Civil Works

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

S.

No Description UOM Rate Remarks

A.1.1 EARTHWORKS

1 Excavation 0 to 1.5m m3 585.0

2 Backfilling & Compaction m3 351.0

3 GSB (Below Footing, Plinth beam & Grade Slab) m3 2,455.0

4 Antitermite m2 110.0

5 Polythene sheet, 200micron m2 110.0

6 Cleaning of Existing road Lot 50,000.0

A.1.2 CONCRETE WORKS

1 Lean concrete, M10 m3 6,307.0

2 RCC Concrete, M25 Grade - Sub-structure m3 8,364.0

3 RCC Concrete, M25 Grade - Super-structure m3 8,464.0

4 Power Trowel Finishing m2 110.0

5 Mastic Flooring m2 4,500.0

A.1.3 FORMWORKS

1 Formwork - Sub-structure m2 760.0

2 Formwork - Super-structure m2 760.0

A.1.4 REBAR ton 85,045.0

A.1.5 MASONRY WORK

1 Block Work, 230mm m3 10,000.0

2 Internal Plastering m2 701.0

3 External Plastering m2 701.0

4 Internal Painting m2 600.0

5 External Thermoplastic Painting m2 1,169.0

A.1.5 STEEL WORK

1 PEB works (Grade Fe 250N/mm2) ton 151,970.0

2 Non-Shrink Grout m3 87,675.0

3 MS Metal works ton 151,970.0

A.1.6 SHEETING WORK

1 Roof Sheeting, Galvalume 0.50mm TCT m2 1,700.0

2 Wall Claddding, Galvalume 0.47mm TCT m2 1,550.0

3 Rain Water Gutter m2 900.0

4 Downtake pipe m 2,000.0

5 Flashing, 0-300mm m2 400.0

6 Rain water chamber with Cover Nos 25,000.0

A.1.7 FENCE WORKS

1 MS Fence, 1.8m height with civil works m 6,500.0

2 Fence Gate m2 7,500.0

Roundoff

SUB-TOTAL - 1