Quote#: 23011196

Quotation

M/S: HQWS
Atten: Mr. Adnan Akhtar

We are pleased to offer you the below Fire Fighting Works as per your request.

Item
Items QTY Total
No.

1.0 Mechanical Works: Fire Fighting L.S SAR 901,640.00

Grand Total (SAR) SAR 901,640.00


VAT 15% (SAR) SAR 135,246.00

Grand Total Include VAT 15% (SAR) SAR 1,036,886.00

We hope the above prices meets your requirements.

Sincerely,
Item no Description Unit Quantity Rate Amount

1 FIRE FIGHTING SYSTEMS


Pipes network
Above ground pipes:
Supply and installation and testing black steel pipe schedule 40, complete with all
1.1 accessories and groove fittings and supports and two layer primer coating before two
final coating layer with pipe marking approved from authorities, as per specification,
codes, drawings and supervisor engineers and owner recommendations:
1 * 160mm, 6” dia LM 590 255 150450
2 * 65mm, 2 1/2”dia LM 2970 112 332640
4 * 40mm, 1 1/2" dia LM 114 85 9690
5 * 40mm, 1 dia LM 25 52 1300
Under ground pipes:
Supply and installation and testing HDPE schedule.80 for underground pipes , complete
2
with all accessories and fittings, as per specification, codes, drawings and supervisor
engineers and owner recommendations:
1 * 250mm , 10” dia LM 140 280 39200
2 * 200mm , 8” dia LM 70 230 16100
3 * 160mm , 6” dia LM 6 180 1080
3 Sprinkler head
Supply & install upright Sprinkler K=11.2 @ 68 degree C,according to civil defense
3.1 No. 1152 35 40320
requirements.
3.2 Fire extinguisher
Supply & install fire extinguisher chemical powder 6 Kg, according to civil defense
3.3 No. 19 100 1900
requirements.
3.4 Supply & install fire extinguisher CO2 10 Kg, according to civil defense requirements. No. 37 380 14060
4 Fire hose cabinet
Supply & install fire hose reel cabinet including gates valve, nozzle – 100 ft. long and 1
4.1 inch diameter fire hose (rubber) & according to civil defense requirements. In No. 19 1,350 25650
warehouse and production area
5.1 Risers & Valves from Globe or Muller (UL&FM)
Supply & and installing 6" riser set with alarm complete with all accessories and alarm
5.2 No. 3 4,200 12600
check valve and OS&Y gate valve, according to civil defense requirements.
Supply & and installing zone control valve for pump room complete with all
5.3 accessories(flow swith,OS&Y gate valve, pressure gauge, ckeck valve and test and No. 1 6,500 6500
drain valve) according to civil defense requirements.
Supply & and installing test and drain valve complete with all accessories, according to
5.4 No. 5 250 1250
civil defense requirements.
5.5 Supply & and installing automatic air release valve No. 3 450 1350
5.6 Supply & and installing OS&Y GATE VALVE 10" No. 5 3,150 15750
Fire department connection (6”x4x2.5”) from Black steel, c/w non return valve 6"
5.7 No. 1 1,800 1800
according to civil defense requirements.
Fire pumps
Supply INSTALLATION and testing, commissioning complete horizontal split case pump
set (UL-FM) from (SAFECO) for firefighting system according to NFPA 20 requirments:
- Electrical fire pump.
- Diesel fire pump.
6 No. 1 230,000 230000
- Jockey fire pump.
Complete with all accessories,valves, and fitting and control panel, pressure tank
(Approved from authorities.)

… Electrical fire pump 750 GPM at 10.0 bar


… Diesel fire pump 750 GPM at 10.0 bar
… Jockey fire pump 75 GPM at 10.5 bar

Carried Forward to Section Summary SAR 901,640.00