UP -------------------- STANDARD DETAIL REFERENCE DRAWINGS

| BILL OF MATERIAL |
DETAIL OF HEAVY WELDING BOSSES FOR THREADED CONNECTIONS AE-036175
-------------------- CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING AD-036627

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
AWAY AWAY

N PT NPD INSULATION DETAILS FOR HOT PIPING

INSULATION DETAILS FOR COLD PIPING


AA-036911

AA-036913
NO DESCRIPTION (IN) CMDTY CODE QTY INSTALLATION OF JACK SCREWS FOR FLANGED JOINTS AC-036630
-- PIPE ----------- -- ----- ---- ---
----
TOWARD TOWARD
1 PIPE SCH 40 SEAMLESS, BE API 5L GR.B PSL 8 P_1LE2P022 24.629 M
2, (INTERNAL FBE LINED/EXTERNAL COAT
DOWN
WITH APCS-113C) (NACE MR-0175/ISO
15156), ASME B36.10M NOTES
1. MATERIAL SHOWN WITH A BROKEN LINE AND SPOOLS LISTED IN THE SAUDI ARAMCO

FITTINGS FABRICATION LIST ARE NOT TO BE FURNISHED BY THE VENDOR.

-------- 2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).

2 TEE SCH 40 SEAMLESS, BW, ASTM A234 8X8 T_1LE2P022 1 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.

GR.WPB, (INTERNAL FBE LINED/EXTERNAL 4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.
(B) BOLT HOLES ON FLANGES STRADDLE C. (C) WELDING ELBOWS ARE LONG RADIUS.
COAT WITH APCS-113C) (NACE
5. FABRICATION SHALL BE IN ACCORDANCE WITH SAUDI ARAMCO SPECIFICATION
MR-0175/ISO 15156), ASME B16.9 01-SAMSS-10.

3 90 DEG LR ELBOW SCH 40 SEAMLESS, BW, 8 E_1LE2P022 5


6. GASKET ALLOWANCE PER SPEC
ASTM A234 GR.WPB, (INTERNAL FBE
7. PIPING MATERIAL IS PER BOM
LINED/EXTERNAL COAT WITH APCS-113C)
PIPE SIZE SCHEDULE SPECIFICATION
(NACE MR-0175/ISO 15156), ASME B16.9

FLANGES
-------
4 FLANGE CLASS 150, SCH 40, WN, RF ASTM 8 F_1LE2P022 19
A105N, (INTERNAL FBE LINED) (NACE
MR-0175/ISO 15156), ASME B16.5 8. WELDING STRESS RELIEF - YES NO
PER SAES-W-011 TABLE 17.6.2.1
100% X-RAY SPOT X-RAY 01-SAMSS-10

CONT.ON F4 G5 B6
GASKETS
NO
9. TESTING SHOP HYDROSTATIC TEST - YES
------- THE SHOP HYDROSTATIC TEST SHALL BE CARRIED OUT ON PIECES HAVING ALL ENDS
SHT 2 FLANGED. HYDROSTATIC TEST PRESSURE PER HYDROTEST DIAGRAM
5 4.5 MM THK GASKETS SPIRAL-WOUND, SS316 8 G_5CS9U1 10
E 184750 6
40 WINDINGS, FLEXIBLE GRAPHITE FILLED,
31
10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING

52
N 357204 WITH SS316 OUTER RING, ASME B16.20, SPECIFICATION SAES-L-105 CLASS 1LE2P02 .

1 ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.

.1
ASME B16.5, CL 150
EL.115638 64 EL
14
11. INSULATION

BOLTS INSULATION TYPE & THK. ON DWG.


F4
----- 12. TIE-IN LOCATIONS AND DETAILS SHALL BE FIELD VERIFIED BEFORE START OF WORK.

3 6 BOLTING ASTM A193 GR.B7M STUD BOLTS, 3/4 B_9CS9P1 80 13. FOR SMALL BORE LINES (UPTO 1-1/2") DIMENSIONS, ROUTING & SUPPORTING SHALL
406
SEMI-FINISHED HEAVY PATTERN, ASTM BE FIELD ADJUSTED.

F4 F4 G5 B6
A194 GR.2HM, W/2 HEAVY HEX NUTS, 14. ALL DIMENSIONS AND COORDINATES ARE IN MM. CONTRACTOR TO FIELD VERIFY ALL
1
1

115.0MM BOLT LENGTH DIMENSIONS PRIOR TO CONSTRUCTION.


8"NS 15. FOR INTERNAL LINED PIPE, LINING SHALL BE DONE AFTER SPOOL FABRICATION
708

& COMPLETION OF ALL HOT WORKS.


VALVES/IN-LINE ITEMS
214 F4 16. FOR GALVANIZED PIPE, GALVANIZING SHALL BE DONE AFTER SPOOL FABRICATION
--------------------
S9
3 F4 G5 B6 7 GATE VALVE CLASS 150 RF, FLANGED, BODY: 8 VA_1LE2P022 1
& COMPLETION OF ALL HOT WORKS.

FR02-A-600-400-B-1-11 ASTM A216 GR.WCB, (INTERNAL FBE


CPS-022-3480-001 3 F4 LINED), TRIM: UNS S31254, ALLOY-6 SPOOLS TO BE FABRICATED BY VENDOR
406 F4 G5 B6 HARD FACED SEAT, BOLTED BONNET, OS&Y, NO.
MARK NO. SIZE
WEIGHT NO.
MARK NO. SIZE
WEIGHT
PIECES LBS PIECES LBS
FLEXIBLE WEDGE, GRAPHITE PACKING, API
1
F4 G5 B6 600, (NACE MR-0175/ISO 15156)
F4
12
8 BLIND FLANGE CLASS 150, RF ASTM A105N, 8 FB_1LE2P02 1
CPS-022-3540-001 141 (INTERNAL FBE LINED) (NACE
79 .1 MR-0175/ISO 15156), ASME B16.5
96
1 F4 EL
406 6
40 PIPE SUPPORTS

79 1 F4 -------------
CPS-022-3520-001
96 64 9 PIPE SUPPORT 8 PSL 2
38 F4
3

1019
CPS-022-3530-001
7225
7197 26 SPOOLS TO BE FABRICATED BY SAUDI ARAMCO

1
79 NO. NO.
S9 1 F4 G5 B6 PIECES
MARK NO. SIZE
PIECES
MARK NO. SIZE

FR02-A-600-400-B-1-13 1937

F4 G5 B6 406 3
B97-TPL-630
279
F4
VALVE STEM UP 2
8X8"NS

1
F4 G5 B6 REFERENCE DRAWINGS
F4 8"NS
14 8 DWG. CONTROL FOR J.O. 10-12862-0001 TD-718027
8"-WBD-1845-1LE2P02 17
PIPING PLAN BA-752286

CONT.ON F4 G5 B6 27 HYDROTEST DIAGRAM TA-011934001


9
8"-WBD-9510-1CS9P2-N_03
G5 B6
/ 1101
752304-117 7
E 190900 VALVE STEM UP
N 339120
EL.112810 292

REVISION VALIDATION

THIS REVISION NO. IS COVERED, FOR ALL APPROVAL AND CERTIFICATION


0F1
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-12862-0001-029

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER


(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

FAW LAK ASD AHB


06/12/23 06/12/23 06/12/23 06/12/23

REV.NO.DATE REVISION DESCRIPTION

0F1 06/12/23 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR
10-12862-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
STRESS SYSTEM (SYS-) 022

PIPING CLASS 1LE2P02 SAUDI ARABIAN OIL COMPANY


DRAWING TYPE

P & ID No. BA-747595001 ISO 8"-WBD-1845-1LE2P02-B97


ISO
OPER/DESN PRESS.(psig) 210 / 210
INLET & GAS TREATMENT SHAYBAH
OPER/DESN TEMP.( F) 60 / 200
INLET FACILITIES
FLUID PHASE V + L
MODULE NO: SHAYBAH SAUDI ARABIA
PAINT SPEC (APCS-) 1D
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

LINE ID B97-WBD-1845-B97-01
B97 L TB-013512 001 0F1
Saudi Aramco 5994 ENG. (09/03)

RESTRICTED VECTOR CADD-05

20/03/2024 10:32:58 Wison