT


D4.a Soil and Foundation, Architecture and Civil Engineering
Planning & Designing and Project Management
Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id

DETAIL D4 SECTION D4.a-D4.a APPROVED BY KONSULTAN

SCALE 1:20 SCALE 1:20

Name D4 KONTRAKTOR
1720
Total 5 Unit PT. MALIGO MAS UTAMA
Soil and Foundation, Architecture and Civil Engineering

A UPVC Frame Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
North Sumatera-Indonesia

B Solid Wood Frame (Damar Laut) DRAWN BY CHECKED BY

860 860 C Wood Panel (Engineered Particle Board)


MATERIAL D UPVC Panel

SECTION D4.b-D4.b E Panasap Euro Green 8mm


TITLE
DODI. A AZMI AREF

SCALE 1:20 F Panasap Euro Green 6mm


G Clear Glass 6mm MAIN OFFICE
H Clear Glass 8mm
SUB TITLE
I Tempered Glass 12mm
J Sundblasting Sticker DETAIL DOOR 4

Completeness
D RAWING CODE DATE
Lock 3 Unit
SDOSMR-OFF-A 008 DESEMBER 2023
Hinge 3" -
SCALE P AGE R EVIS ION
Hinge 4" 6 Unit
1:20 08 R.00

THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA


TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.
NOTE

4.a3

NO. R E V I S ION DATE

PROJECT
C C

2110
THE PROPOSED CONSTRUCTION OF
A NEW INTEGRATED REFINERY COMPLEX
AT KEK SEI MANGKEI, KAB. SIMALUNGUN
SUMATERA UTARA

CLIENT

PT. Sime Darby Oils Sei Mangkei Refinery


The City Tower Lt. 12 Unit 1N
JL. MH. Thamrin No. 81
Kecamatan Menteng, Jakarta Pusat

APPROVED BY CLIENT

Elv +49.400

4.a1

DETAIL D4.a SECTION 4.a.1-4.a.1 KONSULTAN

PT. LYDUMA INTERMAS CONSULTANT


Soil and Foundation, Architecture and Civil Engineering
SCALE 1:25 SCALE 1:25 Planning & Designing and Project Management
Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id

APPROVED BY KONSULTAN
Name D4.a
1720
Total 1 Unit
A UPVC Frame
KONTRAKTOR
860 860 B Solid Wood Frame (Damar Laut)
C Wood Panel (Engineered Particle Board) PT. MALIGO MAS UTAMA
SECTION 4.a.3-4.a.3
Soil and Foundation, Architecture and Civil Engineering

D UPVC Panel

MATERIAL
Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
North Sumatera-Indonesia

SCALE 1:25
E Panasap Euro Green 8mm DRAWN BY CHECKED BY

F Panasap Euro Green 6mm


G Clear Glass 6mm
H Clear Glass 8mm DODI. A AZMI AREF

TITLE
I Tempered Glass 12mm
J Sundblasting Sticker MAIN OFFICE
Completeness
SUB TITLE
Lock 3 Unit
Hinge 3" - DETAIL DOOR 4a

Hinge 4" 6 Unit


D R AW I N G CODE DATE

SDOSMR-OFF-A 009 DESEMBER 2023

SCALE PAGE REVISION

1:20 09 R.00

THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA


TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.
NOTE

C C

2110

NO. REVISION DATE

PROJECT

THE PROPOSED CONSTRUCTION OF


A NEW INTEGRATED REFINERY COMPLEX
AT KEK SEI MANGKEI, KAB. SIMALUNGUN
SUMATERA UTARA

Elv +49.400 CLIENT

PT. Sime Darby Oils Sei Mangkei Refinery


4.b1
The City Tower Lt. 12 Unit 1N
JL. MH. Thamrin No. 81

DETAIL D4.b SECTION 4.a.1-4.a.1 Kecamatan Menteng, Jakarta Pusat

APPROVED BY CLIENT
SCALE 1:25 SCALE 1:25

1720
KONSULTAN

PT. LYDUMA INTERMAS CONSULTANT


Soil and Foundation, Architecture and Civil Engineering
Planning & Designing and Project Management
Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id
860 860
APPROVED BY KONSULTAN

SECTION 4.a.3-4.a.3
SCALE 1:25

KONTRAKTOR

Name D4.b PT. MALIGO MAS UTAMA


Soil and Foundation, Architecture and Civil Engineering

Total 1 Unit Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
North Sumatera-Indonesia

A UPVC Frame DRAWN BY CHECKED BY

B Solid Wood Frame (Damar Laut)


C Wood Panel (Engineered Particle Board)
DODI. A AZMI AREF
D UPVC Panel
MATERIAL

TITLE
E Panasap Euro Green 8mm
F Panasap Euro Green 6mm MAIN OFFICE
G Clear Glass 6mm
SUB TITLE
H Clear Glass 8mm
I Tempered Glass 12mm DETAIL DOOR 4b

J Sundblasting Sticker
DRAWING CODE DATE
Completeness
SDOSMR-OFF-A 010 DESEMBER 2023
Lock 3 Unit
SCALE PAGE REVISION
Hinge 3" -
Hinge 4" 1:20 10 R.00
6 Unit

THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA


TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.
NOTE

D6.a D6.a

C C C C C C C C C C D7.b
3100

F.F.L Elv +44.900

DETAIL- D6 NO. REVISION DATE

PROJECT
SCALE 1:50
1 2
8000

THE PROPOSED CONSTRUCTION OF


D7.a D7.a A NEW INTEGRATED REFINERY COMPLEX
AT KEK SEI MANGKEI, KAB. SIMALUNGUN
SUMATERA UTARA
8025 CLIENT

SECTION D6.a-D6.a 3100


PT. Sime Darby Oils Sei Mangkei Refinery
The City Tower Lt. 12 Unit 1N
JL. MH. Thamrin No. 81
SCALE 1:50 Kecamatan Menteng, Jakarta Pusat

C C C
APPROVED BY CLIENT

Name D6

Total 1 Unit KONSULTAN

A UPVC Frame PT. LYDUMA INTERMAS CONSULTANT


Soil and Foundation, Architecture and Civil Engineering
Planning & Designing and Project Management
B Solid Wood Frame (Damar Laut) Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id
C Wood Panel (Engineered Particle Board)
APPROVED BY KONSULTAN
D UPVC Panel
MATERIAL

E Panasap Euro Green 8mm


F Panasap Euro Green 6mm
G Clear Glass 6mm
KONTRAKTOR
H Clear Glass 8mm
I Tempered Glass 12mm PT. MALIGO MAS UTAMA
F.F.L Elv +44.900 Soil and Foundation, Architecture and Civil Engineering

J Sundblasting Sticker Name D7


Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
North Sumatera-Indonesia

Completeness Total 2 Unit


Lock 3 Unit A UPVC Frame DETAIL - D7 DRAWN BY CHECKED BY

Hinge 3" - B Solid Wood Frame (Damar Laut) 3 SCALE 1:20

Hinge 4" 13 Unit C Wood Panel (Engineered Particle Board) 3000


DODI. A AZMI AREF
D UPVC Panel
MATERIAL

TITLE
E Panasap Euro Green 8mm
F Panasap Euro Green 6mm MAIN OFFICE
G Clear Glass 6mm
SUB TITLE
H Clear Glass 8mm
I Tempered Glass 12mm
DETAIL DOOR 6-7
J Sundblasting Sticker
Completeness DR A W I N G CODE DATE

Lock 3 Unit SDOSMR-OFF-A 011 DESEMBER 2023


Hinge 3" -
2600 SCALE PAGE REVISION
Hinge 4" 9 Unit

SECTION D7.a-D7.a 1:20 11 R.00

SCALE 1:20
THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA
TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.
NOTE
8.a1

D8.b D8.b 8.a2 8.a2


C
C

H 2110 2110 NO. REVISION DATE

PROJECT
C

H THE PROPOSED CONSTRUCTION OF


A NEW INTEGRATED REFINERY COMPLEX
AT KEK SEI MANGKEI, KAB. SIMALUNGUN
C
SUMATERA UTARA

CLIENT
H
PT. Sime Darby Oils Sei Mangkei Refinery
The City Tower Lt. 12 Unit 1N
JL. MH. Thamrin No. 81
Kecamatan Menteng, Jakarta Pusat

C APPROVED BY CLIENT
F.F.L Elv +44.900 F.F.L Elv +49.400

D8.a 8.a1

DETAIL D8 SECTION D8.a-D8.a DETAIL D8.a SECTION 8.a1-8.a1 KONSULTAN

PT. LYDUMA INTERMAS CONSULTANT


SCALE 1:20 SCALE 1:20 SCALE 1:20 SCALE 1:20
Soil and Foundation, Architecture and Civil Engineering
Planning & Designing and Project Management
Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id

D8.a APPROVED BY KONSULTAN


Name
Name D8
Total 3 Unit
Total 9 Unit A UPVC Frame
A UPVC Frame B Solid Wood Frame (Damar Laut) KONTRAKTOR
B Solid Wood Frame (Damar Laut) C Wood Panel (Engineered Particle Board) PT. MALIGO MAS UTAMA
C Wood Panel (Engineered Particle Board) D UPVC Panel
Soil and Foundation, Architecture and Civil Engineering

MATERIAL
820 820 Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa

D UPVC Panel
MATERIAL

North Sumatera-Indonesia
E Panasap Euro Green 8mm
SECTION D8.b-D8.b E Panasap Euro Green 8mm
SECTION 8.a2-8.a2 F Panasap Euro Green 6mm
DRAWN BY CHECKED BY

SCALE 1:20 F Panasap Euro Green 6mm G Clear Glass 6mm


SCALE 1:20
G Clear Glass 6mm H Clear Glass 8mm DODI. A AZMI AREF
H Clear Glass 8mm I Tempered Glass 12mm TITLE
I Tempered Glass 12mm J Sundblasting Sticker
J Sundblasting Sticker MAIN OFFICE
Completeness
Completeness Lock 1 Unit SUB TITLE

Lock 1 Unit Hinge 3" - DETAIL DOOR 8-8a


Hinge 3" - Hinge 4" 3 Unit
Hinge 4" 3 Unit DRAWING CODE DATE

SDOSMR-OFF-A 012 DESEMBER 2023

SCALE PAGE REVISION

1:20 12 R.00

THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA


TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.
NOTE

8.c2
NO. REVISION DATE
C
PROJECT

2110

THE PROPOSED CONSTRUCTION OF


A NEW INTEGRATED REFINERY COMPLEX
AT KEK SEI MANGKEI, KAB. SIMALUNGUN
SUMATERA UTARA

CLIENT

PT. Sime Darby Oils Sei Mangkei Refinery


The City Tower Lt. 12 Unit 1N
JL. MH. Thamrin No. 81
Kecamatan Menteng, Jakarta Pusat

APPROVED BY CLIENT

F.F.L Elv +49.400


KONSULTAN
8.c1 PT. LYDUMA INTERMAS CONSULTANT
Soil and Foundation, Architecture and Civil Engineering
Planning & Designing and Project Management

DETAIL D8.c SECTION 8.c1-8.c1


Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id

APPROVED BY KONSULTAN
SCALE 1:20 SCALE 1:20

Name D8.c
KONTRAKTOR

Total 1 Unit PT. MALIGO MAS UTAMA


Soil and Foundation, Architecture and Civil Engineering
A UPVC Frame
Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
North Sumatera-Indonesia
B Solid Wood Frame (Damar Laut)
DRAWN BY CHECKED BY
820 C Wood Panel (Engineered Particle Board)
D UPVC Panel

MATERIAL
E Panasap Euro Green 8mm
SECTION 8.c2-8.c2 F Panasap Euro Green 6mm TITLE
DODI. A AZMI AREF

SCALE 1:20
G Clear Glass 6mm
MAIN OFFICE
H Clear Glass 8mm
I Tempered Glass 12mm SUB TITLE

J Sundblasting Sticker
DETAIL DOOR 8c
Completeness
Lock 1 Unit DRAWING CODE DATE

Hinge 3" SDOSMR-OFF-A 014 DESEMBER 2023


-
Hinge 4" 3 Unit SCALE PAGE REVISION

1:20 14 R.00

THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA


TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.
NOTE

NO. REVISION DATE


8.d2
H 2110 PROJECT

THE PROPOSED CONSTRUCTION OF


A NEW INTEGRATED REFINERY COMPLEX
H
AT KEK SEI MANGKEI, KAB. SIMALUNGUN
SUMATERA UTARA
C
CLIENT

PT. Sime Darby Oils Sei Mangkei Refinery


The City Tower Lt. 12 Unit 1N
H JL. MH. Thamrin No. 81
Kecamatan Menteng, Jakarta Pusat

APPROVED BY CLIENT

C
F.F.L Elv +44.900

8.d1
KONSULTAN
PT. LYDUMA INTERMAS CONSULTANT
Soil and Foundation, Architecture and Civil Engineering
Planning & Designing and Project Management

DETAIL D8.d SECTION 8.d1-8.d1 Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id

SCALE 1:20 SCALE 1:20 APPROVED BY KONSULTAN

1850 Name D8.d


Sliding Door
Total 1 Unit KONTRAKTOR

A UPVC Frame
PT. MALIGO MAS UTAMA
140

Soil and Foundation, Architecture and Civil Engineering


B Solid Wood Frame (Damar Laut)
Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa

810 920 C Wood Panel (Engineered Particle Board) North Sumatera-Indonesia

40 40 40 DRAWN BY CHECKED BY
D UPVC Panel

MATERIAL
E Panasap Euro Green 8mm
SECTION 8.d2-8.d2 F Panasap Euro Green 6mm
DODI. A AZMI AREF
SCALE 1:20
G Clear Glass 6mm TITLE

H Clear Glass 8mm


Tempered Glass 12mm MAIN OFFICE
I
J Sundblasting Sticker SUB TITLE

Completeness
DETAIL DOOR 8d
Lock 1 Unit
Hinge 3" - DRAWING CODE DATE

Hinge 4" 3 Unit SDOSMR-OFF-A 013 DESEMBER 2023

SCALE PAGE REVISION

1:20 13 R.00

THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA


TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.
NOTE

D9.a

H I

H I

D9.b D9.b
C
NO. REVISION DATE

PROJECT
H I
2110

C
THE PROPOSED CONSTRUCTION OF
A NEW INTEGRATED REFINERY COMPLEX
H I AT KEK SEI MANGKEI, KAB. SIMALUNGUN
SUMATERA UTARA

CLIENT
C
PT. Sime Darby Oils Sei Mangkei Refinery
The City Tower Lt. 12 Unit 1N

H I JL. MH. Thamrin No. 81


Kecamatan Menteng, Jakarta Pusat

APPROVED BY CLIENT

C
F.F.L Elv +44.900
KONSULTAN
D9.a
PT. LYDUMA INTERMAS CONSULTANT
Soil and Foundation, Architecture and Civil Engineering
Planning & Designing and Project Management

DETAIL D9 SECTION D9.a-D9.a Jl. Abdullah Lubis No.37/25 Medan 20154, North Sumatera-Indonesia
Phone: 061-4148585 (Hunting) Fax.: 061-4560940 E-mail: lic@indo.net.id

SCALE 1:20 SCALE 1:20 APPROVED BY KONSULTAN

Name D9
KONTRAKTOR
Total 10 Unit
PT. MALIGO MAS UTAMA
A UPVC Frame Soil and Foundation, Architecture and Civil Engineering

Jl. Lilawangsa No. 99. Gp. PB Tunong Kec. Langsa Baro Kota Langsa
B Solid Wood Frame (Damar Laut) North Sumatera-Indonesia

C Wood Panel (Engineered Particle Board) DRAWN BY CHECKED BY


720
D UPVC Panel
MATERIAL

SECTION D9.b-D9.b E Panasap Euro Green 8mm


DODI. A AZMI AREF

SCALE 1:20 F Panasap Euro Green 6mm


TITLE
G Clear Glass 6mm
H Clear Glass 8mm MAIN OFFICE

I Tempered Glass 12mm SUB TITLE

J Sundblasting Sticker
DETAIL DOOR 9
Completeness
Lock 1 Unit DRAWING CODE DATE

Hinge 3" - SDOSMR-OFF-A 015 DESEMBER 2023


Hinge 4" 3 Unit SCALE PAGE REVISION

1:20 15 R.00

THIS DRAWING IS PROPERTY OF PT. MALIGO MAS UTAMA


TOTAL OR PARTIAL REPRODUCTION OR UTILIZATION OF THIS DOCUMENT
IS FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF
PT. MALIGO MAS UTAMA.

You might also like