Weight Contract 1 Facilitation of acquisition of Building Permit 165,000.00 for the local goverment 1.88% 2 Mobilization and qll necessary temporary facilities 325,000.00 and utilities 3.70% 3 Construction of temporary site enclosure/fences in 75,000.00 accordance with relevant codes and ordinances 0.85% 4 Civil/Structural Works Earthworks 313,930.00 3.58% Concrete Works 4000psi@28days 599,350.00 6.83% Structural Steel Works A-36 1,803,860.00 20.55% Reinforcing Bars(Grade40/275Mpa) 686,150.00 7.81% Formworks 115,000.00 1.31% Steel Roof Framing 84,445.00 0.96% 5 Construction of Building Envelope Exterior Walls 1,122,890.00 12.79% Water Proofing 136,200.00 1.55% Roof System 159,300.00 1.81% 6 Construction of all interior partition/walls Interior Partitions 337,200.00 3.84% CHB wall plastering of interior walls 215,280.00 2.45% 7 Supply, installation and Construction of the building Plumbing System Pipes and Plumbing Lines 205,000.00 2.33% Area drain & catch basin 17,500.00 0.20% Septic Tank 40,000.00 0.46% Cistern Tank 42,500.00 0.48% 8 Supply, Installation and Construction for the building eletrical system from the building 317,500.00 3.62% eletrcial service entrance up to the final utilization device (lighting, power, etc) 9 Coordination and processing works of the installation process of normal power supply from 15,000.00 0.17% the power company (Meralco)/Testing and commisioning 10 Production of As-built drawings and Documents nessry for the acquisition of 17,500.00 0.20% 17,500.00 0.20% the occupancy permit 11 Facilitation of the acquisition of the OCCUPANCY 0.57% PERMITS for the Projects 50,000.00 12 Mark-up Overhead and Contingencies 1,936,395.00 22.05% TOTAL 8,780,000.00 100.00%
Requested by: Recommended for Approval
Engr. Leovino C. Datario Engr. Angel Jairique
Contractor Consultant Accomplishment (%) % % Relative Relative Previous This Period To Date Weight Weight to previous date