PROPOSAL FOR
FINAL YEAR PROJECT ON
“DETAILED ENGINEERING SURVEY, DESIGN AND COST
ESTIMATION OF TRIBENI TEMPLE-ANANTALINGESHWOR VIEW
TOWER HILL-ROAD”
PROJECT MEMBERS
JAY PRAKASH BANIYA(148-3-2-01822-2019)
NIRAJAN KHANAL(148-3-2-01833-2019)
RAMSHARAN DHAKAL(148-3-2-01843-2019)
SAWAN PANDIT(148-3-2-01856-2019)
SHREESHA GAIHRE(148-3-2-01857-2019)
UTSAV CHAPAGAIN(148-3-2-01868-2019)
DATE OF SUBMISSION:2080/12/17
1. INTRODUCTION
2. OBJECTIVES
3. METHODOLOGY
3.1. Desk study
3.1.1) Existing maps and literature will be studied.
3.1.2) Tentative alignment of road will be determined.
3.2. Reconnaissance
3.2.1) Site visit will be done to know basic information about site.
3.2.2) Feasibility of the proposed road alignment will be determined.
3.3. Topographic survey
3.3.1) Control points will be established according to site requirement.
3.3.2) Hairpin bends and curves as required will be established.
3.3.3) Survey will be performed using open traverse method.
3.3.4) EDM will be used in this survey
3.4.2) Quantity and cost estimation will be done of the project by considering
various factors.
3.4.3) Report including the progress and output of our work will be prepared.
The road alignment will then be designed with the help of software such as
AUTO-CAD, SW DTM and SW ROAD.
4.DISCUSSION
The existing road condition is below average as it is very narrow in many points
and not suitable for heavy vehicles. The roadway becomes dusty in the dry
season and gets muddy in the monsoon and have poor drainage facilities. This
project focuses on providing an alternative solution to these problems. Proper
design of the road can help solve various issues that occur on this route each
year, including improving pedestrian safety, and mitigating environmental
pollution. Construction of a well-designed road in this area would benefit many
people during travel - both drivers and pedestrians alike.
4.1. Instruments required
4.1.1) Total Station
4.1.2) Prism and stand
4.1.3) Measuring tape
4.1.4) GPS
5. CONCLUSION
Due to the small-time frame allocated for this semester, our proposed
schedule may get heavily affected. So, considering this tight schedule, we
shall complete the project on Detail Design, survey and Quantity Estimate of
road with proper safety.