3storey Multi Purposed Building 1 Phase
3storey Multi Purposed Building 1 Phase
3storey Multi Purposed Building 1 Phase
RENTAL:
Dump Truck : P 376.48
Cargo Truck : 334.65
Frt. End Loader(1.15-1.45cu.m.) : 807.50
Concrete Mixer : 117.59
10" Water Pump 121.55
4" Water Pump : 84.70
Welding Machine : 220.50
Crawler Excavator : 3,500.00
130-159 HP Dozer : 1,433.67
Crane : 738.00
110-130 HP Grader : 812.07
4-8 T Vibratory : 678.70
Water Truck : 1,108.25
Trailer : 1,620.00
Crane Crawler Mounted 709.09
Hammer Pile w/o Crane 980.00
Truck Trailer 1,113.20
BASE COST (PRICES USED TO THIS PROGRAM) Column1 Column2 Column3 Column4 Column5 Column6 Column7
CEMENT : P 333.25
PLYWOOD 1/2"X4'X8' : 853.19
FORM LUMBER (Coco Lumber) : 35.13
RSB : 69.95
CWN : 90.11
TIE WIRE #16 : 121.47
GRAVEL 1,632.45
SAND : 1,408.45
BOULDERS : 1,620.41
4" CHB : 15.00
6" CHB : 20.00
Hacksaw Blade : 60.00
5cm.f G.I.Pipe : 1,000.00
Diesel 60.00
Selected Borrow 100.00
Aggregate Base Course 200.00
LABOR COST: :
FOREMAN : P 650.0000
SR. CARPENTER P 450.0000
CARPENTER : P 427.0900
MASON : P 427.0900
HEO : P 850.0000
LEO : P 450.0000
STEELMAN : P 427.0900
DRIVER : P 450.0000
WELDER : P 427.0900
LABORER : P 316.0000
By Administration
Engineer A P 1,644.5084
Eng'g. Asst. A : P 1,052.4196
Laborer ` : P 409.0900
Approved by: :
Regional Irrigation Manager
DATA SHEET
Program No. :
Date : December 15, 2022
FUND SOURCE : CCAW FUND
WATER SOURCE : Labangan River
FUEL CONSUMPTION
/hr. 15.00 lit/hr.
/hr. 10.00 lit/hr.
/hr. 9.00 lit/hr.
/hr. 1.26 lit/hr.
/hr.
/hr. 1.30 lit/hr.
/hr. 1.30 lit/hr.
/hr. 15.00 lit/hr.
/hr. 12.00 lit/hr.
/hr. 12.00 lit/hr.
/hr. 15.00 lit/hr.
/hr. 8.00 lit/hr.
/hr. 8.00 lit/hr.
/hr. 35.00 lit/hr.
/hr. 11.93 lit/hr.
/hr.
/hr. 20.00 lit/hr.
Column8 Column9 Column10 Column11 Column12 CURRENT MARKET PRICE + 12% VAT Column13 Column14
/bag 319.20 /bag
/pc 840.00 /pc
/bdft 33.60 /bdft
/kg. 69.44 /kg
/kg 89.60 /kg
/kg 120.96 /kg
/cum 1,344.00 /cu.m
/cu.m. 1,120.00 /cu.m
/cum 1,344.00 /cu.m
/pc 12.32 /pc
/pc 15.68 /pc
/lin.m. 78.40 /pc
/pc. - /pc
/lit 89.60 /lit
/cu.m. 672.00 /cu.m
/cu.m. 784.00 /cu.m
/day
/day
/day
/day
/day
/day
/day
/day
/day
/day
/day
/day
/day
HENRY A. POTESTAS
Acting Div. Manager, ZDS IMO
Division Manager A, ED
B) CONSTRUCTION WORKS
1. Concreting & Curing with Concrete Mixer 896.44 35.28 0.00 52.92 62.41
1303.46 205.39 3482.09 308.04 348.00
B) CONSTRUCTION WORKS
Spreading of Aggregates 81.82
TOTAL E.D.C. 289.29 0.00 0.00 9.70 0.00 14.56 117.02
430.57
"ANNEX A"
UNIT COST DERIVATION
LABANGAN CLIMATE CHANGE CY 2022
Labangan, Zamboanga del Sur
Page 10
"ANNEX A"
UNIT COST DERIVATION
LABANGAN CLIMATE CHANGE CY 2022
Labangan, Zamboanga del Sur
Page 11
"ANNEX A"
UNIT COST DERIVATION
LABANGAN CLIMATE CHANGE CY 2022
Labangan, Zamboanga del Sur
Page 12
"ANNEX A"
UNIT COST DERIVATION
LABANGAN CLIMATE CHANGE CY 2022
Labangan, Zamboanga del Sur
Page 13
"ANNEX A"
UNIT COST DERIVATION
LABANGAN CLIMATE CHANGE CY 2022
Labangan, Zamboanga del Sur
Page 14
"ANNEX A"
UNIT COST DERIVATION
LABANGAN CLIMATE CHANGE CY 2022
Labangan, Zamboanga del Sur
Page 15
Breakdown of 2400 psi
WAGES EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL
ITEMS QTY.
Unit Unit
Unit Cost Total Total Unit Cost Total Unit Cost Total Total
Cost Cost
ESTIMATED DIRECT COST
A) PROCUREMENT AND HAULING OF CONSTRUCTION MATERIALS
Cement 7.50 bags 9.61 72.08 0.99 7.43 339.29 2,544.68 1.49 11.18 6.51 48.83
Sand 0.48 cu.m. 207.47 99.59 9.70 4.66 1408.45 676.06 14.56 6.99 56.72 27.23
Gravel 0.96 cu.m. 207.47 199.17 9.70 9.31 1632.45 1,567.15 14.56 13.98 56.72 54.45
Form Lumber 25.00 bd.ft 1.20 30.00 0.04 1.00 35.13 878.25 0.05 1.25 0.24 6.00
Plywood 1.25 sheet 7.79 9.74 0.60 0.75 853.19 1,066.49 0.89 1.11 3.91 4.89
CWN 0.25 kgs. 0.40 0.10 0.04 0.01 90.11 22.53 0.04 0.01 0.17 0.04
TOTAL 8,653.40
"ANNEX B"
UNIT COST DERIVATION
LABANGAN CLIMATE CHANGE CY 2022
Labangan, Zamboanga del Sur
CONSTRUCTION WORKS
EXCAVATION (Mechanized)
Labor to be utilized : 1 - Heavy Equipment Operator & 1 - Laborer
Labor Cost
Wages
1 - H. E. Operator x 850.00 /day/Heavy Equipment Oper. / 200.00 cu.m/day = 4.25 /cu.m
1 - Laborer x 316.00 /day/Laborer / 200.00 cu.m/day = 1.58 /cu.m
TOTAL 5.83 /cu.m
Equipment Cost
Equipment to be utilized : 0.70 - 1.00 Crawler Excavator
Capability : 35.00 cu.m/hr or 200.00 cu.m/day
Rental : 3500.00 /hr.
Fuel Consumption : 15.00 lit/hr.
Fuel Cost = 15.00 lit/hr. x 60.00 /lit / 35.00 cu.m/hr = 25.71 /cu.m
Oil Cost (10% of Fuel Cost) = 2.57 /cu.m
Spareparts (60% of E. R.) = 0.60 x 3500.00 /hr. / 35.00 cu.m/hr = 60.00 /cu.m
Depreciation(40% of E. R.) = 0.40 x 3500.00 /hr. / 35.00 cu.m/hr = 40.00 /cu.m
TOTAL 128.28 /cu.m
SUMMARY
Wages 5.83 /cu.m
Fuel Cost 25.71 /cu.m
Oil Cost 2.57 /cu.m
Spareparts 60.00 /cu.m
Depreciation 40.00 /cu.m
TOTAL (Structure Excavation, Mechanized) 134.11 /cu.m
DEWATERING
Capability : 200.00 cu.m/day
Labor Cost
Wages
1 - L. E. Operator x 450.00 /day/L. E. Operator / 200.00 cu.m/day = 2.25 /cu.m
0- 2.25 /cu.m
Equipment Cost
Equipment to be Utilized : 1.00 unit 4" Ø Water Pumps
Capability : 200.00 cu.m/day
Rental : 84.70 /hr.
Fuel Consumption : 1.30 lit/hr.
Fuel Cost = 1.30 lit/hr. x 60.00 /lit x 8.00 hrs/day / 200.00 cu.m/day = 3.12 /cu.m
Oil Cost (10% of Fuel Cost) = 0.31 /cu.m
Spareparts (60% of E. R.) = 0.60 x 84.70 /hr. x 8.00 hrs/day / 200.00 cu.m/day = 2.03 /cu.m
Depreciation(40% of E. R.) = 0.40 x 84.70 /hr. x 8.00 hrs/day / 200.00 cu.m/day = 1.36 /cu.m
0- 6.82 /cu.m
SUMMARY
Wages 8.08 /cu.m
Fuel Cost 28.83 /cu.m
Oil Cost 2.88 /cu.m
Spareparts 62.03 /cu.m
Depreciation 41.36 /cu.m
TOTAL (Structure Excavation, Mechanized with Dewatering) 143.18 /cu.m
BACKFILL (Mechanized)
Labor to be utilized : 1 - Heavy Equipment Operator & 1 - Laborer
Capability : 440.00 cu.m/day
Labor Cost
Wages
1 - H. E. Operator x 850.00 /day/Heavy Equipment Oper. / 440.00 cu.m/day = 1.93 /cu.m
1 - Laborer x 316.00 /day/Laborer / 440.00 cu.m/day = 0.72 /cu.m
TOTAL 2.65 /cu.m
Equipment Cost
Equipment to be utilized : Backhoe
Capability : 55.00 cu.m/hr
Rental : 3500.00 /hr.
Fuel Consumption : 12.00 lit/hr.
Fuel Cost = 12.00 lit/hr. x 60.00 /lit / 55.00 cu.m/hr = 13.09 /cu.m
Oil Cost (10% of Fuel Cost) = 1.31 /cu.m
Spareparts (60% of E. R.) = 0.60 x 3500.00 /hr. / 55.00 cu.m/hr = 38.18 /cu.m
Depreciation(40% of E. R.) = 0.40 x 3500.00 /hr. / 55.00 cu.m/hr = 25.45 /cu.m
TOTAL 78.03 /cu.m
SUMMARY
Wages 2.65 /cu.m
Fuel Cost 13.09 /cu.m
Oil Cost 1.31 /cu.m
Spareparts 38.18 /cu.m
Depreciation 25.45 /cu.m
TOTAL (Structure Backfill, Mechanized) 83.10 /cu.m
Page 17
NATIONAL IRRIGATION ADMINISTRATION
ZAMBOANGA DEL SUR IRRIGATION MANAGEMENT OFFICE
LABANGAN RIVER IRRIGATION SYSTEM
2022 PROGRAM OF WORK
REGION / PMO : Program No. : 1
PROJECT TITLE : LABRIS CLIMATE CHANGE CY 2022 Date : April 15, 2024
NAME OF SYSTEM / PROJECT :
SYSTEM CATEGORY
( NIS/CIS, MP/SIP : NATIONAL IRRIG. SYSTEM
PROJ. DESCRIPTIO : Diversion Works, Desilting of Bokong Dam
I. GENERAL INFORMATION
1. Project Location 6. Overall Proje Original Revised
a. Region IX a. GOP 60,000.00
b. Province Zamboanga del Sur b. Loan Proceeds
City / Municipality Labangan c. Other (Equity, etc.)
District TOTAL 60,000.00
2. Service Area /FUSA 3,064.71 7. Physical Target (Overall)
Designed Area ( Ha. ) 3,500.00 a. New Area (Ha.) N/A
3. Source of Water Labangan River b. Restored Area (Ha.) N/A
3a. Drainage Area c. Repair Works : (specific for Rehab.)
3b. Dependable Flow
8. Overall Implementation Schedule Original Revised
4. Type of Irrigation 5. PT. of Diversion Latitude Longitude a. Physical Starting Date Mar 2022
( Please Check the type of Irrigation ) 7°54'50.58"N 123°26'12.90"E b. Completion Date Aug 2022
a. Run off the River N/A
b.Reservoir N/A
c.Ground Water Pump N/A
d.Others N/A
I. MANPOWER REQUIREMENT
1. Project Engineer
2. Foreman
3. Skilled
4. Laborer
II. EQUIPMENT REQUIREMENT
DIRECT COST
1. CIVIL WORKS
0
Err:509
Err:509
Henry A. Potestas Ernesto T. Benliro Jr. Rey M. Pinatacan Benedicto Isagani O. Pulis Jr.
F. A. SWRFT Engineer A OIC ZDSIMO
Attachment "E"
CMD FORM Y-1A
LABANGAN RIS
CY 2022 IMPLEMENTATION SCHEDULE AND STATUS
% WT. PARTI- CY 2022
ESTIMATED
NO. MAJOR COMPONENT CLASS ORIG./RE CULARS
COST ORIG./REV.
V Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509
Err:509 ACTUAL
PROJECTED
Err:509 Err:509
Err:509 ACTUAL
PROJECTED
Err:509 Err:509
Err:509 ACTUAL
PROJECTED
Err:509 Err:509
Err:509 ACTUAL
PROJECTED
Err:509 Err:509
Err:509 ACTUAL
PROJECTED
Err:509 Err:509
Err:509 ACTUAL
PROJECTED
Err:509 Err:509
Err:509 ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
Err:509
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL 0.00%
PROJECTED
CY PHYSICAL STATUS Err:509 Err:509
ACTUAL
Cumulative Accomp. PROJECTED 0 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
(Has) ACTUAL
AREA (Has.)
GENERATED PROJECTED
HAS ACTUAL
Joshua Royce M. Berondo Rey M. Pinatacan Benedicto Isagani O. Pulis Jr. Salome N. Layasan
Engineer A Engineer A Division Manager A Acting Regional Manager
Attachment "E"
CMD FORM Y-2A
LABANGAN RIS
CY 2022 SCHEDULE EXPENDITURE
% WT. PARTI- CY 2022
ESTIMATED
NO. MAJOR COMPONENT CLASS ORIG./RE CULARS
COST ORIG./REV.
V Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
Err:509 Err:509 Err:509
ACTUAL
PROJECTED
II. Construction Survey Err:509 Err:509
ACTUAL
PROJECTED 0.00%
TOTAL PROJECT COST Err:509 Err:509
ACTUAL
Cumulative Accomp. PROJECTED 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
ACTUAL
FINANCIAL STATUS
Php '000 PROJECTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
ACTUAL
Joshua Royce M. Berondo Rey M. Pinatacan Benedicto Isagani O. Pulis Jr. Salome N. Layasan
Engineer A Engineer A Division Manager A Acting Regional Manager
REPUBLIC OF THE PHILIPPINES
REGION IX
E
MASTERLIST OF DIVERSION WORKS x
c
a
v
Supply and Delivery a
t
OGEE EXCAVATION BACKFILL COFFERDAMMING & CARE of Installation of Supply and Delivery of Installation of 3000 PSI Reinf. 2,400 PSI Conc. PVC Pipe 2"
ITEMS OF WORK LOCATION RUBBLE MASONRY Lean Concrete Filter Drain LATITUDE LONGITUDE i
LENGTH (Mechanized) (Mechanized) OF RIVER 5mx400mmx100mm 5mx400mmx100mmx10mm 4mx400mmx100mmx10mm 4mx400mmx100mmx10mm Conc. Blocks dia. X 10' o
x10mm n
A. CIVIL WORKS M
mtrs cu.m cu.m cu.m cu.m pcs. pcs. pcs. cu.m cu.m cu.m cu.m pcs.
BY Contract e
c
h
1. Diversion Works Brgy. Bokong Labangan ZDS 86.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 7°54'50.58"N 123°26'12.90"E ###
TOTAL 86.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Joshua Royce M. Berondo Rey M. Pinatacan Benedicto Isagani O. Pulis Jr. Salome N. Layasan
Engineer A Engineer A Division Manager A Acting Regional Manager
National Irrigation Administration
Region IX
Labangan River Irrigation System
Labangan, Zamboanga Del Sur
#REF!
HENRY A. POTESTAS 0 0
Eng'g Asst. A. Acting Div. Manager, ZDS IMO
Construction Survey Details
6,705.52
Prepared by : Approved:
ITEMS QTY. WAGES EQUIP. RENTAL Spare Parts FUEL & OIL
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
TOTAL
Supervision 3%
TOTAL E.D.C.
of 2400 (For Canal Lining)
48.83
27.23
54.45
6.00
4.89
0.07
0.04
4.90
0.00
97.09
243.50
11,266.37
337.99
11,604.36
Attachment "E"
CMD FORM Y-2A
LABANGAN RIS
CY__2020___Scheduled expenditures and status
0
100
PROJECTED 18% 50% 68% 100%
ACTUAL 90
PROJECTED
ACTUAL 80
PROJECTED
ACTUAL 70
PROJECTED
ACTUAL 60
PROJECTED
ACTUAL 50
PROJECTED
ACTUAL 40
PROJECTED
ACTUAL 30
PROJECTED
ACTUAL 20
PROJECTED
ACTUAL 10
PROJECTED
ACTUAL 0
PROJECTED
TOTAL PROJECT COST - 0.00%
ACTUAL
Cumulative Accomp PROJECTED 17.97% 50.00% 67.97% 100.00%
ACTUAL
Php '000 PROJECTED - - - -
FINANCIAL STATUS
ACTUAL
Breakdown of 3000 psi Reinf. Concrete (Canal, CS, & Other Structures)
WAGES EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL
ITEMS QTY.
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
ESTIMATED DIRECT COST
A) PROCUMENT AND HAULING OF CONSTRUCTION MATERIALS
Cement 9.00 bags 9.61 86.49 0.99 8.91 319.20 2,872.80 1.49 13.41 6.51 58.59
Sand 0.45 cu.m. 207.47 93.36 9.70 4.37 1120.00 504.00 14.56 6.55 56.72 25.52
Gravel 0.90 cu.m. 207.47 186.72 9.70 8.73 1344.00 1,209.60 14.56 13.10 56.72 51.05
Form Lumber 25.00 bd.ft 1.20 30.00 0.04 1.00 33.60 840.00 0.05 1.25 0.24 6.00
0.00 0.00 0.00 0.00 0.00
B) CONSTRUCTION WORKS
1. Fabrication, Placing & Dismantling of Forms 618.28 0.00
2. Concreting with Concrete Mixer & Curing 1,280.62 70.55 105.83 124.83
2,295.47 93.56 5,426.40 140.14 265.99
TOTAL E.D.C. 8,221.56
#REF! #REF!
WORK TO BE DONE
ACTIVITY unit Estimated
Quantity Unit Cost
Cost
A. DIRECT COST
BY CONTRACT
1. Sluice Gates unit 2.00 1,750,000.00 3,500,000.00
2. Steel Gates unit 21.00 1,840,574.94
BY ADMIN
1. 2400 psi for Canal mᶾ #REF! 11,266.37 #REF!
2. Common Excavation Mech. mᶾ #REF! 138.13 #REF!
3. Backfill w/ Compaction mᶾ #REF! 218.18 #REF!
4. Conc. Demolition mᶾ #REF! 585.84 #REF!
5. 76 dia. RCP pcs #REF! 2,500.00 #REF!
6. Common Excavation Manual mᶾ #REF! 168.55 #REF!
7. 3000 psi mᶾ #REF! 8,221.56 #REF!
8. IA OFFICE pcs 28.00 100,000.00 2,800,000.00
9. FIELD SUPPORT, SUPERVISION & MONITORING #REF!
2. IDP 375,000.00
3. Construction Survey 250,000.00
4. Parcellary Survey
5. RIGHT OF WAY ACQUISITION /DAMAGES
1. Land Acquisition
2. Plant Damages
3. Property Damages
6. PROCUREMENT OF EQUIPMENT & VEHICLES
7. CONSULTING SERVICES
8. TAXES (For selected FAPs only)
9. CONTINGENCIES
1. Physical Contingency
2. Financial Contingency
TOTAL DIRECT COST #REF!
B. INDIRECT COST
I. GESA (2.85% of Direct Cost)
II. MANAGEMENT FEE (5% of Direct Cost)
TOTAL INDIRECT COST
GRAND TOTAL #REF!
Breakdown of Sub-Total "A"
ITEMS OF WORK Qty. Unit Wages Equipt. Rental Const. Materials Spare Parts Fuel & Oil Total
A. BY CONTRACT
1. Sluice Gates 2.00 LS 3,500,000.00 3,500,000.00
2. Steel Gates 21.00 LS 1,840,049.94 1,840,049.94
B. BY ADMIN
1. 2400 psi for Canal 1,313.00 cu.m 1,749,416.38 290,236.16 9,280,410.05 193,287.26 540,057.65 12,053,407.49
2. Common Excavation Mech. 18,390.84 cu.m 83,157.84 1,136,553.69 757,702.46 750,125.43 2,727,539.43
3. Backfill w/ Compaction 2,176.00 cu.m 16,999.95 132,931.67 88,645.17 122,356.33 360,933.12
4. Conc. Demolition 6.00 cu.m 3,515.04 3,515.04
5. 76 dia. RCP 4.00 pcs. 10,000.00 10,000.00
6. Common Excavation Manual 90.00 cu.m 14,414.85 14,414.85
7. 3000 psi 27.00 69,885.42 7,336.00 219,534.92 4,886.22 13,497.58 315,140.14
8. IA OFFICE 28.00 2,800,000.00 2,800,000.00
9. FIELD SUPPORT, SUPERVISION & MONITORING 750,000.00 750,000.00
IDP 375,000.00 375,000.00
Construction Survey 250,000.00 250,000.00
Attachment "C" 5 of 5
Number of
I. MANPOWER REQUIREMENT
Personnel
1. Monthly Personnel
2. Daily Personnel
GRAND TOTAL
3. Contractual
II. EQUIPMENT REQUIREMENT Units
REGULAR BUDGET
III. MATERIALS REQUIREMENT
Peso Counterpart LP-Cash TOTAL
IV. CASH REQUIREMENT F.O. C.O. F.O. C.O. PC LP TOTAL
DIRECT COST
1. CIVIL WORKS
a. Contract Works 5,340,575 5,340,575
b. Force Account Works #REF! #REF!
Page 41 of 232
NIA FORM 11-7 (REVISED APRIL 27, 2000)
INDIVIDUAL PROGRAM OF WORK
Program No.:
Date: .
CY 2013 POW
PERCENT
ITEMS OF WORK UNIT QUANTITY UNIT COST AMOUNT AGE
WEIGHT
I. CIVIL WORKS
A Siphon
1 3,000 psi Concrete cu.m. #REF! 8,221.56 #REF!
2 Cofferdamming cu.m. #REF! 69.47 #REF!
3 Structure Exc. w/ dewat. cu.m. #REF! 143.18 #REF!
4 Structure Backfill cu.m. #REF! 83.10 #REF!
WAGES EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL
ITEMS QTY. Unit
Unit Cost Total Total Unit Cost Total Unit Cost Total Unit Cost Total
Cost
B)CONSTRUCTION WORKS
1. Fabrication, Placing & Dismantling of Forms 618.28
2. Concreting with Concrete Mixer & Curing 1280.62 70.55 105.83 124.83
0 0.00
2,306.14 94.81 10,230.35 142.10 276.94
Rubble Masonry
L T W Vol TOTAL
Apron
Length 28.24
Width 86
12mm Ø (Spaced @ 25cm OCBW)
Vertical Wall
Width 2.5 m
Length 27 m
12mm Ø (Spaced @ 25cm OCBW)
Retaining Wall
length= 175 m
16mm Ø longitudinal bars length no. pcs total length
spaced @ 0.17 2.04 1031 2103.24 2103.24
spaced @ 0.34 2.79 516 1439.64 1439.64
spaced @ 0.34 5.53 516 2853.48 2853.48
Afflux Dike
EARTHWORKS
LABANGAN RIS
Labangan, Zamboanga del Sur
WAGES EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL
ITEMS QTY.
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
ESTIMATED DIRECT COST
A) CONSTRUCTION WORKS 5.83 40.00 40.00 60.00 60.00 28.28 28.28
5.83 40.00 60.00 28.28
TOTAL E.D.C. 138.13
FUND SOURCE: LEGEND FOR S-CURVE: (----) - Projected Accomp. ( ) - Fund released
LABANGAN RIS
REMARKS: (----) - Actual Accomp. ( ) - Expenditures
ITEM MAJOR ITEM OF WORK CODE UNIT QTY. TOTAL EST'D COST PERCENTAGE WT PAR- CY 2012 - 2013 CONSTRUCTION SCHEDULE & S - CURVE
NO. JOB ORIGINAL REVISED ORIGINAL REVISED TICULAR DEC JAN FEB MAR APR MAY JUN JUL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) 100%
Projected
BY CINTRACT #REF!
Actual 90%
Projected
A. #REF! mtrs 253 #REF! #REF!
Actual 80%
Projected
BY ADMIN. #REF!
Actual 70%
Projected
B. DRAINAGE STRUCTURE pcs 7 - #REF!
Actual 60%
Projected
C. CONSTRUCTION SURVEY ls - #REF!
Actual 50%
Projected
D. 0.00 ls - #REF!
Actual 0.00 40%
Projected
#REF!
Actual 30%
Projected
#REF!
Actual 20%
Projected
#REF!
Actual 10%
Projected
Actual 0%
Projected
Actual
DIRECT 0.000 #REF! 0.00 Projected 0.00 5.00 25.00 60.00 80.00 95.00 100.00 0.00 0.00 0.00 0.00
TOTAL #REF!
COST Actual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF!
Contingencies 0 Projected
ESTIMATED INDIRECT GESA #REF! Actual
PROJECT COST MGT. FEE #REF! Actual
COST OVERALL TOTAL COST #REF! #REF! #REF! #REF! #REF! #REF! #REF!
CASH FLOW Cummulative (P'000) Projected
RELEASED Cummulative (P'000)
EXPENDITURES Cummulative (P'000) Actual
Projected 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EQUITY GENERATION P Cummulative (P'000) Actual
Project: Err:509
Location: 0
Breakdown of Structure Excavation w/ Dewatering
ITEMS QTY. WAGES EQUIP. RENTAL Spare Parts FUEL & OIL
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
ESTIMATED DIRECT COST
A) CONSTRUCTION WORKS 8.08 41.36 41.36 62.03 62.03 31.71 31.71
8.08 41.36 62.03 31.71
#REF!
B) CONSTRUCTION WORKS
Installation Cost 441.35 5.64 8.47 9.99
TOTAL E.D.C. 471.90 7.44 2,691.66 11.19 21.33
HENRY A. POTESTAS 0
Eng'g Asst. A. Acting Div. Manager, ZDS IMO
744915091.xlsx Date:04/15/2024
Republic of the Philippines
PAMBANSANG PANGASIWAAN NG PATUBIG
(National Irrigation Administration)
Region IX
Office of the Provincial Irrigation Officer
B) CONSTRUCTION WORKS
Installation Cost 529.62 0.00 7.29
TOTAL E.D.C. 856.55 9.62 3,449.37
744915091.xlsx Date:04/15/2024
ublic of the Philippines
G PANGASIWAAN NG PATUBIG
al Irrigation Administration)
Region IX
e Provincial Irrigation Officer
10.94 12.90
14.44 27.43
1.73 3.29
1.88 3.57
0.29 0.55
18.34 34.84
Approved by:
0
Regional Irrigation Manager
744915091.xlsx Date:04/15/2024
Republic of the Philippines
PAMBANSANG PANGASIWAAN NG PATUBIG
(National Irrigation Administration)
Region IX
Office of the Provincial Irrigation Officer
B) CONSTRUCTION WORKS
Labor Cost 105.17
TOTAL E.D.C. 312.64 0.00 0.00 9.70 1344.00
n of Gravel Blanket
Spare Parts FUEL & OIL
Unit Cost Total Unit Cost Total
14.56 56.72
1.75 6.81
1.89 7.37
0.29 1.13
18.49 72.03
Approved by:
0
Regional Irrigation Manager
National Irrigation Administration
Region IX
Labangan River Irrigation System
Labangan, Zamboanga Del Sur
#REF!
HENRY A. POTESTAS 0 0
Eng'g Asst. A. Acting Div. Manager, ZDS IMO
National Irrigation Administration
Region IX
Labangan River Irrigation System
Labangan, Zamboanga Del Sur
Project: Err:509
Location: 0
Breakdown of Boulder Riprap
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
ESTIMATED DIRECT COST
A) PROCUREMENT AND HAULING OF CONSTRUCTION MATERIALS
Boulders 1.00 cu.m 225.97 225.97 167.04 167.04 750.00 750.00 250.56 250.56 226.84 226.84
B) CONSTRUCTION WORKS
Laying of Boulders 210.67
TOTAL E.D.C. 436.64 167.04 750.00 250.56 226.84
744915091.xlsx Date:04/15/2024
Republic of the Philippines
PAMBANSANG PANGASIWAAN NG PATUBIG
(National Irrigation Administration)
Region IX
Office of the Provincial Irrigation Officer
Project: LABANGAN CLIMATE CHANGE CY 2022
Location: Labangan, Zamboanga del Sur Sheet 61 of 232 .
VIII. #REF!
PIC & ASST. PIC LS #REF! - none
NERATION PROGRAMMING
EQUITY
GENERATION
0.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
#REF!
808.00
1,212.00
2,020.00
0.00
#REF!
Republic of the Philippines
PAMBANSANG PANGASIWAAN NG PATUBIG
(National Irrigation Administration)
Region IX
Office of the Provincial Irrigation Officer
ITEMS QTY.WAGES Fringe Benefits TEV EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL SUNDRIES
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
A) PROCUREMENT AND HAULING OF CONSTRUCTION MATERIALS
Cement 4.20 bags 9.61 40.36 0.00 0.99 4.16 319.20 1,340.64 1.49 6.26 6.51 27.34
Sand 0.35 cu.m. 207.47 72.61 0.00 9.70 3.40 1120.00 392.00 14.56 5.1 56.72 19.85
Gravel 0.05 cu.m. 207.47 10.37 0.00 9.70 0.49 1344.00 67.20 14.56 0.73 56.72 2.84
Boulders 1.00 cu.m 225.97 225.97 0.00 167.04 167.04 750.00 750.00 250.56 250.56 226.84 226.84
0
B) CONSTRUCTION WORKS 0.04 70.00 0.06 0
0.00 0.00 0.00 0
0.00 0.00 0.00
0.00
Labor Cost #REF! #REF! Err:508
HENRY A. POTESTAS 0 0 0 0
Eng'g Asst. A. 0 0 0 0
Republic of the Philippines
PAMBANSANG PANGASIWAAN NG PATUBIG
(National Irrigation Administration)
Region IX
Office of the Provincial Irrigation Officer
ITEMS QTY.
WAGES Fringe Benefits TEV EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL SUNDRIES
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
A) PROCUREMENT AND HAULING OF CONSTRUCTION MATERAILS
Cement 2.52 bags 319.20 804.38 0.00 0.00 0.99 2.49 319.20 804.38 1.49 3.75 6.51 16.41
Sand 0.11 cu.m. 207.47 22.82 0.00 9.70 1.07 1120.00 123.20 14.56 1.60 56.72 6.24
Gravel 0.21 cu.m. 207.47 43.57 0.00 9.70 2.04 1344.00 282.24 14.56 3.06 56.72 11.91
Form Lumber 0.60 bd.ft 1.20 0.72 0.00 0.00 0.04 0.02 33.60 20.16 0.05 0.03 0.24 0.14
RSB 23.22 kgs. 0.28 6.50 0.00 0.00 0.02 0.46 69.44 1,612.40 0.04 0.93 0.17 3.95
Tiewire 0.26 kgs. 0.28 0.07 0.00 0.00 0.02 0.01 120.96 30.90 0.04 0.01 0.17 0.04
CWN 0.40 kgs. 0.28 0.11 0.00 0.00 0.02 0.01 89.60 35.84 0.04 0.02 0.17 0.07
G. I. Sheet 0.30 L. F. 7.79 2.34 0.00 0.00 0.6 0.18 320.00 96.00 0.89 0.27 3.91 1.17
B) CONSTRUCTION WORKS
Fabrication Cost 882.69 0.00 19.76 29.63 34.95
744915091.xlsx Date:04/15/2024
Republic of the Philippines
PAMBANSANG PANGASIWAAN NG PATUBIG
(National Irrigation Administration)
Region IX
Office of the Provincial Irrigation Officer
WAGES Fringe Benefits TEV EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL SUNDRIES
ITEMS QTY.
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
A) PROCUREMENT AND HAULING OF CONSTRUCTION MATERIALS
Cement 1.82 bags 9.61 17.49 0.00 0.00 0.99 1.80 319.20 580.94 1.49 2.71 6.51 11.85
Sand 0.08 cu.m. 207.47 16.60 0.00 0.00 9.70 0.78 1120.00 89.60 14.56 1.16 56.72 4.54
Gravel 0.15 cu.m. 207.47 31.12 0.00 0.00 9.70 1.46 1344.00 201.60 14.56 2.18 56.72 8.51
Form Lumber 0.48 bd.ft 1.20 0.58 0.00 0.00 0.04 0.02 33.60 16.13 0.05 0.02 0.24 0.12
RSB 9.77 kgs. 0.28 2.74 0.00 0.00 0.02 0.20 69.44 678.43 0.04 0.39 0.17 1.66
Tiewire 0.05 kgs. 0.28 0.01 0.00 0.00 0.02 0.00 120.96 6.05 0.04 0.00 0.17 0.01
CWN 0.30 kgs. 0.28 0.08 0.00 0.00 0.02 0.01 89.60 26.88 0.04 0.01 0.17 0.05
G. I. Sheet 0.24 L. F. 7.79 1.87 0.00 0.00 0.6 0.14 320.00 76.80 0.89 0.21 3.91 0.94
B) CONSTRUCTION WORKS
Fabrication Cost 882.69 0.00 0.00 0.00 19.76 29.63 34.95
744915091.xlsx Date:04/15/2024
Republic of the Philippines
PAMBANSANG PANGASIWAAN NG PATUBIG
(National Irrigation Administration)
Region IX
Office of the Provincial Irrigation Officer
ITEMS QTY.
WAGES Fringe Benefits TEV EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL SUNDRIES
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
A) PROCUREMENT AND HAULING OF CONSTRUCTION MATERIALS
Cement 0.45 bags 9.61 4.32 0.00 0.00 0.99 0.45 319.20 143.64 1.49 0.67 6.51 2.93
Sand 0.02 cu.m. 207.47 4.15 0.00 9.70 0.19 1120.00 22.40 14.56 0.29 56.72 1.13
Gravel 0.04 cu.m. 207.47 8.30 0.00 9.70 0.39 1344.00 53.76 14.56 0.58 56.72 2.27
Form Lumber 2.00 bd.ft 1.20 2.40 0.00 0.00 0.04 0.08 33.60 67.20 0.05 0.10 0.24 0.48
RSB 3.65 kgs. 0.28 1.02 0.00 0.02 0.07 69.44 253.46 0.04 0.15 0.17 0.62
Tiewire 0.04 kgs. 0.28 0.01 0.00 0.00 0.02 0.00 120.96 4.84 0.04 0.00 0.17 0.01
CWN 0.20 kgs. 0.28 0.06 0.00 0.00 0.00 0.02 0.00 89.60 17.92 0.04 0.01 0.17 0.03
B) CONSTRUCTION WORKS
Installation Cost 378.31 0.00 9.58 14.36 16.94
744915091.xlsx Date:04/15/2024
Republic of the Philippines
PAMBANSANG PANGASIWAAN NG PATUBIG
(National Irrigation Administration)
Region IX
Office of the Provincial Irrigation Officer
ITEMS QTY. WAGES Fringe Benefits TEV EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL SUNDRIES
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
A) PROCUREMENT AND HAULING OF CONSTRUCTION MATERIALS
Cement 9.00 bags 9.61 86.49 0.00 0 0.99 8.91 319.20 2,872.80 1.49 13.41 6.51 58.59
Sand 0.45 cu.m. 207.47 93.36 0.00 0 9.70 4.37 1120.00 504.00 14.56 6.55 56.72 25.52
Gravel 0.90 cu.m. 207.47 186.72 0.00 0 9.70 8.73 1344.00 1,209.60 14.56 13.10 56.72 51.05
Form Lumber 40.00 bd.ft 1.20 48.00 0.00 0 0.04 1.60 33.60 1,344.00 0.05 2.00 0.24 9.60
Plywood 1.25 sheet 7.79 9.74 0.00 0 0.60 0.75 840.00 1,050.00 0.89 1.11 3.91 4.89
RSB 80.00 kgs 0.28 22.40 0.00 0 0.02 1.60 69.44 5,555.20 0.04 3.20 0.17 13.60
Tiewire 1.00 kgs. 0.28 0.28 0.00 0.00 0 0.02 0.02 120.96 120.96 0.04 0.04 0.17 0.17
CWN 2.50 kgs. 0.28 0.70 0.00 0.00 0 0.02 0.05 89.60 224.00 0.04 0.10 0.17 0.43
B) CONSTRUCTION WORKS
WAGES Fringe Benefits TEV EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL SUNDRIES
ITEMS QTY.
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
A) PROCUREMENT AND HAULING OF CONSTRUCTION MATERIALS
Cement 1.48 bags 9.61 14.22 0.00 0.00 0 0 0.99 1.47 319.20 472.42 1.49 2.21 6.51 9.63
Sand 0.12 cu.m. 207.47 25.52 0.00 0 0 9.70 1.19 1120.00 137.76 14.56 1.79 14.56 1.79
Gravel 0.00 cu.m. 207.47 0.00 0.00 0.00 0 0 9.70 0.00 1344.00 0.00 14.56 0.00 14.56 0.00
RSB 4.10 kgs 0.28 1.15 0.00 0.00 0 0 0.02 0.08 69.44 284.70 0.04 0.16 0.17 0.70
Tiewire 0.12 kgs. 0.28 0.03 0.00 0.00 0 0 0.02 0.00 120.96 14.52 0.04 0.00 0.17 0.02
CHB (4" thk.) 12.50 sq.m 6.00 75.00 0.00 0 0.31 3.88 13.00 162.50 0.47 5.88 1.10 13.75
0.00 0.00 0.00 0.00 0.00
B) CONSTRUCTION WORKS 0.00 0.00 0.00 0.00 0.00
Labor Cost #REF! #REF! 0.00 #REF! #REF! 0.00
Err:508 Err:508 0.00 Err:508 Err:508
0.00
Total #REF! #REF! 0 6.62 #REF! 10.04 25.89
Use P #REF! /sq.m.
HENRY A. POTESTAS 0 0 0 0
Eng'g Asst. A. 0 0 Err:509 Acting Div. Manager, ZDS IMO
Republic of the Philippines
PAMBANSANG PANGASIWAAN NG PATUBIG
(National Irrigation Administration)
Region IX
Office of the Provincial Irrigation Officer
WAGES Fringe Benefits TEV EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL SUNDRIES
ITEMS QTY.
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
A) PROCUREMENT AND HAULING OF CONSTRUCTION MATERIALS
Cement 1.48 bags 9.61 14.22 0.00 0.00 0 0 0.99 1.47 319.20 472.42 1.49 2.21 6.51 9.63
Sand 0.12 cu.m. 207.47 25.52 0.00 0 0 9.70 1.19 1120.00 137.76 14.56 1.79 14.56 1.79
Gravel 0.00 cu.m. 207.47 0.00 0.00 0.00 0 0 9.70 0.00 1344.00 0.00 14.56 0.00 14.56 0.00
RSB 4.10 kgs 0.28 1.15 0.00 0.00 0 0 0.02 0.08 69.44 284.70 0.04 0.16 0.17 0.70
Tiewire 0.12 kgs. 0.28 0.03 0.00 0.00 0 0 0.02 0.00 120.96 14.52 0.04 0.00 0.17 0.02
CHB (6" thk.) 12.50 sq.m 6.00 75.00 0.00 0 0.31 3.88 13.00 162.50 0.47 5.88 1.10 13.75
0.00 0.00 0.00 0.00 0.00
B) CONSTRUCTION WORKS 0.00 0.00 0.00 0.00 0.00
Labor Cost #REF! #REF! 0.00 #REF! #REF! 0.00
Err:508 Err:508 0.00 Err:508 Err:508
0.00
Total #REF! #REF! 0 6.62 #REF! 10.04 25.89
Use P #REF! /sq.m.
HENRY A. POTESTAS 0 0 0 0
Eng'g Asst. A. 0 0 Err:509 Acting Div. Manager, ZDS IMO
GATEKEEPER'S QUARTER AND PERIMETER FENCE
BACK UP COMPUTATION
LABRIS CCAW CY 2022
Labangan, Zamboanga del Sur
PUMP HOUSE
Gravel Bedding Volume= (1 x 1 x 0.1 x 4) +(3 x 3 x 0.1) (footing and on grade slab)
= 1.3 cu.m
FORMWORKS COLUMN
AREA= 1.20 x 3.40 x 4(COLUMNS)
= 16.32
USING 1.2 X 2.4 PLYWOOD = 16.32/ 2.88
= 2PCS
2"X2" WOOD FRAME = 2 x 29.67
= 60 BD.FT.
SECURITY FENCE
Vfooting= Depth x Length x width x # of units (cu.m)
Vfooting= 0.30 x 1.00 x 1.00 x 14 x 2.4 = 10.08
CONTRACTOR :
COMPUTED BY:
CONTRACTOR :
NAME OF STRUCTURE/CANAL :
STATIONING :
PAY ITEM :
LANDING
COMPUTED BY:
CONTRACTOR :
Protection Dike
Vertical Bars (300m / 0.45m spcng) x 2 length/spcng 1333.33333333333 1334 length
Longitudunal Bars (300m/6m) x 26 length/spcng 1300 1300 length
PILE CAP
Lateral ties ( 300m /.30m ) / 3 ties per Length 333.333333333333 334 length
Longitudunal Bars (300m / 6m lenght) * 6pcs / spcng 300 300 length
COMPUTED BY:
CONTRACTOR :
NAME OF STRUCTURE/CANAL :
STATIONING :
PAY ITEM :
LANDING
COMPUTED BY:
1. Material Costing:
3. Equipment Costing
Haulling Of Materials Using Stake Truck
Rental rate /Hr 1,012.00
Haulling Distance 61
Asphalt 49
Gravel Road 12
Cycle Time
a. With Load Pagadian City to Brgy. Leonardo (Concrete/Asphalt Road)
49 kms / 25 km/hr = 1.96 hrs
b. With Load Brgy. Leonardo to Leonardo SIP Dropsite (Gravel Road)
12 kms / 20 km/hr = 0.6 hrs
c. W/out Load from Leonardo SIP Dropsite to Brgy. Leonardo (Gravel Road)
12 kms / 25 km/hr = 0.48 hrs
d. W/out Load from Brgy. Leonardo to Pagadian City (Concrete/Asphalt)
49 kms / 35 km/hr = 1.4 hrs
e. Manual Loading
8000 kgs / 12000 kgs/hr = 0.667 hrs
f. Manual UnLoading
8000 kgs / 12000 kgs/hr = 0.667 hrs
Total = 5.107 hrs
1. Material Costing:
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
CEMENT 0.55 bag 172.70 8.97 17 198.54
SAND 0.05 cu.m. 44.53 21.07 22.25 87.85
Tie Wire 2.00 kgs 109.36 2.45 1.78 113.59
CHB 4" 12.50 pcs Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509 Err:509
3. Equipment Costing:
Equipment Operated Rate Bare Rental
1-bagger Concrete Mixer 172.00
Capacity:
4.50 cu.m./day 172/0.56
0.56 (4.50/8)cu.m./hr 305.78
Plastering
1. Material Costing:
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
CEMENT 0.41 bag 128.74 6.69 13 148.00
SAND 0.03 cu.m. 32.91 15.57 16.45 64.93
TOTAL 161.65 22.26 29.02 212.93
TOTAL DC 255.58
Profit 8% 20.45
OCM 10% 25.56
TOTAL EDC+PROFIT+OCM 301.58
VAT 5% 15.08
UNIT COST 316.66
3% Supervision of Civil Works 9.50
TOTAL UNIT COST 326.16
1. Material Costing:
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
2" x 2" x 1.2mm Angle Bar 6.00 length Err:509 Err:509 Err:509 Err:509
2" x 4" x 1.2mm C-Purlins 4.00 length Err:509 Err:509 Err:509 Err:509
Welding Rod (small) 10.00 kgs 85.00 Err:509 Err:509 Err:509
Metal Primer 1.00 gallon 850.00 Err:509 Err:509 Err:509
Paint brush 4" 2.00 pcs 240.00 Err:509 Err:509 Err:509
Lacquer Thinner 1.00 gallon 500.00 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509 Err:509
3. Equipment Costing:
Equipment Operated Rate Bare Rental
1-Welding machine 380.00
Capacity:
4.00 4 hrs/day 1520
2.00 days to complete 3040.00
1. Material Costing:
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
2" x 2" x 1.2mm Angle Bar 6.00 length Err:509 Err:509 Err:509 Err:509
2" x 4" x 1.2mm C-Purlins 4.00 length Err:509 Err:509 Err:509 Err:509
Welding Rod (small) 10.00 kgs 85.00 Err:509 Err:509 Err:509
Metal Primer 1.00 gallon 850.00 Err:509 Err:509 Err:509
Paint brush 4" 2.00 pcs 240.00 Err:509 Err:509 Err:509
Lacquer Thinner 1.00 gallon 500.00 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509 Err:509
3. Equipment Costing:
Equipment Operated Rate Bare Rental
1-Welding machine 380.00
Capacity:
4.00 4 hrs/day 1520
2.00 days to complete 3040.00
1. Material Costing:
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
CEMENT 0.55 bag 172.70 8.97 17 198.54
SAND 0.05 cu.m. 44.53 21.07 22.25 87.85
Tie Wire 2.00 kgs 109.36 2.45 1.78 113.59
CHB 4" 12.50 pcs Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509 Err:509
3. Equipment Costing:
Equipment Operated Rate
1-bagger Concrete Mixer 172.00
Capacity:
4.50 cu.m./day 172/0.56
0.56 (4.50/8)cu.m./hr 305.78
Plastering
1. Material Costing:
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
CEMENT 0.41 bag 128.74 6.69 13 148.00
SAND 0.03 cu.m. 32.91 15.57 16.45 64.93
TOTAL 161.65 22.26 29.02 212.93
TOTAL DC 255.58
Profit 8% 20.45
OCM 12% 30.67
TOTAL EDC+PROFIT+OCM 306.70
VAT 5% 15.33
UNIT COST 322.03
3% Supervision of Civil Works 9.66
TOTAL UNIT COST 331.69
1. Materials
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
2"Ø G.I Pipe Schedule 40 56.00 length 89,600.00 Err:509 Err:509 Err:509
GALVANIZED INTER-LINKED
84.00 meters 33,600.00
MESH (2"X2"x 8ft ) Err:509 Err:509 Err:509
Welding Rod 40.00 kgs 3,400.00 Err:509 Err:509 Err:509
TOTAL 126,600.00 Err:509 Err:509 Err:509
3. Equipment Costing:
Equipment Operated Rate
1-Welding machine 380.00
1- Cut off Wheel 450.00
Capacity:
4.00 4 hrs/day 1520
8.00 days to complete 12,160.00
3. Equipment Costing:
Equipment Operated Rate
Spray Apint 450.00
Capacity:
4.00 4 hrs/day 1800
4.00 days to complete 7200.00
1. Materials
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
2"x3"x .4mm thck Rectangular
118.00 length 141,600.00
Tube Err:509 Err:509 Err:509
Base Plate 4'x8'x.4mm thck 2.00 Sheet 16,000.00 Err:509 Err:509 Err:509
16mm x 6" Stainless Steel Bolt w/
176.00 kgs 45,760.00
Cap Nut Err:509 Err:509 Err:509
TOTAL 203,360.00 Err:509 Err:509 Err:509
3. Equipment Costing:
Equipment Operated Rate
1-Welding machine 380.00
1- Cut off Wheel 450.00
Capacity:
4.00 4 hrs/day 1520
12.00 days to complete 18,240.00
3. Equipment Costing:
Equipment Operated Rate
Spray Apint 450.00
Capacity:
4.00 4 hrs/day 1800
5.00 days to complete 9000.00
1. Materials
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
PRE-PAINTED RIB-TYPE
6.00 sheet 8,400.00
ROOFING 5m-Length Err:509 Err:509 Err:509
Welding Rod 8.00 kls 680.00 Err:509 Err:509 Err:509
Tek Screw 1.00 pcs 1,500.00 1.22 0.89 1,502.11
1x1 Angle Bar 8.00 length 4,480.00 Err:509 Err:509 Err:509
Flat Bar - 1" 6.00 length 960.00 7.34 5.35 972.69
Fascia Cap 8ft 6.00 length 2,880.00 Err:509 Err:509 Err:509
Pre painted Gutter 8ft 6.00 length 5,100.00 Err:509 Err:509 Err:509
blind Rivets 1.00 cartoon 400.00 1.22 0.89 402.11
TOTAL 45,900.00 Err:509 Err:509 - - Err:509
3. Equipment Costing:
Equipment Operated Rate
1-Welding machine 380.00
1- Cut off Wheel 450.00
Capacity:
4.00 4 hrs/day 1520
12.00 days to complete 18,240.00
3. Equipment Costing:
Equipment Operated Rate
Spray Apint 450.00
Capacity:
4.00 4 hrs/day 1800
10.00 days to complete 18000.00
TOTAL DC 2,993.30
Profit 8% 239.46
OCM 12% 359.20
TOTAL EDC+PROFIT+OCM 3,591.97
VAT 5% 179.60
UNIT COST 3,771.56
3% Supervision of Civil Works 113.15
TOTAL UNIT COST 3,884.71
TOTAL DC 4,493.30
Profit 8% 359.46
OCM 12% 539.20
TOTAL EDC+PROFIT+OCM 5,391.97
VAT 5% 269.60
UNIT COST 5,661.56
3% Supervision of Civil Works 169.85
TOTAL UNIT COST 5,831.41
MANPOWER REQUIREMENT, EQUIPMENT REQUIREMENT, & CASH REQUIREMENT
CONTRUCTION OF 3 STOREY MULTI-PURPOSED BUILDING (PHASE 1)
CY 2023 PROGRAM OF WORKS
Attachment "C" 2 OF 5
PARTICULARS Descriptio APRIL MAY JUNE
n TOTAL
1. Project Engineer 1 1 1 1
2. Foreman 3 3 3 3
3. Skilled 12 12 12 12
4. Laborer 40 40 40 40
1. Project Engineer 3 3 3 3
2. Foreman 9 9 9 9
3. Skilled 36 36 36 36
4. Laborer 72 72 72 72
1. Project Engineer 3 3 2 3
2. Foreman 9 9 6 9
3. Skilled 36 36 24 36
4. Laborer 72 72 48 72
GRADER:
Operated Rate Bare Rate Capability Operated Rental Bare rental
ACTIVITIES: EQUIPMENT TO BE USED
Pesos/Hr Pesos/Hr Cu.m./Hr Pesos/cu.m. Pesos/cu.m.
1 2 3 4 = 1/3 5 = 2/3
1. SPREADING Motorized Road Grader, 140 HP 2,173.00 100.00 21.73
DUMP TRUCK:
From quarry to jobsite & vice versa: CYCLE TIME:
Ave. Hauling Distance = 2.00 km a. Loading Time 0.13
Gravel Road = 2.00 km b. Travel time w/ Load (dist./ave. speed) (3km/20km/hr) 0.10
Ave. Speed w/ Load = 20.00 kph c. Travel time w/o Load (dist./ave. speed) (3km/25km/hr) 0.08
Ave. Speed w/o Load = 25.00 kph d. Unloading & maneuvering 0.20
Total time 0.51
PRODUCTION:
Ave. Capacity = 8.00 cu.m./trip 15.58
1. Earthmoving Equipment
1.1 Bulldozer, Crawler D6M XL 140.00 ₱ 4,569.00
1.2 Payloader, Wheel Type LX80-2C 1.5 1.90 110.00 ₱ 1,733.00
1.3 Motorized Road Grader G710A 140.00 ₱ 2,173.00
2. Compaction Equipment
400-500
2.1 Plate Compactor Gasoline Engine 5.00 ₱ 3,938.00
INTAKE 562.25 136.6 1.00 1.00 15.3 44.28 2484.96 250.98 55.8 8° 0'1.84" 123°24'45.66"
MASTERLIST FOR THE CONSTRUCTION OF CONTROL SYSTEM PUMP HOUSE, SOLAR MOUNTING STRUCTURE AND PERIMETER FENCE (SURFACE WATER PUMP)
CONTRUCTION OF 3 STOREY MULTI-PURPOSED BUILDING (PHASE 1)
CY 2023
NIA REGIONAL IRRIGATION OFFICE, BALINTAWAK, PAGADIAN CITY
ATTACHMENT "G"
Reinforcing Steel Bars Supply/Delivery & Suppy/Delivery &
Common Selected 3000 PSI Masonry Steel Works & Painting Works
Plastering Installation of Installation of
Name of Structure Excavation Earthfill Concrete Works Roofing (Steel & Masonry) Latitude Longitude
(sq.m) 10mmØ 12mmØ 16mmØ Doors Window w/ Grills
(cu.m) (cu.m) (cu.m) (sq.m) (l/s) (l/s)
(kgs) (kgs) (kgs) (unit) (units)
PEREMETER FENCE
21.00 52.80 9.24 108.00 108.00 1.00 468.72 530.88 1.00 8°00'1.41" 123°24'45.81"
subtotal 29.75 54.60 16.56 142.68 177.36 877.92 891.12 1.00 2.00
Prepared by : 0 Err:509
MASTERLIST OF CANALIZATION
CY 2023
CONTRUCTION OF 3 STOREY MULTI-PURPOSED BUILDING (PHASE 1)
NIA REGIONAL IRRIGATION OFFICE, BALINTAWAK, PAGADIAN CITY
ATTACHMENT "G"
2,400 psi Reinforced Concrete, m 3 DIME
Gravel
No. Stationing Kind of Canal Length b, cm Dc, cm Cut Fill Remarks
Bedding
Concrete 10mmØ kg Latitude Longitude
MAIN CANAL
0 + 000 0 + 574 CANAL BENCH FLUME 574.00 40 65 108.81 715.62 22.96 78.92 5,017.91 8° 0'1.71" 123°24'45.92"
0 + 574 1 + 828 CANAL BENCH FLUME 1,254.00 35 60 182.53 1,039.35 43.89 26.71 10,962.47
1 + 898 1 + 970 CANAL BENCH FLUME 72.00 35 60 25.85 8.41 2.52 19.60 629.42 CY 2023
1 + 970 2 + 056 CANAL BENCH FLUME 86.00 30 55 19.87 24.05 2.58 12.48 751.81
2 + 095 2 + 170 CANAL BENCH FLUME 75.00 30 55 40.12 82.90 2.25 10.89 655.65
Subtotal Main Canal 2023 1,986.00 377.18 1,870.33 74.20 148.60 18,017.26
LATERAL - A
0 + 000 0 + 440 CANAL BENCH FLUME 440.00 30 50 35.38 376.96 13.20 60.40 3,846.48 7°59'46.87" 123°24'46.09"
CY 2023
0 + 440 1 + 020 CANAL BENCH FLUME 580.00 30 45 183.01 121.18 17.40 75.14 5,070.36 7°59'28.68" 123°24'53.18"
Subtotal Lateral A 2023 1,020.00 218.39 498.14 30.60 135.53 8,916.84
MAIN CANAL
0 + 000 0 + 574 CANAL BENCH FLUME 574.00 40 65 108.81 715.62 22.96 78.92 5,017.91 8° 0'1.71" 123°24'45.92"
0 + 574 1 + 828 CANAL BENCH FLUME 1,254.00 35 60 182.53 1,039.35 43.89 26.71 10,962.47
1 + 898 1 + 970 CANAL BENCH FLUME 72.00 35 60 25.85 8.41 2.52 19.60 629.42
1 + 970 2 + 056 CANAL BENCH FLUME 86.00 30 55 19.87 24.05 2.58 12.48 751.81
2 + 095 2 + 572 CANAL BENCH FLUME 477.00 30 55 84.76 95.08 14.31 58.27 4,169.93
2 + 604 2 + 986 CANAL BENCH FLUME 382.00 30 50 98.81 79.93 11.46 52.43 3,339.44 7°59'17.66" 123°24'44.34"
Subtotal Main Canal 2,845.00 520.63 1,962.44 97.72 248.41 24,870.99
LATERAL - A
0 + 000 0 + 440 CANAL BENCH FLUME 440.00 30 50 35.38 376.96 13.20 60.40 3,846.48 7°59'46.87" 123°24'46.09"
0 + 440 1 + 020 CANAL BENCH FLUME 580.00 30 45 183.01 121.18 17.40 75.14 5,070.36 7°59'28.68" 123°24'53.18"
Subtotal Lateral - A 1,020.00 218.39 498.14 30.60 135.53 8,916.84
SUPPLY, DELIVERY AND INSTALLATION OF SOLAR PV & PUMPING SYSTEM WITH COMPLETE ACCESSORIES & PUMPING TEST (SURFACE WATER)
TOTAL 4,152,000.00
ESTIMATED COST FOR SUPPLY, DELIVERY AND INSTALLATION OF SOLAR PV & PUMPING SYSTEM WITH COMPLETE ACCESSORIES & PUMPING TEST (SURFACE WATER)
DIRECT COST TOTAL
Labor 304,000.00 304,000.00
Materials & Equipment 3,848,000.00 3,848,000.00
TOTAL DC 4,152,000.00
INDIRECT COST TOTAL
Profit 8% 332,160.00
OCM 12% 498,240.00
TOTAL EDC+PROFIT+OCM 4,982,400.00
VAT 5% 249,120.00
Estimated Cost 5,231,520.00
3% Supervision of Civil Works 156,945.60
Total Unit Cost 5,388,465.60
SUPPLY, DELIVERY AND INSTALLATION OF SOLAR PV & PUMPING SYSTEM WITH COMPLETE ACCESSORIES & PUMPING TEST (GROUND WATER)
TOTAL 5,062,400.00 -
ESTIMATED COST FOR SUPPLY, DELIVERY AND INSTALLATION OF SOLAR PV & PUMPING SYSTEM WITH COMPLETE ACCESSORIES & PUMPING TEST (SURFACE WATER)
DIRECT COST TOTAL
Labor 304,000.00 304,000.00
Materials & Equipment 4,758,400.00 4,758,400.00
TOTAL DC 5,062,400.00
INDIRECT COST TOTAL
Profit 8% 404,992.00
OCM 12% 607,488.00
TOTAL EDC+PROFIT+OCM 6,074,880.00
VAT 5% 303,744.00
Estimated Cost 6,378,624.00
3% Supervision of Civil Works 191,358.72
Total Unit Cost 6,569,982.72
CONTRUCTION OF 3 STOREY MULTI-PURPOSED BUILDING (PHASE 1)
NIA REGIONAL IRRIGATION OFFICE, BALINTAWAK, PAGADIAN CITY
UNIT COST DERIVATION FOR THE SUPPLY & INSTALLATION OF SOLAR PUMP IRRIGATION SYSTEM
Masonry Works
1. Material Costing:
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
CEMENT 0.55 bag 172.70 8.97 17 198.54
SAND 0.05 cu.m. 44.53 21.07 22.25 87.85
Tie Wire 2.00 kgs 298.00 2.45 1.78 302.23
CHB 4" 12.50 pcs Err:509 Err:509 Err:509 Err:509
TOTAL Err:509 Err:509 Err:509 Err:509
3. Equipment Costing:
Equipment Operated Rate
1-bagger Concrete Mixer 172.00
Capacity:
4.50 cu.m./day 172/0.56
0.56 (4.50/8)cu.m./hr 305.78
TOTAL DC 255.58
Profit 8% 20.45
OCM 12% 30.67
TOTAL EDC+PROFIT+OCM 306.70
VAT 5% 15.33
UNIT COST 322.03
3% Supervision of Civil Works 9.66
TOTAL UNIT COST 331.69
Steel Works (Fence)
1. Materials
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
2"Ø G.I Pipe Schedule 40 28.00 length 44,800.00
Err:509 Err:509 Err:509
GALVANIZED INTER-LINKED
50.00 meters 20,000.00
MESH (2"X2"x 8ft ) Err:509 Err:509 Err:509
Welding Rod 20.00 kgs 1,700.00 Err:509 Err:509 Err:509
TOTAL 66,500.00 Err:509 Err:509 Err:509
3. Equipment Costing:
Equipment Operated Rate
1-Welding machine 380.00
1- Cut off Wheel 450.00
Capacity:
4.00 4 hrs/day 1520
8.00 days to complete 12,160.00
3. Equipment Costing:
Equipment Operated Rate
Spray Apint 450.00
Capacity:
4.00 4 hrs/day 1800
4.00 days to complete 7200.00
1. Materials
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
2"x3"x .4mm thck Rectangular
59.00 length 70,800.00
Tube Err:509 Err:509 Err:509
Base Plate 4'x8'x.4mm thck 2.00 Sheet 16,000.00 Err:509 Err:509 Err:509
16mm x 6" Stainless Steel Bolt w/
176.00 kgs 45,760.00
Cap Nut Err:509 Err:509 Err:509
TOTAL 132,560.00 Err:509 Err:509 Err:509
3. Equipment Costing:
Equipment Operated Rate
1-Welding machine 380.00
1- Cut off Wheel 450.00
Capacity:
4.00 4 hrs/day 1520
12.00 days to complete 18,240.00
3. Equipment Costing:
Equipment Operated Rate
Spray Apint 450.00
Capacity:
4.00 4 hrs/day 1800
5.00 days to complete 9000.00
1. Materials
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
PRE-PAINTED RIB-TYPE
6.00 sheet 8,400.00
ROOFING 5m-Length Err:509 Err:509 Err:509
Welding Rod 8.00 kls 680.00 Err:509 Err:509 Err:509
Tek Screw 1.00 pcs 1,500.00 1.22 0.89 1,502.11
1x1 Angle Bar 8.00 length 4,480.00 Err:509 Err:509 Err:509
Flat Bar - 1" 6.00 length 960.00 7.34 5.35 972.69
Fascia Cap 8ft 6.00 length 2,880.00 Err:509 Err:509 Err:509
Pre painted Gutter 8ft 6.00 length 5,100.00 Err:509 Err:509 Err:509
blind Rivets 1.00 cartoon 400.00 1.22 0.89 402.11
TOTAL 45,900.00 Err:509 Err:509 - - Err:509
3. Equipment Costing:
Equipment Operated Rate
1-Welding machine 380.00
1- Cut off Wheel 450.00
Capacity:
4.00 4 hrs/day 1520
12.00 days to complete 18,240.00
3. Equipment Costing:
Equipment Operated Rate
Spray Apint 450.00
Capacity:
4.00 4 hrs/day 1800
10.00 days to complete 18000.00
TOTAL DC 2,993.30
Profit 8% 239.46
OCM 12% 359.20
TOTAL EDC+PROFIT+OCM 3,591.97
VAT 5% 179.60
UNIT COST 3,771.56
3% Supervision of Civil Works 113.15
TOTAL UNIT COST 3,884.71
Supply & Delivery of Window w/ Grills
1. Material Costing:
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
Pre Faricated Window w/ grills 1.00 unit 4,000.00 16.32 30.67 4,046.99
TOTAL 4,000.00 16.32 30.67 4,046.99
TOTAL DC 4,493.30
Profit 8% 359.46
OCM 12% 539.20
TOTAL EDC+PROFIT+OCM 5,391.97
VAT 5% 269.60
UNIT COST 5,661.56
3% Supervision of Civil Works 169.85
TOTAL UNIT COST 5,831.41
PROJECT PROFILE
NAME OF PROJECT: RESTO NIS CY 2023 (TAMBULIG AREA)
LOCATION: Tambulig, Zamboanga del Sur
FUNDING SOURCE: GAA
PROGRAM AMOUNT: 5,696,000.00
RATE OF PERSONNEL
Kind of Personnel FAW CW
FOREMAN 941.17 650
FOREMAN B 814.42 500
SR. CARPENTER 814.42 500
Carpenter A 655.57 500
Carpenter B 655.57 500
MASON A 704.77 500
STEEL MAN 704.77 450
DRIVER 875.51 500
L.E. OPERATOR 704.77 360
H.E. OPERATOR 875.41 600
LABORER (UWA) 567.32 360
LABORER (UWB) 490.91 360
EQUIPMENT RENTAL
Kind of Equipment Operated/Hr Bare Rental
4- 6 CU.M. DUMP TRUCK (ACEL) 1,824.55 832.09
6- 8MT STAKE TRUCK/CARGO TRUCK 1,296.59 304.23
1-BAGGER CONC. MIXER 172.00 111.54
WATER PUMP 100mm Ø,(Diesel Eng.) 466.00 223.65
MOTORIZED GRADER 60-75 HP 1,097.16 427.46
ROAD ROLLER 2,824.35 1,154.65
METRIC TON CRANE 5,000.00 6,200.00
BACKHOE 0.75 CUM. 2,865.56 1,432.78
PURCHASE REQUEST
Stock No. UoM Item Description Quantity Unit Cost Total Cost
#REF!
#REF!
#REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
Purpose: For the use of NIA-ZDSIMO BAGONG BAROY SPIP CY 2023 PROJECT
Signature:
Printed Name: REY M. PINATACAN BENEDICTO ISAGANI O. PULIS JR.
Designation: Engineer A Division Manager A, ZDSIMO
NAME OF PROJECT: CONTRUCTION OF 3 STOREY MULTI-PURPOSED BUILDING (PHASE 1)
LOCATION: NIA REGIONAL IRRIGATION OFFICE, BALINTAWAK, PAGADIAN CITY
FUNDING SOURCE: GAA CY2024
PROJECT TITLE IMPROVEMENT OF NIA RIO RIX
Construction of Structures
Gravel Road Concrete/Asphalt
Sources of Material
Lantian, Labangan 10.00 0
Pagadian City 35.00 61
Mahayag Quarry 23.00 15
Davao City 6.00 372
Dipolog City 5.00 110
Molave 9.00 1
RATE OF PERSONNEL
Kind of Personnel FAW CW
FOREMAN A 941.17 650
FOREMAN B 814.42 500
SR. CARPENTER 814.42 500
CARPENTER A 655.57 500
CARPENTER B 655.57 500
MASON A 655.57 500
STEEL MAN 704.77 450
DRIVER 757.63 500
L.E. OPERATOR 704.77 360
H.E. OPERATOR 875.51 600
LABORER (UWA) 567.32 360
LABORER (UWB) 490.91 360
EQUIPMENT RENTAL
Kind of Equipment Operated/Hr Bare Rental
4- 6 CU.M. DUMP TRUCK (ACEL) 3,427.00 832.09
10 TONNERS DUMP TRUCK 3,233.00 955.50
6- 8MT STAKE TRUCK/CARGO TRUCK 1,012.00 304.23
1-BAGGER CONC. MIXER 172.00 111.54
WATER PUMP 100mm Ø,(Diesel Eng.) 466.00 223.65
MOTORIZED GRADER 60-75 HP 1,097.16 427.46
ROAD ROLLER 2,824.35 1,154.65
METRIC TON CRANE 5,000.00 6,200.00
TRAILER TRUCK 1,824.55
BACKHOE 0.7 CUM. 2,153.00 1,432.78
A. CAPITAL OUTLAY
1. COB GAA 2023 9,491,977.58 9,491,977.58 JUNE NATHANIEL S. PLAZA
2. LOAN PROCEEDS Regional Irrigation Manager
Republic of the Philippines
DEPARTMENT OF AGRICULTURE
NATIONAL IRRIGATION ADMINISTRATION
REGIONAL OFFICE NO. IX (ZAMBOANGA PENINSULA)
A. DIRECT COST
1. CIVIL WORKS
A. CONTRACT WORKS 2,783,054.58 390,652.13 622,920.02 1,386,932.77 1,921,521.26 181,479.77 2,205,417.07 9,491,977.58
B. FORCE ACCOUNT WORKS
TOTAL CIVIL WORKS
2. INSTITUTIONAL DEVELOPMENT PROGRAM
3. CONSTRUCTION S URVEY
4. PARCELLARY
5. RIGHT OF WAY ACQUISITION
PLANT/ PROPERTY DAMAGES
6. PROCUREMENT OF EQUIPMENT AND VEHICLES
7. FIELD SUPPORT, SUPERVISION AND VEHICLES
8. CONSULTING SERVICES
9. TAXES
10. CONTINGENCIES
TOTAL ESTIMATED DIRECT COST -
-
-
-
-
- - - - - - - - - - - - - -
Prepared by : Checked & Reviewed by: Benedicto Isagani O. Pulis Jr. Recommending Approval Approved By:
Division Manager A
JOHANNES GREGORII B. LAGUE JOEL G. JANIOLA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
Engineer B Principal Engineer C/ Chief of Engineering Section Acting Division Manager - EOD REGIONAL MANAGER
Republic of the Philippines
DEPARTMENT OF AGRICULTURE
NATIONAL IRRIGATION ADMINISTRATION
REGIONAL OFFICE NO. IX (ZAMBOANGA PENINSULA)
JOHANNES GREGORII B. LAGUE ROBERT BERNIE L. RADA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
Engineer B Principal Engineer C Acting Division Manager - EOD REGIONAL MANAGER
Republic of the Philippines
DEPARTMENT OF AGRICULTURE
NATIONAL IRRIGATION ADMINISTRATION
REGIONAL OFFICE NO. IX (ZAMBOANGA PENINSULA)
Attachment "D-1"
YEAR 2024 YEAR 2025 TOTAL
ACTIVITY UNIT
QUANTITY UNIT COST TOTAL QUANTITY UNIT COST TOTAL QUANTITY UNIT COST TOTAL
A. CIVIL WORKS
I. Mobilization/Demobilization ls
II. Temporary Working Facilities ls
III. CIVIL WORKS
Earthworks
DEMOLITION Cu.m 44.35 470.56 20,870.00
Excavation (Common Soil) Cu.m 621.86 1,206.95 750,550.28
Gravel Bedding Cu.m 15.29 1,746.82 26,713.50
Embankment from structure excavation Cu.m 531.48 1,287.41 684,240.54
Concrete Works -
3000 PSI Reinforce Concrete Cu.m 221.83 9,941.19 2,205,262.75
2,400 PSI Reinforce Concrete Cu.m 12.22 8,748.64 106,899.62
STEEL WORKS- SUPPLY/DELIVERY & CUTTING/BENDING OF
10MMØ/12MMØ/16MMØ REINFORCING STEEL BARS -
Ø RSB Furnishing & Stock Filing, Cutting , bending, & placing kgs 9,644.13 86.36 832,851.37
TILE WORKS -
GLAZED TILES sq.m 391.11 1,732.58 677,623.52
UNGLAZED TILES sq.m 9.60 1,369.39 13,146.11
MASONRY WORKS -
MASONRY With Plaster Finished sq.m 452.56 970.71 439,309.88
PAINTING WORKS FOR MASONRY sq.m 232.03 270.07 62,662.54
ROOFING WORKS -
PRE PAINTED METAL ROOFING SHEET GA # 26 LONGSPAN sq.m 0.00 576.58 -
STRUCTURAL STEEL kgs 0.00 67.77 -
PAINTING WORKS FOR STEEL sq.m 0.00 410.04 -
Fascia Cover 6mm x 0.3m x 2.4m ln.m 0.00 637.40 -
PRE PAINTED GUTTER ln.m 0.00 222.94 -
FASCIA STRUTS kgs 0.00 176.44 -
CEILING sq.m 152.93 1,739.85 266,068.14
MISCELLANEOUS MATERIALS -
STEEL DECK METAL SLAB lot 1.00 121,804.79 121,804.79
DOORS & WINDOWS lot 1.00 277,537.35 277,537.35
PLUMBING WORKS -
PLUMBING WORKS lot 1.00 86,789.58 86,789.58
SEPTIC VAULT lot 1.00 191,094.79 191,094.79
ELECTRICAL WORKS -
CONDUIT BOXES, & FITTINGS lot 1.00 105,293.60 105,293.60
PANEL BOARD & MAIN FEEDER lot 1.00 132,297.60 132,297.60
MECHANICAL WORKS -
FIRE SPRINKLER SYSTEM lot 1.00 104,064.79 104,064.79
WATER PUMPING SYSTEM lot 1.00 - -
Subtotal 7,105,080.75
TOTAL CIVIL WORKS
JOHANNES GREGORII B. LAGUE ROBERT BERNIE L. RADA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
ENGINEER B Principal Engineer C Acting Div. Manager -EOD Regional Manager
Republic of the Philippines
NATIONAL IRRIGATION ADMINISTRATION
Region IX
NIA BLK. 15 LOT2, REGIONAL CENTER IX, BALINTAWAK PAGADIAN CITY
Material Cost Labor Cost Equipment Cost TOTAL Indirect Cost Supervision
ITEMS QTY UNIT Total indirect UNIT COST
ESTIMATED Total (EDC+IC)
UNIT COST TOTAL UNIT COST TOTAL UNIT COST TOTAL OCM (%) PROFIT (%) VAT (%) Cost UNIT COST TOTAL
DIRECT COST
Earthworks
DEMOLITION 44.35 Cu.m - 163.89 7,268.87 306.67 13,601.12 20,870.00 1,878.30 1,669.60 2,930.15 6,478.05 4.92 218.07 27,566.11 621.54
Excavation (Common Soil) 621.86 Cu.m - 1,206.95 750,550.28 - - 750,550.28 67,549.53 60,044.02 105,377.26 232,970.81 36.21 22,516.51 1,006,037.60 1,617.80
Gravel Bedding 15.29 Cu.m 1,417.50 21,677.29 226.82 3,468.72 102.50 1,567.49 26,713.50 2,404.21 2,137.08 3,750.58 8,291.87 6.80 104.06 35,109.43 2,295.84
Embankment from structure excavation 531.48 Cu.m - - 1,287.41 684,240.54 - - 684,240.54 61,581.65 54,739.24 96,067.37 212,388.26 38.62 20,527.22 917,156.02 1,725.65
Subtotal A 21,677.29 1,445,528.41 15,168.61 1,482,374.32 133,413.69 118,589.95 208,125.35 460,128.99 43,365.85 1,985,869.16
Concrete Works -
3000 PSI Reinforce Concrete 221.83 Cu.m 5,942.75 1,318,285.04 2,701.24 599,218.62 1,297.20 287,759.10 2,205,262.75 198,473.65 176,421.02 309,618.89 684,513.56 298.24 66,157.88 2,955,934.19 13,325.17
2,400 PSI Reinforce Concrete 12.22 Cu.m 5,618.11 68,647.73 1,890.87 23,104.59 1,239.65 15,147.30 106,899.62 9,620.97 8,551.97 15,008.71 33,181.64 262.46 3,206.99 143,288.25 11,726.68
Subtotal B 1,386,932.77 622,323.20 302,906.40 2,312,162.37 208,094.61 184,972.99 324,627.60 717,695.20 69,364.87 3,099,222.44
STEEL WORKS- SUPPLY/DELIVERY & CUTTING/BENDING OF 10MMØ/12MMØ/16MMØ REINFORCING STEEL BARS -
Ø RSB Furnishing & Stock Filing, Cutting , bending, & placing 9,644.13 kgs 64.59 622,920.02 21.08 203,321.26 0.69 6,610.09 832,851.37 74,956.62 66,628.11 116,932.33 258,517.06 2.59 24,985.54 1,116,353.97 115.75
Subtotal C 622,920.02 203,321.26 6,610.09 832,851.37 74,956.62 66,628.11 116,932.33 258,517.06 24,985.54 1,116,353.97
TILE WORKS - - - - - -
GLAZED TILES 391.11 sq.m 1,104.11 431,823.78 611.88 239,311.89 16.59 6,487.85 677,623.52 60,986.12 54,209.88 95,138.34 210,334.34 51.98 20,328.70 908,286.57 2,322.35
UNGLAZED TILES 9.60 sq.m 924.37 8,873.99 428.46 4,113.24 16.55 158.88 13,146.11 1,183.15 1,051.69 1,845.71 4,080.55 41.08 394.38 17,621.05 1,835.53
Subtotal D 440,697.78 243,425.13 6,646.73 690,769.64 62,169.27 55,261.57 96,984.06 214,414.90 20,723.09 925,907.62
MASONRY WORKS -
MASONRY With Plaster Finished 452.56 sq.m 639.66 289,485.28 265.52 120,164.34 65.54 29,660.26 439,309.88 39,537.89 35,144.79 61,679.11 136,361.79 29.12 13,179.30 588,850.96 1,301.14
PAINTING WORKS FOR MASONRY 232.03 sq.m 106.78 24,775.74 163.29 37,886.81 - - 62,662.54 5,639.63 5,013.00 8,797.82 19,450.45 8.10 1,879.90 83,992.90 362.00
Subtotal E 314,261.01 158,051.15 29,660.26 501,972.42 45,177.52 40,157.79 70,476.93 155,812.24 15,059.19 672,843.85
ROOFING WORKS -
CEILING 152.93 sq.m 1,078.27 164,895.73 467.63 71,512.37 193.95 29,660.04 266,068.14 23,946.13 21,285.45 37,355.97 82,587.55 52.19 7,981.22 356,636.91 2,332.09
Subtotal F 164,895.73 71,512.37 29,660.04 266,068.14 23,946.13 21,285.45 37,355.97 82,587.55 135.32 7,981.22 356,636.91
MISCELLANEOUS MATERIALS
STEEL DECK METAL SLAB 1.00 lot 120,000.00 1,804.79 121,804.79 10,962.43 9,744.38 17,101.39 37,808.21 159,613.00 159,613.00
DOORS & WINDOWS 1.00 lot 261,163.45 16,373.90 - 277,537.35 24,978.36 22,202.99 38,966.24 86,147.59 - 363,684.94 363,684.94
Subtotal G 381,163.45 - 18,178.69 - - 399,342.14 35,940.79 31,947.37 56,067.64 123,955.80 - - 523,297.94
PLUMBING WORKS
PLUMBING WORKS 1.00 lot 83,180.00 3,609.58 - - 86,789.58 7,811.06 6,943.17 12,185.26 26,939.49 - 113,729.07 113,729.07
SEPTIC VAULT 1.00 lot 189,290.00 1,804.79 191,094.79 17,198.53 15,287.58 26,829.71 59,315.82 250,410.61 250,410.61
Subtotal H 272,470.00 5,414.37 - 277,884.37 25,009.59 22,230.75 39,014.97 86,255.31 - 364,139.68
ELECTRICAL WORKS
CONDUIT BOXES, & FITTINGS 1.00 lot - 98,546.00 - 6,747.60 - - 105,293.60 9,476.42 8,423.49 14,783.22 32,683.13 - 137,976.73 137,976.73
PANEL BOARD & MAIN FEEDER 1.00 lot 125,550.00 6,747.60 132,297.60 11,906.78 10,583.81 18,574.58 41,065.18 173,362.78 173,362.78
Subtotal I 224,096.00 - 13,495.20 - - 237,591.20 21,383.21 19,007.30 33,357.80 73,748.31 - 311,339.51
MECHANICAL WORKS
FIRE SPRINKLER SYSTEM 1.00 lot 102,260.00 1,804.79 - 104,064.79 9,365.83 8,325.18 14,610.70 32,301.71 - 136,366.50 136,366.50
Subtotal J 102,260.00 - 1,804.79 - - 104,064.79 9,365.83 8,325.18 14,610.70 32,301.71 - - 136,366.50
TOTAL CONTRACT WORKS 3,931,374.05 2,783,054.58 390,652.13 7,105,080.75 639,457.27 568,406.46 997,553.34 2,205,417.07 181,479.77 9,491,977.58
- - - - - - - - - -
Prepared by: Checked and Submitted by: Recommending Approval Approved: 9,310,497.82
1,144,885.18 9,310,497.82
JOHANNES GREGORII B. LAGUE ROBERT BERNIE L. RADA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
ENGINEER B Principal Engineer C Acting Div. Manager -EOD Regional Manager
Republic of the Philippines
NATIONAL IRRIGATION ADMINISTRATION
Region IX
NIA BLK. 15 LOT2, REGIONAL CENTER IX, BALINTAWAK PAGADIAN CITY
APPROVED BUDGET FOR THE CONTRACT (ABC)
INDIRECT COST
ITEM NO. DESCRIPTION UNIT QUANTITY UNIT COST DIRECT COST OCM PROFIT VAT SUPERVISION AMOUNT
TOTAL Indirect Cost
0.09 0.08 0.12
I. EARTHWORKS
102 DEMOLITION cu.m. 44.35 470.56 20,870.00 1,878.30 1,669.60 2,930.15 6,478.05 218.07 27,566.11
103 Excavation (Common Soil) cu.m. 621.86 1,206.95 750,550.28 67,549.53 60,044.02 105,377.26 232,970.81 22,516.51 1,006,037.60
104 Gravel Bedding cu.m. 15.29 1,746.82 26,713.50 2,404.21 2,137.08 3,750.58 8,291.87 104.06 35,109.43
105 Embankment from structure excavation cu.m. 531.48 1,287.41 684,240.54 61,581.65 54,739.24 96,067.37 212,388.26 20,527.22 917,156.02
SUB-TOTAL: 1,482,374.32 133,413.69 118,589.95 208,125.35 460,128.99 43,365.85 1,985,869.16
II. CONCRETE WORKS - - - - - -
202 3000 PSI Reinforce Concrete cu.m. 221.83 9,941.19 2,205,262.75 198,473.65 176,421.02 309,618.89 684,513.56 66,157.88 2,955,934.19
203 2,400 PSI Reinforce Concrete cu.m. 12.22 8,748.64 106,899.62 9,620.97 8,551.97 15,008.71 33,181.64 3,206.99 143,288.25
SUB-TOTAL: 2,312,162.37 208,094.61 184,972.99 324,627.60 717,695.20 69,364.87 3,099,222.44
III. REINFORCING STEEL BARS, ALL SIZES - - - - - -
302 Ø RSB Furnishing & Stock Filing, Cutting , bending, & placing kgs 9,644.13 86.36 832,851.37 74,956.62 66,628.11 116,932.33 258,517.06 24,985.54 1,116,353.97
SUB-TOTAL: 832,851.37 74,956.62 66,628.11 116,932.33 258,517.06 24,985.54 1,116,353.97
IV. TILE WORKS - - - - - -
402 GLAZED TILES sq.m. 391.11 1,732.58 677,623.52 60,986.12 54,209.88 95,138.34 210,334.34 20,328.70 908,286.57
403 UNGLAZED TILES sq.m. 9.60 1,369.39 13,146.11 1,183.15 1,051.69 1,845.71 4,080.55 394.38 17,621.05
SUB-TOTAL: 690,769.64 62,169.27 55,261.57 96,984.06 214,414.90 20,723.09 925,907.62
V. MASONRY WORKS - - - - - -
502 MASONRY With Plaster Finished sq.m. 452.56 970.71 439,309.88 39,537.89 35,144.79 61,679.11 136,361.79 13,179.30 588,850.96
503 PAINTING WORKS FOR MASONRY sq.m. 232.03 270.07 62,662.54 5,639.63 5,013.00 8,797.82 19,450.45 1,879.90 83,992.90
SUB-TOTAL: 501,972.42 45,177.52 40,157.79 70,476.93 155,812.24 15,059.19 672,843.85
VI. ROOFING WORKS - - - - - -
607 CEILING sq.m 152.93 1,739.85 266,068.14 23,946.13 21,285.45 37,355.97 82,587.55 7,981.22 356,636.91
SUB-TOTAL: 266,068.14 23,946.13 21,285.45 37,355.97 82,587.55 7,981.22 356,636.91
VII. ELECTRICAL WORKS - - - - - -
701 CONDUIT BOXES, & FITTINGS lot 1.00 105,293.60 105,293.60 9,476.42 8,423.49 14,783.22 32,683.13 - 137,976.73
702 PANEL BOARD & MAIN FEEDER lot 1.00 132,297.60 132,297.60 11,906.78 10,583.81 18,574.58 41,065.18 - 173,362.78
SUB-TOTAL: 237,591.20 21,383.21 19,007.30 33,357.80 73,748.31 311,339.51
VIII. PLUMBING WORKS - - - - - -
801 PLUMBING WORKS lot 1.00 86,789.58 86,789.58 7,811.06 6,943.17 12,185.26 26,939.49 113,729.07
802 SEPTIC VAULT lot 1.00 191,094.79 191,094.79 17,198.53 15,287.58 26,829.71 59,315.82 250,410.61
SUB-TOTAL: 277,884.37 25,009.59 22,230.75 39,014.97 86,255.31 364,139.68
IX. MISCELLANEOUS MATERIALS - - - - - -
901 STEEL DECK METAL SLAB lot 1.00 121,804.79 121,804.79 10,962.43 9,744.38 17,101.39 37,808.21 159,613.00
902 DOORS & WINDOWS lot 1.00 277,537.35 277,537.35 24,978.36 22,202.99 38,966.24 86,147.59 363,684.94
SUB-TOTAL: 399,342.14 35,940.79 31,947.37 56,067.64 123,955.80 523,297.94
X. MECHANICAL WORKS
1001 FIRE SPRINKLER SYSTEM lot 1.00 104,064.79 104,064.79 9,365.83 8,325.18 14,610.70 32,301.71 136,366.50
SUB-TOTAL: 104,064.79 9,365.83 8,325.18 14,610.70 32,301.71 136,366.50
TOTAL APPROVED BUDGET FOR THE CONTRACT (ABC) 7,105,080.75 639,457.27 568,406.46 997,553.34 2,205,417.07 181,479.77 9,491,977.58
Prepared by: Checked and Submitted by: Recommending Approval Approved by:
JOHANNES GREGORII B. LAGUE JOEL G. JANIOLA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
Engineer B Principal Engineer C/ Chief of Engineering Section Acting Div. Manager -EOD Regional Manager
0
Location: Balintawak, Pagadian City
ROOFING WORKS
1. Roof Framing
Output: 680.0000 KG/day (Building)
Equipment
Erection Fabrication
Personnel Wages Personnel Wages a. Welding Machine 1 1038 1038
1 Foreman 941.17 b. Cutting Outfit 1 300 300
2 Skilled Laborer 642.4586 2 Installer/Carpenter 1,311.14
2 Unskilled Laborer 481.0918 2 - Laborers 981.82 Total 1338
TOTAL 1123.5504 TOTAL 3,234.13
1.96764706 ./kg
Labor Cost: : 4,357.68 /day P 6.41 /sq.m
Wages 680.0000 sq.m/day
SUMMARY
Wages P 6.41
TOTAL P 6.41 /kg
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
a. Structural Steel Angular Bar (A36) 1.000 kg 1.97 1.96 59.00 59.00 0.00 0.00
b. Welding Rod 0.060 kg 6.67 0.40 0.00 0.00
ROOFING WORKS
1. Laying of roofing
Output: 28.0000 kg/day (Building)
LABOR COMPOSITION
Personnel Wages
1 Foreman 941.17
1 Welder 655.57
2 - Laborers 981.82
TOTAL 2,578.56
Labor Cost:
Wages : 2,578.56 /day P 92.09 kg/day
28.0000 kg/day
SUMMARY
Wages P 92.09
TOTAL P 92.09 kg/day
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
ROOFING GUTTER
1. Laying of Gutter
Output: 94.40 L.m/day (Building)
LABOR COMPOSITION
Personnel Wages
1 Foreman 704.77
1 Installer 704.77
2 - Laborers 981.82
TOTAL 2,391.36
Labor Cost:
Wages : 2,391.36 /day P 25.33 /l.m
94.40 L.m/day
SUMMARY
Wages P 25.33
TOTAL P 25.33 /l.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
Fabricated Metal Roofing Gutter 1.00 m 14.71 14.71 24.97 24.97 150.61 150.61 0.00 0.00
12" x 1" G.I. Plain Strap 3.000 pc - 5.23 5.23 0.00 0.00
Blind Rivets 16.00 pc - 2.09 2.09 0.00 0.00
Prepared by:
RODEL J. YUNTING
Project In-Charge
CONTRUCTION OF 3 STOREY MULTI-PURPOSED BUILDING (PHASE 1)
(1) (2) (3) (4) (5) '(6) (7) (8) (9) (10)=(5)+(9)
A. DIRECT COST 0.09 0.08 0.12
I. CIVIL WORKS
1.A Contract Works
Earthworks
DEMOLITION cu.m 44.35 470.56 20,870.00 1,878.30 1,669.60 2,930.15 6,478.05 616.62 218.07 27,566.11
Excavation (Common Soil) cu.m 621.86 1,206.95 750,550.28 67,549.53 60,044.02 105,377.26 232,970.81 1,581.59 22,516.51 1,006,037.60
Gravel Bedding cu.m 15.29 1,746.82 26,713.50 2,404.21 2,137.08 3,750.58 8,291.87 2,289.04 104.06 35,109.43
Embankment from structure excavation cu.m 531.48 1,287.41 684,240.54 61,581.65 54,739.24 96,067.37 212,388.26 1,687.03 20,527.22 917,156.02
3000 PSI Reinforce Concrete cu.m 221.83 9,941.19 2,205,262.75 198,473.65 176,421.02 309,618.89 684,513.56 13,026.93 66,157.88 2,955,934.19
2,400 PSI Reinforce Concrete cu.m 12.22 8,748.64 106,899.62 9,620.97 8,551.97 15,008.71 33,181.64 11,464.22 3,206.99 143,288.25
Ø RSB Furnishing & Stock Filing, Cutting , bending, & placing kg 9,644.13 86.36 832,851.37 74,956.62 66,628.11 116,932.33 258,517.06 113.16 24,985.54 1,116,353.97
GLAZED TILES sq.m 391.11 1,732.58 677,623.52 60,986.12 54,209.88 95,138.34 210,334.34 2,270.37 20,328.70 908,286.57
UNGLAZED TILES sq.m 9.60 1,369.39 13,146.11 1,183.15 1,051.69 1,845.71 4,080.55 1,794.44 394.38 17,621.05
MASONRY With Plaster Finished sq.m 452.56 970.71 439,309.88 39,537.89 35,144.79 61,679.11 136,361.79 1,272.02 13,179.30 588,850.96
PAINTING WORKS FOR MASONRY sq.m 232.03 270.07 62,662.54 5,639.63 5,013.00 8,797.82 19,450.45 353.90 1,879.90 83,992.90
CEILING sq.m 152.93 1,739.85 266,068.14 23,946.13 21,285.45 37,355.97 82,587.55 2,279.90 7,981.22 356,636.91
CONDUIT BOXES, & FITTINGS lot 1.00 105,293.60 105,293.60 9,476.42 8,423.49 14,783.22 32,683.13 137,976.73 137,976.73
PANEL BOARD & MAIN FEEDER lot 1.00 132,297.60 132,297.60 11,906.78 10,583.81 18,574.58 41,065.18 173,362.78 173,362.78
PLUMBING WORKS lot 1.00 86,789.58 86,789.58 7,811.06 6,943.17 12,185.26 26,939.49 113,729.07 113,729.07
SEPTIC VAULT lot 1.00 191,094.79 191,094.79 17,198.53 15,287.58 26,829.71 59,315.82 250,410.61 250,410.61
STEEL DECK METAL SLAB lot 1.00 121,804.79 121,804.79 10,962.43 9,744.38 17,101.39 37,808.21 159,613.00 159,613.00
DOORS & WINDOWS lot 1.00 277,537.35 277,537.35 24,978.36 22,202.99 38,966.24 86,147.59 363,684.94 363,684.94
FIRE SPRINKLER SYSTEM lot 1.00 104,064.79 104,064.79 9,365.83 8,325.18 14,610.70 32,301.71 136,366.50 136,366.50
JOHANNES GREGORII B. LAGUE ROBERT BERNIE L. RADA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
Engineer B Principal Engineer C Acting Division Manager - EOD REGIONAL MANAGER
.
MASTERLIST OF ACTIVITIES
CURRENT YEAR 2024 / OVERALL PROGRAM OF WORK
Attachment "G"
Page 1 of 1
Name of Structure/Canal/Location
.
ITEMS OF WORK
Dime Coordinates
Unit Qty Unit Cost Total amount 7°50'50.26"N 123°28'53.15"E
I. EARTHWORKS
DEMOLITION cu.m. 44.35 470.56 20,870.00
Excavation (Common Soil) cu.m. 621.86 1,206.95 750,550.28
Gravel Bedding cu.m. 15.29 1,746.82 26,713.50
Embankment from structure excavation cu.m. 531.48 1,287.41 684,240.54
II. CONCRETE WORKS
3000 PSI Reinforce Concrete cu.m. 221.83 9,941.19 2,205,262.75
2,400 PSI Reinforce Concrete cu.m. 12.22 8,748.64 106,899.62
III. REINFORCING STEEL BARS, ALL SIZES
Ø RSB Furnishing & Stock Filing, Cutting , bending, & placing kg 9,644.13 86.36 832,851.37
IV. TILE WORKS
GLAZED TILES sq.m 391.11 1,732.58 677,623.52
UNGLAZED TILES sq.m 9.60 1,369.39 13,146.11
V. MASONRY WORKS
MASONRY With Plaster Finished sq.m 452.56 970.71 439,309.88
PAINTING WORKS FOR MASONRY sq.m 232.03 270.07 62,662.54
VI. ROOFING WORKS
CEILING sq.m 152.93 1,739.85 266,068.14
VII. ELECTRICAL WORKS
CONDUIT BOXES, & FITTINGS lot 1.00 105,293.60 105,293.60
PANEL BOARD & MAIN FEEDER lot 1.00 132,297.60 132,297.60
VIII. PLUMBING WORKS
PLUMBING WORKS lot 1.00 86,789.58 86,789.58
SEPTIC VAULT lot 1.00 191,094.79 191,094.79
IX. MISCELLANEOUS MATERIALS
STEEL DECK METAL SLAB lot 1.00 121,804.79 121,804.79
DOORS & WINDOWS lot 1.00 277,537.35 277,537.35
X. MECHANICAL WORKS
FIRE SPRINKLER SYSTEM lot 1.00 104,064.79 104,064.79
JOHANNES GREGORII B. LAGUE JOEL G. JANIOLA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
Engineer B Principal Engineer C/ Chief of Engineering Section Acting Division Manager - EOD REGIONAL MANAGER
.
KEY INDICATORS
CURRENT YEAR 2024 / OVERALL PROGRAM OF WORK
ATTACHMENT "F"
PARTICULARS UNIT ESTIMATED QUANTITY UNIT COST AMOUNT
I. EARTHWORKS
DEMOLITION cu.m. 44.35 470.56 20,870.00
Excavation (Common Soil) cu.m. 621.86 1,206.95 750,550.28
Gravel Bedding cu.m. 15.29 1,746.82 26,713.50
Embankment from structure excavation cu.m. 531.48 1,287.41 684,240.54
II. CONCRETE WORKS
3000 PSI Reinforce Concrete cu.m. 221.83 9,941.19 2,205,262.75
2,400 PSI Reinforce Concrete cu.m. 12.22 8,748.64 106,899.62
PHYSICAL ACCOMPLISHMENT
Y-1a
Item
Description Amount % Wt 20 days 20 days 20 days 20 days 20 days 20 days 20 days 20 days 20 days 20 days
No.
A CONTRACT WORKS
I. EARTHWORKS
PROJECTED 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03%
0.07% DEMOLITION 27,566.11 0.29%
ACTUAL
PROJECTED 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53% 0.53%
2.12% Excavation (Common Soil) 1,006,037.60 10.60%
ACTUAL
PROJECTED 0.12% 0.12% 0.12%
0.12% Gravel Bedding 35,109.43 0.37%
ACTUAL
PROJECTED 0.97% 0.97% 0.97% 0.97% 0.97% 0.97% 0.97% 0.97% 0.97% 0.97%
0.97% Embankment from structure excavation 917,156.02 9.66%
ACTUAL
Ø RSB Furnishing & Stock Filing, PROJECTED 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18%
1.68% 1,116,353.97 11.76%
Cutting , bending, & placing ACTUAL
PROJECTED 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27%
0.048 GLAZED TILES 908,286.57 9.57%
ACTUAL
PROJECTED 0.19%
0 UNGLAZED TILES 17,621.05 0.19%
ACTUAL
V. MASONRY WORKS
PROJECTED 0.34% 0.34% 0.34% 0.34% 0.34% 0.34% 0.34% 0.34% 0.34% 0.34% 0.34% 0.34% 0.34% 0.34% 0.34% 0.34% 0.34% 0.34%
0.009 MASONRY With Plaster Finished 588,850.96 6.20%
ACTUAL
PROJECTED 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06% 0.06%
0.004 PAINTING WORKS FOR MASONRY 83,992.90 0.88%
ACTUAL
PROJECTED 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23%
0.008 CEILING 356,636.91 3.76%
ACTUAL
PROJECTED 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11%
STEEL DECK METAL SLAB 159,613.00 1.68%
ACTUAL
PROJECTED 0.77% 0.77% 0.77% 0.77% 0.77%
DOORS & WINDOWS 363,684.94 3.83%
ACTUAL
X. MECHANICAL WORKS
0.03%
0.56%
1.74%
1.74%
1.74%
2.12%
2.32%
2.69%
2.90%
6.41%
6.41%
6.86%
5.50%
5.71%
5.45%
5.45%
5.45%
1.48%
1.60%
1.60%
1.60%
1.92%
1.92%
2.58%
2.58%
2.58%
2.58%
2.64%
1.87%
1.87%
1.87%
0.91%
0.91%
0.88%
0.88%
0.53%
0.53%
0.53%
0.53%
0.53%
0.33%
0.27%
0.27%
0.27%
0.27%
0.27%
0.27%
PHYSICAL ACCOMPLISHMENT (%)
100.00%
10.28%
12.97%
15.87%
22.28%
28.69%
35.55%
41.06%
46.77%
52.22%
57.68%
63.13%
64.61%
66.21%
67.82%
69.42%
71.34%
73.25%
75.83%
78.41%
80.99%
83.56%
86.21%
88.08%
89.96%
91.83%
92.74%
93.65%
94.53%
95.40%
95.94%
96.47%
97.01%
97.54%
98.08%
98.41%
98.67%
98.94%
99.20%
99.47%
99.73%
0.03%
0.06%
0.63%
2.37%
4.10%
5.84%
7.96%
MANPOWER UTILIZATION
EQUIPMENT UTILIZATION
JOHANNES GREGORII B. LAGUE ROBERT BERNIE L. RADA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
Engineer B Principal Engineer C Acting Division Manager A, EOD Regional Irrigation Manager
Republic of the Philippines
National Irrigation Administration
Region IX
FINANCIAL ACCOMPLISHMENT
Y-1a
Item
Description Amount % Wt 20 days 20 days 20 days 20 days 20 days 20 days 20 days 20 days 20 days 20 days
No.
A CONTRACT WORKS
I. EARTHWORKS
PROJECTED 3062.90 3062.90 3062.90 3062.90 3062.90 3062.90 3062.90 3062.90 3062.90
0.07% DEMOLITION 27,566.11 0.29%
ACTUAL
PROJECTED ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
2.12% Excavation (Common Soil) 1,006,037.60 10.60%
ACTUAL
PROJECTED ### ### ###
0.12% Gravel Bedding 35,109.43 0.37%
ACTUAL
PROJECTED ### ### ### ### ### ### ### ### ### ###
0.97% Embankment from structure excavation 917,156.02 9.66%
ACTUAL
Ø RSB Furnishing & Stock Filing, PROJECTED ### ### ### ### ### ### ### ### ### ###
1.68% 1,116,353.97 11.76%
Cutting , bending, & placing ACTUAL
PROJECTED ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
0.048 GLAZED TILES 908,286.57 9.57%
ACTUAL
PROJECTED ###
0 UNGLAZED TILES 17,621.05 0.19%
ACTUAL
V. MASONRY WORKS
PROJECTED ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
0.009 MASONRY With Plaster Finished 588,850.96 6.20%
ACTUAL
PROJECTED 5999.49 5999.49 5999.49 5999.49 5999.49 5999.49 5999.49 5999.49 5999.49 5999.49 5999.49 ### 5999.49 5999.49
0.004 PAINTING WORKS FOR MASONRY 83,992.90 0.88%
ACTUAL
PROJECTED ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
0.008 CEILING 356,636.91 3.76%
ACTUAL
PROJECTED 9975.81 9975.81 9975.81 9975.81 9975.81 9975.81 9975.81 9975.81 9975.81 9975.81 9975.81 9975.81 9975.81 9975.81 9975.81 9975.81
STEEL DECK METAL SLAB 159,613.00 1.68%
ACTUAL
PROJECTED ### ### ### ### ###
DOORS & WINDOWS 363,684.94 3.83%
ACTUAL
X. MECHANICAL WORKS
165,000.18
165,000.18
200,822.24
220,533.20
255,275.12
274,958.04
608,627.75
608,627.75
651,478.98
522,222.53
542,368.41
517,602.30
517,602.30
517,602.30
140,511.62
152,214.77
152,214.77
152,214.77
181,925.35
181,925.35
244,686.52
244,686.52
244,686.52
244,686.52
250,686.01
177,949.03
177,949.03
177,949.03
53,364.78
86,233.42
86,233.42
83,424.55
83,424.55
50,710.60
50,710.60
50,710.60
50,710.60
31,229.67
25,230.18
25,230.18
25,230.18
25,230.18
25,230.18
25,230.18
3,062.90
3,062.90
50,710.60
FINANCIAL ACCOMPLISHMENT (%)
1,231,121.68
1,506,079.72
2,114,707.47
2,723,335.22
3,374,814.20
3,897,036.74
4,439,405.15
4,957,007.45
5,474,609.76
5,992,212.06
6,132,723.68
6,284,938.45
6,437,153.22
6,589,367.98
6,771,293.33
6,953,218.68
7,197,905.20
7,442,591.72
7,687,278.24
7,931,964.76
8,182,650.78
8,360,599.81
8,538,548.83
8,716,497.86
8,802,731.28
8,888,964.71
8,972,389.25
9,055,813.80
9,106,524.40
9,157,235.00
9,207,945.61
9,309,366.82
9,340,596.49
9,365,826.67
9,391,056.85
9,416,287.04
9,441,517.22
9,466,747.40
9,491,977.58
9,258,656.21
224,490.76
389,490.94
554,491.12
755,313.36
975,846.56
59,490.58
3,062.90
6,125.80
MANPOWER UTILIZATION
EQUIPMENT UTILIZATION
JOHANNES GREGORII B. LAGUE ROBERT BERNIE L. RADA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
Engineer B Principal Engineer C Acting Division Manager A, EOD Regional Irrigation Manager
CONTRUCTION OF 3 STOREY MULTI-PURPOSED BUILDING (PHASE 1)
ATTACHMENT "F"
PARTICULARS UNIT ESTIMATED QUANTITY OUTPUT DURATION
I. EARTHWORKS
DEMOLITION cu.m. 44.35 8.87 9.00
Excavation (Common Soil) cu.m. 621.86 19.43 20.00
Gravel Bedding cu.m. 15.29 1.59 3.00
Embankment from structure excavation cu.m. 531.48 6.75 10.00
II. CONCRETE WORKS
3000 PSI Reinforce Concrete cu.m. 221.83 7.45 8.00
2,400 PSI Reinforce Concrete cu.m. 12.22 3.49 4.00
Prepared by :
CEILING WORKS
1. Laying of metal frame
Output: 9.94 sq.m/day (Building)
LABOR COMPOSITION
Personnel Wages
1 Foreman 941.17
2 Carpenter/installer 1,311.14
4 - Laborers 1,963.64
TOTAL 4,215.95
Labor Cost:
Wages : 4,215.95 /day P 423.97 /sq.m
9.94 sq.m/day
SUMMARY
Wages P 423.97
TOTAL P 423.97 /sq.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
4"x 8' x 4.5mm Thick Shera Board 0.37 pc 4.85 1.77 7.58 2.76 410.00 149.65 0.00 0.00
Double Metal Furring 19mm x 50mm x 0.6mm thick (5m
length) 1.131 pc 28.15 31.84 128.49 145.32 270.00 305.37 0.00 0.00
Carrying Channel 12mm x 38mm, 0.5m thicnkess (5m
length) 0.357 pc 28.15 10.05 128.49 45.87 250.00 89.25
Metal Furring Clip (W-clip) 6.000 pc - 0.00 80.00 480.00
Blind Rivets 1/8" x 1/2" 14.00 pc - 0.00 3.00 42.00
Drywall Screw 4.00 pc - 0.00 3.00 12.00
Labor Cost 423.97 0.00
Prepared by:
RODEL J. YUNTING
Project In-Charge
DERIVATION OF HAULING OF COST with (manual hauling)
Supply, Delivery, and installation of Equipment, Tools & Accessories for Regional Command Center/ Control Room
=
=
Equipment Rental: 9.01 /bag
Materials Cost: 295.00 /bag
Total Cost 304.01 /bag
= = =
DERIVATION OF HAULING OF COST with (manual hauling)
Supply, Delivery, and installation of Equipment, Tools & Accessories for Regional Command Center/ Control Room
LUMBER
Vehicle Used: 1 unit cargo truck (all model)
Rental: 7,690.00 /day 961.25 /hr
Capacity: 4,000.00 bd.ft./hr
Haul Dist.: 16.00 km. (Average hauling distance from the Source to project site)
16.00 Good maintained concrete road
- Good maintained gravel road
Base Cost: 30.00 /bd.ft. =
Labor Cost:
Equipment Rental: =
RSB 10 mm Ø
=
Vehicle Used: 1 unit 10 W truck (all models)
Rental: 7,690.00 /day 961.25 /hr
Capacity: 2,000.00 kgs/trip
=
Haul Dist.: 16.00 km. (Average hauling distance from the Source to project site)
16.00 Good maintained concrete road
=
Good maintained gravel road
Base Cost: 55.72 /kg
3.7037037037037 245 php per piece of 10mm RSB
TRAVEL CYCLE TIME: =
Labor (Loading ):
0.33 X 1.43 X 5.00 4.9713404E-05
=
6,000.00 8.00
Labor (unLoading ):
0.29 X 1.43 X 5.00 3.6524133E-05
7,000.00 8.00
Truckman/Driver
97.44 X 1.43 0.07
2,000.00
Labor Cost: 0.01
Equipment Rental:
RSB 12 mm Ø
=
Vehicle Used: 1 unit 10 W truck (all models)
Rental: 7,690.00 /day 961.25 /hr
Capacity: 2,000.00 kgs/trip
=
Haul Dist.: 16.00 km. (Average hauling distance from the Source to project site)
16.00 Good maintained concrete road
- =
Good maintained gravel road
Base Cost: 55.49 /kg
5.33333333333333 350 php per piece of 12mm RSB
TRAVEL CYCLE TIME: =
Labor (Loading ):
0.33 X 1.43 X 5.00 4.9713404E-05
=
6,000.00 8.00
Labor (unLoading ):
0.29 X 1.43 X 5.00 3.6524133E-05
7,000.00 8.00
Truckman/Driver
97.44 X 1.43 0.07
2,000.00
Labor Cost: 0.01
Equipment Rental:
RSB 16 mm Ø
=
Vehicle Used: 1 unit 10 W truck (all models)
Rental: 7,690.00 /day 961.25 /hr
Capacity: 2,000.00 kgs/trip
=
Haul Dist.: 16.00 km. (Average hauling distance from the Source to project site)
16.00 Good maintained concrete road
- =
Good maintained gravel road
Base Cost: 56.55 /kg
9.48148148148148 545 php per piece of 16mm RSB
TRAVEL CYCLE TIME: =
RSB 20 mm Ø =
Vehicle Used: 1 unit 10 W truck (all models)
Rental: 41.88 /day 5.235 /hr
Capacity: 2,000.00 kgs/trip =
Haul Dist.: 16.00 km. (Average hauling distance from the Source to project site)
16.00 Good maintained concrete road
20mmØ =
Good maintained gravel road
Base Cost: 58.14 /kg
14.8148148148148 545 php per piece of 16mm RSB
TRAVEL CYCLE TIME: =
Equipment Rental:
Equipment Rental:
961.25 5.44 522.58 /cu.m
10.00
Equipment Rental: 522.58
Materials Cost: 1,600.00
Mechanized Hauling
Equipment to be utilized : 1 unit stick truck 10.00 lit/hr
Capacity/Trip : 500.00 pc/trip
Fuel Consumption : 10.00 lit/hr
Source : Zamboanga City
Hauling distance by type of road
Concrete/Asphalt road : 268.00 km/trip
Good maintained road : - km/trip
Poorly maintained : - km/trip
Total Hauling Distance : 268.00 km/trip
Equipment average speed by type of road without load
Concrete/Asphalt road : 45.00 km/hr
Good maint. gravel ro : 35.00 km/hr
Poorly maint. gravel r : 25.00 km/hr
Equipment average speed by type of road without load
Concrete/Asphalt road : 35.00 km/hr
Good maint. gravel ro : 30.00 km/hr
Poorly maint. gravel r : 20.00 km/hr
Cycle time without Load
Concrete/Asphalt road : 268.00 km/trip / 45.00 km/hr = 5.96 hr/trip
Good maint. gravel ro : 0.00 km/trip / 35.00 km/hr = 0 hr/trip
Poorly maint. gravel r : 0.00 km/trip / 25.00 km/hr = 0 hr/trip
Cycle time with Load
Concrete/Asphalt road : 268.00 km/trip / 35.00 km/hr = 7.66 hr/trip
Good maint. gravel ro : 0.00 km/trip / 30.00 km/hr = 0 hr/trip
Poorly maint. gravel r : 0.00 km/trip / 20.00 km/hr = 0 hr/trip
Manual Loading capability of 5 laborers: 250.00 pc/hr & Unloading 200.00 pc/hr
Loading : 500.00 pc/trip / 250.00 pc/hr = 2.00 hr/trip
Unloading : 500.00 pc/trip / 200.00 pc/hr = 2.50 hr/trip
Loading, spot and manuever time = 0.20 hr/trip
Total Time 18.32 hr/trip
Equipment Cost
Fuel : 10.00 lit/hr x 13.82 hr/trip x 81.67 /lit / 500.00 pc/trip = P 22.57 0
Oil (10% of Fuel cost) : = 2.26 0
Equipment Rental : 961.25 /hr. x 13.82 hr/trip / 500.00 pc/trip = 26.57 0
Labor Cost (Loading and Unloading)
1 Driver : 757.63 /day x 18.32 hr/trip / 8.00 hr/day / 500.00 pc/trip = P 3.47 0
5 Laborer : 490.91 /day x 18.32 hr/trip / 8.00 hr/day / 500.00 pc/trip = P 11.24 0
SUMMARRY OF COST Prepainted Metal Sheets (Rib type long span) Tek Screw
BASE COST 300.00 / SQ.M 5.23 /pc
WAGES 14.71
FUEL AND OIL 24.83
EQUIPMENT RENTAL-DEPRECIATION (40% of Equipment Rental) 10.63
SPAREPARTS (60% of Equipment Rental) 15.94
TOTAL COST OF ROOF (at jobsite) 366.11 /sq.m 5.23 /pc
DERIVATION OF HAULING OF COST with (manual hauling)
Supply, Delivery, and installation of Equipment, Tools & Accessories for Regional Command Center/ Control Room
Equipment Rental:
Equipment Rental:
961.25 X 4.53 0.362630291 /kgs
12,000.00
F. 4" CHB
Base Cost of 4"CHB P 18.00 /pc
Mechanized Hauling
Equipment to be utilized : 1 unit dump truct (all models)
Capacity/Trip : 600.00 pc/trip
Fuel Consumption : 10.00 lit/hr
Source : Pagadian City
Hauling distance by type of road
Concrete/Asph : 16.00 km/trip
Good maintai : - km/trip
Poorly mainta : - km/trip
Total Hauling Distance : 16.00 km/trip
Equipment average speed by type of road without load
Concrete/Asph : 45.00 km/hr
Good maint. g : 35.00 km/hr
Poorly maint. : 25.00 km/hr
Equipment average speed by type of road with load
Concrete/Asph : 35.00 km/hr
Good maint. g : 30.00 km/hr
Poorly maint. : 20.00 km/hr
Cycle time without Load
Concrete/Asph : 16.00 km/trip / 45.00 km/hr = 0.36 hr/trip
Good maint. g : 0.00 km/trip / 35.00 km/hr = 0 hr/trip
Poorly maint. : 0.00 km/trip / 25.00 km/hr = 0 hr/trip
Cycle time with Load
Concrete/Asph : 16.00 km/trip / 35.00 km/hr = 0.46 hr/trip
Good maint. g : 0.00 km/trip / 30.00 km/hr = 0 hr/trip
Poorly maint. : 0.00 km/trip / 20.00 km/hr = 0 hr/trip
Manual Loading capability of 5 laborers: 2400.00 pc/hr & Unloading 2400.00 pc/hr
Loading : 600.00 pc/trip / 2400.00 pc/hr = 0.25 hr/trip
Unloading : 600.00 pc/trip / 2400.00 pc/hr = 0.25 hr/trip
Loading, spot and manuever time = 0.20 hr/trip
Total Time 1.52 hr/trip
Equipment Cost
Fuel : 10.00 lit/hr x 1.02 hr/trip x 32.00 /lit / 600.00 pc/trip = P 0.54 /pc
Oil (10% of Fuel cost) : = 0.05 /pc
Equipment Rental : 334.65 /hr. x 1.02 hr/trip / 600.00 pc/trip = 0.57 /pc
Labor Cost (Loading and Unloading)
1 Driver : 369.95 /day x 1.52 hr/trip / 8.00 hr/day / 600.00 pc/trip = P 0.12 /pc
5 Laborer : 225.00 /day 1.52 hr/trip / 8.00 hr/day / 600.00 pc/trip = P 0.36 /pc
SUMMARRY OF COST 4" CHB
BASE COST : P 18.00 /pc
WAGES : 0.48
FUEL AND OIL : 0.59
EQUIPMENT RENTAL-DEPRECIATION (40% of Equipment Rental) 0.23
SPAREPARTS (60% of Equipment Rental) 0.34
TOTAL COST OF 4"CHB (at jobsite) 19.64 /pc
Prepared by:
Johannes Gregorii B. Lague
TILES
Mechanized Hauling
Equipment to be utilized : stake truck (all models)
Capacity/Trip : 500.00 pc/trip
Fuel Consumption : 10.00 lit/hr
Source : Pagadian City
Hauling distance by type of road
Concrete/Asph : 16.00 km/trip
Good maintai : km/trip
Poorly mainta : km/trip
Total Hauling Distance : 16.00 km/trip
Equipment average speed by type of road without load
Concrete/Asph : 45.00 km/hr
Good maint. g : 35.00 km/hr
Poorly maint. : 25.00 km/hr
Equipment average speed by type of road without load
Concrete/Asph : 35.00 km/hr
Good maint. g : 30.00 km/hr
Poorly maint. : 20.00 km/hr
Cycle time without Load
Concrete/Asph : 16.00 km/trip / 45.00 km/hr = 0.36 hr/trip
Good maint. g : 0.00 km/trip / 35.00 km/hr = 0 hr/trip
Poorly maint. : 0.00 km/trip / 25.00 km/hr = 0 hr/trip
Cycle time with Load
Concrete/Asph : 16.00 km/trip / 35.00 km/hr = 0.46 hr/trip
Good maint. g : 0.00 km/trip / 30.00 km/hr = 0 hr/trip
Poorly maint. : 0.00 km/trip / 20.00 km/hr = 0 hr/trip
Manual Loading capability of 5 laborers: 2000.00 pc/hr & Unloading 2000.00 pc/hr
Loading : 500.00 pc/trip / 2000.00 pc/hr = 0.25 hr/trip
Unloading : 500.00 pc/trip / 2000.00 pc/hr = 0.25 hr/trip
Loading, spot and manuever time = 0.20 hr/trip
Total Time 1.52 hr/trip
Equipment Cost
Fuel : 10.00 lit/hr x 1.02 hr/trip x 43.00 /lit / 500.00 pc/trip = P 0.88 0
Oil (10% of Fuel cost) : = 0.09 0
Equipment Rental : 334.65 /hr. x 1.02 hr/trip / 500.00 pc/trip = 0.68 0
Labor Cost (Loading and Unloading)
1 Driver : 369.95 /day x 1.52 hr/trip / 8.00 hr/day / 500.00 pc/trip = P 0.14 0
5 Laborer : 225.00 /day x 1.52 hr/trip / 8.00 hr/day / 500.00 pc/trip = P 0.43 0
SUMMARRY OF COST 60 x 60 Granite tiles 60 x 60 Glaze Granite tiles 40 x 40 Tile
BASE COST 313.05 / Pc 313.05 / Pc 96.32 / Pc
WAGES 0.57 869.5916667 per sq.m 0.57 869.59167 per sq.m 0.57 602.025 per sq.m
FUEL AND OIL 0.97 0.97 0.97
EQUIPMENT RENTAL-DEPRECIATION (40% of Equipment Rental) 0.27 0.27 0.27
SPAREPARTS (60% of Equipment Rental) 0.41 0.41 0.41
TOTAL COST OF TILES (at jobsite) 315.27 /pc 315.27 /pc 98.54 /pc
BASE COST 30 x 30 Rusty Ceramic tiles 30 x 30 Granite tiles
WAGES P 68.06 / Pc 68.06 /Pc
FUEL AND OIL 0.57 756.1666667 per sq.m 0.57 756.166666666667 per sq.m
EQUIPMENT RENTAL-DEPRECIATION (40% of Equipment Rental) 0.97 0.97
SPAREPARTS (60% of Equipment Rental) 0.27 0.27
TOTAL COST OF TILES (at jobsite) 0.41 0.41
70.275 /pc 70.27 /pc
1 ft x 6ft thick Granite stone Jet Black Slab Counter top Tile Grout Tile Adhesive
8650.00 /pc 89.00 /bag 424.04 /bag
0.57 0.57 0.57
0.97 0.97 0.97
0.27 0.27 0.27
0.41 0.41 0.41
8652.22 /pc 91.21 /bag 426.26 /bag
PURLINS AND ANGLE BARS
Mechanized Hauling
Equipment to be utilized : 10 W Dumptruct (all models) 10.00 lit/hr
Capacity/Trip : 100.00 length/trip
Fuel Consumption : 10.00 lit/hr
Source : Pagadian City
Hauling distance by type of road
Concrete/Asphalt ro : 16.00 km/trip
Good maintained ro : - km/trip
Poorly maintained : - km/trip
Total Hauling Distance : 16.00 km/trip
Equipment average speed by type of road without load
Concrete/Asphalt ro : 45.00 km/hr
Good maint. gravel : 35.00 km/hr
Poorly maint. gravel : 25.00 km/hr
Equipment average speed by type of road without load
Concrete/Asphalt ro : 35.00 km/hr
Good maint. gravel : 30.00 km/hr
Poorly maint. gravel : 20.00 km/hr
Cycle time without Load
Concrete/Asphalt ro : 16.00 km/trip / 45.00 km/hr = 0.36 hr/trip
Good maint. gravel : 0.00 km/trip / 35.00 km/hr = 0 hr/trip
Poorly maint. gravel : 0.00 km/trip / 25.00 km/hr = 0 hr/trip
Cycle time with Load
Concrete/Asphalt ro : 16.00 km/trip / 35.00 km/hr = 0.46 hr/trip
Good maint. gravel : 0.00 km/trip / 30.00 km/hr = 0 hr/trip
Poorly maint. gravel : 0.00 km/trip / 20.00 km/hr = 0 hr/trip
Manual Loading capability of 5 laborers: 250.00 pc/hr & Unloading 200.00 pc/hr
Loading : 100.00 length/trip / 250.00 pc/hr = 0.40 hr/trip
Unloading : 100.00 length/trip / 200.00 pc/hr = 0.50 hr/trip
Loading, spot and manuever time = 0.20 hr/trip
Total Time 1.92 hr/trip
Equipment Cost
Fuel : 10.00 lit/hr x 1.02 hr/trip x 81.67 /lit / 100.00 length/trip = P 8.33 /length
Oil (10% of Fuel cost) : = 0.83 /length
Equipment Rental : 961.25 /hr. x 1.02 hr/trip / 100.00 length/trip = 9.8 /length
Labor Cost (Loading and Unloading)
1 Driver : 757.63 /day x 1.92 hr/trip / 8.00 hr/day / 100.00 length/trip = P 1.82 /length
5 Laborer : 490.91 /day x 1.92 hr/trip / 8.00 hr/day / 100.00 length/trip = P 5.89 /length
SUMMARRY OF COST Purlins 6mm x 50mm x50 mm angle bar 6mm x 75mm x75 mm angle bar Purlin Cost per meter
BASE COST 227.2688 / m 220.92 /m 296.65 /m
WAGES 7.71 / m 7.71 /m 7.71 /m
FUEL AND OIL 9.16 / m 9.16 /m 9.16 /m
EQUIPMENT RENTAL-DEPRECIATION (40% of Equipment Rental) 3.92 / m 3.92 /m 3.92 /m
SPAREPARTS (60% of Equipment Rental) 5.88 / m 5.88 /m 5.88 /m
TOTAL COST OF ROOF (at jobsite) 233.28 /m 247.59 /m 323.32 /m
Welding Rod Turn buckle M12 eye-eye stainless Steel 304 (500g) 1/4" x 1' x 1" x 20' angle bar @ 1.78 kg/m
6.67 /pc 78.53 /pc 50.10 /m
/pc /pc /m
/pc /pc /m
/pc /pc /m
/pc /pc /m
TOTAL COST OF ROOF (at jobsite) 6.67 /pc 78.53 /pc 50.10 /m
Location: Balintawak, Pagadian City
DESCRIPTION CAPACITY ROLL PER DAY NO. OF UNIT NO. OF DAY RATE/DAY TOTAL COST
Prepared by:
Prepared by:
189,290.00
5 941.17 4705.85
5 704.77 3,523.85
5 490.91 9818.2
0.0125
18,047.90
1,804.79 22.56
NO. OF DAY RATE/DAY TOTAL COST
219.75
191,094.79
-
191,094.79 740.13
Location: Balintawak, Pagadian City
DESCRIPTION CAPACITY ROLL PER DAY NO. OF UNIT NO. OF DAY RATE/DAY TOTAL COST
DESIGNATION CAPABILITY ROLL PER DAY NO. OF PERSONNEL NO OF DAYS RATE PER DAY AMOUNT
DESCRIPTION CAPACITY ROLL PER DAY NO. OF UNIT NO. OF DAY RATE/DAY TOTAL COST
DESCRIPTION CAPACITY ROLL PER DAY NO. OF UNIT NO. OF DAY RATE/DAY TOTAL COST
Prepared by:
DESCRIPTION CAPACITY ROLL PER DAY NO. OF UNIT NO. OF DAY RATE/DAY TOTAL COST
Prepared by:
Location: Balintawak, Pagadian City
DESCRIPTION CAPACITY ROLL PER DAY NO. OF UNIT NO. OF DAY RATE/DAY TOTAL COST
Prepared by:
Location: Balintawak, Pagadian City
Prepared by:
UNIT UNIT COST AMOUNT
10 941.17 9411.7
10 704.77 7047.7
10 490.91 19636.4
0.0125
36,095.80
1,804.79 22.56
NO. OF DAY RATE/DAY TOTAL COST
219.75
104,064.79
-
104,064.79 403.06
Republic of the Philippines
DEPARTMENT OF AGRICULTURE
NATIONAL IRRIGATION ADMINISTRATION
REGIONAL OFFICE NO. IX (ZAMBOANGA PENINSULA)
"ANNEX A"
UNIT COST DERIVATION
0
Location: Balintawak, Pagadian City
OUTPUT 2 cu.m/day
Equim
Labor Cost
Personnel Wages
1 Construction fore 941.17
3 Laborer 1,472.73
Total 2,413.90 .day
Wages ### /day = 1206.95 /cu.m
2.00 cu.m/day
Labor Cost
Personnel Wages
1 Construction fore 941.17
3 Laborer 1,472.73
Total 2,413.90 .day
OUTPUT 12 cu.m/day
1 1 compressor 3,680.00
Total 3,680.00 /.day
Wages ### /day = 306.67 /cu.m
12.00 cu.m/day
: = 306.67 /cu.m.
Gravel Bedding
Output per hour 1.2 cu.m/hr
Output per day 9.6 cu.m/day
Labor Cost
Personnel Wages
Construction
1 Foreman 704.77
3 Laborer 1,472.73
Total 2,177.50 .day
Wages ### /day = 226.82 /cu.m
9.60 cu.m/day
: = 102.50 /cu.m.
CLASS "A" CONCRETE (3000 psi) -Suspended Slab, Beams, Columns and Roof CLASS "B" CONCRETE (2,400 psi) -Slab on fill
1. Fabrication, Placing & Dismantling of Forms
3000 PSI Output: 3.50 cu.m/day
2400 PSI Output 5.00 cu.m/day LABOR COMPOSITION
Personnel Wages
2 - Carpenters 1,311.14
4 - Laborers 1,963.64
TOTAL 3,274.78
Labor Cost:
Wages : 3,274.78 /day = P 935.65 /cu.m 3,000 PSI
3.50 cu.m/day
5.00 cu.m/day = P 654.96 /cu.m 2.400 PSI
2. Concreting & Curing: with one - Bagger Mixer
Output: 3.50 cu.m/day
LABOR COMPOSITION
Personnel Wages
1 - Const. Foreman 941.17
2 - Mason 1,311.14
1 - L.E.O. 704.77
8 - Laborers 3,927.28
TOTAL 6,179.59
Labor Cost:
Wages : 6,179.59 /day = P 1,765.60 /cu.m 3,000 PSI
3.50 cu.m/day
5.00 cu.m/day = P 1,235.92 /cu.m 2.400 PSI
Equipment Rental
Utilized: 1 Bagger Concrete Mixer
Capacity: 3.50 cu.m./day
Rental: 1,376.00 /day
1,376.00 /day = P 393.14 /cu.m 3,000 PSI
3.5
5.00 = P 275.20 /cu.m 2.400 PSI
SUMMARY
Wages 2,701.25 /cu.m
Equipment Rental 393.14 /cu.m
Fuel 104.57
TOTAL P 3,198.96 /cu.m 3,000 PSI
3.33333333333333
Wages 1,890.87 /cu.m
Equipment Rental 275.20 /cu.m
Fuel 104.57
TOTAL 0.00 2,270.65 /cu.m 2,400 PSI
1 of 2
0
Location: Balintawak, Pagadian City
Breakdown of 3000 PSI Concrete
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
Cement 9 bags 9.01 81.11 304.01 2,736.09 0.00 0.00 0.00 0.00
Sand 0.45 cu.m. 522.58 235.16 1422.58 640.16 0.00 0.00 0.00 0.00
Gravel 0.9 cu.m. 522.58 470.32 2122.58 1,910.32 0.00 0.00 0.00 0.00
2"X2"X10' COCO LUMBER 7.19 bd.ft 0.67 4.81 30.67 220.52 0.00 0.00 0.00 0.00
2"X3"X10' COCO LUMBER 7.19 bd.ft 0.67 4.81 30.67 220.52
1/4"X4'X8' ORDINARY PLYWOO 0.347 pcs 9.26 3.21 559.26 194.06 0.00 0.00 0.00 0.00
COMMON NAILS (ASSORTED CW 0.21 kgs. 0.36 0.07 100.36 21.08 0.00 0.00 0.00 0.00
Labor Cost 2,701.24 497.71
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
Cement 7 bags 9.01 63.09 304.01 2,128.0700 0.00 0.00 0.00 0.00
Sand 0.5 cu.m. 522.58 261.29 1422.58 711.2900 0.00 0.00 0.00 0.00
Gravel 1 cu.m. 522.58 522.58 2122.58 2,122.5800 0.00 0.00 0.00 0.00
2"X2"X10' COCO LUMBER 7.19 bd.ft 0.67 4.82 30.67 220.5173 0.00 0.00 0.00 0.00
2"X3"X10' COCO LUMBER 7.19 bd.ft 0.67 4.82 30.67 220.5173
1/4"X4'X8' ORDINARY PLYWOO 0.347 pcs 9.26 3.21 559.26 194.0632 0.00 0.00 0.00 0.00
COMMON NAILS (ASSORTED CW 0.21 kgs. 0.36 0.08 100.36 21.0756 0.00 0.00 0.00 0.00
Labor Cost 1,890.87 379.77
Prepared by:
JOHANNES GREGORII B. LAGUE JOEL G. JANIOLA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
MASTERLIST OF CANALIZATION
CY 2024
CONTRUCTION OF 3 STOREY MULTI-PURPOSED BUILDING (PHASE 1)
NIA REGIONAL IRRIGATION OFFICE, BALINTAWAK, PAGADIAN CITY
ATTACHMENT "G"
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0
Force Account Work Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - cu.m -
Prepared By: Checked and Reviewed by: Recommending Approval Approved By:
JOHANNES GREGORII B. LAGUE JOEL G. JANIOLA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
Engineer B Principal Engineer C/ Chief of Engineering Section Acting Division Manager - EOD REGIONAL MANAGER
Attachment "E"
ESTIMATED COST
% WT.
PARTI- CULARS
CY 2024
NO. MAJOR COMPONENT CLASS ORIG./REV
ORIG./REV.
Prepared By: Checked and Reviewed by: Recommending Approval Approved By:
Benedicto Isagani O. Pulis Jr.
Division
Benedicto Manager
Isagani A Jr.
O. Pulis
Division Manager A
JOHANNES GREGORII B. LAGUE JOEL G. JANIOLA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
Engineer B Principal Engineer C/ Chief of Engineering Section Acting Division Manager - EOD REGIONAL MANAGER
MASTERLIST OF CANALIZATION
CY 2024
CONTRUCTION OF 3 STOREY MULTI-PURPOSED BUILDING (PHASE 1)
NIA REGIONAL IRRIGATION OFFICE, BALINTAWAK, PAGADIAN CITY
ATTACHMENT "G"
2,400 psi Reinforced
DIME
Gravel Concrete, m3
No. Stationing Kind of Canal Length b, cm Dc, cm Cut Fill Remarks
Bedding
Concrete 10mmØ kg Latitude Longitude
MAIN CANAL
2 + 005 2 + 537 CANAL BENCH FLUME 532.00 30 40 106.40 96.86 26.60 78.92 - 7° 56'17.92" 123°37'59.20"
TOTAL 712.00 142.40 112.90 35.60 105.63 -
Prepared By: Checked and Reviewed by: Recommending Approval Approved By:
JOHANNES GREGORII B. LAGUE JOEL G. JANIOLA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
Engineer B Principal Engineer C/ Chief of Engineering Section Acting Division Manager - EOD REGIONAL MANAGER
GANNT CHART
CONTRUCTION OF 3 STOREY MULTI-PURPOSED BUILDING (PHASE 1)
NIA REGIONAL IRRIGATION OFFICE, BALINTAWAK, PAGADIAN CITY
Attachment H
CY 2024
JANUARY FEBRUARY MARCH APRIL
Percent
Item of works Estimated Cost
Weight
W1 W2 W3 W4 W5 W1 W2 W3 W4 W5 W1 W2 W3 W4 W5 W1 W2 W3 W4 W5
A. CIVIL WORKS
I. Temporary Working Facilities - 0.00% 1.00 1.00 1.00 1.00
Subtotal - 0.00%
II. Construction Safety & Health - 0.00% 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Subtotal - 0.00%
IV. PROJECT SCHEME
Err:509 Err:509 Err:509 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Err:509 Err:509 Err:509 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Err:509 Err:509 Err:509 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Err:509 Err:509 Err:509 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Err:509 Err:509
Err:509 Err:509 Err:509 1.00
Err:509 Err:509 Err:509 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
0 Err:509 Err:509
TOTAL CIVIL WORKS Err:509 Err:509
CONSTRUCTION SURVEY 20,000.00 33.33% 1.00 1.00 1.00 1.00
IDP 40,000.00 66.67% 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1. HAULING TIME:
Capacity of Truck: 200 bags
Average Speed: With Load (kph) W/out Load (kph)
Concrete/Asphalt 25 35
Gravel Road 20 25
Manual Loading Capability: 5 Laborers
Loading 300 bags/hr
Unloading 300 bags/hr
CYCLE TIME:
a. With Load Pagadian City toBibilop Crossing (Concrete/Asphalt Road)
41.00 kms / 25 km/hr 1.64 hr
b. With Load Bibilop Crossing to Bibilop Dropsite (Gravel Road)
4.00 kms / 20 km/hr 0.20 hr
c. W/out Load from Bibilop Dropsite to Bibilop Crossing (Gravel Road)
4.00 kms / 25 km/hr 0.16 hr
d. W/out Load from Bibilop Crossing to Pagadian City (Concrete/Asphalt)
41.00 kms / 35 km/hr 1.17 hr
e. Manual Loading
200 bags / 300 bags/hr 0.67 hr
f. Manual Unloading
200 bags / 300 bags/hr 0.67 hr
TOTAL 4.50 hrs
2. LABOR & EQUIPMENT COST:
a. Labor Cost
Total Cost per day = 360.00 per day x 5 Laborers = 1,800.00 per day
Cost per hour = 1,800.00 per day / 8 hr/day = 225.00 per hr
Total Cost per hour = 225.00 per hr x 4.50 hrs = 1,013.57 pesos/hr
Labor Cost per bag = 1,013.57 pesos/hr / 200 bags/hr = 5.07 pesos/bag
b. Equipment Cost
Operated Cost = 1,012.00 per hr x 4.50 hrs = 4,558.82 pesos/hr
= 4,558.82 pesos/hr / 200 bags = 22.79 pesos/bag
c. Fuel Cost
Total Cost per km = 70.00 Pesos/Liter x 0.25 lit/km = 17.50 Pesos/km
= 17.50 pesos/km x 90.00 kms/trip = 1,575.00 Pesos/trip
Fuel Cost per bag = 1,575.00 Pesos/trip / 200.00 Bags/trip = 7.88 pesos/bag
1. HAULING TIME:
Capacity of Truck: 7000 kls
Average Speed: With Load (kph) W/out Load (kph)
Concrete/Asphalt 35 45
Gravel Road 20 25
Manual Loading Capability: 5 Laborers
Loading 6000 kls/hr
Unloading 7000 kls/hr
CYCLE TIME:
a. With Load Pagadian City toBibilop Crossing (Concrete/Asphalt Road)
41 kms / 35 km/hr 1.17 hr
b. With Load Bibilop Crossing to Bibilop Dropsite (Gravel Road)
4 kms / 20 km/hr 0.20 hr
c. W/out Load from Bibilop Dropsite to Bibilop Crossing (Gravel Road)
4 kms / 25 km/hr 0.16 hr
d. W/out Load from Bibilop Crossing to Pagadian City (Concrete/Asphalt)
41 kms / 45 km/hr 0.91 hr
e. With Load Pagadian City toBibilop Crossing (Concrete/Asphalt Road)
7000 kls / 6000 kls/hr 1.17 hr
f. Manual Unloading
7000 kls / 7000 kls/hr 1.00 hr
TOTAL 4.61 hrs
2. LABOR & EQUIPMENT COST:
a. Labor Cost
Total Cost per day = 360.00 per day x 5 Laborers = 1,800.00 per day
Cost per hour = 1800.00 per day / 8 hr/day = 225.00 per hr
Total Cost per hour = 225 per hr x 4.61 hrs = 1,037.07 pesos/hr
Labor Cost per bag = 1037.07 pesos/hr / 7000 bags/hr = 0.15 pesos/kg
b. Equipment Cost
Operated Cost = 1012.00 per hr x 4.61 hrs = 4,664.52 pesos/hr
= 4664.52 pesos/hr / 7000 kls = 0.67 pesos/kg
c. Fuel Cost
Total Cost per km = 70.00 Pesos/Liter x 0.25 lit/km = 17.50 Pesos/km
= 17.50 pesos/km x 90.00 kms/trip = 1,575.00 Pesos/trip
Fuel Cost per kg = 1575.00 Pesos/trip / 7,000.00 kls/trip = 0.23 pesos/kg
1. HAULING TIME:
Capacity of Truck: 150 Sheets
Average Speed: With Load (kph) W/out Load (kph)
Concrete/Asphalt 35 45
Gravel Road 20 25
Manual Loading Capability: 5 Laborers
Loading 250 kls/hr
Unloading 250 kls/hr
CYCLE TIME:
a. With Load Pagadian City toBibilop Crossing (Concrete/Asphalt Road)
41 kms / 35 km/hr 1.17 hr
b. With Load Bibilop Crossing to Bibilop Dropsite (Gravel Road)
4 kms / 20 km/hr 0.20 hr
c. W/out Load from Bibilop Dropsite to Bibilop Crossing (Gravel Road)
4 kms / 25 km/hr 0.16 hr
d. With Load Pagadian City toBibilop Crossing (Concrete/Asphalt Road)
41 kms / 45 km/hr 0.91 hr
e. Manual Loading
150 Sheets / 250 kls/hr 0.60 hr
f. Manual Unloading
150 Sheets / 250 kls/hr 0.60 hr
TOTAL 3.64 hrs
2. LABOR & EQUIPMENT COST:
a. Labor Cost
Total Cost per day = 360.00 per day x 5 Laborers = 1,800.00 per day
Cost per hour = 1800.00 per day / 8 hr/day = 225.00 per hr
Total Cost per hour = 225 per hr x 3.64 hrs = 819.57 pesos/hr
Labor Cost per bag = 819.57 pesos/hr / 150 bags/hr = 5.46 pesos/sheet
b. Equipment Cost
Operated Cost = 1012.00 per hr x 3.64 hrs = 3,686.25 pesos/hr
= 3686.25 pesos/hr / 400 Sheets = 9.22 pesos/sheet
c. Fuel Cost
Total Cost per km = 70.00 Pesos/Liter x 0.25 lit/km = 17.50 Pesos/km
= 17.50 pesos/km x 90.00 kms/trip = 1,575.00 Pesos/trip
Fuel Cost per bag = 1575.00 Pesos/trip / 35.00 Bags/trip = 45.00 pesos/sheet
1. HAULING TIME:
Capacity of Truck: 6000 Bd.ft.
Average Speed: With Load (kph) W/out Load (kph)
Concrete/Asphalt 35 45
Gravel Road 20 25
Manual Loading Capability: 5 Laborers
Loading 4000 Bd.ft./hr
Unloading 4000 Bd.ft./hr
CYCLE TIME:
a. With Load Pagadian City toBibilop Crossing (Concrete/Asphalt Road)
41 kms / 35 km/hr 1.17 hr
b. With Load Bibilop Crossing to Bibilop Dropsite (Gravel Road)
4 kms / 20 km/hr 0.20 hr
c. W/out Load from Bibilop Dropsite to Bibilop Crossing (Gravel Road)
4 kms / 25 km/hr 0.16 hr
d. With Load Pagadian City toBibilop Crossing (Concrete/Asphalt Road)
41 kms / 45 km/hr 0.91 hr
e. Manual Loading
6000 Bd.ft. / 4000 Bd.ft./hr 1.50 hr
f. Manual Unloading
6000 Bd.ft. / 4000 Bd.ft./hr 1.50 hr
TOTAL 5.44 hrs
2. LABOR & EQUIPMENT COST:
a. Labor Cost
Total Cost per day = 360.00 per day x 5 Laborers = 1,800.00 per day
Cost per hour = 1800.00 per day / 8 hr/day = 225.00 per hr
Total Cost per hour = 225 per hr x 5.44 hrs = 1,224.57 pesos/hr
Labor Cost per bag = 1224.57 pesos/hr / 6000 bags/hr = 0.20 pesos/bdft
b. Equipment Cost
Operated Cost = 1012.00 per hr x 5.44 hrs = 5,507.85 Pesos/hr
= 5507.85 Pesos/hr / 6000 Bd.ft. = 0.92 pesos/bdft
c. Fuel Cost
Total Cost per km = 70.00 Pesos/Liter x 0.25 lit/km = 17.50 Pesos/km
= 17.50 pesos/km x 90.00 kms/trip = 1,575.00 Pesos/trip
Fuel Cost per bag = 1575.00 Pesos/trip / 4000.00 Bags/trip = 0.39 pesos/bdft
1. HAULING TIME:
Capacity of Truck: 10 cu.m/trip
Average Speed: With Load (kph) W/out Load (kph)
Concrete/Asphalt 35 45
Gravel Road 20 25
Manual Loading Capability: 1 Laborers
Loading 250 cu.m./hr.
Unloading 250 cu.m./hr.
CYCLE TIME:
a. With Load Labangan to Bibilop Crossing (Gravel Road)
4 kms / 20 km/hr 0.20 hr
b. With Load Bibilop Crossing to Bibilop Dropsite (Concrete/Asphalt)
26.00 kms / 35 km/hr 0.74 hr
c. W/out Load from Bibilop Dropsite to Bibilop Crossing (Concrete/Asphalt)
26.00 kms / 45 km/hr 0.58 hr
d. W/out Load from Bibilop Crossing to Labangan (Gravel Road)
4 kms / 25 km/hr 0.16 hr
TOTAL 3.00 hrs/trip
2. LABOR & EQUIPMENT COST:
a. Labor Cost
Total Cost per day = 360.00 per day x 1 Laborers = 360.00 per day
Cost per hour = 360.00 per day / 8 hr/day = 45.00 per hr
Total Cost per hour = 45 per hr x 3.00 hrs/trip = 135.06 pesos/trip
Labor Cost per bag = 135.06 pesos/trip / 10 cubic/hr = 13.51 pesos/cu.m.
b. Equipment Cost
Operated Cost = 1087.00 Pesos/hr x 3.00 hrs/trip = 3,262.38 pesos/trip
= 3262.38031746 pesos/trip / 10 cu.m/trip = 326.24 pesos/cu.m.
c. Fuel Cost
Total Cost per km = 70.00 Pesos/Liter x 0.25 lit/km = 17.50 Pesos/km
= 17.50 pesos/km x 90.00 kms/trip = 1,575.00 Pesos/trip
Fuel Cost per bag = 1575.00 Pesos/trip / 10.00 cu.m/trip = 157.50 pesos/cu.m.
1. HAULING TIME:
Capacity of Truck: 10 cu.m.
Average Speed: With Load (kph) W/out Load (kph)
Concrete/Asphalt 35 45
Gravel Road 20 25
Manual Loading Capability: 5 Laborers
Loading 250 cu.m./hr.
Unloading 250 cu.m./hr.
CYCLE TIME:
a. With Load Labangan to Bibilop Crossing (Gravel Road)
4 kms / 20 km/hr 0.20 hr
b. With Load Bibilop Crossing to Bibilop Dropsite (Concrete/Asphalt)
26.00 kms / 35 km/hr 0.74 hr
c. W/out Load from Bibilop Dropsite to Bibilop Crossing (Concrete/Asphalt)
26.00 cu.m. / 45 km/hr 0.58 hr
d. W/out Load from Bibilop Crossing to Labangan (Gravel Road)
4 cu.m. / 25 km/hr 0.16 hr
TOTAL 3.00 hrs
2. LABOR & EQUIPMENT COST:
a. Labor Cost
Total Cost per day = 360.00 per day x 1 Laborers = 360.00 per day
Cost per hour = 360.00 per day / 8 hr/day = 45.00 per hr
Total Cost per hour = 45 per hr x 3.00 hrs = 135.06 pesos/hr
Labor Cost per bag = 135.06 pesos/hr / 10 bags/hr = 13.51 pesos/cu.m.
b. Equipment Cost
Operated Cost = 1087.00 per hr x 3.00 hrs = 3,262.38 pesos/trip
= 3262.38031746 pesos/hr / 10 cu.m. = 326.24 pesos/cu.m.
c. Fuel Cost
Total Cost per km = 70.00 Pesos/Liter x 0.25 lit/km = 17.50 Pesos/km
= 17.50 pesos/km x 90.00 kms/trip = 1,575.00 Pesos/trip
Fuel Cost per bag = 1575.00 Pesos/trip / 10.00 cu.m/trip = 157.50 pesos/cu.m.
1. Material Costing:
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
CEMENT 9.00 bag 2,826.00 146.86 276 3,248.88
SAND 0.45 cu.m. 435.60 206.08 217.68 859.36
GRAVEL 0.90 cu.m. 1,039.50 412.16 435.36 1,887.02
PLYWOOD 1.25 sheet 1,313.75 26.83 67.77 1,408.35
CWN 2.00 kgs 196.00 2.45 1.78 200.23
FORM LUMBER 25.00 bd.ft. 750.00 35.10 32.79 817.90
Tie Wire 0.60 kgs 89.40 0.73 0.53 90.67
TOTAL 6,650.25 830.21 1,031.95 8,512.40
3. Equipment Costing:
Equipment Operated Rate Rate/Day
1-bagger Concrete Mixer 172.00 1,376.00
Capacity:
3.50 cu.m./day 393.14
3. Equipment Costing:
Equipment Operated Rate Rate/Day
1-bagger Concrete Mixer 172.00 1,376.00
Capacity:
4.50 cu.m./day 305.78
RUBBLE MASONRY
1. Material Costing:
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (E) TOTAL
CEMENT 4.50 bag 1,413.00 73.43 138 1,624.44
SAND 0.23 cu.m. 217.80 103.04 108.84 429.68
GRAVEL 0.45 cu.m. 519.75 206.08 217.68 943.51
Boulder 0.95 kgs 1,045.00 435.05 459.55 1,939.60
PLYWOOD 0.25 sheet 262.75 5.37 13.55 281.67
CWN 0.25 kgs 24.50 0.31 0.22 25.03
FORM LUMBER 5.00 bd.ft. 150.00 7.02 6.56 163.58
TOTAL 3,632.80 830.29 944.42 5,407.51
Position Rate /day Fabrication, Placing, & Dismantling of Concreting & Curing Works (Grouted Cut, Bend and Placing of
Forms Riprap) RSB
No. Cost No. Cost No. Cost
Foreman 941.17 1.00 941.17
Carpenter/ Mason 814.42 1.00 814.42 2.00 1,628.84
LE Operator 704.77 1.00 704.77
Laborer 490.91 4.00 1,963.64 8.00 3,927.28
Total Cost 2,057.76 617.35 1,440.41
3. Equipment Costing:
Equipment Operated Rate Bare Rental
1-bagger Concrete Mixer 172.00
Capacity:
5.00 cu.m./day 275.2
CONTRUCTION OF 3 STOREY MULTI-PURPOSED BUILDING (PHASE 1)
Attachment
NIA REGIONAL IRRIGATION OFFICE, BALINTAWAK, PAGADIAN CITY "I"
UNIT COST DERIVATION
FORCE ACCOUNT WORKS
ESTIMATED COST FOR RUBBLE MASONRY
DIRECT COST TOTAL
Labor 2,057.76 830.29 2,888.05
Materials 3,632.80 3,632.80
Equipment 944.42 275.20 1,219.62
TOTAL DC 7,740.47
3% Supervision of Civil Works 232.21
TOTAL UNIT COST 7,972.69
H. COMMON BACKFILL W/ COMPACTION:
1. Backfill
Manpower: Rate/day Capability Cost
1-Laborer 490.91 3.00 per cu.m. 350/3.00 163.64
2. Compaction
1-Laborer 490.91 5.00 per cu.m. 350/5.00 98.18
TOTAL 261.82
I. GRAVEL BEDDING
1. Material Costing:
HAULING COST
ITEM QUANTITY UNIT BASE COST
LABOR RENTAL VAT (L) VAT (L) TOTAL
GRAVEL 1.00 cu.m. 1,155.00 457.95 483.74 2,096.69
TOTAL 1,155.00 457.95 483.74 2,096.69
NO. OF
SAFETY
WORKERS SAFETY HELMET SAFETY GLOVES DAYS MAN-DAYS
SHOES
(DURATION)
TOTAL 2,310
SUMMARY
A. MATERIALS = 27,693.90 /l.s
B. LABOR = - /l.s
C. EQUIPMENT UTILIZATION: = - /l.s
EDC = 27,693.90 /l.s
Supervision 3% = 830.82 /l.s
TOTAL UNIT COST 28,524.72 /l.s
K. TEMPORARY FACILITIES:
BILL OF MATERIALS
Description Quantity bd.ft Price
Post 2x3x10 9 45.00 32.72 1,472.21
Girt 2x3x10 8 40.00 32.72 1,308.63
2x3x8 12 48.00 32.72 1,570.36
Rafter 2x3x12 12 72.00 32.72 2,355.54
Purlins 2x2x8 42 112.00 32.72 3,664.17
Vertical Studs 2x2x10 32 106.67 32.72 3,489.69
Horizontal Studs 2x2x10 44 146.67 32.72 4,798.32
1/2" Oord. Plywood 1.2xx2.4 16 950.00 15200
G.I Corr. Sheet 12ft x.4 12ft x .4 thck 20 475 9500
Assorted Nails 10 70 700
Plain Sheet R. Roll 4 380 1520
UPVC Plastic Bowl 1 750 750
G.I Kitchen Sink 1 350 350
46,678.92
a. Materials 46,678.92
b. Labor (40%) 18,671.57
For Slab
A+B = 58 pcs
Unit Weight of 10mm rsb = 0.61728 kg/m
Commercial Length = 6 meters
For Masonry
Height 2.8 Length 34 Opening 18.8
Total Area = Area of Wall - Area of Opening = 76.4
Constant Factor for Vertical bar = 2.13
Constant Factor for Horizontal bar = 2.15
# of 10mm RSB
Along Vertical Bar, Total Area X Constant 162.732 m
Along Horizontal Bar, Total Area X Constant 164.26 m
56 pcs to kgs
Unit Weight of 10mm rsb = 3.7037 kg/pc = 207.407 kgs of 10mm RSB
D1 D2 D3 W1 W2
2.1 4.41 2.52 8.64 2.88
COMPUTED BY: COMPUTED BY:
Length 34 m
24 pcs to kgs
Unit Weight of 12mm rsb = 5.33333 kg/pc = 128 kgs 12mm of RSB
TILE WORKS
GLAZED TILES
UNGLAZED TILES
MASONRY WORKS
MASONRY With Plaster Finished
PAINTING WORKS FOR MASONRY
ROOFING WORKS
ROOFING Works RAVAK (8MM X 900MM X 3660MM FB RIB TL)
Prepared By: Checked and Reviewed by: Recommending Approval Approved By:
Benedicto Isagani O. Pulis Jr.
Division
Benedicto Manager
Isagani A Jr.
O. Pulis
Division Manager A
JOHANNES GREGORII B. LAGUE JOEL G. JANIOLA ANTONIO B. GUJELING JUNE NATHANIEL S. PLAZA
Engineer B Principal Engineer C/ Chief of Engineering Section Acting Division Manager - EOD REGIONAL MANAGER
0
Location: Balintawak, Pagadian City
REINFORCING STEEL BARS
1. Cutting, Bending, & Placing of Bars
Output: 400.00 kgs/day
LABOR COMPOSITION
Personnel Wages
5 - Steelman 3,523.85
10 - Laborers 4,909.10
TOTAL 8,432.95
Labor Cost:
Wages : 8,432.95 /day P 21.08 /kg.
400.00 kgs/day
SUMMARY
Wages P 21.08
TOTAL P 21.08 /kg.
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
Ø RSB 1.00 kg - 0.68 0.68 63.09 63.09 0.00 0.00
#16 G.I Tie Wire 0.015 kg - 0.36 0.0054 100.36 1.51 0.00 0.00
LABOR COMPOSITION
Personnel Wages
1 Foreman 941.17
5 Installer/Carpenter 3,277.85
5 - Laborers 2,454.55
TOTAL 6,673.57
Labor Cost:
Wages : 6,673.57 /day P 611.13 /sq.m
10.9200 sq.m/day
SUMMARY
Wages P 611.13
TOTAL P 611.13 /sq.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
a Glazed Tiles- 60 x 60 1.05 sq.m. 0.57 0.60 869.59 913.07 0.00 0.00
c Cement 0.325 bags - 9.01 2.93 295.00 95.88 0.00 0.00
d Sand 0.026 cu.m - 522.58 13.59 900.00 23.40
e Tile Grout 0.125 bags 0.57 0.07 0.27 0.03 89.00 11.12 0.97
f Tile Adhesive (25Kg) 0.143 bags 0.57 0.08 0.27 0.04 424.04 60.64
LABOR COMPOSITION
Personnel Wages
1 Foreman 941.17
5 Installer/Carpenter 3,277.85
5 - Laborers 2,454.55
TOTAL 6,673.57
Labor Cost:
Wages : 6,673.57 /day P 427.79 /sq.m
15.6000 sq.m/day
SUMMARY
Wages P 427.79
TOTAL P 427.79 /sq.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
a UnGlazed Tiles 30 X 30 1.05 sq.m. 0.57 0.60 756.17 793.98 0.00 0.00
c Cement 0.325 bags - 9.01 2.93 295.00 95.88 0.00 0.00
d Sand 0.026 cu.m - 522.58 13.59 900.00 23.40
e Tile Grout 0.125 bags 0.57 0.07 0.27 0.03 89.00 11.12 0.97
TOTAL 3,274.78
Labor Cost:
Wages : 3,274.78 /day P 163.74 /sq.m - /sq.m
20.00 sq.m/day
SUMMARY
TOTAL Wage 259.28 /sq.m
Wages
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
CHB 13.00 pcs 0.48 6.24 1.16 15.08 18.00 234.00 0.00 0.00
Cement 0.960 bags - 9.01 8.65 304.01 291.85 0.00 0.00
sand 0.080 cu.m - 522.58 41.81 1422.58 113.81
Painting Works
Painting Masonry
Output: 16.8000 sq.m/day (Building)
LABOR COMPOSITION
Personnel Wages
1 Foreman 941.17
2 Installer/Carpenter 1,311.14
1 - Laborers 490.91
TOTAL 2,743.22
Labor Cost:
Wages : 2,743.22 /day P 163.29 /sq.m
16.8000 sq.m/day
SUMMARY
Wages P 163.29
TOTAL P 163.29 /sq.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
a. Concrete Nuetralizer 0.020 gal 450.00 9.00 0.00 0.00
b. Concrete Primer 0.040 gal 772.00 30.88 0.00 0.00
c. Patching Compound 0.050 gal 138.00 6.90
d. Semi Gloss Latex (Two Coats Only) 0.080 gal 750.00 60.00
ROOFING WORKS
1. Laying of roofing
Output: 16.6080 sq.m/day (Building)
LABOR COMPOSITION
Personnel Wages
1 Foreman 941.17
1 Installer/Carpenter 655.57
2 - Laborers 981.82
TOTAL 2,578.56
Labor Cost:
Wages : 2,578.56 /day P 155.26 /sq.m
16.6080 sq.m/day
SUMMARY
Wages P 155.26
TOTAL P 155.26 /sq.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
ROOFING WORKS
1. Laying of roofing
Output: 33.2160 sq.m/day (Building)
LABOR COMPOSITION
Personnel Wages
2 Foreman 1,882.34 250.42
2 Installer/Carpenter 1,311.14 7.54
4 - Laborers 1,963.64
TOTAL 5,157.12
Labor Cost:
Wages : 5,157.12 /day P 155.26 /sq.m
33.2160 sq.m/day
SUMMARY
Wages P 155.26
TOTAL P 155.26 /sq.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
a. ROOFING WORKS PRE PAINTED
METAL ROOFING SHEET GA # 26
LONGSPAN
1.050 sq.m. 51.40 53.97 300.00 315.00 0.00 0.00
b. Tekscrew 10.000 pc 5.24 52.35 0.00 0.00
Painting Works
Metal Painting
Output: 48.0000 sq.m/day (Building)
LABOR COMPOSITION
Personnel Wages
3 Foreman 2,823.51
6 Installer/Carpenter 3,933.42
3 - Laborers 1,472.73 370.608
TOTAL 8,229.66 7.721
Labor Cost:
Wages : 8,229.66 /day P 171.45 /sq.m
48.0000 sq.m/day
SUMMARY
Wages P 171.45
TOTAL P 171.45 /sq.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
a. Red Oxide Primer 0.040 gal 753.50 30.14 0.00 0.00
b. Enamel Paint 0.100 gal 902.00 90.20 0.00 0.00
c. Paint Thinner 0.250 gal 473.00 118.25
ROOFING WORKS
1. Laying of Cyclone Wire
Output: 28.0000 sq.m/day (Building)
LABOR COMPOSITION
Personnel Wages
1 Foreman 941.17
1 Installer/Carpenter 655.57
2 - Laborers 981.82
TOTAL 2,578.56
Labor Cost:
Wages : 2,578.56 /day P 92.09 /sq.m
28.0000 sq.m/day
SUMMARY
Wages P 92.09
TOTAL P 92.09 /sq.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
CAPENTRY WORKS
1. Laying and installation of Capentry Works
Output: 7.00 length/day (Building)
LABOR COMPOSITION
Personnel Wages
1 Foreman 757.63
1 Carpenter/installer 655.57
2 - Laborers 490.91
TOTAL 1,904.11
Labor Cost:
Wages : 1,904.11 /day P 272.02 /length
7.00 length/day
Wages P 272.02
TOTAL P 272.02 /length
1 of 2
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. Spare Parts FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
3/4" x 4" x 8" LAMINATTED
PLYBOARD 0.73 sheet 5.95 4.34 1.65 1.20 3500.00 2,555.00 0.00 0.00 0.00 0.00
STONE CERAMIC 60cm x
240cm top cover 1.44 pcs 5.64 8.12 0.32 0.46 1000.00 1,440.00 0.00 0.00 0.00 0.00
TUBE 1.00 length 5.64 5.64 0.32 0.32 980.00 980.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
1.44
Prepared by:
RODEL J. YUNTING
Project In-Charge 2 of 2
QUANTITY COMPUTATIONS SHEET
NAME OF STRUCTURE: STRUCTURE
STATION: N/A
ITEM: 3000 PSI (COLUMN FTG , COLUMN, ROOF BEAM, WALL FTG, TIE BEAM, SOF
CONSTRUCTION. OF LIGHT EQUIPMENT REPAIR AND
PROJECT NAME: MAINTENANCE SHOP AT NIA LABANGAN
LOCATION: LABANGAN , ZAMBOANGA DEL SUR
CONTRACT NO: N/A
SKETCH COMPUTATIONS VOLUME
COLUMN FOOTING C1
L= 1.60 M
W= 1.60 M
THK = 0.4 M
NO. OF FTG = 5 PCS
Volume = 1.60 x 1.60 x 0.40 M X 5 PCS 5.12 cu.m
COLUMN FOOTING C2
L= 1.00 M
W= 1.00 M
THK = 0.3 M
NO. OF FTG = 5 PCS
COLUMN C1
D = 0.45 M
W= 0.45 M 4.40 cu.m
HEGHT = 4.35 M
NO. OF FTG = 5 PCS
COLUMN C2
D = 0.30 M
W= 0.30 M
1.35 cu.m
HEGHT = 3.00 M
NO. OF FTG = 5 PCS
TIE BEAM
D= 0.25 M
W = 0.30 M
L = 27.31 M
ROOF BEAM
W= 0.20 M
D = 0.25 M
L =49.25 M
WALL FOOTING
D= 0.20 M
W = 0.30 M
L = 49.25 M
L= 15.0 M
W = 7.0 M
THK = 0.10 M
L= 15.00 M
W = 5.00 M
THK = 0.10 M
L= 49.25 M
H= =2.75 M
113.93 SQ.M
WALL OPENING= 21.51 SQ.M
PLASTERING
227.855 X 0.41 = 93 CEMENT BAGS
227.855 X 0.034 = 8 CU.M SAND
CEILING AREA
STORAGE ROOM 21.76 SQ.M
OFFICE 10 SQ.M
TILEWORKS
STORAGE ROOM 22 SQ.M
5.16 SQ.M
COMFORT ROOM
L= 1.45 M
W= 1.45 M
# OF BARS L = 8 PCS
# OF BARS W = 8 PCS
NO. OF FTG = 5 PCS
L= 1.45 M
W= 1.45 M
# OF BARS L = 8 PCS
# OF BARS W = 8 PCS
NO. OF FTG = 5 PCS
IN KILOGRAMS 95 KGS
COLUMN C1
IN KILOGRAMS 74 KGS
TIE BEAM
WALL FOOTING
D= 0.20 M
W = 0.30 M
L = 49.25 M
IN KILOGRAMS 96 KGS
L= 15.0 M
W = 12.0 M
BAR SPACING = 0.20 M BOTHWAYS
10 mm Ø RSB X 6M
MASONRY REINFORCEMENT
L= 49.25 M
H= =2.75 M
WALL OPENING= 21.51 SQ.M 113.93 SQ.M
10 mm Ø RSB X 6M
COMPUTED BY:
JOHANNES GREGORII B. LAGUE
ENGINEER B
Project Title: NIA R9 COMMAND CENTER
Location: Balintawak, Pagadian City
LABOR COMPOSITION
Personnel Wages
1 Mason 655.57
1 - Laborers 490.91
TOTAL 1,146.48
Labor Cost:
Wages : 1,146.48 /day P 95.54 /sq.m
12.00 sq.m/day
SUMMARY
Wages P 95.54
TOTAL P 95.54 /sq.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
CEMENT 0.41 bags - 9.01 3.69 304.01 124.64 0.00 0.00
SAND 0.034 cu.m - 522.58 17.76 1422.58 48.36 0.00 0.00
Prepared by:
CEILING WORKS
LABOR COMPOSITION
Personnel Wages
1 Foreman 941.17
2 Carpenter/installer 1,311.14
4 - Laborers 1,963.64
TOTAL 4,215.95
Labor Cost:
Wages : 4,215.95 /day P 708.13 /sq.m
5.95 sq.m/day
SUMMARY
Wages P 708.13
TOTAL P 708.13 /sq.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
4"x 8' x 4.5mm Thick Shera Board 0.37 pc 4.85 1.77 7.58 2.76 422.43 154.18 0.00 0.00
Double Metal Furring 19mm x 50mm x 0.6mm thick
(5m length) 1.130 pc 28.15 31.81 128.49 145.19 418.39 472.78 0.00 0.00
Carrying Channel 12mm x 38mm, 0.5m thicnkess (5m
length) 0.360 pc 28.15 10.13 128.49 46.25 444.57 160.04
25mm x 25mm x 0.40mm thk x 5.0m long wall angle
0.238 pc 28.15 6.70 128.49 30.58 263.43 62.69
Metal Furring Clip (W-clip) 6.000 pc - 0.00 8.38 50.28
Blind Rivets 1/8" x 1/2" 14.00 pc - 0.00 3.00 42.00
Drywall Screw 4.00 pc - 0.00 3.00 12.00
Labor Cost 708.13 0.00
FINISHING HARDWARE
1. Installation of DOORS and WINDOWS
Output: 1.78 sq.m/day 0.00
LABOR COMPOSITION
Personnel Wages
1 carpenter 704.77
2 Laborers 981.82
TOTAL 1,686.59
Labor Cost:
Wages : 1,686.59 /day P 949.24 ./sq.m
1.78 sq.m/day
SUMMARY
Wages P 949.24
TOTAL P 949.24 ./sq.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
0.00
HIGH QUALITY SOLID DOOR (0.9M X 2.10M) 0.15 sq.m. - 0.00 0.00
0.00
2" X 4" ALUMINUM FRAMED ANNEALED GLASS AWNING TYPE AND COMPLETE
ACCESSORIES (3.2M X 0.8M) 0.30 sq.m. 0.00 -
2" X 4" ALUMINUM FRAMED ANNEALED GLASS AWNING TYPE AND COMPLETE
ACCESSORIES (1.60M X 1.60M) 0.10 sq.m. 0.00 -
2" X 4" ALUMINUM FRAMED ANNEALED GLASS AWNING TYPE AND COMPLETE
ACCESSORIES (0.40M X 0.40M) 0.01 sq.m. 0.00 -
HIGH QUALITY TEMPERED GLASS DOUBLE DOOR (3.2M X 2.10M) 0.26 sq.m. 0.00 -
-
sq.m. -
Labor Cost 949.24 0.00
Sub-total 949.23 /kg. HIGH QUALITY SOLID DOOR (0.9M X 2.10M) 949.24
Supervision for Civil Works 0 /kg. PVC LOUVER DOOR (0.75M X 2.10M) 949.24
ESTIMATED DIRECT COST 949.23 /kg. 2" X 4" ALUMINUM FRAMED ANNEALED GLASS AWNING 949.24
VAT 5% OF (EDC, OCM & PROFIT) #REF! /kg. 2" X 4" ALUMINUM FRAMED ANNEALED GLASS AWNING 949.24
Prepared by: 2" X 4" ALUMINUM FRAMED ANNEALED GLASS AWNING 949.24
HIGH QUALITY TEMPERED GLASS DOUBLE DOOR (3.2M X 949.24
JOHANNES GREGORII B. LAGUE 949.24
Engineer B 949.24
Project Title: Construction of Motorpool NIA Labangan, Labangan, Zamboanga del Sur
ROOFING WORKS
1. Laying of roofing
Output: 16.6080 sq.m/day (Building)
LABOR COMPOSITION
Personnel Wages
1 Foreman 941.17
1 Installer/Carpenter 655.57
2 - Laborers 981.82
TOTAL 2,578.56
Labor Cost:
Wages : 2,578.56 /day P 155.26 /sq.m
16.6080 sq.m/day
SUMMARY
Wages P 155.26
TOTAL P 155.26 /sq.m
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
L= 1.60 M
W= 1.60 M
THK = 0.4 M
NO. OF FTG = 5 PCS
Volume = 1.60 x 1.60 x 0.40 M X 5 PCS 5.12 cu.m
COLUMN FOOTING C2
L= 1.00 M
W= 1.00 M
THK = 0.3 M
NO. OF FTG = 5 PCS
COLUMN C1
D = 0.45 M
W= 0.45 M 4.40 cu.m
HEGHT = 4.35 M
NO. OF FTG = 5 PCS
COLUMN C2
D = 0.30 M
W= 0.30 M
1.35 cu.m
HEGHT = 3.00 M
NO. OF FTG = 5 PCS
TIE BEAM
D= 0.25 M
W = 0.30 M
L = 27.31 M
ROOF BEAM
W= 0.20 M
D = 0.25 M
L =49.25 M
WALL FOOTING
D= 0.20 M
W = 0.30 M
L = 49.25 M
Volume = 0.20 x 0.30 x 49.25 M 2.96 cu.m
SLAB ON FILL
L= 15.0 M
W = 12.0 M
THK = 0.10 M
MASONRY
WALL AREA
L= 49.25 M
H= =2.75 M
113.93 SQ.M
WALL OPENING= 21.51 SQ.M
PLASTERING
227.855 X 0.41 = 93 CEMENT BAGS
227.855 X 0.034 = 8 CU.M SAND
CEILING AREA
STORAGE ROOM 21.76 SQ.M
OFFICE 10 SQ.M
TILEWORKS
STORAGE ROOM 22 SQ.M
5.16 SQ.M
COMFORT ROOM
L= 1.45 M
W= 1.45 M
# OF BARS L = 8 PCS
# OF BARS W = 8 PCS
NO. OF FTG = 5 PCS
L= 1.45 M
W= 1.45 M
# OF BARS L = 8 PCS
# OF BARS W = 8 PCS
NO. OF FTG = 5 PCS
IN KILOGRAMS 95 KGS
COLUMN C1
IN KILOGRAMS 74 KGS
TIE BEAM
ROOF BEAM
WALL FOOTING
D= 0.20 M
W = 0.30 M
L = 49.25 M
IN KILOGRAMS 96 KGS
L= 15.0 M
W = 12.0 M
BAR SPACING = 0.20 M BOTHWAYS
10 mm Ø RSB X 6M
MASONRY REINFORCEMENT
L= 49.25 M
H= =2.75 M
WALL OPENING= 21.51 SQ.M 113.93 SQ.M
10 mm Ø RSB X 6M
COMPUTED BY:
KET ANTHONY C. LUBGUBAN
ENGINEER B
Project Title: Construction of Motorpool NIA Labangan, Labangan, Zamboanga del Sur
ROOFING WORKS
1. Laying of roofing
Output: 16.6080 sq.m/day (Building)
LABOR COMPOSITION
Personnel Wages
1 Foreman 941.17
1 Installer/Carpenter 655.57
2 - Laborers 981.82
TOTAL 2,578.56
Labor Cost:
Wages : 2,578.56 /day P 155.26 /sq.m
16.6080 sq.m/day
SUMMARY
Wages P 155.26
TOTAL P 155.26 /sq.m
Breakdown of Roofing Works
ITEMS QTY. WAGES EQUIP. RENTAL CONST. MAT. FUEL & OIL MANUAL HAULING
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
% WT. CY 2023
NO. MAJOR COMPONENT ESTIMATED COST PARTI-
CLASS ORIG./REV
ORIG./REV. CULARS
January February March April May June July August September October November December
I. A. CIVIL WORKS
PROJECTED Err:509 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 100.00%
Err:509 Err:509 Err:509
ACTUAL
PROJECTED #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 90.00%
I. Temporary Working Facilities - Err:509
ACTUAL
PROJECTED Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Err:509 Err:509 Err:509 80.00%
ACTUAL
PROJECTED
Err:509 70.00%
ACTUAL
PROJECTED Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Err:509 Err:509 Err:509 60.00%
ACTUAL
PROJECTED Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Err:509 Err:509 Err:509 50.00%
ACTUAL
PROJECTED Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Err:509 Err:509 Err:509 40.00%
ACTUAL
PROJECTED Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
IV. PROJECT SCHEME - Err:509 30.00%
ACTUAL
PROJECTED #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
IV. CANAL STRUCTURES #REF! #REF! 20.00%
ACTUAL
PROJECTED 0.00% 50.00% 75.00% 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF!
II. Construction Survey 20,000.00 Err:509 10.00%
ACTUAL
PROJECTED 11.76% 41.18% 70.59% 100.00% #REF! #REF! #REF! #REF! #REF! #REF! #REF!
III. Institutional Development Program 40,000.00 Err:509 0.00%
ACTUAL
PROJECTED Err:509 Err:509 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Err:509 Err:509
ACTUAL
CY FINANCIAL STATUS
PROJECTED Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IN MILLION PESOS
ACTUAL