0+000
0+050
0+100
0+150
0+200
0+250
0+300
0+350
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
0+000
0+025
0+050
0+067
0+076
0+100
0+150
0+155
0+177
0+184
0+188
0+200
0+205
0+233
0+244
0+250
0+268
0+299
0+300
0+304
0+311
0+339
0+350
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
0+350
0+400
0+450
0+500
0+550
0+600
0+650
0+700
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
Awal Segmen 1
AC-BC dan
LPA Klas A Full
0+350
0+400
0+402
0+416
0+450
0+453
0+482
0+500
0+550
0+600
0+650
0+670
0+700
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
0+700
0+750
0+800
0+850
0+900
0+950
1+000
1+050
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
0+700
0+750
0+800
0+850
0+900
0+950
1+000
1+050
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
1+050
1+100
1+150
1+200
1+250
1+300
1+350
1+400
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
1+050
1+100
1+150
1+200
1+250
1+300
1+350
1+400
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
1+400
1+450
1+500
1+550
1+600
1+650
1+700
1+750
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
1+400
1+450
1+500
1+550
1+600
1+650
1+700
1+750
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
1+750
1+800
1+850
1+900
1+950
2+000
2+050
2+100
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
1+750
1+800
1+850
1+900
1+950
2+000
2+050
2+100
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
2+100
2+150
2+200
2+250
2+300
2+350
2+400
2+450
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
2+100
2+150
2+178
2+200
2+250
2+300
2+350
2+400
2+450
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
2+450
2+500
2+550
2+600
2+650
2+700
2+750
2+800
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
2+450
2+500
2+550
2+600
2+650
2+700
2+750
2+800
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
2+800
2+850
2+900
2+950
3+000
3+050
3+100
3+150
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
2+800
2+850
2+900
2+950
3+000
3+050
3+100
3+150
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
3+150
3+200
3+250
3+300
3+350
3+400
3+450
3+500
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
3+150
3+200
3+250
3+300
3+350
3+400
3+450
3+500
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
3+500
3+550
3+600
3+650
3+700
3+750
3+800
3+850
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
3+500
3+550
3+600
3+650
3+700
3+750
3+800
3+850
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
3+850
3+900
3+950
4+000
4+050
4+100
4+150
4+200
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
3+850
3+900
3+950
4+000
4+050
4+100
4+150
4+200
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
4+200
4+250
4+300
4+350
4+400
4+450
4+500
4+550
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
Akhir Segmen 1
AC-BC dan
LPA Klas A Full
4+200
4+250
4+260
4+300
4+350
4+354
4+400
4+412
4+450
4+461
4+471
4+475
4+479
4+500
4+550
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
4+550
4+600
4+650
4+700
4+750
4+800
4+850
4+900
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
4+550
4+598
4+600
4+618
4+650
4+681
4+700
4+725
4+750
4+800
4+838
4+846
4+850
4+861
4+880
4+900
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
4+900
4+950
5+000
5+050
5+100
5+150
5+200
5+250
PAS. BATU/TALUD
PAS. BATU/MORTAR
BAHU JALAN
BADAN JALAN
BADAN JALAN
BAHU JALAN
PAS. BATU/MORTAR
PAS. BATU/TALUD
4+900
4+921
4+923
4+950
4+991
4+997
5+000
LASTON AC-WC
LASTON AC-BC
KLAS A
KLAS B
PAS. BATU
PAS. MORTAR
TIMPIL (SIRTU)
KET. : LASTON AC-WC AGREGAT KLAS A Full TIMPIL (SIRTU) PAS. BATU
VOLUME SELISIH
NO. ITEM JENIS PEKERJAAN SAT. VOLUME CC0 01 KET.
RENCANA AWAL VOLUME
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 1.00 - TETAP
1.2 Manajemen dan Keselamatan Lalu Lintas LS 1.00 1.00 - TETAP
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air m3 360.00 240.00 (120.00) BERKURANG
2.2.(1) Pasangan Batu dengan Mortar m3 234.00 130.00 (104.00) BERKURANG
DIVISI 7. STRUKTUR
7.1.(5a) Beton Struktur fc'30 Mpa m3 3.30 6.30 3.00 BERTAMBAH
7.3.(1) Baja Tulangan Polos-BjTP 280 Kg 396.00 707.71 311.71 BERTAMBAH
7.3.(5) Baja Tulangan Sirip-BjTS 520 Kg 495.00 318.07 (176.93) BERKURANG
7.9.(1) Pasangan Batu m3 380.91 354.00 (26.91) BERKURANG
ANDI ERWIN. BP, ST, MM IRFAN NURSANI, ST. NURBAETY, ST. NASRUN, S. ST KAHARUDDIN,ST.
NIP. 19800802 200902 1 006 NIP. 19840102 201903 1 009 NIP. 19890503 201903 2 015 Site Engineer General Superintendent
BACK UP DATA
Paket PPK 1.1 Preservasi Jalan dan Jembatan Jeneponto-Bantaeng-Bulukumba-Sinjai (Longsegment)
Tahun Anggaran 2024
ARAH BANTAENG
CL L x P
2+129.10
9 13.10 9 2.10 x 13.10 27.51 0.05 1.38 HOLDING
2+116.00
2+072.50
8 3.50 8 1.30 x 3.50 4.55 0.05 0.23 RUTIN KONDISI
2+069.00
1+957.50
b 2.50 b 2.80 x 2.50 7.00 0.05 0.35 RUTIN KONDISI
1+955.00 7
a 3.00 7 a 5.60 x 3.00 16.80 0.05 0.84 HOLDING
1+952.00
1+878.50
1+867.00
1+860.00
5 2.00 5 1.30 x 2.00 2.60 0.05 0.13 RUTIN KONDISI
1+858.00
1+511.50
4 0.50 4 0.50 x 0.50 0.25 0.05 0.01 RUTIN KONDISI
1+511.00
0+720.80
3 0.80 3 0.70 x 0.80 0.56 0.05 0.03 RUTIN KONDISI
0+720.00
0+428.70
2 13.70 2 1.80 x 13.70 24.66 0.05 1.23 HOLDING
0+415.00
0+213.70
1 6.70 1 1.00 x 6.70 6.70 0.05 0.33 RUTIN KONDISI
0+207.00 AWAL PEKERJAAN
KM.
ARAH MAKASSAR 91+995
Sub Total 1 57.30 122.83 6.14 m3
Edy
Direksi Inspector Pelaksana
BACK UP DATA
Paket PPK 1.1 Preservasi Jalan dan Jembatan Jeneponto-Bantaeng-Bulukumba-Sinjai (Longsegment)
Tahun Anggaran 2024
ARAH BANTAENG
CL L x P
7
2+246.10
2+225.50
19 2.50 19 1.30 x 2.50 3.25 0.05 0.16
2+223.00
2+217.50
18 4.50 18 2.50 x 4.50 11.25 0.05 0.56
2+213.00
2+195.00
17 6.00 17 2.30 x 6.00 13.80 0.05 0.69
2+189.00
2+208.00
2+187.00
15 2.00 15 1.50 x 2.00 3.00 0.05 0.15
2+185.00
2+178.50
14 5.50 14 2.50 x 5.50 13.75 0.05 0.69
2+173.00
2+176.50
2+167.00
12 6.00 12 1.70 x 6.00 10.20 0.05 0.51
2+161.00
2+153.50
2+127.00
2+122.50
10 4.50 10 1.80 x 4.50 8.10 0.05 0.41
2+118.00
ARAH MAKASSAR
Sub Total 2 100.10 201.45 10.07 m3
ARAH BANTAENG
CL L x P
7
2+469.50
2+458.00
2+442.10
2+430.00
2+414.30 c
4.50 c 2.20 x 4.50 9.90 0.05 0.50
2+409.80 b
26 18.50 b 3.10 x 18.50 57.35 0.05 2.87
2+391.30
a 6.30 26 a 2.20 x 6.30 13.86 0.05 0.69
2+385.00
2+409.50
2+385.00
2+347.00
24 1.00 24 1.60 x 1.00 1.60 0.05 0.08
2+346.00
2+300.30
23 8.30 23 2.70 x 8.30 22.41 0.05 1.12
2+292.00
2+292.20
22 4.20 22 1.20 x 4.20 5.04 0.05 0.25
2+288.00
2+276.10
ARAH MAKASSAR
Sub Total 3 99.00 247.41 12.37 m3
ARAH BANTAENG
CL L x P
7
2+598.50
2+580.00
2+574.50
33 3.50 33 1.10 x 3.50 3.85 0.05 0.19
2+571.00
2+549.80
2+536.00
2+541.00
2+530.00
2+518.60
2+507.50
30 a. 9.50 30 a. 5.00 x 9.50 47.50 0.05 2.38
2+498.00
2+491.70
2+483.00
ARAH MAKASSAR
Sub Total 4 76.10 264.61 13.23 m3
ARAH BANTAENG
CL L x P
7
3+053.20
43
4.20 43 1.70 x 4.20 7.14 0.05 0.36
3+049.00
2+987.50
42 1.50 42 1.00 x 1.50 1.50 0.05 0.08
2+986.00
2+941.70
2+923.50
2+925.00
2+903.00
2+897.10
38 7.10 38 1.70 x 7.10 12.07 0.05 0.60
2+890.00
2+883.30
37 4.30 37 1.70 x 4.30 7.31 0.05 0.37
2+879.00
2+866.00
36 1.00 36 2.80 x 1.00 2.80 0.05 0.14
2+865.00
2+623.00
35 5.00 35 1.00 x 5.00 5.00 0.05 0.25
2+618.00
ARAH MAKASSAR
Sub Total 5 62.30 96.58 4.83 m3
ARAH BANTAENG
CL L x P
7
3+237.50
53 3.50 53 1.00 x 3.50 3.50 0.05 0.18
3+234.00
3+190.50
3+173.00
3+177.50
49 8.50 49 1.50 x 8.50 12.75 0.05 0.64
3+169.00
3+165.10
48 7.10 48 1.50 x 7.10 10.65 0.05 0.53
3+158.00
3+136.50
47 3.50 47 1.10 x 3.50 3.85 0.05 0.19
3+133.00
3+119.50
46 3.50 46 1.30 x 3.50 4.55 0.05 0.23
3+116.00
3+108.00
3+091.00
ARAH MAKASSAR
Sub Total 6 65.20 97.01 4.85 m3
ARAH BANTAENG
CL L x P
7
3+390.70
62 2.70 62 1.10 x 2.70 2.97 0.05 0.15
3+388.00
3+387.00
61 1.00 61 1.00 x 1.00 1.00 0.05 0.05
3+386.00
3+389.50
60 9.50 60 2.00 x 9.50 19.00 0.05 0.95
3+380.00
3+312.00
59 2.00 59 1.10 x 2.00 2.20 0.05 0.11
3+310.00
3+306.80
58 3.80 58 1.80 x 3.80 6.84 0.05 0.34
3+303.00
3+310.00
57
11.00 57 1.70 x 11.00 18.70 0.05 0.94
3+299.00
3+284.00
56
3.00 56 1.50 x 3.00 4.50 0.05 0.23
3+281.00
3+265.80
55 1.80 55 1.30 x 1.80 2.34 0.05 0.12
3+264.00
3+248.00
54
5.00 54 1.70 x 5.00 8.50 0.05 0.43
3+243.00
ARAH MAKASSAR
Sub Total 7 39.80 66.05 3.30 m3
ARAH BANTAENG
CL L x P
7
AKHIR
4+468.00 RUAS
KM.
67 96+475
10.00 67 2.00 x 10.00 20.00 0.05 1.00
4+458.00
3+751.30
66
7.30 66 1.30 x 7.30 9.49 0.05 0.47
3+744.00
3+736.50
65 13.50 65 1.60 x 13.50 21.60 0.05 1.08
3+723.00
3+398.10
64 1.10 64 1.10 x 1.10 1.21 0.05 0.06
3+397.00
3+394.30
63 1.30 63 1.40 x 1.30 1.82 0.05 0.09
3+393.00
ARAH MAKASSAR
Sub Total 8 33.20 54.12 2.71 m3
TOTAL 1-8 533.00 1150.06 57.50 m3
ARAH BANTAENG
CL L x P
7
0+720.80
5 0.80 5 0.70 x 0.80 0.56 0.05 0.03 CAP
0+720.00
0+428.70
4 3.70 4 1.80 x 3.70 6.66 0.05 0.33 CAP
0+425.00
3 5.00 3 1.80 x 5.00 9.00 0.05 0.45 CAP
0+213.70
1 6.70 1 1.00 x 6.70 6.70 0.05 0.33 CAP
0+207.00
1+504.00
1+430.70
5 1.70 5 1.00 x 1.70 1.70 0.05 0.09 CAP
1+429.00
1+423.00
4 10.00 4 1.00 x 10.00 10.00 0.05 0.50 CAP
1+413.00
1+034.60
3 1.60 3 1.00 x 1.60 1.60 0.05 0.08 CAP
1+033.00
KM.90
0+443.20
2 8.00 2 1.30 x 8.00 10.40 0.05 0.52 CAP
0+435.20 AWAL
1 4.20 1 0.70 x 4.20 2.94 0.05 0.15 PROYEK
0+431.00 KM.
89+527
ARAH MAKASSAR
Sub Total 1 55.70 65.76 3.29 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
2+196.00
2+173.00
2+139.50
2+127.00
2+124.50
12 3.50 12 2.00 x 3.50 7.00 0.05 0.35 CAP
2+121.00
11 3.00 11 2.00 x 3.00 6.00 0.05 0.30 CAP
2+118.00
1+956.50
10 2.50 10 2.60 x 2.50 6.50 0.05 0.33 CAP
1+954.00
9 2.00 9 2.60 x 2.00 5.20 0.05 0.26 CAP
1+952.00
1+873.10
1+868.00
1+860.00
7 2.00 7 1.30 x 2.00 2.60 0.05 0.13 CAP
1+858.00
1+511.50
6 0.50 6 0.50 x 0.50 0.25 0.05 0.01 CAP
1+511.00
ARAH MAKASSAR
Sub Total 2 41.10 83.43 4.17 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
2+510.50
26 10.50 26 1.50 x 10.50 15.75 0.05 0.79 CMM
2+500.00
2+505.00
25 5.00 25 1.00 x 5.00 5.00 0.05 0.25 CAP
2+500.00
2+520.00
2+500.00
2+488.40
23 3.50 23 2.50 x 3.50 8.75 0.05 0.44 CMM
2+484.90 22
4.40 22 2.70 x 4.40 11.88 0.05 0.59 CMM
2+484.00
2+467.50
21 5.50 21 1.50 x 5.50 8.25 0.05 0.41 CAP
2+462.00
2+443.30
20 4.50 20 1.30 x 4.50 5.85 0.05 0.29 CAP
2+438.80
19 2.80 19 2.10 x 2.80 5.88 0.05 0.29 CAP
2+436.00
18 5.00 18 1.30 x 5.00 6.50 0.05 0.33 CAP
2+431.00
2+293.20
17 4.20 17 1.20 x 4.20 5.04 0.05 0.25 CAP
2+289.00
2+225.50
16 2.50 16 1.30 x 2.50 3.25 0.05 0.16 CAP
2+223.00
ARAH MAKASSAR
Sub Total 3 67.90 136.15 6.81 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
4+468.00
32 10.00 32 2.00 x 10.00 20.00 0.05 1.00 CMM
4+458.00
3+752.30
31 7.30 31 1.30 x 7.30 9.49 0.05 0.47 CAP
3+745.00
3+737.50
3+724.00
3+393.70
29 1.00 29 1.00 x 1.00 1.00 0.05 0.05 CAP
3+392.70
3+389.00
3+380.00
2+990.50
27 1.50 27 1.00 x 1.50 1.50 0.05 0.08 CAP
2+989.00
ARAH MAKASSAR
Sub Total 4 42.30 72.49 3.62 m3
TOTAL 1-4 207.00 357.83 17.89 m3
ARAH BANTAENG
CL L x P
7
0+590.00
10 6.00 10 1.70 x 6.00 10.20 0.05 0.51
0+584.00
0+550.00
9 2.00 9 0.60 x 2.00 1.20 0.05 0.06
0+548.00
0+201.90
8 1.90 8 1.00 x 1.90 1.90 0.05 0.10
0+200.00
0+202.00
7 2.00 7 1.20 x 2.00 2.40 0.05 0.12
0+200.00
0+202.10
6 2.10 6 1.30 x 2.10 2.73 0.05 0.14
0+200.00
0+204.20
5 4.20 5 1.50 x 4.20 6.30 0.05 0.31
0+200.00
0+205.70 c.
7.00 c. 3.50 x 7.00 24.50 0.05 1.23
0+203.80 b.
1.00 b. 1.30 x 1.00 1.30 0.05 0.07
0+201.90
a. 4 5.00 4 a. 2.40 x 5.00 12.00 0.05 0.60
0+200.00
0+155.00
b. 2.00 b. 1.20 x 2.00 2.40 0.05 0.12
0+153.00
3 3.00 3 a. 2.10 x 3.00 6.30 0.05 0.32
0+150.00 a.
0+038.70
2 0.70 2 0.70 x 0.70 0.49 0.05 0.02
0+038.00
AWAL
0+032.00 PROYEK
1 1.00 1 0.90 x 1.00 0.90 0.05 0.05 KM.
0+031.00 93+000
ARAH MAKASSAR
Sub Total 1 37.90 72.62 3.63 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
1+099.40
b. 1.20 b. 1.90 x 1.20 2.28 0.05 0.11
1+098.20
19 a. 1.20 19 a. 1.40 x 1.20 1.68 0.05 0.08
1+097.00
1+071.00
18 1.00 18 0.80 x 1.00 0.80 0.05 0.04
1+070.00
1+031.30
17 1.30 17 1.10 x 1.30 1.43 0.05 0.07
1+030.00
0+982.10
16 1.10 16 0.70 x 1.10 0.77 0.05 0.04
0+981.00
0+956.00
15 6.00 15 1.20 x 6.00 7.20 0.05 0.36
0+950.00
0+916.40
14 1.40 14 1.40 x 1.40 1.96 0.05 0.10
0+915.00
0+899.90
13 0.90 13 0.40 x 0.90 0.36 0.05 0.02
0+899.00
0+818.20
12 1.20 12 0.80 x 1.20 0.96 0.05 0.05
0+817.00
0+641.00
11 9.00 11 1.00 x 9.00 9.00 0.05 0.45
0+632.00
ARAH MAKASSAR
Sub Total 2 24.30 26.44 1.32 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
1+116.50
27 1.00 27 0.70 x 1.00 0.70 0.05 0.03
1+115.50
1+114.50
26 1.30 26 2.30 x 1.30 2.99 0.05 0.15
1+113.20
1+112.20
25 0.80 25 0.01 x 0.80 0.00 0.05 0.00
1+111.40
1+110.40
24 1.70 24 2.00 x 1.70 3.40 0.05 0.17
1+108.70
1+107.70
23 1.70 23 1.20 x 1.70 2.04 0.05 0.10
1+106.00
1+106.50
22 1.50 22 1.60 x 1.50 2.40 0.05 0.12
1+105.00
1+104.00
21 0.90 21 0.70 x 0.90 0.63 0.05 0.03
1+103.10
1+102.10
20 1.10 20 a 0.90 x 1.10 0.99 0.05 0.05
1+101.00
ARAH MAKASSAR
Sub Total 3 10.00 13.16 0.66 m3
TOTAL 1-3 72.20 112.22 5.61 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
ARAH BANTAENG
CL L x P
7
1+479.00
1+310.50
8 9.00 8 1.20 x 9.00 10.80 0.05 0.54
1+301.50
0+724.00
7 10.00 7 1.30 x 10.00 13.00 0.05 0.65
0+714.00
0+487.30
0+481.30
6
a. 4.30 6 a. 1.60 x 4.30 6.88 0.05 0.34
0+477.00
0+383.00
0+372.00
0+318.40
4 1.40 4 1.10 x 1.40 1.54 0.05 0.08
0+317.00
0+195.00
3
10.00 3 1.40 x 10.00 14.00 0.05 0.70
0+185.00
0+164.00
8.00 2 1.50 x 8.00 12.00 0.05 0.60
2
0+156.00
0+110.00
1 4.00 1 2.00 x 4.00 8.00 0.05 0.40 AWAL
0+106.00 KM.
99+195
ARAH MAKASSAR
Sub Total 1 71.70 120.12 6.01 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
3+599.80
18 2.80 18 1.10 x 2.80 3.08 0.05 0.15
3+597.00
3+488.00
3+477.00
3+197.00
3+095.80
15 3.80 15 1.30 x 3.80 4.94 0.05 0.25
3+092.00
3+079.50
14 2.50 14 1.30 x 2.50 3.25 0.05 0.16
3+077.00
2+930.00
2+916.00
2+816.00
2+803.00
2+600.00
2+588.00
1+921.00
1+908.00
ARAH MAKASSAR
Sub Total 2 79.10 114.77 5.74 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
5+487.50
26 5.50 26 1.30 x 5.50 7.15 0.05 0.36
5+482.00
5+350.60
5+336.00
5+320.50
5+305.00
5+280.70
5+275.00
4+805.50
4+797.80
22 a. 3.80 22 a. 3.00 x 3.80 11.40 0.05 0.57
4+794.00
4+414.60
4+403.00
4+122.00
20 3.00 20 1.80 x 3.00 5.40 0.05 0.27
4+119.00
4+141.50
4+115.00
ARAH MAKASSAR
Sub Total 3 93.90 140.83 7.04 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
6+512.60
35
4.60 35 1.30 x 4.60 5.98 0.05 0.30
6+508.00
6+489.20
34 b. 4.20 b. 2.50 x 4.20 10.50 0.05 0.52
6+474.60
33 3.60 33 1.20 x 3.60 4.32 0.05 0.22
6+471.00
6+447.10
32 4.10 32 1.00 x 4.10 4.10 0.05 0.21
6+443.00
6+391.00
31 1.00 31 0.50 x 1.00 0.50 0.05 0.03
6+390.00
6+294.70
30 3.70 30 1.10 x 3.70 4.07 0.05 0.20
6+291.00
5+843.20
5+831.00
28 5.00 28 1.50 x 5.00 7.50 0.05 0.38
5+826.00
5+499.30
b. 4.80 b. 1.10 x 4.80 5.28 0.05 0.26
5+494.50
27 a. 3.50 27 a. 3.10 x 3.50 10.85 0.05 0.54
5+491.00
ARAH MAKASSAR
Sub Total 4 45.70 75.74 3.79 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
7+338.60
7+332.00
7+331.20
42
4.20 42 1.30 x 4.20 5.46 0.05 0.27
7+327.00
7+041.20
7+034.00
7+025.60
40 6.60 40 2.20 x 6.60 14.52 0.05 0.73
7+019.00
7+017.20
b. 7.00 b. 2.80 x 7.00 19.60 0.05 0.98
7+010.20
39 a. 5.20 39 a. 2.70 x 5.20 14.04 0.05 0.70
7+005.00
6+697.00
6+685.00
37
6.00 37 1.80 x 6.00 10.80 0.05 0.54
6+679.00
6+525.00
b.
36 11.00 36 b. 2.00 x 11.00 22.00 0.05 1.10
6+514.00
a. 2.00 a. 1.50 x 2.00 3.00 0.05 0.15
6+512.00
ARAH MAKASSAR
Sub Total 5 62.80 126.28 6.31 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
7+906.50
7+900.00
7+778.30
b.
12.00 b. 3.00 x 12.00 36.00 0.05 1.80
7+766.30
7+667.00
7+655.00
7+637.80
c. 3.00 c. 2.00 x 3.00 6.00 0.05 0.30
7+634.80
7+628.50
a. 1.50 a. 1.50 x 1.50 2.25 0.05 0.11
7+627.00
7+558.00
7+490.50
44
11.50 44 1.50 x 11.50 17.25 0.05 0.86
7+479.00
ARAH MAKASSAR
Sub Total 6 95.10 312.00 15.60 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
11+123.50
b. 24.50 b. 1.20 x 24.50 29.40 0.05 1.47
11+099.00
11+071.00
11+061.00
11+031.00
9+126.20
54 9.20 54 1.70 x 9.20 15.64 0.05 0.78
9+117.00
9+083.10
9+066.00
8+169.00
52 8.00 52 1.50 x 8.00 12.00 0.05 0.60
8+161.00
8+156.50
8+143.00
8+055.00
8+013.00
ARAH MAKASSAR
Sub Total 7 172.30 518.59 25.93 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
11+357.60
11+333.00
11+334.50
11+317.00
11+285.00
61 10.00 61 1.00 x 10.00 10.00 0.05 0.50
11+275.00
11+273.50
11+256.00
11+253.50
b. 4.00 b. 3.00 x 4.00 12.00 0.05 0.60
11+249.50
59 a. 6.50 59 a. 6.00 x 6.50 39.00 0.05 1.95
11+243.00
11+209.60
b. 12.60 b. 3.00 x 12.60 37.80 0.05 1.89
11+197.00
11+177.00
11+152.20
11+142.00
ARAH MAKASSAR
Sub Total 8 122.90 333.55 16.68 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
11+820.00
1.50 69 1.50 x 1.50 2.25 0.05 0.11
11+791.50
11+782.00
11+764.60
64.60 67 1.50 x 64.60 96.90 0.05 4.85
67
66
64.60 66 3.00 x 64.60 193.80 0.05 9.69
11+700.00
11+574.50
11+550.00
11+508.20
e. 11.50 e. 1.50 x 11.50 17.25 0.05 0.86
11+496.70
d. 27.50 d. 3.00 x 27.50 82.50 0.05 4.13
11+469.20
64 10.00 64 c. 6.00 x 10.00 60.00 0.05 3.00
c.
11+459.20
b. 13.00 b. 3.00 x 13.00 39.00 0.05 1.95
11+446.20
11+426.00
ARAH MAKASSAR
Sub Total 9 275.40 709.50 35.48 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
13+063.50
13+043.00
13+025.50
74 4.50 74 3.00 x 4.50 13.50 0.05 0.68
13+021.00
12+988.20
73 5.20 73 1.20 x 5.20 6.24 0.05 0.31
12+983.00
12+963.00
b. 8.50 b. 3.00 x 8.50 25.50 0.05 1.28
12+954.50
72 11.50 72 a. 1.50 x 11.50 17.25 0.05 0.86
a.
12+943.00
12+912.00
c. 10.50 c. 3.00 x 10.50 31.50 0.05 1.58
12+901.50
71 16.50 71 b. 1.50 x 16.50 24.75 0.05 1.24
b.
12+885.00
a. 3.50 a. 3.00 x 3.50 10.50 0.05 0.53
12+881.50
12+761.50
12+728.50
70 a. 19.00 70 a. 3.00 x 19.00 57.00 0.05 2.85
12+709.50
ARAH MAKASSAR
Sub Total 10 132.70 297.24 14.86 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
14+004.60
13+978.00
13+349.00
81 13.00 81 b. 3.00 x 13.00 39.00 0.05 1.95
b.
13+336.00
a. 24.00 a. 1.00 x 24.00 24.00 0.05 1.20
13+312.00
13+280.10
b. 2.50 b. 1.70 x 2.50 4.25 0.05 0.21
13+277.60
80
a. 30.10 80 a. 1.30 x 30.10 39.13 0.05 1.96
13+250.00
13+197.00
13+161.00
13+159.00
13+146.00
13+144.10
77
8.10 77 3.00 x 8.10 24.30 0.05 1.22
13+136.00
13+125.00
13+108.00
ARAH MAKASSAR
Sub Total 11 170.30 462.28 23.11 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
14+811.00
90 11.00 90 3.00 x 11.00 33.00 0.05 1.65
14+800.00
14+600.00
89 12.00 89 3.00 x 12.00 36.00 0.05 1.80
14+588.00
14+572.50
14+540.00
14+531.00
87 10.00 87 3.00 x 10.00 30.00 0.05 1.50
14+521.00
14+515.80
86 3.80 86 1.50 x 3.80 5.70 0.05 0.28
14+512.00
14+396.00
85 11.00 85 3.00 x 11.00 33.00 0.05 1.65
14+385.00
14+333.70
b. 11.70 b. 6.00 x 11.70 70.20 0.05 3.51
14+322.00
84 13.00 84 a. 3.00 x 13.00 39.00 0.05 1.95
a.
14+309.00
14+171.00
83
8.00 83 3.00 x 8.00 24.00 0.05 1.20
14+163.00
ARAH MAKASSAR
Sub Total 12 113.00 368.40 18.42 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
15+794.50
98 4.50 98 1.60 x 4.50 7.20 0.05 0.36
15+790.00
15+749.50
97 19.50 97 3.00 x 19.50 58.50 0.05 2.93
15+730.00
15+667.00
96 14.00 96 3.00 x 14.00 42.00 0.05 2.10
15+653.00
15+499.60
95 7.60 95 1.50 x 7.60 11.40 0.05 0.57
15+492.00
15+439.50
94 8.50 94 1.00 x 8.50 8.50 0.05 0.43
15+431.00
14+999.00
93 6.00 93 3.00 x 6.00 18.00 0.05 0.90
14+993.00
14+958.00
92
30.00 92 3.00 x 30.00 90.00 0.05 4.50
14+928.00
14+875.00
b.
18.00 b. 3.00 x 18.00 54.00 0.05 2.70
14+857.00
ARAH MAKASSAR
Sub Total 13 150.10 373.60 18.68 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
16+500.00
107 20.00 107 3.00 x 20.00 60.00 0.05 3.00
16+480.00
16+475.70
106 2.70 106 1.50 x 2.70 4.05 0.05 0.20
16+473.00
16+408.70
105 38.70 105 3.00 x 38.70 116.10 0.05 5.81
16+370.00
16+210.50
104 23.50 104 3.00 x 23.50 70.50 0.05 3.53
16+187.00
16+182.80
103 19.80 103 3.00 x 19.80 59.40 0.05 2.97
16+163.00
15+976.00
15+945.00
101 8.00 101 1.70 x 8.00 13.60 0.05 0.68
15+937.00
15+933.00
100 7.00 100 1.70 x 7.00 11.90 0.05 0.60
15+926.00
15+851.60
99 8.60 99 2.00 x 8.60 17.20 0.05 0.86
15+843.00
ARAH MAKASSAR
Sub Total 14 150.30 390.15 19.51 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
0+005.00
116 5.00 116 3.00 x 5.00 15.00 0.05 0.75
17+108.00
0+009.50
115 9.50 115 3.00 x 9.50 28.50 0.05 1.43
17+082.00
17+075.30
114 16.30 114 3.00 x 16.30 48.90 0.05 2.44
17+059.00
17+027.00
113 5.00 113 2.00 x 5.00 10.00 0.05 0.50
17+022.00
16+969.50
b. 2.00 b. 3.00 x 2.00 6.00 0.05 0.30
16+967.50
112 2.50 112 a. 4.00 x 2.50 10.00 0.05 0.50
16+965.00 a.
16+961.00
111 3.00 111 3.00 x 3.00 9.00 0.05 0.45
16+958.00
16+866.00
110 18.00 110 1.65 x 18.00 29.70 0.05 1.49
16+848.00
16+800.00
109 3.50 109 1.50 x 3.50 5.25 0.05 0.26
16+796.50
16+611.80
b. 11.50 b. 1.50 x 11.50 17.25 0.05 0.86
16+600.30
108
a. 12.30 108 a. 3.00 x 12.30 36.90 0.05 1.84
16+588.00
ARAH MAKASSAR
Sub Total 15 88.60 216.50 10.82 m3
TOTAL 1 - 15 1823.90 4559.55 227.98 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
ARAH BANTAENG
CL L x P
7
0+750.20
0+741.20
0+633.00
0+626.00
0+628.00
0+605.00
0+548.00
3
13.00 3 1.50 x 13.00 19.50 0.05 0.98
0+535.00
0+523.00
0+505.00
0+489.70
1 5.70 1 1.10 x 5.70 6.27 0.05 0.31 AWAL
PROYEK
0+484.00 KM.
99+195
ARAH MAKASSAR
Sub Total 1 82.90 119.97 6.00 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
0+950.00
0+940.00
0+936.70
b. 3.60 b. 2.80 x 3.60 10.08 0.05 0.50
0+933.10 a.
12 4.10 12 a. 1.70 x 4.10 6.97 0.05 0.35
0+929.00
0+922.80
c. 2.80 c. 1.50 x 2.80 4.20 0.05 0.21
0+920.00
b. 11 7.00 11 b. 3.00 x 7.00 21.00 0.05 1.05
0+913.00
a. 9.00 a. 1.50 x 9.00 13.50 0.05 0.68
0+904.00
0+899.00
9 9.00 9 1.50 x 9.00 13.50 0.05 0.68
0+890.00
0+880.00
0+868.00
8 9.00 8 a. 2.00 x 9.00 18.00 0.05 0.90
a.
0+859.00
0+809.50
7 1.50 7 1.30 x 1.50 1.95 0.05 0.10
0+808.00
ARAH MAKASSAR
Sub Total 2 68.00 124.60 6.23 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
1+126.00
1+121.00
1+090.00
1+089.90
b. 2.80 b. 1.50 x 2.80 4.20 0.05 0.21
1+087.10 a.
18 7.00 18 a. 1.30 x 7.00 9.10 0.05 0.46
1+083.00
1+060.90
b. 17 2.70 17 b. 2.50 x 2.70 6.75 0.05 0.34
1+058.20
a. 4.20 a. 1.50 x 4.20 6.30 0.05 0.32
1+054.00
1+041.00
16 7.00 16 1.50 x 7.00 10.50 0.05 0.53
1+034.00
1+031.00
1+015.00
0+961.00
b. 8.00 b. 3.00 x 8.00 24.00 0.05 1.20
0+953.00 14
a. 7.00 14 a. 1.20 x 7.00 8.40 0.05 0.42
0+946.00
ARAH MAKASSAR
Sub Total 3 59.70 98.25 4.91 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
2+386.00
2+371.00
2+337.50
2+328.00
2+310.00 a.
2+303.30
c. 8.10 c. 1.50 x 8.10 12.15 0.05 0.61
2+295.20
22 7.20 b. 5.50 x 7.20 39.60 0.05 1.98
b.
2+288.00
a. 9.00 22 a. 1.50 x 9.00 13.50 0.05 0.68
2+279.00
2+189.00
21 5.00 21 1.20 x 5.00 6.00 0.05 0.30
2+184.00
2+090.00
b. 7.00 b. 2.00 x 7.00 14.00 0.05 0.70
2+083.00 20
a. 13.00 20 a. 1.20 x 13.00 15.60 0.05 0.78
2+070.00
ARAH MAKASSAR
Sub Total 4 102.80 222.60 11.13 m3
Nama Ruas : 2.3 BTS. KOTA JENEPONTO-BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
2+997.20
30
2.20 30 2.60 x 2.20 5.72 0.05 0.29
2+995.00
2+908.00
2+895.00
2+854.00
2+845.00
27 1.00 27 1.00 x 1.00 1.00 0.05 0.05
2+844.00
2+826.00
2+816.00
2+627.00
25
10.00 25 1.50 x 10.00 15.00 0.05 0.75
2+617.00
ARAH MAKASSAR
Sub Total 5 42.20 97.32 4.87 m3
TOTAL 1-5 355.60 662.74 33.14 m3
Nama Ruas : 2.4 RUAS BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG - BTS. KOTA BANTAENG
ARAH BANTAENG
CL L x P
7
0+277.00
7 b. 7.00 7 b. 2.90 x 7.00 20.30 0.05 1.02
0+270.00
0+247.00
0+235.20
6 4.20 6 1.00 x 4.20 4.20 0.05 0.21
0+231.00
0+218.10
5 5.10 5 1.60 x 5.10 8.16 0.05 0.41
0+213.00
0+201.20
b. 4.20 b. 3.20 x 4.20 13.44 0.05 0.67
0+197.00
4 4.00 4 a. 1.80 x 4.00 7.20 0.05 0.36
0+193.00 a.
0+180.10
0+155.00
0+104.00
b. 8.00 2 b. 6.60 x 8.00 52.80 0.05 2.64
2
0+096.00
0+053.00
0+046.00
0+031.00
ARAH MAKASSAR
Sub Total 1 138.60 344.57 17.23 m3
Nama Ruas : 2.4 RUAS BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG - BTS. KOTA BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
0+497.10
14 9.10 14 1.80 x 9.10 16.38 0.05 0.82
0+488.00
0+435.00
0+422.00
0+412.10
12 3.80 12 b. 1.80 x 3.80 6.84 0.05 0.34
b.
0+408.30
a. 8.30 a. 1.00 x 8.30 8.30 0.05 0.42
0+400.00
0+388.30
b. 8.20 b. 4.30 x 8.20 35.26 0.05 1.76
0+380.10
11 3.10 11 a. 3.00 x 3.10 9.30 0.05 0.47
0+377.00 a.
0+367.70
0+352.00
0+348.30
0+333.00
0+311.70
0+300.00
ARAH MAKASSAR
Sub Total 2 88.20 147.89 7.39 m3
Nama Ruas : 2.4 RUAS BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG - BTS. KOTA BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
1+698.80
22 3.80 22 1.10 x 3.80 4.18 0.05 0.21
1+695.00
1+346.70
1+328.00
1+249.60
20 3.60 20 1.50 x 3.60 5.40 0.05 0.27
1+246.00
1+187.80
19 4.80 19 2.00 x 4.80 9.60 0.05 0.48
1+183.00
1+083.90
18 b. 2.40 18 b. 3.00 x 2.40 7.20 0.05 0.36
1+081.50
a. 8.50 a. 1.50 x 8.50 12.75 0.05 0.64
1+073.00
1+074.30
17 5.30 17 1.50 x 5.30 7.95 0.05 0.40
1+069.00
0+783.00
16 8.00 16 1.00 x 8.00 8.00 0.05 0.40
0+775.00
0+612.00
b. 2.80 b. 4.10 x 2.80 11.48 0.05 0.57
0+609.20
15 9.20 15 a. 6.20 x 9.20 57.04 0.05 2.85
a.
0+600.00
ARAH MAKASSAR
Sub Total 3 67.10 151.65 7.58 m3
Nama Ruas : 2.4 RUAS BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG - BTS. KOTA BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
2+213.00
2+203.00
2+202.20
30 2.20 30 1.00 x 2.20 2.20 0.05 0.11
2+200.00
2+014.90
5.90 29 1.60 x 5.90 9.44 0.05 0.47
2+014.50 29
2+000.00
1+978.70
1+973.00
1+743.10
6.10 26 1.50 x 6.10 9.15 0.05 0.46
1+750.40 26
1+735.00
1+744.00
b. 19.50 b. 1.90 x 19.50 37.05 0.05 1.85
1+724.50
24 6.50 24 a. 1.50 x 6.50 9.75 0.05 0.49
a.
1+718.00
1+716.40
23 3.40 23 1.10 x 3.40 3.74 0.05 0.19
1+713.00
ARAH MAKASSAR
Sub Total 4 89.20 149.97 7.50 m3
Nama Ruas : 2.4 RUAS BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG - BTS. KOTA BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
2+365.10
1.50 40 1.00 x 1.50 1.50 0.05 0.08
2+363.50 39
40 3.10 39 1.50 x 3.10 4.65 0.05 0.23
2+362.00
2+374.70
38 4.70 38 1.10 x 4.70 5.17 0.05 0.26
2+370.00
2+347.40
2+340.00
2+337.70
36 4.70 36 1.30 x 4.70 6.11 0.05 0.31
2+333.00
2+317.50
35 4.50 35 2.00 x 4.50 9.00 0.05 0.45
2+313.00
2+310.60
34 4.60 34 2.50 x 4.60 11.50 0.05 0.57
2+306.00
2+265.10
2+258.00
2+246.40
2+238.00
ARAH MAKASSAR
Sub Total 5 46.00 76.57 3.83 m3
Nama Ruas : 2.4 RUAS BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG - BTS. KOTA BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
2+616.80
49 3.80 49 1.00 x 3.80 3.80 0.05 0.19
2+613.00
2+607.70
48 3.70 48 1.00 x 3.70 3.70 0.05 0.18
2+604.00
2+565.10
2+553.10
46 3.10 46 1.10 x 3.10 3.41 0.05 0.17
2+550.00
2+521.60
2+510.00
2+479.10
44 4.10 44 1.60 x 4.10 6.56 0.05 0.33
2+475.00
2+476.20
43 6.20 43 1.00 x 6.20 6.20 0.05 0.31
2+470.00
2+461.50
2+450.00
2+390.10
41 5.10 41 0.50 x 5.10 2.55 0.05 0.13
2+385.00
ARAH MAKASSAR
Sub Total 6 61.10 101.05 5.05 m3
Nama Ruas : 2.4 RUAS BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG - BTS. KOTA BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
2+983.10
2+966.25
2+863.00
56 b. 2.50 56 3.50 x 2.50 8.75 0.05 0.44
2+860.50
a. 1.50 1.00 x 1.50 1.50 0.05 0.08
2+859.00
2+772.50
2+720.50
2+704.50
53 4.50 53 1.50 x 4.50 6.75 0.05 0.34
2+700.00
2+689.00
2+674.00
2+638.60
2+637.70 1.70 51 1.60 x 1.70 2.72 0.05 0.14
50 51
2+636.00 2.60 50 2.40 x 2.60 6.24 0.05 0.31
ARAH MAKASSAR
Sub Total 7 52.15 75.54 3.78 m3
Nama Ruas : 2.4 RUAS BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG - BTS. KOTA BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
3+749.60
60 11.60 60 1.80 x 11.60 20.88 0.05 1.04
3+738.00
3+714.50
59 7.50 59 2.30 x 7.50 17.25 0.05 0.86
3+707.00
3+692.50
58 3.00 58 2.00 x 3.00 6.00 0.05 0.30
3+689.50
57 4.50 57 1.50 x 4.50 6.75 0.05 0.34
3+685.00
3+679.70
56 3.70 56 1.80 x 3.70 6.66 0.05 0.33
3+676.00
3+670.50
55 9.50 55 1.00 x 9.50 9.50 0.05 0.48
3+661.00
3+155.50
54 5.50 54 1.00 x 5.50 5.50 0.05 0.28
3+150.00
3+114.50
53 5.50 53 1.20 x 5.50 6.60 0.05 0.33
3+109.00
3+106.50
52 9.50 52 1.35 x 9.50 12.83 0.05 0.64
3+097.00
3+070.50
51 9.50 51 1.30 x 9.50 12.35 0.05 0.62
3+061.00
ARAH MAKASSAR
Sub Total 8 69.80 104.31 5.22 m3
Nama Ruas : 2.4 RUAS BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG - BTS. KOTA BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
3+963.50
70 7.50 70 1.50 x 7.50 11.25 0.05 0.56
3+956.00
3+929.00
69 7.00 69 1.00 x 7.00 7.00 0.05 0.35
3+922.00
3+917.60
68 8.60 68 1.20 x 8.60 10.32 0.05 0.52
3+909.00
3+894.00
13.00 67 2.75 x 13.00 35.75 0.05 1.79
3+889.00 67
66 8.00 66 1.30 x 8.00 10.40 0.05 0.52
3+881.00
3+871.00
65 8.00 65 1.30 x 8.00 10.40 0.05 0.52
3+863.00
3+841.00
7.50 64 3.70 x 7.50 27.75 0.05 1.39
3+827.50
63 64 27.00 63 1.50 x 27.00 40.50 0.05 2.03
3+820.00
3+814.00
3+811.70
62 4.70 62 1.70 x 4.70 7.99 0.05 0.40
3+807.00
3+782.50
61 5.50 61 5.00 x 5.50 27.50 0.05 1.38
3+777.00
ARAH MAKASSAR
Sub Total 9 96.80 188.86 9.44 m3
Nama Ruas : 2.4 RUAS BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG - BTS. KOTA BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
4+622.75
78 3.75 78 1.00 x 3.75 3.75 0.05 0.19
4+619.00
4+565.40
b. 3.20 b. 1.00 x 3.20 3.20 0.05 0.16
4+562.20
77 5.20 77 a. 1.10 x 5.20 5.72 0.05 0.29
a.
4+557.00
4+547.00
76 6.00 76 1.20 x 6.00 7.20 0.05 0.36
4+541.00
4+380.70
75 7.70 75 1.60 x 7.70 12.32 0.05 0.62
4+373.00
4+248.20
74 2.20 74 1.20 x 2.20 2.64 0.05 0.13
4+246.00
4+123.50
73 5.50 73 1.36 x 5.50 7.48 0.05 0.37
4+118.00
4+091.60
72 4.60 72 1.70 x 4.60 7.82 0.05 0.39
4+087.00
4+012.00
71 4.00 71 1.20 x 4.00 4.80 0.05 0.24
4+008.00
ARAH MAKASSAR
Sub Total 10 42.15 54.93 2.75 m3
Nama Ruas : 2.4 RUAS BTS. KAB. JENEPONTO/BTS. KAB. BANTAENG - BTS. KOTA BANTAENG
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
4+983.80
82 3.80 82 1.60 x 3.80 6.08 0.05 0.30
4+980.00
4+933.70
4+922.00
4+834.00
80 4.00 80 1.40 x 4.00 5.60 0.05 0.28
4+830.00
4+811.00
4+800.00
ARAH MAKASSAR
Sub Total 11 30.50 43.15 2.16 m3
TOTAL 1 - 11 781.60 1438.50 71.93 m3
ARAH BANTAENG
CL L x P
7
1+057.50
8 1.50 8 1.30 x 1.50 1.95 0.05 0.10
1+056.00
0+969.70
7 6.70 7 1.70 x 6.70 11.39 0.05 0.57
0+963.00
0+909.50
6 2.50 6 1.00 x 2.50 2.50 0.05 0.13
0+907.00
0+814.10
b. 2.30 b. 2.10 x 2.30 4.83 0.05 0.24
0+811.80
5 8.80 5 a. 1.80 x 8.80 15.84 0.05 0.79
0+803.00 a.
0+712.20
0+699.00
0+686.50
3
6.50 3 1.20 x 6.50 7.80 0.05 0.39
0+680.00
0+533.50
0+505.00
0+351.00
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BANTAENG
CL L x P
7
1+854.50
12 7.50 12 1.50 x 7.50 11.25 0.05 0.56
1+847.00
1+679.90
11
6.90 11 2.00 x 6.90 13.80 0.05 0.69
1+673.00
1+277.70
b. 12.00 b. 2.60 x 12.00 31.20 0.05 1.56
10
1+236.60
9 c. 6.10 x 8.00 48.80 0.05 2.44
c. 8.00
ARAH BANTAENG
CL L x P
7
0+159.70
10 9.70 10 1.60 x 9.70 15.52 0.05 0.78
0+150.00
0+141.10
9 1.10 9 1.20 x 1.10 1.32 0.05 0.07
0+140.00
0+130.00
b. 3.00 b. 2.00 x 3.00 6.00 0.05 0.30
0+129.20
0+127.00 8 6.20 8 a. 2.10 x 6.20 13.02 0.05 0.65
a.
0+123.00
0+119.30
7 6.30 7 2.00 x 6.30 12.60 0.05 0.63
0+113.00
0+006.00
6 6.00 6 2.70 x 6.00 16.20 0.05 0.81
0+113.00
0+115.20
5 2.20 5 1.40 x 2.20 3.08 0.05 0.15
0+113.00
0+111.10
11.10 4 2.30 x 11.10 25.53 0.05 1.28
0+109.50
4
3 9.50 3 0.75 x 9.50 7.13 0.05 0.36
0+100.00
0+095.20
0+074.00
0+070.00
1 6.00 1 1.60 x 6.00 9.60 0.05 0.48
0+064.00
ARAH MAKASSAR
Sub Total 1 82.30 146.03 7.30 m3
ARAH BANTAENG
CL L x P
7
0+166.70
14 4.70 14 1.10 x 4.70 5.17 0.05 0.26
0+162.00
0+254.70
13 4.70 13 3.70 x 4.70 17.39 0.05 0.87
0+250.00
0+246.20
h. 4.10 h. 3.10 x 4.10 12.71 0.05 0.64
0+242.10
g. 4.50 g. 2.60 x 4.50 11.70 0.05 0.59
0+237.60
f. 7.30 f. 3.10 x 7.30 22.63 0.05 1.13
0+230.30
0+222.20
d. 8.10 d. 3.80 x 8.10 30.78 0.05 1.54
0+214.10
c. 15.00 c. 3.10 x 15.00 46.50 0.05 2.33
0+199.10
0+184.30
a. 3.30 a. 3.70 x 3.30 12.21 0.05 0.61
0+181.00
0+165.00
ARAH MAKASSAR
Sub Total 2 89.10 293.90 14.69 m3
ARAH BANTAENG
CL L x P
7
0+458.60
21 8.60 21 6.00 x 8.60 51.60 0.05 2.58
0+450.00
0+438.80
c. 2.30 c. 2.60 x 2.30 5.98 0.05 0.30
0+436.50
0+426.50
a. 2.50 a. 2.60 x 2.50 6.50 0.05 0.33
0+424.00
0+418.50
19 1.50 19 1.50 x 1.50 2.25 0.05 0.11
0+417.00
0+318.70
b. 2.60 b. 2.10 x 2.60 5.46 0.05 0.27
0+316.10
18 a. 2.10 18 a. 5.10 x 2.10 10.71 0.05 0.54
0+314.00
0+316.80
b. 12.00 b. 2.60 x 12.00 31.20 0.05 1.56
0+308.50
8.50 17 1.10 x 8.50 9.35 0.05 0.47
0+304.80 17
16 4.80 16 a. 3.70 x 4.80 17.76 0.05 0.89
a.
0+300.00
0+176.00
15 5.00 15 1.10 x 5.00 5.50 0.05 0.28
0+171.00
ARAH MAKASSAR
Sub Total 3 59.90 191.31 9.57 m3
ARAH BANTAENG
CL L x P
7
0+931.00
1.60 30 1.30 x 1.60 2.08 0.05 0.10
0+926.60 29
30 6.00 29 1.00 x 6.00 6.00 0.05 0.30
0+925.00
0+849.80
28 4.70 28 1.00 x 4.70 4.70 0.05 0.24
0+845.10
27 5.10 27 1.20 x 5.10 6.12 0.05 0.31
0+840.00
0+830.10
26 3.10 26 1.10 x 3.10 3.41 0.05 0.17
0+827.00
0+815.50
25 3.50 25 1.30 x 3.50 4.55 0.05 0.23
0+812.00
0+789.60
0+777.00
0+608.10
23 1.10 23 1.30 x 1.10 1.43 0.05 0.07
0+607.00
0+534.00
c. 3.00 c. 2.00 x 3.00 6.00 0.05 0.30
0+531.00
0+514.00
a. 9.00 a. 2.30 x 9.00 20.70 0.05 1.04
0+505.00
ARAH MAKASSAR
Sub Total 4 66.70 167.39 8.37 m3
ARAH BANTAENG
CL L x P
7
1+141.50
40 8.50 40 2.00 x 8.50 17.00 0.05 0.85
1+136.50
1+114.00
1+082.80
1+069.20
1+026.60
1+018.50
0+993.80
33 3.80 33 1.30 x 3.80 4.94 0.05 0.25
0+990.00
0+956.50
32 1.50 32 1.00 x 1.50 1.50 0.05 0.08
0+955.00
0+953.20
ARAH MAKASSAR
Sub Total 5 65.60 101.17 5.06 m3
ARAH BANTAENG
CL L x P
7
1+317.20
1+313.30
1+300.00
1+228.80
48 1.80 48 1.00 x 1.80 1.80 0.05 0.09
1+227.00
1+178.20
47 3.20 47 1.20 x 3.20 3.84 0.05 0.19
1+175.00
1+152.70
46 2.70 46 1.50 x 2.70 4.05 0.05 0.20
1+150.00
1+251.00
6.00 45 1.60 x 6.00 9.60 0.05 0.48
1+247.00 45
44 2.00 44 1.00 x 2.00 2.00 0.05 0.10
1+245.00
1+221.50
43 6.50 43 2.00 x 6.50 13.00 0.05 0.65
1+215.00
1+198.10
1+181.00
1+168.70
1+162.00
ARAH MAKASSAR
Sub Total 6 63.50 91.00 4.55 m3
ARAH BANTAENG
CL L x P
7
1+546.70
58 4.70 58 2.20 x 4.70 10.34 0.05 0.52
1+542.00
1+464.50
7.30 b. 4.20 x 7.30 30.66 0.05 1.53
1+460.80
57 b.
a. 14.50 57 a. 3.30 x 14.50 47.85 0.05 2.39
1+453.50
1+450.00
1+421.50
1+415.00
1+378.50
1+377.50 3.50 55 1.20 x 3.50 4.20 0.05 0.21
54 55
4.50 54 1.20 x 4.50 5.40 0.05 0.27
1+374.00
1+359.30
53 1.30 53 2.80 x 1.30 3.64 0.05 0.18
1+358.00
1+340.20
1+333.00
1+326.00
1+320.00
ARAH MAKASSAR
Sub Total 7 55.50 129.10 6.45 m3
ARAH BANTAENG
CL L x P
7
1+598.70
1+589.00
1+584.40
b. 1.60 b. 2.20 x 1.60 3.52 0.05 0.18
1+582.80
1+550.20
59 2.20 59 1.20 x 2.20 2.64 0.05 0.13
1+548.00
ARAH MAKASSAR
Sub Total 8 20.30 58.10 2.90 m3
TOTAL 1-8 502.90 1178.00 58.90 m3
ARAH BANTAENG
CL L x P
7
1+008.20
10 2.20 10 1.10 x 2.20 2.42 0.05 0.12
1+006.00
0+488.70
9 3.70 9 2.00 x 3.70 7.40 0.05 0.37
0+485.00
0+466.80
8 5.80 8 1.10 x 5.80 6.38 0.05 0.32
0+461.00
0+465.50
0+450.00
0+428.50
6 5.50 6 1.20 x 5.50 6.60 0.05 0.33
0+423.00
0+416.50
5 3.50 5 1.10 x 3.50 3.85 0.05 0.19
0+413.00
0+396.50
6.80 4 1.50 x 6.80 10.20 0.05 0.51
0+391.80 3
11.50 3 1.60 x 11.50 18.40 0.05 0.92
4
0+385.00
0+289.60
2 8.60 2 1.80 x 8.60 15.48 0.05 0.77
0+281.00
0+262.50
1 6.50 1 2.00 x 6.50 13.00 0.05 0.65
0+256.00
ARAH MAKASSAR
Sub Total 1 69.60 158.13 7.91 m3
ARAH BANTAENG
CL L x P
7
1+595.60
1 5.60 1 1.00 x 5.60 5.60 0.05 0.28
1+590.00
ARAH MAKASSAR
Sub Total 1 5.60 5.60 0.28 m3
Nama Ruas : 2.9 RUAS BTS. KOTA BANTAENG - BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA
ARAH BANTAENG
CL L x P
6
6+255.00
6+239.30
7 3.30 7 1.50 x 3.30 4.95 0.05 0.25
6+236.00
6+223.80
2+784.30
2+768.00
2+628.00
4 7.00 4 1.60 x 7.00 11.20 0.05 0.56
2+621.00
2+620.00
2+606.00
2+602.00
2+588.00
2+579.00
1 1.00 1 1.10 x 1.00 1.10 0.05 0.06
2+578.00
ARAH MAKASSAR
Sub Total 1 66.40 180.61 9.03 m3
Nama Ruas : 2.9 RUAS BTS. KOTA BANTAENG - BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA
ARAH BANTAENG
CL L x P
6
6+354.50
16 4.50 16 1.50 x 4.50 6.75 0.05 0.34
6+350.00
6+336.60
6+321.00
6+308.70
14 4.70 14 1.20 x 4.70 5.64 0.05 0.28
6+304.00
6+220.10
13 3.10 13 1.20 x 3.10 3.72 0.05 0.19
6+217.00
6+213.70
12 5.70 12 1.20 x 5.70 6.84 0.05 0.34
6+208.00
6+167.00
6+156.00
6+386.50
10 7.50 10 5.10 x 7.50 38.25 0.05 1.91
6+379.00
6+370.70
6+354.00
ARAH MAKASSAR
Sub Total 2 68.80 120.30 6.02 m3
Nama Ruas : 2.9 RUAS BTS. KOTA BANTAENG - BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA
ARAH BANTAENG
CL L x P
6
6+678.80
24 5.80 24 1.30 x 5.80 7.54 0.05 0.38
6+673.00
6+660.00
6+650.00
6+577.80
6+571.00
6+549.00
21 3.00 21 4.00 x 3.00 12.00 0.05 0.60
6+546.00
6+507.10
20 7.10 20 2.40 x 7.10 17.04 0.05 0.85
6+500.00
6+493.50
6+458.00
0+321.60
0+300.00
6+395.30
17 2.30 17 1.30 x 2.30 2.99 0.05 0.15
6+393.00
ARAH MAKASSAR
Sub Total 3 92.10 193.94 9.70 m3
Nama Ruas : 2.9 RUAS BTS. KOTA BANTAENG - BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA
ARAH BANTAENG
CL L x P
6
6+861.00
32 7.00 32 2.00 x 7.00 14.00 0.05 0.70
6+854.00
6+843.00
31 6.00 31 2.10 x 6.00 12.60 0.05 0.63
6+837.00
6+826.00
6+816.00
6+797.00
6+785.00
6+745.70
28 4.70 28 1.40 x 4.70 6.58 0.05 0.33
6+741.00
6+731.00
6+717.00
6+708.50
26 5.50 26 1.50 x 5.50 8.25 0.05 0.41
6+703.00
6+684.00
25 1.00 25 1.80 x 1.00 1.80 0.05 0.09
6+683.00
ARAH MAKASSAR
Sub Total 4 60.20 110.03 5.50 m3
Nama Ruas : 2.9 RUAS BTS. KOTA BANTAENG - BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA
ARAH BANTAENG
CL L x P
6
7+132.30
41 9.30 41 1.70 x 9.30 15.81 0.05 0.79
7+123.00
7+052.10
40 2.10 40 1.50 x 2.10 3.15 0.05 0.16
7+050.00
7+008.20
7+007.90 39 2.20 39 0.80 x 2.20 1.76 0.05 0.09
6+987.80
6+980.00
6+924.80
36 2.80 36 1.70 x 2.80 4.76 0.05 0.24
6+922.00
6+923.70
35 3.70 35 1.40 x 3.70 5.18 0.05 0.26
6+920.00
6+905.70
34 5.70 34 1.70 x 5.70 9.69 0.05 0.48
6+900.00
6+876.00
33 3.00 33 1.70 x 3.00 5.10 0.05 0.26
6+873.00
ARAH MAKASSAR
Sub Total 5 40.30 62.17 3.11 m3
Nama Ruas : 2.9 RUAS BTS. KOTA BANTAENG - BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA
ARAH BANTAENG
CL L x P
6
7+930.60
7+919.00
7+886.00
48 2.00 48 1.10 x 2.00 2.20 0.05 0.11
7+884.00
7+666.60
7+654.00
7+543.50
46 4.50 46 1.20 x 4.50 5.40 0.05 0.27
7+539.00
7+454.10
45 4.10 45 2.10 x 4.10 8.61 0.05 0.43
7+450.00
7+392.80
44 4.80 44 1.10 x 4.80 5.28 0.05 0.26
7+388.00
7+249.20
43 2.20 43 1.00 x 2.20 2.20 0.05 0.11
7+247.00
7+223.50
42 5.50 42 1.50 x 5.50 8.25 0.05 0.41
7+218.00
ARAH MAKASSAR
Sub Total 6 47.30 66.12 3.31 m3
Nama Ruas : 2.9 RUAS BTS. KOTA BANTAENG - BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA
ARAH BANTAENG
CL L x P
7
8+334.60
8+329.00
8+277.00
8+273.00
8+136.70
8+131.00
8+123.20
8+113.00
8+096.30
8+088.00
8+039.00
8+034.00
7+999.00
7+982.00
ARAH MAKASSAR
Sub Total 7 55.80 88.33 4.42 m3
TOTAL 1-7 430.90 821.50 41.08 m3
Nama Ruas : 2.10 RUAS BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA - BTS. KOTA BULUKUMBA
ARAH BANTAENG
CL L x P
6
6+255.00
6+239.30
7 3.30 7 1.50 x 3.30 4.95 0.05 0.25
6+236.00
6+223.80
2+784.30
2+768.00
2+628.00
4 7.00 4 1.60 x 7.00 11.20 0.05 0.56
2+621.00
2+620.00
2+606.00
2+602.00
2+588.00
2+579.00
1 1.00 1 1.10 x 1.00 1.10 0.05 0.06
2+578.00
ARAH MAKASSAR
Sub Total 1 66.40 180.61 9.03 m3
Nama Ruas : 2.10 RUAS BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA - BTS. KOTA BULUKUMBA
ARAH BANTAENG
CL L x P
6
6+354.50
16 4.50 16 1.50 x 4.50 6.75 0.05 0.34
6+350.00
6+336.60
6+321.00
6+308.70
14 4.70 14 1.20 x 4.70 5.64 0.05 0.28
6+304.00
6+220.10
13 3.10 13 1.20 x 3.10 3.72 0.05 0.19
6+217.00
6+213.70
12 5.70 12 1.20 x 5.70 6.84 0.05 0.34
6+208.00
6+167.00
6+156.00
6+386.50
10 7.50 10 5.10 x 7.50 38.25 0.05 1.91
6+379.00
6+370.70
6+354.00
ARAH MAKASSAR
Sub Total 2 68.80 120.30 6.02 m3
Nama Ruas : 2.10 RUAS BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA - BTS. KOTA BULUKUMBA
ARAH BANTAENG
CL L x P
6
6+678.80
24 5.80 24 1.30 x 5.80 7.54 0.05 0.38
6+673.00
6+660.00
6+650.00
6+577.80
6+571.00
6+549.00
21 3.00 21 4.00 x 3.00 12.00 0.05 0.60
6+546.00
6+507.10
20 7.10 20 2.40 x 7.10 17.04 0.05 0.85
6+500.00
6+493.50
6+458.00
0+321.60
0+300.00
6+395.30
17 2.30 17 1.30 x 2.30 2.99 0.05 0.15
6+393.00
ARAH MAKASSAR
Sub Total 3 92.10 193.94 9.70 m3
Nama Ruas : 2.10 RUAS BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA - BTS. KOTA BULUKUMBA
ARAH BANTAENG
CL L x P
6
6+861.00
32 7.00 32 2.00 x 7.00 14.00 0.05 0.70
6+854.00
6+843.00
31 6.00 31 2.10 x 6.00 12.60 0.05 0.63
6+837.00
6+826.00
6+816.00
6+797.00
6+785.00
6+745.70
28 4.70 28 1.40 x 4.70 6.58 0.05 0.33
6+741.00
6+731.00
6+717.00
6+708.50
26 5.50 26 1.50 x 5.50 8.25 0.05 0.41
6+703.00
6+684.00
25 1.00 25 1.80 x 1.00 1.80 0.05 0.09
6+683.00
ARAH MAKASSAR
Sub Total 4 60.20 110.03 5.50 m3
Nama Ruas : 2.10 RUAS BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA - BTS. KOTA BULUKUMBA
ARAH BANTAENG
CL L x P
6
7+132.30
41 9.30 41 1.70 x 9.30 15.81 0.05 0.79
7+123.00
7+052.10
40 2.10 40 1.50 x 2.10 3.15 0.05 0.16
7+050.00
7+008.20
7+007.90 39 2.20 39 0.80 x 2.20 1.76 0.05 0.09
6+987.80
6+980.00
6+924.80
36 2.80 36 1.70 x 2.80 4.76 0.05 0.24
6+922.00
6+923.70
35 3.70 35 1.40 x 3.70 5.18 0.05 0.26
6+920.00
6+905.70
34 5.70 34 1.70 x 5.70 9.69 0.05 0.48
6+900.00
6+876.00
33 3.00 33 1.70 x 3.00 5.10 0.05 0.26
6+873.00
ARAH MAKASSAR
Sub Total 5 40.30 62.17 3.11 m3
Nama Ruas : 2.10 RUAS BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA - BTS. KOTA BULUKUMBA
ARAH BANTAENG
CL L x P
6
7+930.60
7+919.00
7+886.00
48 2.00 48 1.10 x 2.00 2.20 0.05 0.11
7+884.00
7+666.60
7+654.00
7+543.50
46 4.50 46 1.20 x 4.50 5.40 0.05 0.27
7+539.00
7+454.10
45 4.10 45 2.10 x 4.10 8.61 0.05 0.43
7+450.00
7+392.80
44 4.80 44 1.10 x 4.80 5.28 0.05 0.26
7+388.00
7+249.20
43 2.20 43 1.00 x 2.20 2.20 0.05 0.11
7+247.00
7+223.50
42 5.50 42 1.50 x 5.50 8.25 0.05 0.41
7+218.00
ARAH MAKASSAR
Sub Total 6 47.30 66.12 3.31 m3
Nama Ruas : 2.10 RUAS BTS. KAB. BANTAENG/BTS. KAB. BULUKUMBA - BTS. KOTA BULUKUMBA
ARAH BANTAENG
CL L x P
7
8+334.60
8+329.00
8+277.00
8+273.00
8+136.70
8+131.00
8+123.20
8+113.00
8+096.30
8+088.00
8+039.00
8+034.00
7+999.00
7+982.00
ARAH MAKASSAR
Sub Total 7 55.80 88.33 4.42 m3
TOTAL 1-7 430.90 821.50 41.08 m3
ARAH BANTAENG
CL L x P
7
0+871.00
3 4.00 3 1.00 x 4.00 4.00 0.05 0.20
0+867.00
0+211.70
2 1.70 2 0.70 x 1.70 1.19 0.05 0.06
0+210.00
0+201.50
1 0.50 1 6.00 x 0.50 3.00 0.05 0.15
0+201.00
ARAH MAKASSAR
Sub Total 1 6.20 8.19 0.41 m3
ARAH BIRA
CL L x P
5
4+565.00
7 13.00 7 1.20 x 13.00 15.60 0.05 0.78
4+552.00
4+380.00
4+357.00
4+100.00
4+078.00
2+900.00
4 5.00 4 2.70 x 5.00 13.50 0.05 0.68
2+895.00
1+014.00
3
15.00 3 1.50 x 15.00 22.50 0.05 1.13
0+999.00
0+980.00
0+794.00
1 10.00 1 2.70 x 10.00 27.00 0.05 1.35
0+784.00
ARAH MAKASSAR
Sub Total 1 94.00 252.70 12.64 m3
ARAH BIRA
CL L x P
5
5+371.00
5+300.00
12 41.00 12 2.50 x 41.00 102.50 0.05 5.13
5+259.00
5+001.00
11 50.00 11 2.50 x 50.00 125.00 0.05 6.25
4+951.00
4+872.00
c. 2.00 c. 1.00 x 2.00 2.00 0.05 0.10
4+870.00
b. 7.00 b. 2.50 x 7.00 17.50 0.05 0.88
4+864.00
4+863.00 10 10.00 10 a. 2.50 x 10.00 25.00 0.05 1.25
a.
4+854.00
4+566.60
9 5.60 9 1.80 x 5.60 10.08 0.05 0.50
4+561.00
4+599.50
c. 8.00 c. 2.50 x 8.00 20.00 0.05 1.00
4+591.50
4+594.00 b. 7.50 b. 1.00 x 7.50 7.50 0.05 0.38
4+584.00 8
a. 12.00 8 a. 2.50 x 12.00 30.00 0.05 1.50
4+582.00
ARAH MAKASSAR
Sub Total 2 200.60 483.33 24.17 m3
ARAH BIRA
CL L x P
5
15+791.00
17 9.00 17 2.50 x 9.00 22.50 0.05 1.13
15+782.00
5+644.50
12.00 16 2.50 x 12.00 30.00 0.05 1.50
5+636.00 16
5+624.00
5+392.00
14 20.00 14 2.50 x 20.00 50.00 0.05 2.50
5+372.00
ARAH MAKASSAR
Sub Total 3 53.00 132.50 6.63 m3
ARAH BIRA
CL L x P
5
5+089.00
8 5.00 8 1.20 x 5.00 6.00 0.05 0.30
5+084.00
5+063.50
7 3.50 7 1.20 x 3.50 4.20 0.05 0.21
5+060.00
4+181.00
6 6.50 6 1.30 x 6.50 8.45 0.05 0.42
4+174.50
3+848.00
5 2.50 5 1.20 x 2.50 3.00 0.05 0.15
3+845.50
3+829.50
3+608.00
3
13.00 3 2.50 x 13.00 32.50 0.05 1.63
3+595.00
1+761.50
1+753.00
1+729.50
1+705.00
ARAH MAKASSAR
Sub Total 1 69.50 104.75 5.24 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
5+889.50
5+877.00
5+871.50
5+862.00
5+846.00
5+843.00
b. 12 5.00 12 b. 1.30 x 5.00 6.50 0.05 0.33
5+838.00
a. 11.00 a. 1.30 x 11.00 14.30 0.05 0.72
5+835.00
5+829.40
5+820.40
b. 2.20 b. 2.50 x 2.20 5.50 0.05 0.27
5+818.20
a. 11 8.70 11 a. 5.00 x 8.70 43.50 0.05 2.17
5+809.50
5+284.00
10 7.00 10 1.50 x 7.00 10.50 0.05 0.53
5+277.00
5+096.00
9 6.00 9 1.00 x 6.00 6.00 0.05 0.30
5+090.00
ARAH MAKASSAR
Sub Total 2 70.90 136.00 6.80 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
6+050.00
20 1.70 20 1.30 x 1.70 2.21 0.05 0.11
6+048.30
6+010.00
19 3.00 19 1.00 x 3.00 3.00 0.05 0.15
6+007.00
5+999.00
5+992.00
5+969.50
b. 7.00 b. 1.50 x 7.00 10.50 0.05 0.53
5+962.50
17 9.00 17 a. 3.00 x 9.00 27.00 0.05 1.35
a.
5+953.50
5+940.00
1.30 b. 2.50 x 1.30 3.25 0.05 0.16
5+936.30 b.
5+935.00 16 7.00 16 a. 2.50 x 7.00 17.50 0.05 0.88
a.
5+933.00
5+930.30
5+917.30
b. 15 2.50 15 b. 5.00 x 2.50 12.50 0.05 0.63
5+914.80
a. 1.80 a. 1.20 x 1.80 2.16 0.05 0.11
5+913.00
ARAH MAKASSAR
Sub Total 3 53.30 117.62 5.88 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
6+142.50
27 4.50 27 1.00 x 4.50 4.50 0.05 0.23
6+138.00
6+102.70
c. 1.50 c. 1.40 x 1.50 2.10 0.05 0.10
6+101.20
b. 26 1.30 26 b. 3.50 x 1.30 4.55 0.05 0.23
6+099.90
a. 1.90 a. 1.30 x 1.90 2.47 0.05 0.12
6+098.00
6+097.00
d. 2.50 d. 3.30 x 2.50 8.25 0.05 0.41
6+094.50
c. 8.00 c. 2.20 x 8.00 17.60 0.05 0.88
6+086.50
b. 25 2.00 25 b. 3.30 x 2.00 6.60 0.05 0.33
6+084.50
a. 3.50 a. 1.00 x 3.50 3.50 0.05 0.18
6+081.00
6+081.00
6+073.00
23 11.00 23 1.30 x 11.00 14.30 0.05 0.72
6+067.00
6+053.50
21 4.50 21 1.20 x 4.50 5.40 0.05 0.27
6+049.00
ARAH MAKASSAR
Sub Total 4 52.70 81.97 4.10 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
6+672.50
6+656.00
6+597.50
6+587.00
6+452.00
34 1.00 34 1.00 x 1.00 1.00 0.05 0.05
6+451.00
6+407.50
6+352.00
32 11.00 32 1.00 x 11.00 11.00 0.05 0.55
6+342.00
6+341.00
31 11.00 31 1.20 x 11.00 13.20 0.05 0.66
6+331.00
6+197.50
30 2.50 30 1.00 x 2.50 2.50 0.05 0.13
6+195.00
6+179.50
29 4.50 29 1.00 x 4.50 4.50 0.05 0.23
6+175.00
6+159.00
28 1.00 28 1.00 x 1.00 1.00 0.05 0.05
6+158.00
ARAH MAKASSAR
Sub Total 5 60.50 76.20 3.81 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
7+760.00
44 5.00 44 1.00 x 5.00 5.00 0.05 0.25
7+755.00
7+716.50
7+689.50
7+627.50
41 3.50 41 1.30 x 3.50 4.55 0.05 0.23
7+624.00
7+612.00
6+735.00
39 1.00 39 1.00 x 1.00 1.00 0.05 0.05
6+734.00
6+713.00
23.00 38 5.50 x 23.00 126.50 0.05 6.33
38
6+690.00
6+686.00
b. 1.00 b. 1.00 x 1.00 1.00 0.05 0.05
6+685.00
ARAH MAKASSAR
Sub Total 6 59.50 174.35 8.72 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
8+226.70
52 2.70 52 1.30 x 2.70 3.51 0.05 0.18
8+224.00
8+204.50
51 1.00 51 1.00 x 1.00 1.00 0.05 0.05
8+203.50
8+178.00
50 2.00 50 1.00 x 2.00 2.00 0.05 0.10
8+176.00
8+166.80
8+143.20
48 4.20 48 1.00 x 4.20 4.20 0.05 0.21
8+139.00
8+131.60
47 1.60 47 1.00 x 1.60 1.60 0.05 0.08
8+130.00
7+884.00
7+861.00
c. 5.00 c. 4.00 x 5.00 20.00 0.05 1.00
7+856.00
45 b. 17.00 45 b. 5.00 x 17.00 85.00 0.05 4.25
7+839.00
a.
12.00 a. 1.50 x 12.00 18.00 0.05 0.90
7+827.00
ARAH MAKASSAR
Sub Total 7 54.30 145.07 7.25 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
8+410.50
60 6.00 60 b. 2.10 x 6.00 12.60 0.05 0.63
8+404.50
59 2.50 59 b. 2.00 x 2.50 5.00 0.05 0.25
8+402.00
8+385.50
8+352.50
a. 5.50 a. 2.70 x 5.50 14.85 0.05 0.74
8+347.00
8+335.50 b.
1.50 b. 1.50 x 1.50 2.25 0.05 0.11
8+334.00 a.
57 3.00 57 a. 1.00 x 3.00 3.00 0.05 0.15
8+331.00
8+310.50
8+300.00
55 1.00 55 1.00 x 1.00 1.00 0.05 0.05
8+299.00
8+274.80
b. 54 2.30 54 b. 2.80 x 2.30 6.44 0.05 0.32
8+272.50
a. 1.50 a. 1.50 x 1.50 2.25 0.05 0.11
8+271.00
0+004.00
ARAH MAKASSAR
Sub Total 8 67.80 240.39 12.02 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
8+702.00
67 1.00 67 1.00 x 1.00 1.00 0.05 0.05
8+701.00
8+662.00
66 5.00 66 1.50 x 5.00 7.50 0.05 0.38
8+657.00
8+595.00
65 9.00 65 b. 2.50 x 9.00 22.50 0.05 1.13
b.
8+586.00
a. 2.00 a. 1.50 x 2.00 3.00 0.05 0.15
8+584.00
8+570.00
8+560.00
8+521.50
63 3.50 63 1.00 x 3.50 3.50 0.05 0.18
8+518.00
8+501.00
62 9.00 62 b. 2.50 x 9.00 22.50 0.05 1.13
8+492.00
8+432.00
b.
61 5.00 61 b. 2.50 x 5.00 12.50 0.05 0.63
8+427.00
a. 2.00 a. 1.20 x 2.00 2.40 0.05 0.12
8+425.00
ARAH MAKASSAR
Sub Total 9 46.50 84.90 4.25 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
9+035.00
74 1.00 74 1.00 x 1.00 1.00 0.05 0.05
9+034.00
8+970.00
73 1.00 73 1.00 x 1.00 1.00 0.05 0.05
8+969.00
8+909.00
b. 3.50 b. 1.00 x 3.50 3.50 0.05 0.18
8+905.50
72 1.50 72 a. 2.00 x 1.50 3.00 0.05 0.15
8+904.00 a.
8+897.00
71 3.00 71 1.00 x 3.00 3.00 0.05 0.15
8+894.00
8+789.50
70 4.50 70 1.00 x 4.50 4.50 0.05 0.23
8+785.00
8+773.00
8+753.10
8+733.00
a.
68 13.00 68 a. 3.00 x 13.00 39.00 0.05 1.95
8+720.00
ARAH MAKASSAR
Sub Total 10 50.60 99.10 4.96 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
9+250.00
b. 8.00 b. 1.00 x 8.00 8.00 0.05 0.40
9+242.00
81 6.00 0 a. 2.00 x 6.00 12.00 0.05 0.60
a.
9+236.00
9+229.00
80 1.00 80 1.00 x 1.00 1.00 0.05 0.05
9+228.00
9+225.00
79 1.00 79 1.00 x 1.00 1.00 0.05 0.05
9+224.00
9+222.00
b. 4.00 b. 1.00 x 4.00 4.00 0.05 0.20
9+220.00
9+218.00 a.
78 4.00 78 a. 1.50 x 4.00 6.00 0.05 0.30
9+216.00
9+212.00
77 2.00 77 1.00 x 2.00 2.00 0.05 0.10
9+210.00
9+159.00
c. 3.00 c. 1.50 x 3.00 4.50 0.05 0.23
9+156.00
b. 2.00 b. 1.00 x 2.00 2.00 0.05 0.10
9+154.00
a. 3.00 76 a. 3.00 x 3.00 9.00 0.05 0.45
9+151.00 76
9+050.00
9+042.00
ARAH MAKASSAR
Sub Total 11 42.00 57.50 2.88 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
9+492.00
9+488.00
9+447.00
9+362.00
86 2.00 86 2.00 x 2.00 4.00 0.05 0.20
9+360.00
9+324.00
c. 6.00 c. 1.00 x 6.00 6.00 0.05 0.30
9+318.00
85 b. 3.00 85 b. 2.50 x 3.00 7.50 0.05 0.38
9+314.00
9+310.50
9+295.00
9+286.00
9+280.00
ARAH MAKASSAR
Sub Total 12 36.50 43.00 2.15 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
9+784.00
96 3.00 96 1.00 x 3.00 3.00 0.05 0.15
9+781.00
9+732.00
9+690.00
9+683.00
9+665.50
93 1.50 93 1.00 x 1.50 1.50 0.05 0.08
9+664.00
92 1.00 92 1.00 x 1.00 1.00 0.05 0.05
9+663.00
9+627.00
9+620.00
9+608.00
9+565.00
9+555.00
9+554.00
89 a. 6.00 89 a. 2.50 x 6.00 15.00 0.05 0.75
9+549.00
ARAH MAKASSAR
Sub Total 13 61.50 135.00 6.75 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
10+007.00
10+006.00 11.00 104 2.00 x 11.00 22.00 0.05 1.10
104
b. 12.00 b. 2.00 x 12.00 24.00 0.05 1.20
9+996.00
9+994.00
103 a. 2.00 103 a. 2.50 x 2.00 5.00 0.05 0.25
9+992.00
9+975.50
102 b. 2.00 102 b. 2.50 x 2.00 5.00 0.05 0.25
9+973.50
a. 3.50 a. 1.00 x 3.50 3.50 0.05 0.18
9+970.00
9+948.00
101 1.00 101 1.00 x 1.00 1.00 0.05 0.05
9+947.00
9+879.00
100 4.00 100 1.00 x 4.00 4.00 0.05 0.20
9+875.00
9+842.50
99 2.50 99 1.30 x 2.50 3.25 0.05 0.16
9+840.00
9+832.00
9+816.00
9+801.50
97 3.50 97 1.00 x 3.50 3.50 0.05 0.18
9+798.00
ARAH MAKASSAR
Sub Total 14 57.50 87.25 4.36 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
10+136.00
111 5.00 111 2.50 x 5.00 12.50 0.05 0.63
10+131.00
10+122.00
10+111.00
10+080.00
10+067.00
10+052.00
10+037.00
10+035.00
10+029.00
10+022.00
1.80 c. 1.80 x 1.80 3.24 0.05 0.16
10+019.80
c. 105
b. 6.00 105 b. 6.00 x 6.00 36.00 0.05 1.80
10+018.00
10+016.00
a. 1.00 a. 1.00 x 1.00 1.00 0.05 0.05
10+015.00
ARAH MAKASSAR
Sub Total 15 49.80 157.24 7.86 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
10+293.60
10+292.20
b. 117 1.70 117 b. 1.50 x 1.70 2.55 0.05 0.13
10+290.50
a. 4.60 a. 1.50 x 4.60 6.90 0.05 0.35
10+289.00
10+260.00
10+258.70
b. 116 3.70 116 b. 1.50 x 3.70 5.55 0.05 0.28
10+255.00
a. 9.00 a. 1.50 x 9.00 13.50 0.05 0.68
10+251.00
10+250.00
b. 4.50 b. 1.10 x 4.50 4.95 0.05 0.25
10+245.50
115 6.50 115 a. 0.80 x 6.50 5.20 0.05 0.26
a.
10+239.00
10+238.00
10+228.00
10+222.50
113 4.50 113 1.10 x 4.50 4.95 0.05 0.25
10+218.00
10+188.00
10+175.00
ARAH MAKASSAR
Sub Total 16 57.50 66.60 3.33 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
10+717.00
10+707.00
10+717.50
10+707.00
10+692.00
123 2.00 123 1.50 x 2.00 3.00 0.05 0.15
10+690.00
10+648.00
10+638.00
10+590.50
10+585.00
10+478.00
120 3.00 120 1.00 x 3.00 3.00 0.05 0.15
10+475.00
10+330.50
10+319.00
10+299.00
ARAH MAKASSAR
Sub Total 17 56.50 106.00 5.30 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
11+352.00
11+343.00
11+333.00
11+327.00
11+295.70
129 b. 4.70 129 b. 3.40 x 4.70 15.98 0.05 0.80
11+291.00
a. 6.00 a. 2.00 x 6.00 12.00 0.05 0.60
11+285.00
11+227.00
128 4.00 128 b. 2.80 x 4.00 11.20 0.05 0.56
b.
11+223.00
a. 2.00 a. 1.00 x 2.00 2.00 0.05 0.10
11+221.00
11+216.50
b. 2.00 b. 2.80 x 2.00 5.60 0.05 0.28
11+214.50
11+186.80
b. 0.80 b. 0.80 x 0.80 0.64 0.05 0.03
11+186.00
ARAH MAKASSAR
Sub Total 18 53.00 91.22 4.56 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
11+547.50
b. 4.50 b. 1.10 x 4.50 4.95 0.05 0.25
11+543.00
137 5.00 137 a. 1.10 x 5.00 5.50 0.05 0.28
a.
11+538.00
11+475.50
136 10.00 136 c. 5.00 x 10.00 50.00 0.05 2.50
c.
11+465.50
b. 4.50 b. 2.50 x 4.50 11.25 0.05 0.56
11+461.00
a. 3.00 a. 1.50 x 3.00 4.50 0.05 0.23
11+458.00
11+481.50
11+476.00
11+473.00
b. 4.00 b. 1.50 x 4.00 6.00 0.05 0.30
11+469.00
134 11.00 134 a. 5.00 x 11.00 55.00 0.05 2.75
a.
11+458.00
11+452.50
11+446.00
11+438.00
11+426.00
ARAH MAKASSAR
Sub Total 19 66.00 168.40 8.42 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
12+057.00
b. 10.50 b. 1.50 x 10.50 15.75 0.05 0.79
12+046.50
143 9.50 143 a. 2.50 x 9.50 23.75 0.05 1.19
a.
12+037.00
12+003.90
142 2.50 142 b. 2.50 x 2.50 6.25 0.05 0.31
b.
12+001.40
a. 1.40 a. 1.20 x 1.40 1.68 0.05 0.08
12+000.00
11+999.00
11+988.00
11+654.10
11+637.10
140 5.00 140 c. 5.00 x 5.00 25.00 0.05 1.25
c.
11+632.10
b. 6.50 b. 2.50 x 6.50 16.25 0.05 0.81
11+625.60
a. 1.60 a. 1.20 x 1.60 1.92 0.05 0.10
11+624.00
11+626.50
11+614.00
ARAH MAKASSAR
Sub Total 20 80.00 149.45 7.47 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
13+233.70
151 5.70 151 1.70 x 5.70 9.69 0.05 0.48
13+228.00
13+225.00
13+214.00
13+105.00
13+100.00
148 8.00 148 2.50 x 8.00 20.00 0.05 1.00
13+092.00
12+893.00
12+882.00
146 6.00 146 1.00 x 6.00 6.00 0.05 0.30
12+879.00
12+822.50
145 2.50 145 1.00 x 2.50 2.50 0.05 0.13
12+820.00
12+782.50
144 2.50 144 b. 1.30 x 2.50 3.25 0.05 0.16
b.
12+780.00
a. 4.00 a. 1.00 x 4.00 4.00 0.05 0.20
12+776.00
ARAH MAKASSAR
Sub Total 21 70.80 102.74 5.14 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
15+544.70
b. 9.70 b. 5.00 x 9.70 48.50 0.05 2.43
15+535.00
159 15.00 159 a. 2.50 x 15.00 37.50 0.05 1.88
a.
15+520.00
14+741.30
4.50 b. 1.00 x 4.50 4.50 0.05 0.23
14+737.50
b. 158
14+733.00 14.30 158 a. 1.50 x 14.30 21.45 0.05 1.07
a.
14+727.00
14+601.10
157 3.10 157 1.70 x 3.10 5.27 0.05 0.26
14+598.00
14+278.00
156 a. 2.00 156 a. 2.00 x 2.00 4.00 0.05 0.20
14+276.00
13+491.00
13+480.00
13+286.00
154 4.00 154 1.00 x 4.00 4.00 0.05 0.20
13+282.00
13+280.00
153 5.00 153 2.50 x 5.00 12.50 0.05 0.63
13+275.00
13+244.10
152 3.10 152 1.00 x 3.10 3.10 0.05 0.16
13+241.00
ARAH MAKASSAR
Sub Total 22 73.20 169.82 8.49 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
16+800.00
167 10.00 167 3.30 x 10.00 33.00 0.05 1.65
16+790.00
16+761.50
16+759.00 7.00 166 1.30 x 7.00 9.10 0.05 0.46
165
166 9.50 165 2.50 x 9.50 23.75 0.05 1.19
16+752.00
16+531.30
164 4.60 164 c. 5.00 x 4.60 23.00 0.05 1.15
c.
16+526.70
b. 2.50 b. 2.50 x 2.50 6.25 0.05 0.31
16+524.20
a. 2.20 a. 1.50 x 2.20 3.30 0.05 0.17
16+522.00
16+091.50
16+081.00
15+719.10
162 20.60 162 b. 5.00 x 20.60 103.00 0.05 5.15
b.
15+698.50
a. 9.50 a. 0.80 x 9.50 7.60 0.05 0.38
15+689.00
15+695.00
15+688.00
160 5.00 160 1.70 x 5.00 8.50 0.05 0.43
15+683.00
ARAH MAKASSAR
Sub Total 23 87.40 239.55 11.98 m3
PERHITUNGAN TEBAL
STA. SKETSA P LUAS VOLUME KET.
(m) (m)
ARAH BIRA
CL L x P
5
17+207.00
171 3.00 171 b. 2.80 x 3.00 8.40 0.05 0.42
b.
17+204.00
a. 6.00 a. 1.80 x 6.00 10.80 0.05 0.54
17+198.00
17+077.00
17+063.00
16+996.00
16+975.00
16+925.00
168 6.00 168 1.00 x 6.00 6.00 0.05 0.30
16+919.00
ARAH MAKASSAR
Sub Total 24 50.00 123.20 6.16 m3