M-ANM-3000000-GQQC-FOR-000001
ITP FOR INSTALLATION OF FIREFIGHTING PIPING SYSTEM
1 Pipe Installation:
Confirm that fire fighting pipework are painted properly
a
(touch up paint)
Confirm that the expansion bellows are provided on the
b
pipe passes thru building expansion joint
Confirm that the fire fighting pipework are horizontally
c
levelled and aligned
Check that the materials size and schedule is correct
d
and approved.
All pipe thread connections must be free of scale and
e
burrs before installation.
Ensure that all grooved coupling gaskets are lubricated
f
as per manufacturer's specification.
Ensure that the piping system should be securely
g supported with due allowance against agent thrust
forces thermal expansion
Pipe hangers shall be spaced at intervals as per
h
approved shop drawings.
Rigid bracing shall be installed at each directional
i
change, fitting, tee and sprinkler heads.
2 Installation of Sprinklers:
Confirm that the actual location of sprinklers as per
a
approved reflected ceiling plan
Confirm that the fixing of sprinkler is as per
b
manufacturer's installation manual
Sprinkler is selected as per the schedule and approved
c shop drawing and Compliance to manufacturer's written
instruction.
Compliance to the requirements for the installation of
d
sprinklers.
e Actual location and correct fixing.
Accepted Rejected
REMARKS:
SUBCON ANM MEP Site Engineer ANM QA/QC Engineer RMTC Engineer
NAME
SIGNATURE
DATE
M-ANM-300000-GQQC-WIF-000163 - C
Inspection Result
Accepted Rejected
REMARKS:
SUBCON ANM MEP Site Engineer ANM QA/QC Engineer RMTC Engineer
NAME
SIGNATURE
DATE
M-ANM-300000-GQQC-WIF-000163 - C