INSPECTION REQUEST (IR)

Riyadh Metro Package-2 ( Line # 3)


Client Ar-Riyadh Development Authority IR No. 3A1VD1-04009 R02
Engineer Riyadh Metro Transit Consultants (RMTC) Submission Date:
15-04-2024
Contractor Ar-Riyadh New Mobilty (ANM) IR TYPE Regular

Location Code REJECTED IR No.

HOLD POINT WITNESS OTHER

Location Elevated Section


Sub Location Viaduct
Discipline CF00

Element / Structure
Work Description
Sub-Element
Activity Fire Fighting CFFF

Additional Classification

Inspection Date 16-04-2024 Inspection Time: 10AM


Reference
DRAWING NO M-ANM-3A1VD1-CFFF-SDR-200003_PR0

Remarks by ANM QA/QC


Method statement: M-ANM-300000-MST-CFFF-000015 & 000001
ITP: M-ANM-300000-ITP-CFFF-000007
Others:

Name Signature Date Time

Requested By ANM Tousif Khan 02-04-2024 3PM

Verified by ANM QA/QC Arif Khan 02-04-2024 3PM

Under Review Comments

Time for
Review

Status Approved Approved with comments Rejected

Date Time
Closure Name: Signature

M-ANM-3000000-GQQC-FOR-000001
ITP FOR INSTALLATION OF FIREFIGHTING PIPING SYSTEM

RIYADH METRO PROJECT - PACKAGE 2, LINE 3


APPENDIX 4
CHECKLIST FOR INSPECTION OF INSTALLATION OF FIRE PROTECTION

DRAWING REF.NO.: _____________________________________________________________________________

SPECIFICATION REF.: ________________________ INSPECTION REQUEST NO.: _____________________

SPECIFIC LOCATION: __________________ INSPECTION REQUESTED DATE & TIME: ___________________

ITEM DESCRIPTIONS YES NO HOLD REMARKS

1 Pipe Installation:
Confirm that fire fighting pipework are painted properly
a
(touch up paint)
Confirm that the expansion bellows are provided on the
b
pipe passes thru building expansion joint
Confirm that the fire fighting pipework are horizontally
c
levelled and aligned
Check that the materials size and schedule is correct
d
and approved.
All pipe thread connections must be free of scale and
e
burrs before installation.
Ensure that all grooved coupling gaskets are lubricated
f
as per manufacturer's specification.
Ensure that the piping system should be securely
g supported with due allowance against agent thrust
forces thermal expansion
Pipe hangers shall be spaced at intervals as per
h
approved shop drawings.
Rigid bracing shall be installed at each directional
i
change, fitting, tee and sprinkler heads.
2 Installation of Sprinklers:
Confirm that the actual location of sprinklers as per
a
approved reflected ceiling plan
Confirm that the fixing of sprinkler is as per
b
manufacturer's installation manual
Sprinkler is selected as per the schedule and approved
c shop drawing and Compliance to manufacturer's written
instruction.
Compliance to the requirements for the installation of
d
sprinklers.
e Actual location and correct fixing.

3 Installation of Zone Control Valves:


Check that inspection and test drain assembly including
a its accessories & orientation are as per approved shop
drawings.
Compliance to manufacturer's written instruction and
b
Valve is selected as per approved drawing

c Compliance to requirements for installation tolerances.

Confirm that the flow switch is installed as per


d
manufacturer's installation manual
Inspection Result

 Accepted  Rejected
REMARKS:

SUBCON ANM MEP Site Engineer ANM QA/QC Engineer RMTC Engineer

NAME

SIGNATURE

DATE

M-ANM-300000-GQQC-WIF-000163 - C

Page 14 of 19 M-ANM-300000-CFFF-ITP-000007 REV F


ITP FOR INSTALLATION OF FIREFIGHTING PIPING SYSTEM

RIYADH METRO PROJECT - PACKAGE 2, LINE 3


APPENDIX 4

CHECKLIST FOR INSPECTION OF INSTALLATION OF FIRE PROTECTION

DRAWING REF.NO.: _____________________________________________________________________________

SPECIFICATION REF.: ________________________ INSPECTION REQUEST NO.: _____________________

SPECIFIC LOCATION: __________________ INSPECTION REQUESTED DATE & TIME: ___________________

ITEM DESCRIPTIONS YES NO HOLD REMARKS

4 Installation of Fire Hose Reel and Cabinet:


Confirm if cabinet door (if provided) will open 180
a
degrees
Confirm if cabinet is properly identified and easily
b
accessible
Compliance to manufacturer's written instruction and
c
Cabinet is selected as per approved shop drawing.
d Compliance to requirements for installation tolerances.
Check location as per approved shop drawing,
e
alignment and correct fixing.
Installation of Portable Fire Extinguisher and
5
Cabinet:
Actual location, alignment and correct fixing for the
a cabinet and Extinguishers are selected as per
approved schedule
b Actual location, capacity and types are correct.

c Check that the location are unobstructed.


Confirm that all taggings / identifications of pipes,
d
valves, FHC, fire extinguishers are provided.
e Others

Inspection Result

 Accepted  Rejected
REMARKS:

SUBCON ANM MEP Site Engineer ANM QA/QC Engineer RMTC Engineer

NAME

SIGNATURE

DATE

M-ANM-300000-GQQC-WIF-000163 - C

Page 15 of 19 M-ANM-300000-CFFF-ITP-000007 REV F