DPR OF STRUCTURE FABRICATION FOR EPCC-05 - DHDT (AUG-MONTH-23)

Released Raw Material Raw Material Cutting HR Section Fit-up Welding


Sl.No Area Scope Drawing Balance Drawing Received IMIR Done & Plate (MT) Day Cuml. Day Cuml.
1 SR-01 49.7 49.7 0 49.7 49.7 49.7 0 49.7 0 49.7
2 SR-03 75.11 75.11 0 75.11 75.11 75.11 0 75.11 0 75.11
3 PR -01 (LOT-01&02) 486.38 486.38 0 486.38 486.38 486.38 0 486.38 0 486.38
4 PR -01 (LOT-03&04) 504.34 504.34 0 504.34 504.34 504.34 0 504.34 0 504.34
5 South Pump 004A/B 31.05 31.05 0 31.05 31.05 31.05 0 31.05 0 31.05
6 Compressor Shelter 431.46 426.56 4.9 426.56 426.56 426.56 0 422 0 422
7 PR Compressor Shelter 239.98 239.98 0 239.98 239.98 239.98 0 239.98 0 239.98

Misc Steel Including pipe support,


8 Equipment platform etc 250 250 0 250 250 215 1 215 1 210

TOTAL 2068.02 2063.12 4.9 2063.12 2063.12 2028.12 1 2023.56 1 2018.56

1 STR-02 443.84 443.84 0 444 444 443.9 0 443 0 443


2 SR-02 175.36 175.36 0 175.36 175.36 175.36 0 175.36 0 175.36
3 STR 01 359.56 359.56 0 359.6 359.6 359.5 0 359.34 0 359.34

TOTAL 978.76 978.76 0 978.96 978.96 978.76 0 977.7 0 977.7

3046.78 3041.88 4.9 3042.08 3042.08 3006.88 1 3001.26 1 2996.26


3) Date - 14/08/2023
Balance To
Painting Dispatch Dispatch Fabricators Remarks

49.7 49.7 0 SISCOL All Materials Dispatched.


75.11 75.11 0 SISCOL All Materials Dispatched.
486.38 486.38 0 SISCOL All Materials Dispatched.
504.34 504.34 0 SISCOL All Materials Dispatched.
31.05 31.05 0 SISCOL All Materials Dispatched.
417 426.56 0 SISCOL All Materials Dispatched.
239.98 239.98 0 SISCOL All Materials Dispatched.

200 183 67 SISCOL


35 MT fabrication not yet
started.

2003.56 1996.12 67 SISCOL

443 443.84 0 SRISHTI


ESDR matrial will Fabricate at site on the basis of mail
175.36 175.36 0 SRISHTI on 14-09-2023 by Projects
345 359.56 0 SRISHTI

963.36 978.76 0 SRISHTI

2966.92 2974.88 67
Handrail Status - DHDT fabricator:- Supermech all 9/4/2023
Balance to
Area Structure Name / Equipment name Scope (MT) Drawing released qty Material Procured Balance to procure Fabricated Dispatched
Sl.no fabricate
1 Main Steel SR-01 1.26 1.26 1.26
2 Main Steel SR-03 0.67 0.67 0.67
3 Main Steel PR -01 (LOT-01) 11 11 11 Fabrication ongoing
4 Main Steel PR -01 (LOT-02) Drawings released Drawings released
5 Main Steel South Pump 004A/B 0.5 0.5 0.5
6 Main Steel Compressor Shelter 7.29 7.3
7 Main Steel PR Compressor Shelter Area 3.94 0
8 Main Steel STR-02 14.93 14.93 14.93 14.93
9 Main Steel SR-02 2.89 2.89 2.89
10 Main Steel STR 01 6.83 6.83 6.83 6.83
11 Equipment Supported Platform 421-C-001 &V008 1.8436 1.8436 1.8436
12 Equipment Supported Platform 421-C-002 2.247 2.247 2.247 Fabrication ongoing
13 Equipment Supported Platform 421-C-003 0.1165 0.1165 0.1165 Fabrication ongoing
14 Equipment Supported Platform 421-C-004 0.1672 0.1672 0.1672 Fabrication ongoing
15 Equipment Supported Platform 421-V-002 0.904 0.904 0.904 Fabrication ongoing
16 Equipment Supported Platform 421-V-003 1.054 1.054 1.054 Fabrication ongoing
17 Equipment Supported Platform 421-V-004 0.752 0.752
18 Equipment Supported Platform 421-V-005 0.569 0.569
19 Equipment Supported Platform 421-V-006 0.481 0.481
20 Equipment Supported Platform 421-V-009 0.735 0.735
21 Equipment Supported Platform 421-V-011 0.166 0.166
22 Equipment Supported Platform 421-C-001 M.S 0 0
23 Equipment Supported Platform 421-C-002 M.S 0 0
24 Equipment Supported Platform 421-DR-026B misc 0 0
25 Equipment Supported Platform 421-V-012 0.520 0.520
26 Equipment Supported Platform 421-V-016 0.296 0.296
27 Equipment Supported Platform 421-V-018 0.753 0.753
28 Equipment Supported Platform 421-V-021 0.781 0.781
29 Equipment Supported Platform 421-DR-026A 0.718 0.718
30 Equipment Supported Platform 421-DR-026B 0.582 0.582
31 Equipment Supported Platform 421-V-031 0.567 0.567
32 Equipment Supported Platform 421-V-037 0.616 0.616
33 Equipment Supported Platform 421-V-038 0.496 0.496
34 Equipment Supported Platform 421-V-040 0.261 0.261
35 Equipment Supported Platform 421-V-029 0.664 0.664
36 Equipment Supported Platform AIR COOLER PLATFORM north 1.159 1.159
AIR COOLER PLATFORM AC- 1.276
37 Equipment Supported Platform 001A-H 1.276
38 Equipment Supported Platform 421-V-032 PS 0.000 0.000
39 Equipment Supported Platform 421-V-033 PS 0.000 0.000
40 Grade Supported Platform Structure North of 421-V-031 0.15 0.15
EW Subrack on North of 421-V-024 0.00
41 Grade Supported Platform 0.00
Operating Platform on East of 421- 0.17
42 Grade Supported Platform V-029 0.17
Structure on North of 421-P-08A/B 0.32
43 Grade Supported Platform 0.32
Structure on South of 421-P-07A/B 0.34
44 Grade Supported Platform 0.34
Handrail Status - DHDT fabricator:- Supermech all 9/4/2023
Balance to
Area Structure Name / Equipment name Scope (MT) Drawing released qty Material Procured Balance to procure Fabricated Dispatched
Sl.no fabricate
Pipe support (Trestle) West of 421- 0.00
45 Grade Supported Platform C-002 0.00
Operating Platform around 421-C- 0.23
46 Grade Supported Platform 005 0.23
Operating Platform around 421-V- 0.10
47 Grade Supported Platform 019 0.10
Equipment Supporting Structure for 0.30
48 Grade Supported Platform 421-V-025 0.3 0.3
Operating Platform on West of 421- 0.15
49 Grade Supported Platform V-034 0.15
Pipe support (Trestle) South of 0.00
50 Grade Supported Platform 421-E-002C 0.00
Pipe support Structure For HP Heat
exchangers PIPE SUPPORT
STRUCTURE FOR 0.50
421-E-002A/B/C & 421-E-003 &
51 Grade Supported Platform 004 0.50
Operating Platform West of 421-P- 0.26
52 Grade Supported Platform 005A/B 0.26
Operating Platform on North of 0.09
53 Grade Supported Platform 421-V-011 0.09
Operating Platform East of 421-V- 0.10
54 Grade Supported Platform 004 0.10
Structure around 421-C-001/421- 0.30
55 Grade Supported Platform V-008 0.30
Pipe support Structure for 421-E- 0.30
56 Grade Supported Platform 007A/B & 421-E-008A/B 0.30
Pipe supporting Structure over 421- 0.00
57 Grade Supported Platform BA-004/005 0.00
58 Grade Supported Platform Structure South of 421-V-037 0.25 0.25
Pipe support from SR-2 to Anyzer
59 Grade Supported Platform house 0.00
60 Grade Supported Platform Pipe support East of STR-1 0.00 0.00
Pipe support from SR-3 to Deluge 0.00
61 Grade Supported Platform House 0.00
Platform on the south of V-003(UV- 0.12
62 Grade Supported Platform 2601) 0.12
63 Grade Supported Platform Platform around P-001A/B 0.35 0.35
64 Grade Supported Platform Platform on the east of 421-V-007 0.13 0.13
Lubricant and Greese Storage Shed 0.00
65 Grade Supported Platform 0.00
66 Grade Supported Platform Chemical Storage Shed 0.00 0.00
Operating Platform west of 421-V- 0.25
67 Grade Supported Platform 002 0.25
68 Grade Supported Platform 421-K-001 0.08 0.08
421-V-032 & 421-V-033 cover 0.00
69 Grade Supported Platform support and MS-4212-1046 0.00
Compressor area BCW : 421-BA- 0.08
70 Grade Supported Platform 003, PIT Steel Cover. 0.08
Exchanger 421-E-002ABC, Misc 0.00
71 Grade Supported Platform Steel and rail supports 0.00
Total 71.593 67.663 44.7123 0 21.76 0 12/30/1899
Handrail Status - DHDT fabricator:- Supermech all 9/4/2023
Balance to
Area Structure Name / Equipment name Scope (MT) Drawing released qty Material Procured Balance to procure Fabricated Dispatched
Sl.no fabricate

Total Scope 71.593


Drawing released 67.663
Material procured for Handrails 44.7123
Handrail Fabricated 21.76
Handrail Dispatched 0
9/4/2023

Remarks

DISPATCHED

NOT DISPATCH TILL NOW

NOT DISPATCH TILL NOW


NOT DISPATCH TILL NOW
NOT DISPATCH TILL NOW
NOT DISPATCH TILL NOW
NOT DISPATCH TILL NOW
9/4/2023

Remarks
P.O NO
TOYO TYPE I
TOYO TYPE I

PO . SR.
NO. Area UOM

1.1 SR-1 1.1 SQM

1.1 SR-2 1.1 SQM

1.1 SR-3 1.1 SQM

4.1 SR-2 STEPS 1.1 NO'S

1.1 STR-02 1.1 SQM

1.1 STR-01 1.1 SQM

1.1 PR-01 SQM

1.1 AC01H IS OF P.O ITEM


EQSS V-31 & AC01H SQM
NO=2.1

1.1 V-06 & V-011 SQM

1.1 V-18 & V-21 SQM

1.1 V-03 SQM

1.1 V16 & V-05 SQM

1.1 V-02 2.1 SQM

BOM-421-C-001-
CIRCULAR SQM
532_CIRCULAR

VALVE PIT FOR 421-V-032


AND 421-V-033 (CHEQURED CIRCULAR SQM
PLATE)
AIRCOOLER NORTH CIRCULAR SQM

421-C-003 CIRCULAR SQM

421-C-004 CIRCULAR SQM

421-DR-026A SQM

421-V-011 SQM

(4214-421-V-011 SQM

4213-421-V-003 SQM

4213-421-E-007A/B SQM

4212-421-G-007 A/B SQM

4215-421-P-001A SQM

4213-421-V-007 SQM

4215-421-V-031 SQM

4215-421-P-008 A/B SQM

4214-421-V-003 SQM

4215-421-V-002 SQM

V-029,P-07AB,Lubricants
shed,k-01421-kt-001,BA-003
(CHQ PLATE)

421-DR-026B SQM

COMPRESSOR AREA PIPE


1.1 SQM
RACK-4213-CPR

COMPRESSOR AREA PIPE


RACK-4213-CPR (CHQ 1.1
PLATE)

MACDERMOTT EPCC05
SQM
C-01 AND V-08 SR-3
BOM-E-002ABC_623 SQM

4213-421-CH SQM

421-P-004A/B SQM

421-V-004_544 SQM

421-V037_568 SQM

421-V-029 CIRCULAR
SQM
PLATFORM

priority-1 STRIPPER AREA_ 421-C-


CIRCULAR SQM
002 CIRCULAR PLATFORM

COMPRESSOR AREA (421-


SQM
V-009) CIRCULAR

STRIPPER &
STABLIZATION AREA (421- SQM
V-038) CIRCULAR

STRIPPER &
STABLIZATION AREA (421- SQM
V-040) CIRCULAR

TOTAL
356420-PO-059150-001-01 EPCC-05

6100
1005 DRAWING
7105

ENGINEERING BOM DATA

8278 7579.33 1695.833

Type1(SQ
TOE PLATE TOE PLATE
M) PO SR Type-I Wt. PO SR
No of Panels (RM) PO SR Wt. PO. SR.
NO 1.1 & NO 1.1 & 2.1
NO. 3.1 NO. 3.1
2.1

115 113.52 5,343.39 64.15 288.66

269 307.28 14,463.67 132.56 596.52

25 28.55 1,343.85 3.51 15.79

19

1712 1,663.52 78,301.89 482.28 2,170.26

1318 1,222.32 57,534.60 386.25 1,738.13

1603 1,744.50 82,113.62 575.10 2,587.95

124 119.32 5,616.39 26.66 119.99

61 35.01 1,647.92 4.00 18.00

21 8.66 407.63 8.10 36.47

7 3.59 168.98 3.07 13.83

66 43.38 2,041.90 10.14 45.65

46 57.20 2,692.40

150 137.07 3,580.27

32 29.29
90 59.21 2,787.01

11 6.93 181.01

14 11.06 288.89

35 33.76 881.81

12 5.10 133.21

3 2.28 107.32

7 4.13 194.40

49 29.21 1,374.91

18 15.71 739.47

25 22.15 1,042.60

5 4.59 216.05

5 8.94 420.81

32 21.67 1,020.20

9 7.42 349.07

24 17.84 839.73

14 4.77

36 20.15 526.32

693 565.46 26,616.20

2 5.57

116 81.36 3,829.62


15 12.91 607.67

1050 754.82 35,529.38

61 63.13 2,971.53

65 44.47 1,161.56

31 30.40 794.05

40 28.35 740.50

150 126.00 3,291.12

48 48.74 1,273.09

31 19.44 507.77

19 10.55 275.57

8278 7579.33 261205.07 1695.83 7631.25


TYPE I 7057.31
TYPEI 522.02
TOTAL 7579.33
Dispatch
Quantity
Confirmed by
Vendor
0

Material in
Material
Ready for Final Material under Material
TOTAL given for
Inspection Dispatch Dispatched
Production
Upto

113.52

307.28
14.02.2023
28.55

23.03.2023 1,663.52

18.05.2023 1,222.32

18.05.2023 1,744.50

18.05.2023 119.32

18.05.2023 35.01

18.05.2023 8.66

18.05.2023 3.59

18.05.2023 43.38

18.05.2023 57.20

137.07 25.09.2023
17.84 22.09.2023

565.46

81.36
25.09.2023

25.09.2023

0.00 801.73 0.00 0.00 5346.85